DE176885C - - Google Patents

Info

Publication number
DE176885C
DE176885C DE1904176885D DE176885DA DE176885C DE 176885 C DE176885 C DE 176885C DE 1904176885 D DE1904176885 D DE 1904176885D DE 176885D A DE176885D A DE 176885DA DE 176885 C DE176885 C DE 176885C
Authority
DE
Germany
Prior art keywords
reinforced concrete
stems
concrete
posts
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1904176885D
Other languages
German (de)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Application granted granted Critical
Publication of DE176885C publication Critical patent/DE176885C/de
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/842Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf
    • E04B2/845Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf the form leaf comprising a wire netting, lattice or the like

Description

KAISERLICHESIMPERIAL

PATENTAMT.PATENT OFFICE.

PATENTSCHRIFTPATENT LETTERING

- M 176885 -KLASSE ZIa. GRUPPE- M 176885 - CLASS ZIa. GROUP

in BUDAPEST.in Budapest.

Betonausfüllung.Concrete filling.

Patentiert im Deutschen Reiche vom 25. Dezember 1904 ab.Patented in the German Empire on December 25, 1904.

10. Mai 1904 anerkannt.Recognized May 10, 1904.

Den Gegenstand der vorliegenden Erfindung bildet eine Eisenbetonwand aus vorher angefertigten durchbrochenen Eisenbetonstielen und einer im Bau einzubringenden Betonausfüllung. Durch die Erfindung wird bezweckt, den Bau von Eisenbetonmauern, besonders in engen Arbeitsgruben, zu erleichtern, das Holzlehrgerüst zum Teil überflüssig zu machen, die' beim Stampfen des Betons vorkommenden Verdrückungen zu verhindern und die Mauern gegen seitliche Kraftwirkungen widerstandsfähiger zu machen.The subject of the present invention forms a reinforced concrete wall from before made openwork reinforced concrete stems and a concrete filling to be added in the construction. Through the invention aims to facilitate the construction of reinforced concrete walls, especially in narrow work pits, to make the wooden scaffolding partly superfluous, which 'when tamping the Prevent concrete from crushing and the walls against lateral forces to make more resilient.

Gegenüber den bekannten Eisenbeton-Fachwerkwänden wird durch die an sich bei Deckenträgern bekannten Durchbrechungen der Stiele der Vorteil erreicht, daß die Eiseneinlagen und der Beton der Wand besser mit den Stielen verbunden sind.
. Auf der Zeichnung bedeutet
Compared to the known reinforced concrete half-timbered walls the advantage that the iron inlays and the concrete of the wall are better connected to the stems is achieved by the perforations in the stems, which are known per se in ceiling girders.
. In the drawing means

Fig. ι einen senkrechten Längsschnitt durch zwei Eisenbetonstiele und die dazwischen angeordneten Eiseneinlagen.Fig. Ι a vertical longitudinal section through two reinforced concrete posts and the one in between arranged iron inlays.

Fig. 2 zeigt einen senkrechten Querschnitt durch die Wand, und zwar im unteren Teile die fertige Wand nebst Schalung und im oberen Teile den Eisenbetonstiel und die Eiseneinlagen.Fig. 2 shows a vertical cross section through the wall, namely in the lower part the finished wall together with the formwork and in the upper part the reinforced concrete stem and the iron inlays.

Fig. 3 ist ein wagerechter Schnitt durch die fertige Wand vor der Entfernung der Schalung.Fig. 3 is a horizontal section through the finished wall before removal of the Formwork.

Zwischen den in entsprechender Entfernung voneinander aufgestellten durchbrochenen Eisenbetonstielen A, A werden die wagerechten Drähte α und die senkrechten Drähte b verlegt, die an den Kreuzungspunkten durch Drähte c verbunden werden. Die wagerechten Drähte α liegen auf den Querverbindungen f der Stiele A, die die beiden parallelen Gurte e der Stiele verbinden.The horizontal wires α and the vertical wires b , which are connected by wires c at the intersection points , are laid between the perforated reinforced concrete posts A, A , which are set up at a corresponding distance from one another. The horizontal wires α lie on the cross connections f of the stems A, which connect the two parallel straps e of the stems.

Zur Befestigung der Schalbretter werden an den Eisenbetonstielen A, A vor ihrer Aufstellung mittels der durch Aussparungen ρ der Stiele gesteckten Schraubenbolzen k die Führungspfosten i angeschraubt, worauf die Schalbretter I eingesetzt werden und der Beton eingestampft wird.To attach the shuttering boards, the guide posts i are screwed to the reinforced concrete posts A, A before they are set up by means of the screw bolts k inserted through the recesses ρ of the posts, whereupon the shuttering boards I are inserted and the concrete is tamped.

Die Stiele können selbstverständlich auch so bemessen werden, daß sie aus der Wandfläche nicht vortreten und daß sie gegebenenfalls auch als belastete Säulen dienen können.The stems can of course also be dimensioned so that they protrude from the wall surface do not step forward and that they can also serve as loaded pillars if necessary.

In Mauerecken werden Stiele verwendet, die nach zwei Richtungen durchbrochen sind, so daß die wagerechten Einlagen beider Wände auf den Querverbindungen liegen.In wall corners, stems are used that are broken in two directions, so that the horizontal deposits of both walls lie on the cross connections.

Claims (1)

Pate nt-An SPRU ch:Pate nt-An SPRU ch: Eisenbetonwand aus fertigen Eisenbetonstielen und im Bau einzubringender Betonausfüllung, dadurch gekennzeichnet, daß die Stiele in an sich bekannter Weise mit Aussparungen versehen sind, um eine feste Verbindung sowohl der Eiseneinlagen als auch der Betonausfüllung mit den auch zur Befestigung von Schalungsteilen dienenden Eisenbetonstielen zu erreichen.Reinforced concrete wall made of finished reinforced concrete posts and to be introduced into the construction Concrete filling, characterized in that the stems in a known manner are provided with recesses to provide a firm connection to both the iron inserts as well as the concrete filling with the reinforced concrete stems, which are also used to fasten shuttering parts to reach. Hierzu ι Blatt Zeichnungen.For this purpose ι sheet of drawings.
DE1904176885D 1904-05-10 1904-12-25 Expired DE176885C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
HU176885X 1904-05-10
DE176885T 1904-12-25

Publications (1)

Publication Number Publication Date
DE176885C true DE176885C (en) 1906-10-25

Family

ID=441412

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1904176885D Expired DE176885C (en) 1904-05-10 1904-12-25

Country Status (1)

Country Link
DE (1) DE176885C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10314988B2 (en) 2012-08-12 2019-06-11 Vpas Group Pty Ltd Gas flow indicator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10314988B2 (en) 2012-08-12 2019-06-11 Vpas Group Pty Ltd Gas flow indicator

Similar Documents

Publication Publication Date Title
DE2147051A1 (en) PROCEDURE FOR MAKING A PRESSURE POST IN THE SOIL
DE176885C (en)
DE1947249A1 (en) Foundation or civil engineering structure and process for its production
DE576831C (en) Screw tip for well pipes
DE2013630B2 (en) CASED CONCRETE WALL
DE822600C (en) Scarf stone for the production of walls
AT40299B (en) Bank cladding.
DE808779C (en) Formwork for walls made of concrete
DE155384C (en)
AT70928B (en) Method for inserting a girder for bracing construction pits, in particular for building underground railways.
DE220608C (en)
DE290547C (en)
DE2411598A1 (en) SUPPORT PILLAR FOR A CONSTRUCTION IN THE SEA
DE655994C (en) Device for the production of concrete pipelines of any length
DE481580C (en) Method for lining the wetted cross-section of a watercourse with base shells and embankment plates
DE2102613A1 (en) Reinforced concrete beams
DE2641683A1 (en) Concrete bucket for building site use - has feet acting as guides for stacking and hooks at top and bottom to coupled adjacent buckets together using rings
AT287996B (en) Connecting device
DE957258C (en) Process for the production of Schuettbetonwandenden as well as formwork and shaped stone for this
AT145104B (en) Process for the production of upright cast concrete poles.
DE595358C (en) Founding process with compressed air caissons
DE646628C (en) Process for the production of place posts and concrete pillars in the water
DE336019C (en) Procedure for setting up straightening devices in boreholes
AT277884B (en) Concrete pipe head
DE299861C (en)