Hass
2007
The blending of traditional and agile project management
DE1358646U
(show.php )
KR102298208B1
(ko )
2021-09-06
약액 검사 장치에서의 오차 보정 방법
CN108734445A
(zh )
2018-11-02
一种招聘管理系统及其方法
CN109425327A
(zh )
2019-03-05
检查系统和检查用图像的修正方法
CN117114958A
(zh )
2023-11-24
基于视觉处理的插装方法、装置、计算机设备和存储介质
DE3036675A1
(de )
1981-04-02
Automatisches farbdeckungssystem
DE112017008107T5
(de )
2020-06-25
Bauteilmontagevorrichtung
DE102004012029A1
(de )
2005-03-10
Abtastverfahren und- system
Florence
2001
Lessons learned in attempting to achieve software CMM Level 4
DE102008048081B4
(de )
2015-06-18
Verfahren zur Prüfung elektronischer Bauelemente einer Wiederholstruktur unter definierten thermischen Bedingungen
Martin et al.
2005
Timing in the art of integration: 'that's how the bastille got stormed'
Schönberger et al.
2019
Determinants and impacts of the computer system validation on firm performance: a literature review
Selander et al.
1999
Process redesign: is it worth it?
Schidek et al.
2022
Concept for process mining for smart medical device development
DE102014208984A1
(de )
2014-10-02
Baugruppe
Kunert et al.
2017
Culture beats leadership–First insights of the modul_or
Becerril et al.
2019
Use of Ict for the Use of the Residual Values in Anova
Muresan et al.
2006
OrCAD link tool for automated optical inspection of assembled boards
Hartman
2002
Developing a new kind of certification
Гарячевська et al.
2018
Search for an area of interest in a frame for printed circuit boards quality control
Nash
1993
A response to recent GMP-validation interpretations
Jesenko
2017
Commutability of Gamma-limits in problems with multiple scales
Kingston
0
KHE20: An Improved Solver for Nurse Rostering
Cooper
2005
A New Survey Technology: CRAPI