DE1191779B - Arch support at the strut entrance - Google Patents

Arch support at the strut entrance

Info

Publication number
DE1191779B
DE1191779B DEK51612A DEK0051612A DE1191779B DE 1191779 B DE1191779 B DE 1191779B DE K51612 A DEK51612 A DE K51612A DE K0051612 A DEK0051612 A DE K0051612A DE 1191779 B DE1191779 B DE 1191779B
Authority
DE
Germany
Prior art keywords
support
expansion
attached
extension
arches
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEK51612A
Other languages
German (de)
Inventor
Dr-Ing Dr Alfred Wiesner
Kurt Brennemann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aug Kloenne GmbH
Original Assignee
Aug Kloenne GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aug Kloenne GmbH filed Critical Aug Kloenne GmbH
Priority to DEK51612A priority Critical patent/DE1191779B/en
Publication of DE1191779B publication Critical patent/DE1191779B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/36Linings or supports specially shaped for tunnels or galleries of irregular cross-section
    • E21D11/367Linings or supports specially shaped for tunnels or galleries of irregular cross-section for junction with the longwall coal face

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

Bogenabstützung am S'trebeingang Die Erfindung bezieht sich auf eine Abstützung der Ausbaubögen an einem Strebeingang, Kreuzungen, Kammern oder einem sonstigen von einem durchgehenden Ausbau winklig zum Stoß abgehenden untertägigen Hohlraum, bei dem ein Teil einer oder mehrerer Ausbaubögen entfernt ist. Die Vorrichtung gemäß der Erfindung wird im folgenden als >>Stützkreuz« bezeichnet. Auch an der unteren Strecke, in welcher des öfteren die Hauptantriebsstation angeordnet wird, ist die Erfindung mit Vorteil anwendbar.Arch support at the strut entrance The invention relates to a Support of the extension arches at a strut entrance, crossings, chambers or one other undergrounds going from a continuous expansion at an angle to the joint Cavity in which part of one or more extension arches has been removed. The device according to the invention is hereinafter referred to as >> support cross. Also at the lower section, in which the main drive station is often located, the invention can be used to advantage.

Es ist bekannt, an den Anschluß eines Strebs an die Strecke, sei es an die obere Strecke oder an die untere, z. B. an der übergabestelle vom Streb- auf das Abbaustreckenfördermittel, den restlichen Ausbau der Strecke mittels eines Unterzuges abzufangen; diese Ausbauweise bedingt jedoch umständliche Befestigungsvorrichtungen und viel Zeit für den Einbau sowie auch für das Versetzen. Da ein Unterzug zudem eine ganze Reihe von Ausbauten erfaßt, ist ein Wandern des Strebeinganges mit dem Abbaufortschritt zu unwirtschaftlich.It is known to connect a longwall to the route, be it to the upper route or to the lower, z. B. at the transfer point from the longwall on the mining route subsidy, the remaining expansion of the route by means of a To intercept the downstand; However, this type of expansion requires cumbersome fastening devices and a lot of time for installation and relocation. There is also a joist a whole series of expansions is covered, is a wandering of the strut entrance with the Dismantling progress too uneconomical.

Die Erfindung vermeidet diese Nachteile und schafft eine Abstützung für Ausbaubögen an Strebeingängen mittels eines Stützkreuzes, das abnehmbar an jedem einzelnen Bogen zu befestigen ist und daher mit fortschreitendem Abbau von Bogen zu Bogen mitwandert.The invention avoids these disadvantages and provides support for extension arches at strut entrances by means of a support cross that can be removed from each single arch is to be attached and therefore with the progressive dismantling of arches walks along to arch.

Ist die Strecke beispielsweise mit einem vierteiligen Bogen aus Glocken- oder anderen Rinnenprofilen ausgebaut, so wird ein Unterteil jeweils am Strebeingang weggenommen und nach Vorbeigang des Strebs wieder angesetzt.For example, if the route has a four-part arch made of bell-shaped or other channel profiles, a lower part is installed at the strut entrance removed and reattached after the longwall has passed.

Zu diesem Zweck wird erfindungsgemäß auf dem stehenbleibenden Ausbauteil ein kurzes Profilstück z. B. angeklemmt, angeschraubt, verstiftet oder auf ähnliche Weise lösbar befestigt. An diesem Profilstück sind nach beiden Seiten Konsolen angeschweißt, auf denen eine Platte befestigt, z. B. ebenfalls angeschweißt ist. Ebenso sind auf der Platte wiederum zwei laschenartige Ansätze befestigt, in denen ein in Streckenlängsrichtung verlaufendes Profilstück, hier als »Profilarm« bezeichnet, angeschraubt wird. Dies Profilstück besitzt etwa eine Länge von der halben Entfernung zwischen zwei Ausbaubögen und wird mit einem gleichen, am nächsten Ausbau befestigten Profilstück mittels eines geraden Laschenpaares ver-.For this purpose, according to the invention, on the remaining extension part a short profile piece z. B. clamped, screwed, pinned or the like Way releasably attached. Consoles are welded to both sides of this profile piece, on which a plate is attached, e.g. B. is also welded on. Likewise are on the plate, in turn, has two tab-like approaches attached, in which one extends in the longitudinal direction running profile piece, here referred to as "profile arm", is screwed on. this Profile piece has a length of about half the distance between two expansion arches and is attached to the same profile piece on the next expansion by means of of a straight pair of plates.

bunden. Durch das Stützkreuz gemäß der Erfindung ist es inöglich, ein oder mehrere Bogenunterteile ausznbazien und den Restboden an nebenstehende Geiümt2usbau#estelle nach Art eines Kreuzverbandes zu befestigen. Dieses Stützkreuz kann als einheitliches Teil jeweils an ein feststehendes Ausbaubogensegment, welches oberhalb des auszubauenden liegt, befestigt werden. Es können auch mehrere Anschlüsse in der gleichen Art hergestellt werden, um dann die zwischen den äußeren Kreuzungspunkten liegenden Unterteile der Ausbaubogen für die Einfahrt in den Streb entfernen zu können.bound. The support cross according to the invention makes it possible to Remove one or more arch bases and attach the rest of the base to the adjacent ones Geiümt2usbau # estelle to be attached in the manner of a cross bracing. This support cross can be attached as a single part to a fixed extension arch segment, which above the one to be removed. It can also have multiple connections be made in the same way, around then those between the outer crossing points Remove the lower parts of the support arch for the entry into the longwall can.

Dieses Stützkreuz gemäß der Erfindung ist nicht auf Rinnenprofile beschränkt, sondern ist mit entsprechend profilierten Ansatzprofilstücken auch auf GI- und Normalprofile, Schienenprofile sowie Sonderprofile zu benutzen.This support cross according to the invention is not based on channel profiles limited, but is also on with appropriately profiled attachment profile pieces Use GI and normal profiles, rail profiles and special profiles.

Ein Ausführungsbeispiel des Erfindungsgedankens ist in der Zeichnung schematisch dargestellt. Es zeigt Ab 'b. 1 eine Vorderansicht eines Ausbaubogens aus vier Bogensegmenten, A b b. 2 eine Ansicht des Streckenausbaus zum Strebeingang hin, wobei von zwei Ausbaubögen die Unterteile entfernt sind, A b b. 3 eine Draufsicht auf das Stützkreuz gemäß der Erfindung, A b b. 4 eine Seitenansicht nach A b b. 3.An embodiment of the inventive concept is shown schematically in the drawing. It shows Ab 'b. 1 is a front view of an extension arch made of four arch segments, A b b. 2 a view of the extension of the line towards the entrance to the strut, the lower parts of two extension arches being removed, A b b. 3 shows a plan view of the support cross according to the invention, A b b. 4 a side view according to A b b. 3.

In den Abbildungen bezeichnen 1 bis 4 die vier Bogensegmente eines Ausbaugestells, für dessen Darstellung beispielsweise ein Glockenprofil benutzt wurde.In the figures, 1 to 4 denote the four arch segments of an extension frame, for the illustration of which, for example, a bell profile was used.

Es soll angenommen werden, daß das untere Bogensegment 1 entfernt werden soll, um einen freien Zugang 5 zu einem Streb zu erhalten. An das Bogensegment 2 wird zu diesem Zweck ein passendes Profilstück 6 aufgesetzt und lösbar befestigt. Auf diesem Profilstück 6 sind an beiden Seiten in Richtung des Ausbaus Konsolen 7 angeschweißt, auf denen wiederum lotrecht dazu je eine Platte 9 aufgeschweißt ist. Auf jeder Platte sind Ansätze 10 nach Art eines Laschenpaares mit Bohrungen 11 zur Aufnahme von Schrauben aufgeschweißt. In diese laschenartigen Ansätze 10 werden Profilarme 12 eingeschraubt, die zum nächsten Ausbaugestell gerichtet sind und etwa eine Länge aufweisen, die der halben Entfernung zum nächstliegenden Gestell entspricht. Die Profilarme des einen Gestells werden mit den Profilarmen des nächsten Gestells z. B. mittels eines bekannten geraden Laschenpaares 13 verbunden.It should be assumed that the lower arch segment 1 is to be removed in order to obtain free access 5 to a longwall. For this purpose, a suitable profile piece 6 is placed on the arch segment 2 and fastened in a detachable manner. On this profile piece 6 consoles 7 are welded on both sides in the direction of the expansion, on which in turn a plate 9 is welded on each perpendicular to it. Approaches 10 are welded onto each plate in the manner of a pair of tabs with bores 11 for receiving screws. Profile arms 12 are screwed into these tab-like extensions 10 , which are directed to the next support frame and have a length which corresponds to half the distance to the next frame. The profile arms of one frame are z. B. connected by means of a known straight pair of tabs 13 .

Claims (3)

Patentansprüche: 1. Abstützung der Ausbaubögen an einem Strebeingang oder einem sonstigen von einem durchgehenden Ausbau abgehenden untertägigen Hohlraum, bei dem ein Teil eines oder mehrerer Ausbaubögen entfernt ist, d a d u r c h g e k e n n -zeichnet, daß an den verbleibenden Teilen jedes gekürzten Ausbaugestells und an den sie einschließenden, ungekürzten Gestellen ein Stützkreuz befestigt ist, dessen Profilarme (12) durch Laschen (13) verbunden sind. Claims: 1. Support of the extension arches on a strut entrance or any other underground cavity leaving a continuous expansion, in which part of one or more expansion arches has been removed, d u r c h g e k e n n - indicates that on the remaining parts of each shortened extension frame and a supporting cross is attached to the unabridged frames enclosing them, whose profile arms (12) are connected by tabs (13). 2. Abstützung nach Anspruch 1, dadurch gekennzeichnet, daß das Stützkreuz aus einem lösbar am verbleibenden Teil des Ausbaugestells befestigten Profilstück (6) gebildet ist, an welchem beiderseits Konsolen (7) mit je einer Barübergelegten Platte (9) verschweißt sind, auf denen wiederum zwei laschenartige Ansätze (10) befestigt sind, an denen Profilarme (12) anzuschrauben sind, die etwa eine Länge entsprechend dem halben Abstand zweier aufeinanderfolgender Ausbaugestelle aufweisen. 2. Support according to claim 1, characterized in that the support cross is formed from a detachably attached to the remaining part of the extension frame profile piece (6), on which both sides brackets (7) are welded with a bar overlaid plate (9), on which in turn two tab-like lugs (10) are attached to which profile arms (12) are to be screwed, which have a length corresponding to about half the distance between two successive expansion frames. 3. Abstützung nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß das Stützkreuz als vorgefertigtes Ganzes an den Ausbau an-Qesetzt ist.3. Support according to the claims 1 and 2, characterized in that the support cross as a prefabricated whole the expansion is on.
DEK51612A 1963-12-12 1963-12-12 Arch support at the strut entrance Pending DE1191779B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEK51612A DE1191779B (en) 1963-12-12 1963-12-12 Arch support at the strut entrance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEK51612A DE1191779B (en) 1963-12-12 1963-12-12 Arch support at the strut entrance

Publications (1)

Publication Number Publication Date
DE1191779B true DE1191779B (en) 1965-04-29

Family

ID=7226063

Family Applications (1)

Application Number Title Priority Date Filing Date
DEK51612A Pending DE1191779B (en) 1963-12-12 1963-12-12 Arch support at the strut entrance

Country Status (1)

Country Link
DE (1) DE1191779B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3813593C1 (en) * 1988-04-22 1989-09-07 Peter Von Dipl.-Ing. 4630 Bochum De Linsingen-Heintzmann
EP1772591A1 (en) * 2005-10-05 2007-04-11 Georgios Perrakis Fire insulation protection

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3813593C1 (en) * 1988-04-22 1989-09-07 Peter Von Dipl.-Ing. 4630 Bochum De Linsingen-Heintzmann
EP1772591A1 (en) * 2005-10-05 2007-04-11 Georgios Perrakis Fire insulation protection

Similar Documents

Publication Publication Date Title
DE69418118T2 (en) Procedure for fastening guardrails
EP1564331B1 (en) Lifting device
EP0064183B1 (en) Climbing form
DE3924486C1 (en) Side-rail fixing system - is for electromagnetic railway and uses recesses in sides of concrete beam folded with poured concrete
DE1191779B (en) Arch support at the strut entrance
DE4219200C2 (en) Track for magnetic tracks
DE6929529U (en) ATTACHABLE SCAFFOLDING PLATFORM OD. DGL.
EP0027576B1 (en) Supporting insert for use in apparatus for stiffening the sides of trenches
DE760510C (en) Temporary bridge formed from carriers
DE2554033C3 (en) Monorail rack railway
AT211866B (en) Connecting strap for the supports of overhead conveyors
AT349510B (en) AVALANCHE CONSTRUCTION
DE853762C (en) Method and device for supporting railway tracks for makeshift bridges
DE3736077A1 (en) Tubular support
DE3040707C2 (en)
DE1195848B (en) Device for laying electrical cables and lines
DE1006371B (en) Articulated bolting for the expansion of the route
DE8802651U1 (en) Device for attaching a pipe carrying a sign or similar to a sigma-shaped guard rail post
DE1117036B (en) Support frame for curved roller conveyor belts
AT244549B (en) Cladding of external walls with curtain sheets
DE2856180A1 (en) Temporary bridge under bracing system - has full length connector hinging tension rod to lower chord, and movable strut
DE2516787A1 (en) Building opening or column form casing system - involving three units and connecting angle irons, and interconnecting cross-beams
DE7733145U1 (en) CONSOLE FOR CONSTRUCTION SCAFFOLDING
DE1224801B (en) Overhead line mast with more than two high-voltage overhead line systems using plastic trusses
DE7238140U (en) Table for the production of prefabricated concrete components