DE10312006B4 - Method for handling large-sized aerated concrete blocks and device for carrying out the method - Google Patents
Method for handling large-sized aerated concrete blocks and device for carrying out the method Download PDFInfo
- Publication number
- DE10312006B4 DE10312006B4 DE2003112006 DE10312006A DE10312006B4 DE 10312006 B4 DE10312006 B4 DE 10312006B4 DE 2003112006 DE2003112006 DE 2003112006 DE 10312006 A DE10312006 A DE 10312006A DE 10312006 B4 DE10312006 B4 DE 10312006B4
- Authority
- DE
- Germany
- Prior art keywords
- aerated concrete
- concrete blocks
- clamping devices
- clamping
- blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/04—Discharging the shaped articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G57/00—Stacking of articles
- B65G57/02—Stacking of articles by adding to the top of the stack
- B65G57/16—Stacking of articles of particular shape
- B65G57/20—Stacking of articles of particular shape three-dimensional, e.g. cubiform, cylindrical
- B65G57/22—Stacking of articles of particular shape three-dimensional, e.g. cubiform, cylindrical in layers each of predetermined arrangement
- B65G57/24—Stacking of articles of particular shape three-dimensional, e.g. cubiform, cylindrical in layers each of predetermined arrangement the layers being transferred as a whole, e.g. on pallets
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ceramic Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Verfahren zum Handhaben von großformatigen langgestreckten Porenbetonblöcken (2), insbesondere von in mehrere Porenbetonsteine (1) unterteilten Porenbetonblöcken (2), wobei die Porenbetonblöcke (2) zwischen einem Paar von einander gegenüberliegenden und zusammenfahrbaren Klemmeinrichtungen (12) eingespannt werden, wobei die Porenbetonblöck (2) von den Klemmeinrichtungen (12) über ihre gesamten den Klemmeinrichtungen (12) zugewandten Längsflächen (16) erfasst werden und wobei die Porenbetonblöcke (2) jeweils auf einer Auflage (6) aufliegen, dadurch gekennzeichnet, dass die Auflagen (6) für die Porenbetonblöcke (2) beim Zusammenfahren der Klemmeinrichtungen (12) in der Horizontalen schwimmend gehalten werden, so dass sich die den Klemmeinrichtungen (12) zugewandten Längsfläche (16) der Porenbetonblöcke (2) unter einer Schwenkbewegung der Auflagen (6) um vertikale Achsen parallel zu den Klemmeinrichtungen (12) ausrichten können.Method for handling large-sized elongated aerated concrete blocks (2), in particular aerated concrete blocks (2) subdivided into a plurality of aerated concrete blocks (1), wherein the aerated concrete blocks (2) are clamped between a pair of opposing and movable clamping devices (12), the aerated concrete blocks (2) 2) are gripped by the clamping devices (12) over their entire longitudinal surfaces (16) facing the clamping devices (12) and wherein the aerated concrete blocks (2) respectively rest on a support (6), characterized in that the supports (6) for the Autoclaved aerated blocks (2) are kept floating in the horizontal when the clamping devices (12) move together so that the longitudinal surfaces (16) of the aerated concrete blocks (2) facing the clamping devices (12) are parallel to each other under vertical pivoting movement of the supports (6) can align the clamping devices (12).
Description
Die Erfindung betrifft ein Verfahren zum Handhaben von großformatigen langgestreckten Porenbetonblöcken mit den Merkmalen des Oberbegriffs des Anspruchs 1 sowie eine Vorrichtung zur Durchführung des Verfahrens mit den Merkmalen des Oberbegriffs des Anspruchs 11.The The invention relates to a method for handling large format elongated aerated concrete blocks with the features of the preamble of claim 1 and a device to carry out the method having the features of the preamble of the claim 11th
STAND DER TECHNIKSTATE OF THE ART
Beim Herstellen von Porenbetonsteinen werden in der Regel zunächst Porenbetonblöcke hergestellt, bei denen die Porenbetonsteine noch aneinander hängen. Schrittweise werden die Porenbetonblöcke dann in die Porenbetonsteine unterteilt. Anschließend erfolgt ein Palettieren der Porenbetonsteine auf Transportpaletten, wobei typischerweise zwei Reihen von Porenbetonsteinen nebeneinander auf einer Transportpalette angeordnet werden.At the Manufacture of aerated concrete blocks are usually first produced aerated concrete blocks, in which the aerated concrete blocks still hang together. Gradually, the aerated concrete blocks then divided into the aerated concrete blocks. Then done a palletizing the aerated concrete blocks on transport pallets, wherein typically two rows of aerated concrete blocks next to each other a transport pallet are arranged.
Beim Trennen und Palettieren der Porenbetonsteine müssen die Porenbetonblöcke über ihre gesamte Länge oder in Teilen zwischen einem Paar von einander gegenüberliegenden und zusammenfahrbaren Klemmeinrichtungen eingespannt werden. Über ihre gesamte Länge werden Porenbetonblöcke beispielsweise beim Trennen der einzelnen Lagen der Porenbetonblöcke durch Auseinanderziehen dieser Lagen oberhalb und unterhalb der jeweiligen Trennebene eingespannt. Die Einspannung muss relativ fest erfolgen, da quer zur Einspannrichtung relativ große Kräfte zum Trennen der Lagen der Porenbetonsteine aufgebracht werden müssen. Aber auch beim Einspannen eines Porenbetonblocks, um diesen als Ganzes oder in Teilen anzuheben, um ihn umzusetzen, müssen relativ große Klemmkräfte aufgebracht werden. Dabei besteht jeweils die Gefahr einer Beschädigung der Porenbetonsteine im Bereich des Angriffs der Klemmeinrichtungen, wenn die Längsflächen der Porenbetonblöcke nicht parallel zu den Klemmeinrichtungen ausgerichtet sind, weil die Klemmkraft der Klemmeinrichtungen dann nur über den Bereich ihrer ersten Anlage an die Porenbetonblöcke abgestützt wird, was schnell zu einem zerstörerisch hohen Druck auf den Porenbeton führt.At the Separating and palletizing the aerated concrete blocks requires the aerated concrete blocks throughout their entire life Length or in parts between a pair of opposed and collapsible ones Clamping devices are clamped. Over their entire length will be For example, aerated concrete blocks when separating the individual layers of the aerated concrete blocks Pulling apart these layers above and below the respective parting line clamped. The clamping must be done relatively firmly, since transversely to the clamping relatively large forces to separate the layers of Aerated concrete blocks must be applied. But also when clamping an aerated concrete block in order to lift it in whole or in part, to implement it, must relatively large clamping forces be applied. There is always the risk of damage to the aerated concrete blocks in the area of attack of the clamping devices when the longitudinal surfaces of aerated concrete blocks are not aligned parallel to the clamping devices, because the clamping force of the clamping devices then only over the area of their first Attachment to the aerated concrete blocks supported what becomes quickly destructive high pressure on the aerated concrete leads.
Die Gefahr einer Beschädigung der Porenbetonsteine von nicht exakt parallel zu den Klemmeinrichtungen ausgerichteten Porenbetonblöcken ist bislang auch ein Grund dafür gewesen, warum in einer Vorrichtung zum Palettieren von Porenbetonsteinen nicht ganze Porenbetonblöcke über ihre Längsflächen aneinander gedrückt werden, um die zwei Reihen von nebeneinander angeordneten Porenbetonsteinen auszubilden, dies sich später auf den Paletten finden sollen. Hier kommt eine Gefahr der gegenseitigen Beschädigung von zwei nicht parallel zueinander ausgerichteten Porenbetonblöcken hinzu. Wenn die beiden Porenbetonblöcke zunächst nur über eine Ecke aneinander zur Anlage kommen und nicht gleich über ihre gesamtem Längsflächen, wird auch hier durch die Klemmkraft der Klemmeinrichtungen ein zerstörerisch hoher Druck auf den Porenbeton aufgebracht.The Risk of damage the aerated concrete blocks of not exactly parallel to the clamping devices aligned aerated concrete blocks is so far a reason for that why in a device for palletizing aerated concrete blocks not whole aerated concrete blocks over her Longitudinal surfaces to each other depressed be around the two rows of side-by-side aerated concrete blocks train this later to find on the pallets. Here comes a danger of mutual damage of two non-parallel aligned aerated concrete blocks. If the two aerated concrete blocks first only over a corner next to each other and not just about their total longitudinal surfaces, too Here by the clamping force of the clamping devices a destructive high pressure applied to the cellular concrete.
Ein
Verfahren nach dem Oberbegriff des Anspruchs 1 und eine zur Durchführung dieses
Verfahrens geeignete Vorrichtung nach dem Oberbegriff des Anspruchs
11 sind beispielsweise aus der
AUFGABE DER ERFINDUNGOBJECT OF THE INVENTION
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren nach dem Oberbegriff des Anspruchs 1 und eine zur Durchführung dieses Verfahrens geeignete Vorrichtung nach dem Oberbegriff des Anspruchs 11 aufzuzeigen, mit denen Porenbetonblöcke handhabbar sind, ohne dass die Gefahr einer Beschädigung der Porenbetonsteine durch die Klemmkraft der Klemmeinrichtungen besteht, so dass unter anderem ein effizientere Palettieren von Porenbetonsteinen realisierbar wird.Of the Invention is based on the object, a method according to the preamble of claim 1 and one suitable for carrying out this method Device according to the preamble of claim 11 show, with which aerated concrete blocks are manageable without the risk of damaging the Aerated concrete blocks by the clamping force of the clamping devices, so that, among other things, a more efficient palletizing of aerated concrete blocks becomes feasible.
LÖSUNGSOLUTION
Die Aufgabe der Erfindung wird erfindungsgemäß durch ein Verfahren mit den Merkmalen des Patentanspruchs 1 und eine Vorrichtung mit den Merkmalen des Patentanspruchs 11 gelöst. Bevorzugte Ausführungsformen des Verfahrens sind in den Unteransprüchen 2 bis 10 beschrieben. Bevorzugte Ausführungsformen der Vorrichtung finden sich in den Unteransprüchen 12 bis 19.The The object of the invention is achieved by a method with the Features of claim 1 and a device with the features of claim 11 solved. Preferred embodiments of the method are described in the subclaims 2 to 10. Preferred embodiments the device can be found in the subclaims 12 to 19.
BESCHREIBUNG DER ERFINDUNGDESCRIPTION OF THE INVENTION
Bei dem neuen Verfahren werden die Auflagen für die Porenbetonblöcke beim Zusammenfahren der Klemmeinrichtungen in der Horizontalen schwimmend gehalten. So können sich die den Klemmeinrichtungen zugewandten Längsflächen der Porenbetonblöcke unter einer Schwenkbewegung der Auflagen um vertikale Achsen parallel zu den Klemmeinrichtungen ausrichten. Diese Ausrichtung findet während des Zusammenfahrens der Klemmeinrichtungen statt, sobald sich eine Klemmeinrichtung an eine Längsfläche eine Porenbetonblocks anzulegen beginnt. Zu diesem Zeitpunkt ist die von der Klemmeinrichtung auf den Porenbetonblock aufgebrachte Klemmkraft noch gering. Diese Klemmkraft wächst bei dem neuen Verfahren erst dann weiter an, wenn die jeweilige Längsfläche des Porenbetonblocks parallel zu der Klemmeinrichtung ausgerichtet ist. Vorher verschwenkt die Klemmeinrichtung im Fall einer Fehlausrichtung der Längsfläche des Porenbetonblocks zu der Klemmeinrichtung zunächst den Porenbetonblock um die vertikalen Achsen, bis sie über ihre gesamte Länge an der Längsfläche des Porenbetonblocks anliegt. Anschließend wird die eigentliche Klemmkraft aufgebaut, die sich über die gesamte Länge der Klemmeinrichtung verteilt. Dies bedeutet, dass es an keiner Stelle zu einem übermäßigen Druck auf den Porenbeton kommt, der diesen beschädigen oder gar einen oder mehrere Porenbetonsteine zerstören könnte.In the new method, the supports for the blocks of aerated concrete are kept floating in the horizontal when the clamping devices move together. Thus, the clamping surfaces facing the longitudinal surfaces of the aerated concrete blocks can align parallel to the clamping devices under a pivotal movement of the supports about vertical axes. This alignment takes place during the collapse of the clamping devices, as soon as a clamping device begins to apply to a longitudinal surface of an aerated concrete block. At this time, the clamping force applied to the porous concrete block by the clamping device is still small. In the case of the new method, this clamping force only continues to grow when the respective longitudinal surface of the aerated concrete block is aligned parallel to the clamping device. Previously, in the event of misalignment of the longitudinal surface of the porous concrete block to the clamping device, the clamping device first pivots the porous concrete block about the vertical axes until it over their entire length rests against the longitudinal surface of the aerated concrete block. Subsequently, the actual clamping force is built up, which is distributed over the entire length of the clamping device. This means that there is nowhere to excessive pressure on the cellular concrete, which could damage this or even destroy one or more aerated concrete blocks.
Das neue Verfahren kann überall dort eingesetzt werden, wo Porenbetonblöcke zwischen zusammenfahrbaren Klemmeinrichtungen eingespannt werden. Besonders vorteilhaft ist das neue Verfahren dann, wenn sehr lange Porenbetonblöcke mit vergleichsweise großen Gesamtkräften einzuspannen sind. Ganz besonders vorteilhaft ist das neue Verfahren, wenn zwei längs nebeneinander angeordnete Porenbetonblöcke, die jeweils auf einer Auflage angeordnet sind, zusammen zwischen den Klemmeinrichtungen eingespannt werden. In diesem Fall ist jede der beiden Auflagen getrennt voneinander in der Horizontalen schwimmend zu halten, damit das neue Verfahren sicherstellen kann, dass die beiden Porenbetonblöcke in paralleler Ausrichtung zusammengeführt werden und sich nicht gegenseitig beschädigen.The new procedure can be everywhere be used where aerated concrete blocks between collapsible Clamping devices are clamped. Is particularly advantageous the new process then when using very long aerated concrete blocks comparatively large total forces are to be clamped. Especially advantageous is the new process, if two are longitudinal juxtaposed aerated concrete blocks, each on one Pad are arranged together between the clamping devices be clamped. In this case, each of the two editions to keep floating separately from each other in the horizontal The new procedure can ensure that the two aerated concrete blocks in parallel Alignment merged and do not damage each other.
Jede Auflage, die in der Horizontalen schwimmend gehalten wird, ist um mindestens eine vertikale Achse im Bereich ihrer auf die Längserstreckung des Porenbetonblocks bezogenen Mitte verschwenkbar zu lagern. Es ist aber ohne weiteres möglich, zusätzliche weitere vertikale Achsen für die Schwenkbewegung zuzulassen, beispielsweise durch Lagerung der Auflagen auf einem Kugelbett. Das Verschwenken der Porenbetonblöcke um zusätzliche vertikale Achsen wird aber auch durch eine zusätzliche seitliche Verschiebbarkeit der Auflagen ermöglicht.each Pad that is kept floating in the horizontal is around at least one vertical axis in the region of its on the longitudinal extent store the center of gravity of the aerated concrete block pivotally. It but it is easily possible additional more vertical axes for allow the pivoting movement, for example by storage of Pads on a ball bed. The pivoting of the aerated concrete blocks by additional vertical axes but also by an additional lateral displacement the conditions allows.
Um der Auflage bei jedem Klemmvorgang einen möglichst großen Schwenkspielraum einzuräumen, mit dem sie relative Fehlausrichtungen des jeweiligen Porenbetonblocks gegenüber der jeweiligen Klemmeinrichtung kompensieren kann, ist es bevorzugt, wenn jede Auflage durch definierte Kräfte in eine mittlere horizontale Stellung beaufschlagt wird.Around the edition to give the largest possible swivel range in each clamping operation, with they relative misalignments of the respective aerated concrete block across from the respective clamping device can compensate, it is preferred if each edition by defined forces in a middle horizontal Position is applied.
Beim gemeinsamen Einspannen von zwei nebeneinander ausgerichteten Porenbetonblöcken, bei dem an jedem Porenbetonblock eine der Klemmeinrichtungen zur Anlage kommt, ist es bevorzugt, wenn jeder der beiden Porenbetonblöcke über seine einer der beiden Klemmeinrichtungen zugewandten Längsfläche parallel zu dieser Klemmeinrichtung ausgerichtet wird, bevor die Porenbetonblöcke beim Zusammenfahren der Klemmeinrichtung aneinander zur Anlage kommen.At the joint clamping of two juxtaposed aerated concrete blocks, at at each aerated concrete block one of the clamping devices to the plant comes, it is preferable if each of the two aerated concrete blocks over its one the two clamping devices facing longitudinal surface aligned parallel to this clamping device is before the aerated concrete blocks come together when moving the clamping device to each other to the plant.
Um die Verfahrwege einer solchen Einheit von zwei gemeinsam eingespannten Porenbetonblöcken so kurz wie möglich zu halten, können die beiden zusammen zwischen den Klemmeinrichtungen eingespannten Porenbetonblöcke mit den Klemmeinrichtungen von ihren Auflagen nur so viel abgehoben werden, dass die Auflagen unter den Porenbetonblöcken durch mindestens eine sich in der Breite unter beiden Porenbetonblöcken erstreckende Transportpalette ersetzt werden kann, auf die die Porenbetonblöcke anschließend abgesetzt werden.Around the trajectories of such a unit of two clamped together aerated concrete blocks as short as possible to hold the two clamped together between the clamping devices aerated concrete blocks with the clamping devices of their pads only so much to be lifted that the supports under the aerated concrete blocks by at least one extending in width under both blocks of aerated concrete transport pallet can be replaced, to which the aerated concrete blocks then deposited become.
Das Maß, um das die gemeinsam eingespannten Porenbetonblöcke zum Austauschen ihrer Auflagen durch Transportpaletten angehoben werden müssen, kann dadurch minimiert werden, dass die Auflagen in horizontaler Richtung quer zu der Haupterstreckung der Klemmeinrichtungen seitlich auseinandergefahren werden, um sie von den Porenbetonblöcken zu entfernen und dass die Transportpaletten anschließend vertikal von unten angehoben werden, um sie unter die Porenbetonblöcke zu bringen.The Measure, um the jointly clamped aerated concrete blocks for replacing their pads can be lifted by transport pallets, this can be minimized be that the pads in the horizontal direction transverse to the main extension the clamping devices are moved apart laterally to them from the aerated concrete blocks remove and then transport pallets vertically be lifted from below to bring them under the aerated concrete blocks.
In aller Regel sind die Porenbetonblöcke, deren Porenbetonsteine palettiert werden sollen, so lang, dass sie nicht auf einer einzigen Transportpalette Platz finden. Deshalb ist es im Rahmen des Palettierens der Porenbetonsteine der Porenbetonblöcke bevorzugt, wenn die Porenbetonblöcke mit den Klemmeinrichtungen in Gruppen aus mehreren Porenbetonsteinen unterteilt werden, die jeweils auf eine Transportpalette abgesetzt werden. Hierzu müssen einander entsprechende Bereiche der Klemmeinrichtungen in horizontaler Richtung parallel zu ihrer Haupterstreckung auseinanderfahrbar sein.In The rule is the aerated concrete blocks whose aerated concrete blocks be palletized, so long that they are not on a single Transport pallet find space. That's why it's part of palletizing the aerated concrete blocks of the aerated concrete blocks, when the aerated concrete blocks with the clamping devices in groups of several aerated concrete blocks each sold on a transport pallet become. To do this corresponding areas of the clamping devices in horizontal Direction be parallel to their main extension apart.
Am Ende des bevorzugten Verfahrens zum Palettieren von Porenbetonblöcken werden die Transportpaletten mit den Porenbetonblöcken in horizontaler Richtung parallel zu der Haupterstreckung der Klemmeinrichtungen abgefordert.At the End of the preferred method for palletizing aerated concrete blocks the transport pallets with the aerated concrete blocks in the horizontal direction requested parallel to the main extension of the clamping devices.
Eine erfindungsgemäße Vorrichtung ist durch Auflagen für die Porenbetonblöcke gekennzeichnet, die in der Horizontalen schwimmend gelagert sind, so dass sich die Seitenflächen der Porenbetonblöcke auf den Auflagen unter Verschwenkung der Auflagen um vertikale Achsen parallel zu den Klemmeinrichtungen ausrichten können.A inventive device is through editions for the aerated concrete blocks characterized, which are floating in the horizontal, so that the side surfaces the aerated concrete blocks on the pads while pivoting the pads around vertical axes Align parallel to the clamping devices.
Vorzugsweise sind die beiden Klemmeinrichtungen, mit denen 1, 2 oder auch mehr Porenbetonblöcke in Parallelausrichtung zueinander einspannbar sind, in einander entsprechende Bereiche unterteilt, die in horizontaler Richtung parallel zu der Haupterstreckung der Klemmeinrichtungen auseinanderfahrbar sind, um die Porenbetonblöcke in Gruppen von Porenbetonsteinen zu unterteilen. Insbesondere entspricht jede dieser Gruppen von Porenbetonsteinen der Beladung einer Transportpalette.Preferably are the two clamping devices with which 1, 2 or more aerated concrete blocks be clamped in parallel alignment with each other, in each other corresponding areas divided in the horizontal direction movable apart parallel to the main extension of the clamping devices are to the aerated concrete blocks subdivided into groups of aerated concrete blocks. In particular, corresponds each of these groups of aerated concrete blocks loading a transport pallet.
Weiterhin sind die Klemmeinrichtungen vorzugsweise in vertikaler Richtung anhebbar, um die Porenbetonblöcke von den Auflagen abzuheben. Wenn dann die Auflagen unter den angehobenen Klemmeinrichtungen seitlicher Richtung senkrecht zu der Haupterstreckung der Klemmeinrichtungen wegfahrbar sind, können Transportpaletten unter die Porenbetonblöcke gebracht werden. Hierzu kann ein Palettenförderer vorgesehen sein, mit dem die Transportpaletten unterhalb der Porenbetonblöcke anhebbar sind, um die Porenbetonblöcke darauf abzusetzen.Farther the clamping devices are preferably in the vertical direction Liftable to the aerated concrete blocks to withdraw from the conditions. If then the pads under the raised clamping devices lateral direction perpendicular to the main extension of the clamping devices can be moved away Transport pallets are placed under the aerated concrete blocks. For this can be a pallet conveyor be provided with the transport pallets below the aerated concrete blocks liftable are to the aerated concrete blocks to settle on it.
In der konkreten Ausbildung können die beiden Klemmeinrichtungen an einem höhenverfahrbaren Rahmen parallel geführt und an dem Rahmen in horizontaler Richtung auseinander- und zusammenfahrbar sein. Besonders bevorzugt ist es dabei, wenn Sie mit dem Rahmen unter das Niveau der Auflagen für die Porenbetonblöcke absenkbar sind. Sie können so aus dem Weg gebracht werden, um die Porenbetonblöcke in einer im Wesentlichen horizontalen Bewegung auf die Auflagen zu überführen. Die Auflagen für die Porenbetonblöcke selbst sind vorzugsweise ohne Höhenverfahrbarkeit in horizontaler Richtung auseinander und zusammenfahrbar.In of concrete education the two clamping devices on a height-adjustable frame in parallel guided and on the frame in the horizontal direction apart and can be moved together be. It is particularly preferred when using the frame below the level of requirements for the aerated concrete blocks are lowerable. You can be moved out of the way to the aerated concrete blocks in one essentially to transfer horizontal movement to the pads. The terms for the aerated concrete blocks themselves are preferably without Höhenverfahrbarkeit in a horizontal direction apart and collapsible.
Jede Auflage ist jeweils mindestens um eine vertikale Mittelachse verschwenkbar. Diese Verschwenkbarkeit kann sie gegenüber einem senkrecht zu der Haupterstreckung der Klemmeinrichtung verschiebbaren Tisch aufweisen. Durch eine passive Verschiebbarkeit des Tisches unter Einwirkung der Klemmeinrichtungen werden neben der Mittelachse effektiv weitere vertikale Schwenkachsen für die Auflage realisiert.each Pad is in each case at least pivotable about a vertical center axis. This pivotability can be compared to a perpendicular to the Main extension of the clamping device have sliding table. By a passive displacement of the table under impact the clamping devices become effective next to the central axis vertical swivel axes for realized the edition.
In einer bevorzugten Ausführungsform sind die beiden Tische für die beiden Auflagen an einem Paar von Querschienen parallel zueinander geführt.In a preferred embodiment are the two tables for the two supports on a pair of crossbars parallel to each other guided.
Der bereits angesprochene Palettenförderer ist vorzugsweise als Ganzes in Richtung der Haupterstreckung der Klemmeinrichtungen verfahrbar, um die Querschienen und den Rahmen, an dem die Klemmeinrichtungen gelagert sind, zumindest in einer Richtung zu überbrücken. So können die mit den Porenbetonsteinen beladenen Paletten über die Querschienen und den Rahmen, an dem die Klemmeinrichtungen gelagert sind hinweg an eine sich anschließende Fördereinrichtung für die Transportpaletten übergeben werden.Of the already mentioned pallet conveyor is preferably as a whole in the direction of the main extension of the clamping devices movable to the cross rails and the frame on which the clamping devices are stored, at least in one direction to bridge. So can those with the aerated concrete blocks loaded pallets over the crossbars and the frame on which the clamping devices are mounted are handed over to a subsequent conveyor for the transport pallets become.
KURZBESCHREIBUNG DER FIGURENBRIEF DESCRIPTION OF THE FIGURES
Im Folgenden wird die Erfindung anhand eines in den Figuren dargestellten bevorzugten Ausführungsbeispiels weiter erläutert und beschrieben.in the The invention will be described below with reference to one of the figures preferred embodiment further explained and described.
FIGURENBESCHREIBUNGDESCRIPTION OF THE FIGURES
Anhand
der Figuren wird im Folgenden ein Palettiervorgang beschrieben,
bei dem Porenbetonsteine
Um
die Porenbetonblöcke
Erst
wenn jeder einzelne Porenbetonblock
Im
nächsten
Schritt werden die Klemmeinrichtungen
Um
dabei mit dem Palettenförderer
Jetzt
kann der Palettenförderer
Vorzugsweise
ist eine Übergabevorrichtung für die Porenbetonblöcke
Weiterhin
ist in den vorangehenden Figuren nicht gezeigt, dass die beiden
Klemmeinrichtungen
- 11
- PorenbetonsteinCinder block
- 22
- Porenbetonblockaerated concrete block
- 33
- Transportpalettepallet
- 44
- Vorrichtungcontraption
- 55
- Tischtable
- 66
- Auflageedition
- 77
- Querschienecross rail
- 88th
- Unterbausubstructure
- 99
- Fundamentfoundation
- 1010
- Palettenfördererpallet conveyors
- 2121
- Nutgroove
- 2222
- Federfeather
- 2323
- Säulepillar
- 2424
- Hubzylinderlifting cylinder
- 2525
- Querbalkencrossbeam
- 2626
- Führungguide
- 2727
- Hydraulikzylinderhydraulic cylinders
- 2828
- Schienerail
- 2929
- SchienenradA rail
- 3030
- Längsträgerlongitudinal beams
- 1111
- Zentriereinrichtungcentering
- 1212
- Klemmeinrichtungclamper
- 1313
- Längsträgerlongitudinal beams
- 1414
- Rahmenframe
- 1515
- Mittelachsecentral axis
- 1616
- Längsflächelongitudinal surface
- 1717
- Stützrollesupporting role
- 1818
- Drehtellerturntable
- 1919
- Hebelarmlever arm
- 2020
- Zylindercylinder
- 3131
- Oberrahmentop frame
- 3232
- Hubscherescissor lift
- 3333
- Hubzylinderlifting cylinder
- 3434
- WeiterfördererNext conveyor
- 3535
- Antrieb, PalettenfördererDrive, pallet conveyors
- 3636
- Antrieb, WeiterfördererDrive, Next conveyor
- 3737
- Palettenzuführungpallet feed
Claims (19)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003112006 DE10312006B4 (en) | 2003-03-19 | 2003-03-19 | Method for handling large-sized aerated concrete blocks and device for carrying out the method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003112006 DE10312006B4 (en) | 2003-03-19 | 2003-03-19 | Method for handling large-sized aerated concrete blocks and device for carrying out the method |
Publications (2)
Publication Number | Publication Date |
---|---|
DE10312006A1 DE10312006A1 (en) | 2004-10-07 |
DE10312006B4 true DE10312006B4 (en) | 2009-05-28 |
Family
ID=32945964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2003112006 Expired - Fee Related DE10312006B4 (en) | 2003-03-19 | 2003-03-19 | Method for handling large-sized aerated concrete blocks and device for carrying out the method |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10312006B4 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113084984A (en) * | 2021-04-09 | 2021-07-09 | 洛阳久天建材有限公司 | Evaporate and press aerated concrete block curing means |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4423593A1 (en) * | 1993-07-13 | 1995-01-19 | Gd Spa | Process for conveying tobacco articles, especially cigarettes, to a continuous packaging machine |
DE4344299A1 (en) * | 1993-12-23 | 1995-06-29 | Knauer Maschf Gmbh | Machine for transferring stones ready for transporting |
-
2003
- 2003-03-19 DE DE2003112006 patent/DE10312006B4/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4423593A1 (en) * | 1993-07-13 | 1995-01-19 | Gd Spa | Process for conveying tobacco articles, especially cigarettes, to a continuous packaging machine |
DE4344299A1 (en) * | 1993-12-23 | 1995-06-29 | Knauer Maschf Gmbh | Machine for transferring stones ready for transporting |
Also Published As
Publication number | Publication date |
---|---|
DE10312006A1 (en) | 2004-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1718444B1 (en) | Device for separating steam-hardened building material blocks and the use of such a device | |
DE2159714C3 (en) | Device for separating aerated concrete elements which are delimited by horizontal cuts and which stick together to form a stack after hardening | |
DE2715476A1 (en) | METHOD AND DEVICE FOR PRODUCING A FLOORING FROM INDIVIDUAL PAVING STONES | |
DE102012111669A1 (en) | Device for stacking glass sheets to glass package, has glass sheet firmly positioned by pivot around pivot point for managing angle displacement opposite to reference position that is determined by another glass sheet | |
DE1558562A1 (en) | Device for stacking bricks | |
DE8115713U1 (en) | SQUARE FORKLIFT | |
DE2830779A1 (en) | HYDRAULIC DOUBLE PRESSURE PRESS FOR ARTIFICIAL STONES | |
DE10066303B4 (en) | Apparatus and method for separating adherent layers of a porous concrete block | |
DE102006013327B3 (en) | Device for producing glue binders comprises a horizontally moving portal carriage with vertically moving lifting arms arranged outside of a glue binder press | |
DE10312006B4 (en) | Method for handling large-sized aerated concrete blocks and device for carrying out the method | |
DE19905988B4 (en) | Device for separating steam-hardened lightweight concrete bodies | |
DE102010005866B4 (en) | Plant for the production of precast concrete parts | |
EP0495157A2 (en) | Process and apparatus for manufacturing pieces of cores for preparing a core packet ready for use in castings | |
DE69619060T2 (en) | Movable platform for monitoring height differences | |
AT405395B (en) | Apparatus for storing and conveying upright, tubular workpieces made of concrete | |
EP1558409B1 (en) | Rolling mill comprising support plates | |
DE2520716A1 (en) | STACKING DEVICE FOR STACKING TILE BLANKS | |
DE2049678B2 (en) | METHOD AND DEVICE FOR REMOVING A CERAMIC CASTING FROM A MOLD | |
EP0808786A2 (en) | Lifting apparatus for the roller rails of roller tables | |
DE2829044C2 (en) | Device for gripping cuboid building blocks, in particular aerated concrete building blocks, from a stack | |
DE1456741A1 (en) | Device for gripping, transporting and stacking molded parts in the construction industry | |
AT240768B (en) | Device for conveying and depositing plate-shaped moldings | |
DE202012104667U1 (en) | Device for converting glass sheets, in particular for stacking into a glass package | |
DE2354537A1 (en) | METHOD AND EQUIPMENT FOR MANUFACTURING ASSEMBLED PANELS FOR STACKING AND TRANSPORTING SUCH PANELS | |
DE1297819B (en) | Device for stacking metal pegs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8364 | No opposition during term of opposition | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20111001 |