DE10308680A1 - Transport system for car body parts comprises lift with two platforms which can be moved to receive parts arriving on conveyor and second lift fitted with conveyor belts to transfer parts to and from first lift - Google Patents
Transport system for car body parts comprises lift with two platforms which can be moved to receive parts arriving on conveyor and second lift fitted with conveyor belts to transfer parts to and from first lift Download PDFInfo
- Publication number
- DE10308680A1 DE10308680A1 DE2003108680 DE10308680A DE10308680A1 DE 10308680 A1 DE10308680 A1 DE 10308680A1 DE 2003108680 DE2003108680 DE 2003108680 DE 10308680 A DE10308680 A DE 10308680A DE 10308680 A1 DE10308680 A1 DE 10308680A1
- Authority
- DE
- Germany
- Prior art keywords
- lift
- platform
- lifting device
- parts
- platforms
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G65/00—Loading or unloading
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/02—Articles
- B65G2201/0294—Vehicle bodies
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Intermediate Stations On Conveyors (AREA)
Abstract
Description
Die Erfindung bezieht sich auf eine Anlage gemäß dem Oberbegriff des Patentanspruchs.The invention relates to a Plant according to the generic term of the claim.
Derartige Anlagen werden insbesondere an Großpressen angegliedert, wie sie in Automobilwerken zum Einsatz kommen. Auf solchen Pressen werden Karosserieteile geformt, wobei die diesen entsprechenden Werkstücke in der Regel in einer Presse mehrere hintereinanderliegende Preßwerkzeuge durchlaufen. Dazu werden die Werkstücke taktweise vorgeschoben und aus der Presse herausbefördert, und hierfür ist ein Horizontalförderer vorgesehen.Such systems are particularly on large presses affiliated as they are used in automotive plants. On Such presses are molded into body parts, the latter corresponding workpieces usually run through several press tools one behind the other in a press. To do this, the workpieces cyclically advanced and conveyed out of the press, and therefor is a horizontal conveyor intended.
Bei einer derartigen Presseneinrichtung befindet sich am Ende des Horizontalförderers eine Entnahmestation, von wo die Werkstücke entnommen und in oder auf einem Werkstückträger angeordnet werden. Bei den Werkstückträgern kann es sich um Paletten, Boxen oder dergleichen handeln, die jeweils eine bestimmte Anzahl der Werkstücke aufnehmen.With such a press device there is a removal station at the end of the horizontal conveyor, from where the workpieces removed and arranged in or on a workpiece carrier. at the workpiece carriers can they are pallets, boxes or the like, each a certain number of workpieces take up.
Von der Entnahmestation am Ende des Horizontalförderers bis zu dem an der Beladestation bereitgehaltenen Werkstückträger werden die Werkstücke entweder von Hand oder mittels eines Roboters transportiert. Für die Werkstückübergabe steht jeweils die Taktzeit der Presse zur Verfügung, die bei den modernen Pressenanlagen in einer Größenordnung von vier Sekunden und weniger liegt. Hierbei besteht das Problem, daß der Wechsel zwischen einem befüllten Werkstückträger und einem leeren Werkstückträger zur Aufnahme weiterer Werkstücke entsprechend schnell vollzogen werden muß. Dagegen dauert die Befüllzeit der einzelnen Werkstückträger wesentlich länger, sie liegt in der Regel in der Größenordnung von 40 Sekunden. Die befüllten Werkstückträger werden zu einer weiteren Bearbeitung der Werkstücke forttransportiert und der gesamte Vorgang von der Entnahme der Werkstücke vom Horizontalförderer bis zum Abtransport der befüllten Werkstückträger wird im Fachjargon Entsorgung genannt, was also soviel wie Weiterleitung der einzelnen Werkstücke für die nachfolgende Bearbeitung bedeutet.From the removal station at the end of the horizontal conveyor up to the workpiece carrier at the loading station the workpieces either transported by hand or using a robot. For workpiece transfer the cycle time of the press is available, that of the modern Press systems on a scale of four seconds and less. The problem here is that the Switch between a filled one Workpiece carriers and an empty workpiece carrier Pick up additional workpieces accordingly must be carried out quickly. In contrast, the filling time takes of the individual workpiece carriers essential longer, it is usually of the order of magnitude of 40 seconds. The filled workpiece carriers will be transported to a further processing of the workpieces and the entire process from the removal of the workpieces from the horizontal conveyor to for the removal of the filled workpiece carriers in technical jargon called disposal, which means something like forwarding of the individual workpieces for the subsequent processing means.
Der Erfindung liegt nun die Aufgabe zugrunde, eine Anlage zur Entsorgung von taktweise anfallenden Werkstücken zu schaffen, die an die kurze Taktzeit des Fertigungsprozesses der Werkstücke angepaßt ist und innerhalb der Taktzeit den maschinellen Wechsel zwischen einem befüllten Werkstückträger und einem leeren Werkstückträger an der Beladestation ermöglicht.The object of the invention is now based on a system for the disposal of cyclically occurring workpieces create the short cycle time of the manufacturing process Workpieces is adapted and the mechanical change between a filled workpiece carrier and an empty workpiece carrier on the Loading station enables.
Diese Aufgabe wird bei einer Anlage der genannten Art durch die kennzeichnenden Merkmale des Patentanspruchs gelöst.This task is done with a plant of the type mentioned by the characterizing features of the claim solved.
Für die Erfindung ist wesentlich, daß die Hubvorrichtung mit den beiden Plattformen um den Plattformabstand innerhalb einer sehr kurzen Zeit verfahren werden kann, die der Taktzeit des Fertigungsprozesses der Werkstücke entspricht, im praktischen Anwendungsfall unter vier Sekunden liegt. Die Haltezeit der Hubvorrichtung in den beiden Hubpositionen entspricht der Befüllzeit des jeweiligen Werkstückträgers, die in der Regel etwa das 10fache der erwähnten Taktzeit beträgt. Diese Befüllzeit steht dem Lift zur Verfügung, um von der jeweiligen Plattform der Hubvorrichtung einen befüllten Werkstückträger zu übernehmen und gegen einen leeren Werkstückträger auszutauschen. Der Lift muß deshalb mit seiner Liftplattform zumindest zwischen denjenigen beiden Arbeitsebenen verfahrbar sein, die von der oberen Plattform der Hubvorrichtung in deren oberer Position und von der unteren Plattform der Hubvorrichtung in deren unterer Position vorgegeben sind. So ist es möglich, in diesen beiden Arbeitsebenen die Liftplattform niveaugleich unmittelbar neben der jeweiligen Plattform der Hubvorrichtung anzuordnen, um mittels einer geeigneten Transportvorrichtung, die sich sowohl auf den Plattformen der Hubvorrichtung als auch auf der Liftplattform befindet, den zu übernehmenden, befüllten Werkstückträger auf die Liftplattform umzusetzen und in der zweiten Funktion den auf der Liftplattform herantransportierten leeren Werkstückträger auf die jeweilige Plattform der Hubvorrichtung überzusetzen. Die Befüllzeit, die für das Einlegen der Werkstücke in einen Werkstückträger vergeht, reicht für den Lift aus, um von der zu bedienenden Plattform der Hubvorrichtung den be füllten Werkstückträger zu übernehmen, auf derselben Arbeitsebene, der zweiten Arbeitsebene oder einer weiteren Arbeitsebene den befüllten Werkstückträger abzugeben und auf einer dieser Ebenen einen leeren Werkstückträger zu übernehmen, den der Lift mit seiner Liftplattform zu der jeweils bedienten Plattform der Hubvorrichtung hin befördert.For the invention is essential that the lifting device with the two platforms around the platform distance within a very short time can be moved, which is the cycle time of the manufacturing process of the workpieces corresponds, is less than four seconds in practical use. The Holding time of the lifting device in the two lifting positions corresponds the filling time of the respective workpiece carrier, the is usually about 10 times the mentioned cycle time. This Filling time is available to the lift, to take over a filled workpiece carrier from the respective platform of the lifting device and replace it with an empty workpiece carrier. The lift must therefore with its lift platform, at least between those two working levels be movable from the upper platform of the lifting device in its upper position and from the lower platform of the lifting device are specified in their lower position. So it is possible in the lift platform immediately on these two working levels to be arranged next to the respective platform of the lifting device in order to by means of a suitable transport device, which is based on both the platforms of the lifting device as well as on the lift platform is to be taken over, filled Workpiece carrier on to implement the lift platform and in the second function empty workpiece carriers transported up to the lift platform to transfer the respective platform of the lifting device. The filling time, the for inserting the workpieces passes into a workpiece carrier, enough for the lift out from the platform of the lifting device to be operated to take over the filled workpiece carrier, at the same working level, the second working level or one further working level the filled one To deliver the workpiece carrier and to take over an empty workpiece carrier on one of these levels, which the lift also carries its lift platform to the platform of the lifting device being operated transported there.
Die Erfindung wird nachfolgend anhand der Zeichnung an einem Ausführungsbeispiel noch näher erläutert. Dabei zeigen:The invention is described below the drawing of an embodiment even closer explained. Show:
Im einzelnen erkennt man in der Zeichnung einen
Horizontalförderer
In einem Vertikalbereich, der sich über die Beladestation
Wie die
Neben der Hubvorrichtung
Beim niveaugleichen Anschluß der Liftplattform
Die Funktion der abgebildeten Anlage
ist folgende: Während
gemäß
Nun wird innerhalb der Taktzeit,
in der die Werkstücke
Ist die Befüllzeit zu Ende, wird wiederum
in einer Zeitspanne, welche der Taktzeit entspricht die Hubvorrichtung
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003108680 DE10308680B4 (en) | 2003-02-28 | 2003-02-28 | Plant for the disposal of cyclically occurring workpieces |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003108680 DE10308680B4 (en) | 2003-02-28 | 2003-02-28 | Plant for the disposal of cyclically occurring workpieces |
Publications (2)
Publication Number | Publication Date |
---|---|
DE10308680A1 true DE10308680A1 (en) | 2004-09-09 |
DE10308680B4 DE10308680B4 (en) | 2006-10-26 |
Family
ID=32842000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2003108680 Expired - Fee Related DE10308680B4 (en) | 2003-02-28 | 2003-02-28 | Plant for the disposal of cyclically occurring workpieces |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10308680B4 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9278762B2 (en) * | 2013-09-13 | 2016-03-08 | Deutsche Post Ag | Unit load device vertical unload system |
US9517845B2 (en) | 2013-09-13 | 2016-12-13 | Deutsche Post Ag | Movable personnel platform for unloading a unit load device |
US9790039B2 (en) | 2013-09-13 | 2017-10-17 | Deutsche Post Ag | Unit load device shipment loading system for mixed shipments |
WO2018162425A1 (en) * | 2017-03-08 | 2018-09-13 | Tms Turnkey Manufacturing Solutions Gmbh | Container changing station |
CN109607144A (en) * | 2018-12-10 | 2019-04-12 | 深圳市大满包装有限公司 | A kind of orbit transports line and delivery method |
EP3592677B1 (en) | 2017-03-08 | 2021-05-05 | TMS Turnkey Manufacturing Solutions GmbH | Container changing station |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102016216574B3 (en) * | 2016-09-01 | 2017-07-13 | Thyssenkrupp Ag | Bin shifting device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04292322A (en) * | 1991-03-19 | 1992-10-16 | Fujitsu Ltd | Rack supply/discharge device |
JP2000026055A (en) * | 1998-07-13 | 2000-01-25 | Sanki Eng Co Ltd | Truck conveyance equipment |
-
2003
- 2003-02-28 DE DE2003108680 patent/DE10308680B4/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04292322A (en) * | 1991-03-19 | 1992-10-16 | Fujitsu Ltd | Rack supply/discharge device |
JP2000026055A (en) * | 1998-07-13 | 2000-01-25 | Sanki Eng Co Ltd | Truck conveyance equipment |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9278762B2 (en) * | 2013-09-13 | 2016-03-08 | Deutsche Post Ag | Unit load device vertical unload system |
US9517845B2 (en) | 2013-09-13 | 2016-12-13 | Deutsche Post Ag | Movable personnel platform for unloading a unit load device |
US9790039B2 (en) | 2013-09-13 | 2017-10-17 | Deutsche Post Ag | Unit load device shipment loading system for mixed shipments |
WO2018162425A1 (en) * | 2017-03-08 | 2018-09-13 | Tms Turnkey Manufacturing Solutions Gmbh | Container changing station |
EP3592677B1 (en) | 2017-03-08 | 2021-05-05 | TMS Turnkey Manufacturing Solutions GmbH | Container changing station |
CN109607144A (en) * | 2018-12-10 | 2019-04-12 | 深圳市大满包装有限公司 | A kind of orbit transports line and delivery method |
Also Published As
Publication number | Publication date |
---|---|
DE10308680B4 (en) | 2006-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3106241B1 (en) | Machine tool and method for discharging workpiece parts | |
EP2050523B1 (en) | Machine assembly for sheet metal forming with a sheet metal forming unit and with a transport device | |
EP0569689B1 (en) | Method and device for sorting bottles | |
DE19642763A1 (en) | Device for loading and unloading processing machines | |
EP2484483B1 (en) | Supply and loading unit | |
WO2002076638A1 (en) | Method and device for filling and automatically transporting receiving containers for sorting products | |
EP2953873A1 (en) | Palletizing system | |
DE102018121743A1 (en) | Driverless van | |
DE102019115634B3 (en) | Sorting system for a machine tool, machine tool and method for sorting cut parts | |
DE202017106030U1 (en) | Honing machine and use of a honing machine | |
DE10308680B4 (en) | Plant for the disposal of cyclically occurring workpieces | |
DE102006021562B4 (en) | Method and device for loading and / or unloading and / or processing of piece goods | |
DE3910705A1 (en) | Apparatus for manipulating pallets | |
WO2007023078A1 (en) | Device for the machine picking and manipulating of supply pieces | |
DE102020111767A1 (en) | Storage and retrieval machine | |
DE102011012953A1 (en) | Device, particularly palletizing device for mechanical handling of trays, has one position for tray and another position for tray, where former position and latter position are arranged one above other | |
DE102009017045A1 (en) | Transport device for use in machine tool arrangement, has transport carriage supported along guiding device in displaceable manner and positioning workpiece pallet in transport position in which surface of workpiece pallet runs vertically | |
CH665378A5 (en) | DEVICE FOR EXACTLY POSITIONING A WORKPIECE. | |
DE4109294A1 (en) | Load transfer device with horizontal support frame - has vertically movable guides forming horizontal rolling path and drive devices for movement in vertical direction | |
DE102005018087B4 (en) | Casting mold pallet and plant for the production of cast concrete | |
EP0210172B1 (en) | Device for stacking thin-walled parts | |
WO2018055178A1 (en) | Method and machine tool for machining planar workpieces, in particular metal sheets | |
DE102023109559B3 (en) | Load carrier changing system and method for controlling an automatically operating load carrier changing system | |
EP3643631B1 (en) | Method and tool cart for transferring a tool component | |
EP3294508B1 (en) | Workpiece feeding device and workpiece removing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8181 | Inventor (new situation) |
Inventor name: LöDIGE, RUDOLF, 33100 PADERBORN, DE |
|
8364 | No opposition during term of opposition | ||
R081 | Change of applicant/patentee |
Owner name: LOEDIGE MACHINE WARBURG GMBH, DE Free format text: FORMER OWNER: LOEDIGE FOERDERTECHNIK GMBH, 34414 WARBURG, DE Effective date: 20120405 |
|
R082 | Change of representative |
Representative=s name: PATENTANWAELTE FIEDLER, OSTERMANN & SCHNEIDER, DE Effective date: 20120405 Representative=s name: PATENTANWAELTE THIELKING & ELBERTZHAGEN, DE Effective date: 20120405 Representative=s name: THIELKING & ELBERTZHAGEN PATENTANWAELTE PARTNE, DE Effective date: 20120405 |
|
R082 | Change of representative |
Representative=s name: PATENTANWAELTE FIEDLER, OSTERMANN & SCHNEIDER, DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |