DE10300733B3 - Betriebsführungssystem für eine Windenergieanlage - Google Patents
Betriebsführungssystem für eine Windenergieanlage Download PDFInfo
- Publication number
- DE10300733B3 DE10300733B3 DE10300733A DE10300733A DE10300733B3 DE 10300733 B3 DE10300733 B3 DE 10300733B3 DE 10300733 A DE10300733 A DE 10300733A DE 10300733 A DE10300733 A DE 10300733A DE 10300733 B3 DE10300733 B3 DE 10300733B3
- Authority
- DE
- Germany
- Prior art keywords
- rotor blade
- management system
- rotor
- power
- angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001419 dependent effect Effects 0.000 claims abstract description 5
- 230000001105 regulatory effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/022—Adjusting aerodynamic properties of the blades
- F03D7/0224—Adjusting blade pitch
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/0256—Stall control
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/80—Diagnostics
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/30—Control parameters, e.g. input parameters
- F05B2270/32—Wind speeds
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S415/00—Rotary kinetic fluid motors or pumps
- Y10S415/905—Natural fluid current motor
- Y10S415/907—Vertical runner axis
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Wind Motors (AREA)
- Control Of Eletrric Generators (AREA)
Abstract
Description
- Die Erfindung betrifft ein Betriebsführungssystem für eine Windenergieanlage, über das eine Leistungsabgabe der Anlage geregelt wird.
- Gattungsgemäße Betriebsführungssysteme werden in Windenergieanlagen verwendet, die einen Rotor mit wenigstens einem Rotorblatt aufweisen, wobei das Rotorblatt in einem einstellbaren Rotorblattwinkel zu dem Rotor angeordnet ist. Das Betriebsführungssystem regelt innerhalb eines vorgegebenen Windgeschwindigkeitsbereiches die Rotordrehzahl unter Verstellung des Rotorblattwinkels zur Einstellung einer Nennleistung.
- Generell werden Windenergieanlagen so ausgelegt, dass über das Betriebsführungssystem Betriebseinstellungen, wie zum Beispiel die Einstellung des Rotorblattwinkels vorgenommen werden, um eine möglichst hohe Leistungsausbeute aus dem Wind zu erzielen, wobei die Einstellung innerhalb bestimmter Toleranz grenzen erfolgt. Die
DE 101 27 451 A1 offenbart demgegenüber ein Verfahren zur Steuerung einer Windenergieanlage, bei dem eine optimale Leistungsausbeute dadurch erreicht wird, dass wenigstens eine Betriebseinstellung innerhalb der Toleranzgrenzen variiert wird. Durch die Variation der Betriebseinstellung innerhalb der Toleranzgrenzen wird geprüft, ob mit einer veränderten Betriebseinstellung eine verbesserte Leistungsausbeute erreichbar ist. Wird eine Betriebseinstellung gefunden, die dieses Kriterium erfüllt, dann wird die veränderte Betriebseinstellung beibehalten. - Der Betrieb einer Windenergieanlage kann bei zu hohen Windgeschwindigkeiten aufgrund der starken mechanischen Belastung zu der Zerstörung der Anlage führen. Gattungsgemäße Betriebsführungssysteme sind daher so ausgebildet, daß sie ab einer definierten Abschaltwindgeschwindigkeit die Anlage abschalten, wobei das Abschalten der Anlage vorzugsweise nicht abrupt, sondern durch langsame Reduzierung der Leistung erfolgt. Ein gattungsgemäßes Betriebsführungssystem ist z.B. aus der
DE 195 32 409 A1 bekannt. - Auch aus der
DE 198 44 258 A1 ist ein Betriebsführungssystem bekannt, über das die Leistung bei Erreichen einer vorgegebenen Windgeschwindigkeit reduziert wird. Hierbei wird die Reduktion der Leistung ebenfalls durch eine Verstellung des Rotorblattwinkels erreicht. Jedoch wird die Leistungsreduktion bereits bei Erreichen einer Grenzwindgeschwindigkeit eingeleitet, wobei die Grenzwindgeschwindigkeit unterhalb der Abschaltwindgeschwindigkeit liegt. - Ein mechanisches System, das eine Einstellung der Winkel der Rotorblätter einer Windenergieanlage unter anderem aufgrund der Windgeschwindigkeit vornimmt, ist aus der
EP 0 266 715 A1 bekannt. - Mit der Leistungsreduktion soll erreicht werden, daß die mit zunehmender Windgeschwindigkeit steigenden mechanischen Lasten auf die Anlage reduziert werden, wodurch die Anlage weniger stark dimensioniert ausgelegt werden muß und damit die Kosten vermindert werden können.
- Bei den oben beschriebenen Betriebsführungssystemen wird mit der Reduktion der Leistung ab Erreichen eines definierten windgeschwindigkeitsabhängigen Grenzwerts begonnen. Dieser beruht auf der gemessenen Windgeschwindigkeit. Die Messung der Windgeschwindigkeit erfolgt in der Regel mit einem Gondelanemometer. Dieses Meßverfahren ist relativ ungenau und damit kein guter Indikator für die Belastung der Anlage.
- Der Grenzwert, ab dem das Betriebsführungssystem die Leistung einer Windenergieanlage reduziert, sollte daher nicht aufgrund der gemessenen Windgeschwindigkeit erfolgen, sondern aufgrund einer Eingangsgröße, die physikalisch und steuerungstechnisch leichter zu erfassen ist.
- Aufgabe der vorliegenden Erfindung ist es, ein Betriebsführungssystem zu schaffen, daß einen Grenzwert mit den oben genannten Eigenschaften verwendet.
- Gelöst wird die Aufgabe mit einem Betriebsführungssystem, das die Merkmale des Anspruches 1 aufweist.
- Wie bei dem gattungsgemäßen Betriebsführungssystem wird das erfindungsgemäße Betriebsführungssystem in Windenergieanlagen verwendet, die einen Rotor mit verstellbaren Rotorblättern aufweisen, wobei das Betriebsführungssystem so ausgebildet ist, daß es innerhalb eines vorgegebenen Windgeschwindigkeitsbereiches die Rotordrehzahl unter Verstellung des Rotorblattwinkels zur Einstellung einer Nennleistung regelt.
- Dafür wird, wenn mit zunehmender Windgeschwindigkeit die Nenndrehzahl erreicht wird, der Rotorblattwinkel vergrößert, wodurch, wie oben bereits erwähnt, die Einhaltung der Nenndrehzahl und damit auch der Nennleistung trotz zunehmender Windgeschwindigkeit erzielt wird. Das Betriebsführungssystem beginnt mit der Leistungsreduktion, wenn ein definierter windgeschwindigkeitsabhängiger Grenzwert erreicht wird.
- Das erfindungsgemäße Betriebsführungssystem verwendet dabei als Grenzwert einen definierten Rotorblattgrenzwinkel. Bei dem Rotorblattgrenzwinkel handelt es sich um den Rotorblattwinkel, der sich zur Einstellung der Nennleistung bei einer Windstärke, die der Abschaltwindgeschwindigkeit entspricht, ergibt. Der Rotorblattgrenzwinkel ist vom jeweils verwendeten Rotorblatt abhängig und kann empirisch durch Messungen und/ oder Simulationen ermittelt werden.
- zu erfassen ist, da der Winkel des Rotorblatts aufgrund der Einstellung der Nennleistung bereits bekannt ist. Weiterhin ist der Rotorblattgrenzwinkel ein direkter Indikator für die momentane Belastung der Anlage und stellt somit eine zuverlässigere Eingangsgröße für die Reduktion der Belastung dar als die indirekt gemessene Windgeschwindigkeit.
- In einer vorteilhaften Ausgestaltung der Erfindung ist das Betriebsführungssystem gemäß Anspruch 2 so ausgebildet, daß die Leistungsreduktion nach Überschreiten des Rotorblattgrenzwinkels durch weitere Verstellung des Rotorblattwinkels erfolgt. Dabei wird der Winkel des Rotorblatts zu dem Rotor gemäß Anspruch 3 vergrößert.
- Dies bietet den Vorteil, daß die Anlage bei Erreichen der Abschaltwindgeschwindigkeit nicht sofort abgeschaltet wird, sondern die Leistungsabgabe langsam reduziert wird, bis eine Abschaltleistung erreicht ist und die Anlage vom Netz genommen werden kann. Diese Vorgehensweise bietet zum einen den Vorteil einer besseren Netzverträglichkeit. Zum anderen kann auf diese Weise die Leistungskurve erweitert und der Energieertrag verbessert werden.
- In einer weiteren vorteilhaften Ausgestaltung ist das Betriebsführungssystem gemäß Anspruch 4 so ausgebildet, daß der Rotorblattwinkel bis zu dem Erreichen der Nennleistung weitgehend konstant gehalten wird.
- Nach dem Erreichen der Nennleistung ist das Betriebsführungssystem gemäß Anspruch 4 so ausgebildet, daß der Rotorblattwinkel in Abhängigkeit von der Windgeschwindigkeit eingestellt wird, d.h. daß der Rotorblattwinkel je nach der Höhe der Windgeschwindigkeit vergrößert oder verkleinert wird, um die Nennleistung konstant zu halten.
- Bei dem erfindungsgemäßen Betriebsführungssystem erfolgt die Regelung der Leistungsabgabe einer Windenergieanlage oberhalb der Abschaltgeschwindigkeit in vorteilhafter Weise nur in Abhängigkeit vom Rotorblattwinkel. Zusätzliche Meßgrößen, wie z.B. die Windgeschwindigkeit, die aufgrund ungünstiger Bedingungen schwer zu ermitteln und daher oft ungenau sind, sind nicht mehr erforderlich.
- Im folgenden soll die Erfindung anhand zweier Abbildungen näher erläutert werden:
-
1 : zeigt eine Frontansicht auf eine Windenergieanlage, -
2 : zeigt eine schematische Darstellung der Regelung der Nennleistung in Abhängigkeit vom Rotorblattwinkel - Die
1 zeigt die Draufsicht auf eine Windenergieanlage (1 ) mit einem auf einem Boden aufgestellten Turm (2 ), an dessen Spitze eine drehbare Gondel einen um eine waagerechte Achse umlaufenden Rotor- (3 ) trägt, der aus drei Rotorblättern (5 ) besteht, wobei die Rotorblätter in einem einstellbaren Rotorblattwinkel zu dem Rotor angeordnet sind. - Die
2 zeigt eine schematische Darstellung der Regelung der Nennleistung in Abhängigkeit vom Rotorblattwinkel, wobei davon auszugehen ist, daß die Windgeschwindigkeit stetig ansteigt. - Im Punkt
1 der2 fährt die Anlage an. Zwischen Punkt1 und Punkt2 fährt die Anlage eine Drehmoment-Drehzahlkennlinie eines in der Anlage vorgesehenen Generators ab, bis die Nennleistung erreicht ist. Der Im Punkt1 der2 fährt die Anlage an. Zwischen Punkt1 und Punkt2 fährt die Anlage eine Drehmoment-Drehzahlkennlinie eines in der Anlage vorgesehenen Generators ab, bis die Nennleistung erreicht ist. Der Rotorblattwinkel wird in diesem Stadium nicht geändert. In Punkt2 hat die Anlage die Nennleistung erreicht. - Nach Überschreiten des Punktes
2 ist die Windgeschwindigkeit größer als für die Erzeugung der Nennleistung erforderlich, daher beginnt das Betriebsführungssystem mit der Leistungsregelung über den Rotorblattwinkel. Hierfür vergrößert das Betriebsführungssystem den Rotorblattwinkel, wodurch der Auftrieb der Rotorblätter vermindert und die Rotordrehzahl und damit die Leistung reduziert wird. Über die Verstellung des Rotorblattwinkels kann somit eine konstante Nennleistung abgegeben werden. - Wie in
2 zwischen den Punkten2 und3 dargestellt, wird der Rotorblattwinkel mit zunehmender Windgeschwindigkeit stetig vergrößert, damit die Anlage eine konstante Nennleistung abgibt. In Punkt3 erreicht die Windgeschwindigkeit einen Wert, bei dem das Betriebsführungssystem das Rotorblatt in einen Winkel verstellt, der einem in2 dargestellten Grenzwinkel entspricht. Das Betriebsführungssystem beginnt mit dem Überschreiten des Grenzwinkels, die Leistung der Anlage zu reduzieren. Hierfür wird der Rotorblattwinkel so vergrößert, daß die Abgabe der Leistung stetig reduziert wird, bis wie in2 in Punkt4 eine Abschaltleistung der Anlage erreicht wird. - In weiteren Ausgestaltungen der Erfindung kann die Reduzierung der Leistung auch in anderer Form abnehmen, z.B. stufenförmig oder exponentiell.
Claims (5)
- Betriebsführungssystem für eine Windenergieanlage (
1 ), über das eine Leistungsabgabe der Anlage (1 ) geregelt wird, wobei die Windenergieanlage (1 ) einen Rotor (3 ) mit wenigstens einem Rotorblatt (5 ) aufweist, das in einem einstellbaren Rotorblattwinkel zu dem Rotor (3 ) angeordnet ist und das Betriebsführungssystem innerhalb eines vorgegebenen Windgeschwindigkeitsbereichs die Rotordrehzahl unter Verstellung des Rotorblattwinkels zur Einstellung einer Nennleistung regelt und ab einem definierten windgeschwindigkeitsabhängigen Grenzwert die Leistung reduziert, dadurch gekennzeichnet, daß der Grenzwert ein definierter Rotorblattgrenzwinkel ist. - Betriebsführungssystem nach Anspruch 1, dadurch gekennzeichnet, daß es zur Reduzierung der Leistung den Rotorblattwinkel verstellt.
- Betriebsführungssystem nach Anspruch 2, dadurch gekennzeichnet, daß es zur Reduzierung der Leistung den Rotorblattwinkel vergrößert.
- Betriebsführungssystem nach Anspruch 1, dadurch gekennzeichnet, daß es den Rotorblattwinkel bis zu dem Erreichen der Nennleistung konstant hält.
- Betriebsführungssystem nach Anspruch 1, dadurch gekennzeichnet, daß es nach dem Erreichen der Nennleistung den Rotorblattwinkel in Abhängigkeit von der Windgeschwindigkeit einstellt, um die Nennleistung konstant zu halten.
Priority Applications (11)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10300733A DE10300733B3 (de) | 2003-01-11 | 2003-01-11 | Betriebsführungssystem für eine Windenergieanlage |
EP03815067A EP1497556B1 (de) | 2003-01-11 | 2003-12-20 | Betriebsführungssystem für eine windenergieanlage |
PCT/EP2003/014690 WO2004063566A1 (de) | 2003-01-11 | 2003-12-20 | Betriebsführungssystem für eine windenergieanlage |
AT03815067T ATE310163T1 (de) | 2003-01-11 | 2003-12-20 | Betriebsführungssystem für eine windenergieanlage |
ES03815067T ES2251705T3 (es) | 2003-01-11 | 2003-12-20 | Sistema de gestion de explotacion para una instalacion de energia eolica. |
US10/541,699 US7275912B2 (en) | 2003-01-11 | 2003-12-20 | Management system for the operation of a wind turbine |
AU2003296698A AU2003296698B2 (en) | 2003-01-11 | 2003-12-20 | Management system for the operation of a wind turbine |
DE50301683T DE50301683D1 (de) | 2003-01-11 | 2003-12-20 | Betriebsführungssystem für eine windenergieanlage |
CNB2003801075221A CN100424337C (zh) | 2003-01-11 | 2003-12-20 | 用于风能设备的运行管理系统 |
CA002511973A CA2511973C (en) | 2003-01-11 | 2003-12-20 | Management system for the operation of a wind turbine |
DK03815067T DK1497556T3 (da) | 2003-01-11 | 2003-12-20 | Styringssystem til drift af et vindenergianlæg |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10300733A DE10300733B3 (de) | 2003-01-11 | 2003-01-11 | Betriebsführungssystem für eine Windenergieanlage |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10300733B3 true DE10300733B3 (de) | 2004-07-15 |
Family
ID=32519827
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10300733A Expired - Fee Related DE10300733B3 (de) | 2003-01-11 | 2003-01-11 | Betriebsführungssystem für eine Windenergieanlage |
DE50301683T Expired - Lifetime DE50301683D1 (de) | 2003-01-11 | 2003-12-20 | Betriebsführungssystem für eine windenergieanlage |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE50301683T Expired - Lifetime DE50301683D1 (de) | 2003-01-11 | 2003-12-20 | Betriebsführungssystem für eine windenergieanlage |
Country Status (10)
Country | Link |
---|---|
US (1) | US7275912B2 (de) |
EP (1) | EP1497556B1 (de) |
CN (1) | CN100424337C (de) |
AT (1) | ATE310163T1 (de) |
AU (1) | AU2003296698B2 (de) |
CA (1) | CA2511973C (de) |
DE (2) | DE10300733B3 (de) |
DK (1) | DK1497556T3 (de) |
ES (1) | ES2251705T3 (de) |
WO (1) | WO2004063566A1 (de) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006032451A1 (de) * | 2004-09-21 | 2006-03-30 | Repower Systems Ag | Verfahren zur regelung einer windenergieanlage und windenergieanlage |
DE102004057320A1 (de) * | 2004-11-27 | 2006-06-01 | Karl-Heinz Best | Verfahren und Vorrichtung zum Überwachen wenigstens einer Windenergieanlage |
DE102005059888A1 (de) * | 2005-12-15 | 2007-06-21 | Nordex Energy Gmbh | Verfahren zur Momenten- und Pitchsteuerung für eine Windenergieanlage abhängig von der Drehzahl |
DE102007035724A1 (de) | 2007-07-30 | 2009-02-05 | Joachim Falkenhagen | Bedarfsgerecht angepaßte Abschaltgeschwindigkeit bei Windenergieanlagen |
DE102007056161A1 (de) | 2007-11-21 | 2009-05-28 | Repower Systems Ag | Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage |
DE102011081795A1 (de) * | 2011-08-30 | 2013-02-28 | Wobben Properties Gmbh | Verfahren zum Betreiben einer Windenergieanlage |
US8793027B2 (en) | 2008-06-30 | 2014-07-29 | Vestas Wind Systems A/S | Power curtailment of wind turbines |
DE102019130912B3 (de) * | 2019-11-15 | 2021-04-22 | cp.max Rotortechnik GmbH & Co. KG | Anordnung und Verfahren für die Anbringung und Ausbildung einer Referenzmarkierung zur Rotorblattwinkelmessung an Windenergieanlagen |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006027224B3 (de) * | 2006-06-12 | 2008-01-03 | Repower Systems Ag | Windenergieanlage mit einer autarken Energieversorgung für eine Blattverstelleinrichtung |
CN101730796B (zh) * | 2007-04-30 | 2012-09-19 | 维斯塔斯风力系统有限公司 | 运行具有桨距控制的风力涡轮机的方法、风力涡轮机以及风力涡轮机的集群 |
ES2701707T3 (es) * | 2007-05-03 | 2019-02-25 | Siemens Ag | Procedimiento de funcionamiento de un aerogenerador y aerogenerador |
US20100135798A1 (en) * | 2009-02-10 | 2010-06-03 | General Electric Company | Wind turbine noise controls |
US7945350B2 (en) * | 2009-07-07 | 2011-05-17 | General Electric Company | Wind turbine acoustic emission control system and method |
US7763989B2 (en) * | 2009-07-07 | 2010-07-27 | General Electric Company | Method and apparatus for controlling the tip speed of a blade of a wind turbine |
US7902689B2 (en) * | 2009-07-07 | 2011-03-08 | General Electric Company | Method and system for noise controlled operation of a wind turbine |
DK2636893T3 (en) | 2012-03-07 | 2016-11-28 | Siemens Ag | A method for controlling the operation of a wind turbine |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0266715A2 (de) * | 1986-11-03 | 1988-05-11 | Northern Power Systems, Inc. | Windradnabe mit Vorrichtung zur Einstellung des Blattanstellwinkels |
DE19532409A1 (de) * | 1995-09-01 | 1997-03-06 | Aloys Wobben | Verfahren zum Betreiben einer Windenergieanlage und eine zugehörige Windenergieanlage |
DE19844258A1 (de) * | 1998-09-26 | 2000-03-30 | Dewind Technik Gmbh | Windenergieanlage |
DE10127451A1 (de) * | 2001-06-07 | 2002-12-19 | Aloys Wobben | Verfahren zur Steuerung einer Windenergieanlage |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59212576A (ja) * | 1983-05-17 | 1984-12-01 | Sumitomo Precision Prod Co Ltd | プロペラ型風車発電機の制御方法 |
CN2044650U (zh) * | 1989-03-17 | 1989-09-20 | 康德文 | 风力发电机 |
JPH0419366A (ja) * | 1990-05-11 | 1992-01-23 | Mitsubishi Heavy Ind Ltd | 風車発電設備用ピツチ制御装置 |
US5155375A (en) * | 1991-09-19 | 1992-10-13 | U.S. Windpower, Inc. | Speed control system for a variable speed wind turbine |
US6600240B2 (en) * | 1997-08-08 | 2003-07-29 | General Electric Company | Variable speed wind turbine generator |
DK1230479T3 (da) | 1999-11-03 | 2005-01-10 | Vestas Wind Sys As | Fremgangsmåde til styring af en vindmölles drift samt vindmölle til anvendelse ved denne fremgangsmåde |
US7015595B2 (en) * | 2002-02-11 | 2006-03-21 | Vestas Wind Systems A/S | Variable speed wind turbine having a passive grid side rectifier with scalar power control and dependent pitch control |
US6940185B2 (en) * | 2003-04-10 | 2005-09-06 | Advantek Llc | Advanced aerodynamic control system for a high output wind turbine |
-
2003
- 2003-01-11 DE DE10300733A patent/DE10300733B3/de not_active Expired - Fee Related
- 2003-12-20 US US10/541,699 patent/US7275912B2/en not_active Expired - Lifetime
- 2003-12-20 EP EP03815067A patent/EP1497556B1/de not_active Revoked
- 2003-12-20 WO PCT/EP2003/014690 patent/WO2004063566A1/de not_active Application Discontinuation
- 2003-12-20 CA CA002511973A patent/CA2511973C/en not_active Expired - Fee Related
- 2003-12-20 ES ES03815067T patent/ES2251705T3/es not_active Expired - Lifetime
- 2003-12-20 DK DK03815067T patent/DK1497556T3/da active
- 2003-12-20 CN CNB2003801075221A patent/CN100424337C/zh not_active Expired - Fee Related
- 2003-12-20 AU AU2003296698A patent/AU2003296698B2/en not_active Ceased
- 2003-12-20 DE DE50301683T patent/DE50301683D1/de not_active Expired - Lifetime
- 2003-12-20 AT AT03815067T patent/ATE310163T1/de not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0266715A2 (de) * | 1986-11-03 | 1988-05-11 | Northern Power Systems, Inc. | Windradnabe mit Vorrichtung zur Einstellung des Blattanstellwinkels |
DE19532409A1 (de) * | 1995-09-01 | 1997-03-06 | Aloys Wobben | Verfahren zum Betreiben einer Windenergieanlage und eine zugehörige Windenergieanlage |
DE19844258A1 (de) * | 1998-09-26 | 2000-03-30 | Dewind Technik Gmbh | Windenergieanlage |
DE10127451A1 (de) * | 2001-06-07 | 2002-12-19 | Aloys Wobben | Verfahren zur Steuerung einer Windenergieanlage |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7629702B2 (en) | 2004-09-21 | 2009-12-08 | Repower Systems Ag | Method for controlling a wind turbine and corresponding wind turbine |
DE102004054608A1 (de) * | 2004-09-21 | 2006-03-30 | Repower Systems Ag | Verfahren zur Regelung einer Windenergieanlage und Windenergieanlage mit einem Rotor |
DE102004054608B4 (de) * | 2004-09-21 | 2006-06-29 | Repower Systems Ag | Verfahren zur Regelung einer Windenergieanlage und Windenergieanlage mit einem Rotor |
AU2005287572B2 (en) * | 2004-09-21 | 2010-09-09 | Senvion Se | Method for controlling a wind power plant and corresponding wind power plant |
WO2006032451A1 (de) * | 2004-09-21 | 2006-03-30 | Repower Systems Ag | Verfahren zur regelung einer windenergieanlage und windenergieanlage |
EP2063111A3 (de) * | 2004-09-21 | 2010-09-08 | REpower Systems AG | Verfahren zur Regelung einer Windenergieanlage und Windenergieanlage |
EP2063111A2 (de) | 2004-09-21 | 2009-05-27 | REpower Systems AG | Verfahren zur Regelung einer Windenergieanlage und Windenergieanlage |
DE102004057320A1 (de) * | 2004-11-27 | 2006-06-01 | Karl-Heinz Best | Verfahren und Vorrichtung zum Überwachen wenigstens einer Windenergieanlage |
DE102005059888B4 (de) * | 2005-12-15 | 2007-12-20 | Nordex Energy Gmbh | Verfahren zur Momenten- und Pitchsteuerung für eine Windenergieanlage abhängig von der Drehzahl |
DE102005059888A1 (de) * | 2005-12-15 | 2007-06-21 | Nordex Energy Gmbh | Verfahren zur Momenten- und Pitchsteuerung für eine Windenergieanlage abhängig von der Drehzahl |
CN1982699B (zh) * | 2005-12-15 | 2011-08-24 | 诺德克斯能源有限公司 | 根据转速用于风力装置的转矩和节距控制的方法 |
DE102005059888C5 (de) * | 2005-12-15 | 2016-03-10 | Nordex Energy Gmbh | Verfahren zur Momenten- und Pitchsteuerung für eine Windenergieanlage abhängig von der Drehzahl |
DE102007035724A1 (de) | 2007-07-30 | 2009-02-05 | Joachim Falkenhagen | Bedarfsgerecht angepaßte Abschaltgeschwindigkeit bei Windenergieanlagen |
DE102007056161B4 (de) * | 2007-11-21 | 2009-09-17 | Repower Systems Ag | Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage |
DE102007056161A1 (de) | 2007-11-21 | 2009-05-28 | Repower Systems Ag | Verfahren zum Betreiben einer Windenergieanlage sowie Windenergieanlage |
US8793027B2 (en) | 2008-06-30 | 2014-07-29 | Vestas Wind Systems A/S | Power curtailment of wind turbines |
DE102011081795A1 (de) * | 2011-08-30 | 2013-02-28 | Wobben Properties Gmbh | Verfahren zum Betreiben einer Windenergieanlage |
WO2013029993A1 (de) | 2011-08-30 | 2013-03-07 | Wobben Properties Gmbh | Verfahren zum betreiben einer windenergieanlage |
US9845790B2 (en) | 2011-08-30 | 2017-12-19 | Wobben Properties Gmbh | Method for selectively operating a wind turbine in accordance with an operating mode |
EP3584437A1 (de) | 2011-08-30 | 2019-12-25 | Wobben Properties GmbH | Verfahren zum betreiben einer windenergieanlage |
DE102019130912B3 (de) * | 2019-11-15 | 2021-04-22 | cp.max Rotortechnik GmbH & Co. KG | Anordnung und Verfahren für die Anbringung und Ausbildung einer Referenzmarkierung zur Rotorblattwinkelmessung an Windenergieanlagen |
Also Published As
Publication number | Publication date |
---|---|
CA2511973A1 (en) | 2004-07-29 |
US7275912B2 (en) | 2007-10-02 |
CN100424337C (zh) | 2008-10-08 |
US20060147307A1 (en) | 2006-07-06 |
WO2004063566A1 (de) | 2004-07-29 |
ATE310163T1 (de) | 2005-12-15 |
DE50301683D1 (de) | 2005-12-22 |
EP1497556B1 (de) | 2005-11-16 |
DK1497556T3 (da) | 2006-03-27 |
ES2251705T3 (es) | 2006-05-01 |
CA2511973C (en) | 2009-02-24 |
EP1497556A1 (de) | 2005-01-19 |
CN1732341A (zh) | 2006-02-08 |
AU2003296698B2 (en) | 2009-09-03 |
AU2003296698A1 (en) | 2004-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE10300733B3 (de) | Betriebsführungssystem für eine Windenergieanlage | |
DE102004054608B4 (de) | Verfahren zur Regelung einer Windenergieanlage und Windenergieanlage mit einem Rotor | |
EP3095165B1 (de) | Verfahren und regel- und/oder steuereinrichtung zum betrieb einer windenergieanlage und/oder eines windparks sowie windenergieanlage und windpark | |
EP3031115B1 (de) | Verfahren zum steuern von windenergieanlagen | |
DE102006021982C5 (de) | Gestaffelt abschaltbarer Windpark | |
DE102008010543A1 (de) | Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage | |
EP3443223B1 (de) | Verfahren zum betreiben einer windenergieanlage | |
EP3095168B1 (de) | Verfahren und regel- und/oder steuereinrichtung zum betrieb einer windenergieanlage und/oder eines windparks sowie windenergieanlage und windpark | |
DE102018100127A1 (de) | Betreiben einer Windenergieanlage bei Sturm | |
WO2019234168A1 (de) | Verfahren zum betreiben einer windenergieanlage | |
EP3489507B1 (de) | Verfahren und vorrichtung zum betreiben einer windenergieanlage | |
DE102006040970B4 (de) | Verfahren zum Betrieb einer Windenergieanlage | |
EP3555461A1 (de) | Verfahren zum betrieb einer windenergieanlage sowie einrichtung zum steuern und/oder regeln einer windenergieanlage und entsprechende windenergieanlage mit einem rotor und einem über den rotor angetriebenen generator zur erzeugung einer elektrischen leistung | |
DE102013203540A1 (de) | Windenergieanlagen mit verbesserter Leistungsreservenbereithaltung | |
WO2020104664A1 (de) | Reglerstruktur und regelverfahren für eine windenergieanlage | |
EP3390813B1 (de) | Verfahren zum steuern einer windenergieanlage | |
DE102007057925A1 (de) | Verfahren zum Betreiben einer Windenergieanlage mit einer spannungsabhängigen Steuerung einer bereitzustellenden elektrischen Blindgröße | |
EP3842633B1 (de) | Verfahren zum betreiben einer windenergieanlage, windenergieanlage und windpark | |
WO2019192993A1 (de) | Verfahren zum einspeisen elektrischer leistung in ein elektrisches versorgungsnetz | |
EP3768970B1 (de) | Verfahren zum betreiben einer windenergieanlage, windenergieanlage und windpark | |
EP3916219B1 (de) | Verfahren zum steuern einer windenergieanlage | |
EP3425197A1 (de) | Leistungsreduktion bei mehreren windenergieanlagen in einem windpark | |
DE102018116299A1 (de) | Verfahren zum Einspeisen elektrischer Leistung in ein elektrisches Versorgungsnetz |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8100 | Publication of patent without earlier publication of application | ||
8363 | Opposition against the patent | ||
8365 | Fully valid after opposition proceedings | ||
R082 | Change of representative |
Representative=s name: PATENTANWAELTE SCHAEFER EMMEL HAUSFELD, DE |
|
R081 | Change of applicant/patentee |
Owner name: SENVION GMBH, DE Free format text: FORMER OWNER: REPOWER SYSTEMS AG, 22297 HAMBURG, DE Effective date: 20130612 Owner name: SENVION SE, DE Free format text: FORMER OWNER: REPOWER SYSTEMS AG, 22297 HAMBURG, DE Effective date: 20130612 Owner name: REPOWER SYSTEMS SE, DE Free format text: FORMER OWNER: REPOWER SYSTEMS AG, 22297 HAMBURG, DE Effective date: 20130612 |
|
R082 | Change of representative |
Representative=s name: MEISSNER BOLTE PATENTANWAELTE RECHTSANWAELTE P, DE Effective date: 20130612 Representative=s name: MEISSNER BOLTE & PARTNER GBR, DE Effective date: 20130612 Representative=s name: PATENTANWAELTE SCHAEFER EMMEL HAUSFELD, DE Effective date: 20130612 |
|
R082 | Change of representative |
Representative=s name: PATENTANWAELTE SCHAEFER EMMEL HAUSFELD, DE |
|
R081 | Change of applicant/patentee |
Owner name: SENVION GMBH, DE Free format text: FORMER OWNER: REPOWER SYSTEMS SE, 22297 HAMBURG, DE Effective date: 20140402 Owner name: SENVION SE, DE Free format text: FORMER OWNER: REPOWER SYSTEMS SE, 22297 HAMBURG, DE Effective date: 20140402 |
|
R082 | Change of representative |
Representative=s name: MEISSNER BOLTE PATENTANWAELTE RECHTSANWAELTE P, DE Effective date: 20140402 Representative=s name: MEISSNER BOLTE & PARTNER GBR, DE Effective date: 20140402 Representative=s name: PATENTANWAELTE SCHAEFER EMMEL HAUSFELD, DE Effective date: 20140402 |
|
R081 | Change of applicant/patentee |
Owner name: SENVION GMBH, DE Free format text: FORMER OWNER: SENVION SE, 22297 HAMBURG, DE |
|
R082 | Change of representative |
Representative=s name: MEISSNER BOLTE PATENTANWAELTE RECHTSANWAELTE P, DE Representative=s name: MEISSNER BOLTE & PARTNER GBR, DE Representative=s name: PATENTANWAELTE SCHAEFER EMMEL HAUSFELD, DE |
|
R082 | Change of representative |
Representative=s name: MEISSNER BOLTE PATENTANWAELTE RECHTSANWAELTE P, DE Representative=s name: MEISSNER BOLTE & PARTNER GBR, DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |