DE102020002933A1 - Device and method for creating a transition between a sanitary device and a building wall surface - Google Patents

Device and method for creating a transition between a sanitary device and a building wall surface Download PDF

Info

Publication number
DE102020002933A1
DE102020002933A1 DE102020002933.7A DE102020002933A DE102020002933A1 DE 102020002933 A1 DE102020002933 A1 DE 102020002933A1 DE 102020002933 A DE102020002933 A DE 102020002933A DE 102020002933 A1 DE102020002933 A1 DE 102020002933A1
Authority
DE
Germany
Prior art keywords
wall surface
corner
sealing
carrier material
connecting tape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102020002933.7A
Other languages
German (de)
Inventor
Ronald Schlageter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanitaerwerke De GmbH
Original Assignee
RIVAPLAN AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RIVAPLAN AG filed Critical RIVAPLAN AG
Priority to DE102020002933.7A priority Critical patent/DE102020002933A1/en
Priority to CH00242/21A priority patent/CH717414A2/en
Priority to ATA50/2021A priority patent/AT523898A3/en
Publication of DE102020002933A1 publication Critical patent/DE102020002933A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6815Expansion elements specially adapted for wall or ceiling parts
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47KSANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
    • A47K3/00Baths; Douches; Appurtenances therefor
    • A47K3/008Sealing between wall and bathtub or shower tray

Abstract

Vorrichtung (200) die zur Montage zwischen einer Sanitärvorrichtung (1) und einer Gebäudewandfläche ausgelegt ist, wobei die Sanitärvorrichtung (1) eine Vertikalfläche (1.1) umfasst, die ein Eck bildet, und wobei die Vorrichtung (200) umfasst:- ein Anschlussband, das so mit der Vertikalfläche (1.1) und der Wandfläche verbindbar ist, dass es im verbundenen Zustand einen wasserdichten Übergang zwischen der Sanitärvorrichtung (1) und der Wandfläche bildet,- eine Eckabschlussvorrichtung mit einem flächigen Trägermaterial (11) und einem Dicht-Klebe-Streifen, wobei die Eckabschlussvorrichtung (10) so mit dem Anschlussband und der Wandfläche verbindbar ist,◯ dass sie im Bereich des Ecks (1.3) der Sanitärvorrichtung (1) zwischen der Vertikalfläche (1.1) und der Wandfläche angeordnet ist,◯ dass sie einen Abschnitt des Anschlussbandes überlappt,◯ dass der Dicht-Klebe-Streifen eine Klebeverbindung mit dem Anschlussband bildet, und◯ dass ein Abschnitt des flächigen Trägermaterials (11) einen Flansch bildet, der zum Aufbringen einer Dichtmasse (20) ausgelegt ist.Device (200) which is designed for assembly between a sanitary device (1) and a building wall surface, wherein the sanitary device (1) comprises a vertical surface (1.1) which forms a corner, and wherein the device (200) comprises: - a connecting tape, which can be connected to the vertical surface (1.1) and the wall surface in such a way that, when connected, it forms a watertight transition between the sanitary device (1) and the wall surface, - a corner closure device with a flat carrier material (11) and a sealing adhesive strip , wherein the corner closure device (10) can be connected to the connecting tape and the wall surface, ◯ that it is arranged in the region of the corner (1.3) of the sanitary device (1) between the vertical surface (1.1) and the wall surface, ◯ that it is a section of the Connecting tape overlaps, ◯ that the sealing-adhesive strip forms an adhesive connection with the connecting tape, and ◯ that a section of the flat carrier material (11) forms a flange ch, which is designed for applying a sealing compound (20).

Description

Die Erfindung betrifft eine Vorrichtung und ein Verfahren zum Erstellen eines Übergangs zwischen einer Sanitärvorrichtung (z.B. einer Dusch- oder Badewanne) und einer Gebäudewandfläche.The invention relates to a device and a method for creating a transition between a sanitary device (e.g. a shower or bathtub) and a building wall surface.

Es kommt mittlerweile bei der Montage einer Sanitärvorrichtung, wie z.B. einer Dusch- oder Badewanne, häufig ein Anschlussband bzw. Wannenband zum Einsatz, das für einen dichten Übergang zwischen der Sanitärvorrichtung und einer Gebäudewandfläche sorgt. In 1 ist eine entsprechende Einbausituation anhand des Beispiels eines Duschwanne 1 gezeigt. Diese Duschwanne 1 wird hier in einer Ecke 4.3 montiert, die durch die Gebäudewandflächen 4.1 und 4.2 gebildet wird. Die Gebäudewandflächen sind hier allgemein mit dem Bezugszeichen 4 versehen. Die Duschwanne 1 kann eine Abmauerung oder Wannenverkleidung 5 aufweisen, wie gezeigt.In the meantime, when installing a sanitary device, such as a shower or bathtub, a connecting tape or tub tape is often used, which ensures a tight transition between the sanitary device and a building wall surface. In 1 is a corresponding installation situation based on the example of a shower tray 1 shown. This shower tray 1 is here in a corner 4.3 mounted by the building wall surfaces 4.1 and 4.2 is formed. The building wall surfaces are generally given the reference number here 4th Mistake. The shower tray 1 can be masonry or tub cladding 5 as shown.

In 2 ist ein Ausschnitt einer typischen Einbausituation gezeigt. In 2 kann man die Position des Anschlussbandes 6 erkennen, das sich entlang einer Zarge der Duschwanne 1 erstreckt. Das Anschlussband 6 endet typischerweise im Bereich des Ecks 1.3 der Sanitärvorrichtung 1. Hier kann Feuchtigkeit in die dahinter liegende Wand eindringen. Der entsprechende Bereich wird hier als kritischer Bereich kB bezeichnet und ist in 2 durch einen Kreis angedeutet.In 2 a section of a typical installation situation is shown. In 2 one can see the position of the connecting tape 6th recognize that is along a frame of the shower tray 1 extends. The connecting tape 6th typically ends in the area of the corner 1.3 the plumbing fixture 1 . Here moisture can penetrate the wall behind. The corresponding area is called the critical area here kB and is in 2 indicated by a circle.

Es geht nun darum eine Lösung bereit zu stellen, die es ermöglicht diesen kritischen Bereich kB sicher, zuverlässig und dauerhaft abzudichten.The task now is to provide a solution that enables this critical area kB to seal safely, reliably and permanently.

Diese Aufgabe wird durch eine Vorrichtung gemäß Anspruch 1 und durch ein Verfahren gemäß Anspruch 8 gelöst. Vorteilhafte Ausgestaltungen sind in den jeweiligen Unteransprüchen enthalten.This object is achieved by a device according to claim 1 and by a method according to claim 8. Advantageous refinements are contained in the respective subclaims.

Die Vorrichtung der Erfindung ist speziell zur Montage zwischen einer Sanitärvorrichtung und einer Gebäudewandfläche ausgelegt, wobei die Sanitärvorrichtung eine Vertikalfläche (z.B. in Form einer Wannenzarge) umfasst, die ein Eck bildet, und wobei die Vorrichtung umfasst:

  • - ein Anschlussband, das so mit der Vertikalflächc und der Wandfläche verbindbar ist, dass es im verbundenen Zustand einen wasserdichten Übergang zwischen der Sanitärvorrichtung und der Wandfläche bildet,
  • - eine Eckabschlussvorrichtung mit einem flächigen Trägermaterial und einem Dicht-Klebe-Streifen, wobei die Eckabschlussvorrichtung so mit dem Anschlussband und der Wandfläche verbindbar ist,
    • ◯ dass sie im Bereich des Ecks der Sanitärvorrichtung zwischen der Vertikalfläche und der Wandfläche angeordnet ist,
    • ◯ dass sie einen Abschnitt des Anschlussbandes überlappt,
    • ◯ dass der Dicht-Klebe-Streifen eine Klebeverbindung mit dem Anschlussband bildet, und
    • ◯ dass ein Abschnitt des flächigen Trägermaterials einen Flansch bildet, der zum Aufbringen einer Dichtmasse ausgelegt ist.
The device of the invention is specially designed for assembly between a sanitary device and a building wall surface, the sanitary device comprising a vertical surface (e.g. in the form of a tub frame) which forms a corner, and wherein the device comprises:
  • - A connecting tape that can be connected to the vertical surface and the wall surface in such a way that, when connected, it forms a watertight transition between the sanitary device and the wall surface,
  • - a corner closure device with a flat carrier material and a sealing-adhesive strip, the corner closure device being connectable to the connecting tape and the wall surface,
    • ◯ that it is arranged in the area of the corner of the sanitary device between the vertical surface and the wall surface,
    • ◯ that it overlaps a section of the connecting tape,
    • ◯ that the sealing-adhesive strip forms an adhesive connection with the connecting tape, and
    • ◯ that a section of the flat carrier material forms a flange which is designed for applying a sealant.

Das Verfahren der Erfindung ist zum Erstellen eines wasserdichten Übergangs zwischen einer Vertikalfläche einer Sanitärvorrichtung und einer Gebäudewandfläche ausgelegt, wobei die Vertikalfläche der Sanitärvorrichtung ein Eck bildet. Das Verfahren der Erfindung umfasst die folgenden Schritte, die vor der Montage der Sanitärvorrichtung vor der Gebäudewandfläche ausgeführt werden:

  • - Bereitstellen einer Länge eines Anschlussbandes,
  • - Ankleben des Anschlussbandes entlang der Vertikalfläche, so, dass dieses im Bereich des Ecks endet,
dadurch gekennzeichnet, dass zusätzlich die folgenden Schritte ausgeführt werden:
  • - Bereitstellen einer Eckabschlussvorrichtung mit einem flächigen Trägermaterial und einem Dicht-Klebe-Streifen,
  • - Ankleben der Eckabschlussvorrichtung mittels des Dicht-Klebe-Streifens im Bereich des Ecks, so, dass sich die Eckabschlussvorrichtung zwischen der Vertikalfläche und der Gebäudewandfläche befindet,
  • - Positionieren der Sanitärvorrichtung entlang der Gebäudewandfläche, so, dass sich die Vertikalfläche parallel zu der Gebäudewandfläche erstreckt und dass sich das Anschlussband und die Eckabschlussvorrichtung zwischen der Vertikalfläche und der Gebäudewandfläche befinden,
  • - Aufbringen einer Dichtmasse auf das Anschlussband, die Eckabschlussvorrichtung und mindestens einen Bereich der Gebäudewandfläche, um die Gebäudewandfläche gegen eine spätere Wassereinwirkung zu schützen.
The method of the invention is designed for creating a watertight transition between a vertical surface of a sanitary device and a building wall surface, the vertical surface of the sanitary device forming a corner. The method of the invention comprises the following steps, which are carried out prior to the assembly of the sanitary device in front of the building wall surface:
  • - Provision of a length of a connecting tape,
  • - Gluing the connection tape along the vertical surface so that it ends in the area of the corner,
characterized in that the following steps are also carried out:
  • - Provision of a corner closure device with a flat carrier material and a sealing adhesive strip,
  • - Gluing the corner closure device by means of the sealing-adhesive strip in the area of the corner so that the corner closure device is between the vertical surface and the building wall surface,
  • - Positioning the sanitary device along the building wall surface so that the vertical surface extends parallel to the building wall surface and that the connecting tape and the corner termination device are located between the vertical surface and the building wall surface,
  • - Applying a sealing compound to the connecting tape, the corner closure device and at least one area of the building wall surface in order to protect the building wall surface against the later action of water.

Bei allen Ausführungsformen kann eines der folgenden Materialien als Trägermaterial der Eckabschlussvorrichtung zum Einsatz kommen. Es sind auch Kombinationen der genannten Materialien (z.B. als mehrlagiges Trägermaterials) möglich:

  • - Vlies,
  • - Gewirk,
  • - Gewebe,
  • - Gelege,
  • - Fasermatte,
  • - Folie.
In all embodiments, one of the following materials can be used as the carrier material for the corner closure device. Combinations of the mentioned materials (e.g. as multi-layer carrier material) are also possible:
  • - Fleece,
  • - knitted fabric,
  • - tissue,
  • - clutch,
  • - fiber mat,
  • - Foil.

Bei allen Ausführungsformen kann z.B. ein Butyl-Klebstoff als Materialien des Dicht-Klebe-Streifens zum Einsatz kommen. Es sind auch Kombinationen mehrerer Materialien (z.B. als Materialmischung) möglich. Anstatt eines Butyl-Klebstoffs kann bei allen Ausführungsformen auch ein Heißklebestoff, Acrylatklebstoff, Acrylatschaum oder MS- Polymerklebstoff verwendet werden.In all embodiments, a butyl adhesive, for example, can be used as the material for the sealing adhesive strip. Combinations of several materials (e.g. as a mixture of materials) are also possible. Instead of a butyl adhesive, a hot-melt adhesive, acrylate adhesive, acrylate foam or MS polymer adhesive can also be used in all embodiments.

Bei allen Ausführungsformen kann der Dicht-Klebe-Streifen auch getrennt vom Trägermaterial geliefert und in einer geeigneten Position am Trägermaterial befestigt werden.In all embodiments, the adhesive sealing strip can also be supplied separately from the carrier material and attached to the carrier material in a suitable position.

Bei allen Ausführungsformen kann eine Dichtschlämme, Flüssigabdichtung, Fliesenmörtel, Fliesenkleber, als Dichtmasse zum Einsatz kommen.In all embodiments, a sealing slurry, liquid sealant, tile mortar, tile adhesive can be used as a sealing compound.

Bei allen Ausführungsformen kann die Eckabschlussvorrichtung zum beidseitigen Einbetten in Dichtmasse ausgelegt sein. Sie kann aber auch bei allen Ausführungsformen auf der Rückseite des Trägermaterials mit einer (möglichst vollflächigen) Klebeschicht versehen sein, um diese auf eine Abdichtung der Wandfläche aufkleben zu können.In all embodiments, the corner closure device can be designed for embedding in sealant on both sides. In all embodiments, however, it can also be provided with an adhesive layer (covering the entire surface as far as possible) on the back of the carrier material in order to be able to glue this onto a seal on the wall surface.

Die Erfindung lässt sich auch auf andere Einbausituationen anwenden, bei denen z.B. eine Badewanne oder Duschwanne parallel zu einer Wandfläche montiert wird.The invention can also be applied to other installation situations in which, for example, a bathtub or shower tray is mounted parallel to a wall surface.

Weitere Einzelheiten und Vorteile der Erfindung werden im Folgenden anhand von Ausführungsbeispielen und mit Bezug auf die Zeichnung beschrieben. Es ist zu beachten, dass die Zeichnungen nicht massstäblich sind. Vor allem die Dicken der verschiedenen Elemente sind nicht im wirklichen Verhältnis zueinander gezeigt.

  • 1 zeigt eine schematische Perspektivansicht einer typischen Einbausituation;
  • 2 zeigt eine schematische Perspektivansicht des Eckbereichs einer typischen Einbausituation;
  • 3A zeigt eine schematische Perspektivansicht einer ersten Ausführungsform in Explosionsdarstellung, wobei nur der Eckbereich gezeigt ist;
  • 3B zeigt eine schematische Perspektivansicht der Ausführungsform der 3A nachdem das Anschlussband und die Eckabschlussvorrichtung montiert wurden;
  • 3C zeigt eine schematische Perspektivansicht der Ausführungsform der 3A nachdem das Anschlussband und die Eckabschlussvorrichtung zum Teil mit einer Dichtmasse überzogen wurden;
  • 4 zeigt eine schematische Frontansicht einer weiteren Ausführungsform eines Anschlussbandes und der Eckabschlussvorrichtung;
  • 5 zeigt eine schematische Perspektivansicht einer weiteren Ausführungsform nachdem das Anschlussband und die Eckabschlussvorrichtung montiert wurden.
Further details and advantages of the invention are described below using exemplary embodiments and with reference to the drawing. Please note that the drawings are not to scale. In particular, the thicknesses of the various elements are not shown in real relation to one another.
  • 1 shows a schematic perspective view of a typical installation situation;
  • 2 shows a schematic perspective view of the corner area of a typical installation situation;
  • 3A shows a schematic perspective view of a first embodiment in an exploded view, only the corner area being shown;
  • 3B FIG. 11 shows a schematic perspective view of the embodiment of FIG 3A after the connecting tape and the corner finishing device have been installed;
  • 3C FIG. 11 shows a schematic perspective view of the embodiment of FIG 3A after the connection tape and the corner termination device have been partially coated with a sealing compound;
  • 4th shows a schematic front view of a further embodiment of a connecting tape and the corner termination device;
  • 5 shows a schematic perspective view of a further embodiment after the connection tape and the corner termination device have been installed.

Im Folgenden werden Orts- und Richtungsangaben verwendet, um die Erfindung besser beschreiben zu können. Diese Angaben beziehen sich auf die jeweilige Einbausituation und sollen daher nicht als Einschränkung verstanden werden. Um die Orts- und Richtungsangaben besser eingrenzen zu können, wird teilweise auch ein Bezug zur Wand (auch Vertikalfläche genannt) hergestellt, in dem z.B. von einem wandnahen Element, einer wandzugewandten, wandabgewandten Fläche oder einer wandparallelen Montage die Rede ist.In the following, information on location and direction are used in order to be able to describe the invention better. This information relates to the respective installation situation and should therefore not be understood as a restriction. In order to better limit the location and direction information, a reference to the wall (also known as a vertical surface) is sometimes made, in which, for example, an element close to the wall, a surface facing or facing away from the wall or an assembly parallel to the wall is mentioned.

Die Erfindung wird im Folgenden anhand einiger Ausführungsbeispiele beschrieben.The invention is described below with the aid of a few exemplary embodiments.

Es geht um Vorrichtung 200, die zur Montage zwischen einer Sanitärvorrichtung 1 und einer gebäudeseitigen Wandfläche 4 ausgelegt ist. In den 3A bis 3C ist eine erste Ausführungsform der Vorrichtung 200 bei der Montage an einer wasserführenden oder wasserableitenden Sanitärvorrichtung 1 (hier in Form einer Duschwanne 1) gezeigt. 3A zeigt eine schematische Explosionsansicht und 3B zeigt einen Zwischenschritt der Montage. 3C zeigt einen weiteren Zwischenschritt der Montage.It's about device 200 intended for mounting between a plumbing fixture 1 and a wall surface on the building side 4th is designed. In the 3A until 3C is a first embodiment of the device 200 when mounting on a water-bearing or water-draining sanitary device 1 (here in the form of a shower tray 1 ) shown. 3A shows a schematic exploded view and 3B shows an intermediate step in assembly. 3C shows a further intermediate step in the assembly.

Die Sanitärvorrichtung 1 umfasst eine Vertikalfläche 1.1, die ein Eck 1.3 bildet (cf. 3A). Im gezeigten Beispiel ist die Vertikalfläche 1.1 Teil einer Wannenzarge. Diese Wannenzarge wird hier im Wesentlichen durch die umlaufenden Vertikalfläche 1.1 und durch die nach oben weisende Horizontalfläche 1.2 gebildet. Die umlaufenden Vertikalfläche 1.1 bildet hier vier Ecken aus, von denen eine Ecke mit dem Bezugszeichen 1.3 bezeichnet ist.The plumbing fixture 1 includes a vertical surface 1.1 who have favourited a corner 1.3 forms (cf. 3A ). In the example shown is the vertical surface 1.1 Part of a tub frame. This tub frame is here essentially through the circumferential vertical surface 1.1 and by the horizontal surface pointing upwards 1.2 educated. The circumferential vertical surface 1.1 here forms four corners, one of which is marked with the reference number 1.3 is designated.

Die Vorrichtung 200 umfasst ein Anschlussband 6 (z.B. ein Wannenband), das auf seiner wandabgewandten Seite einen Dicht-Klebe-Streifen 6.1 umfassen kann. Auf der Wandseite kann das Anschlussband 6 einen weiteren Dicht-Klebe-Streifen (nicht gezeigt) umfassen, oder ein oberer streifenförmiger Bereich des Anschlussbandes 6 kann zum Einbetten in eine Dichtmasse 20 (z.B. eine Dichtschlämme) ausgelegt sein. Es gibt zahlreiche unterschiedliche Bauformen des Anschlussbandes 6. Letztendlich kommt es nicht auf Details des Anschlussbandes 6 an. Es ist hier lediglich von Bedeutung, dass das Anschlussband 6 so mit der Vertikalfläche 1.1 und der Wandfläche 4 verbindbar ist, dass es im verbundenen Zustand einen wasserdichten Übergang zwischen der Sanitärvorrichtung 1 und der Wandfläche 4 bildet.The device 200 includes a connecting tape 6th (e.g. a tub tape) that has a sealing adhesive strip on its side facing away from the wall 6.1 may include. The connection tape can be on the wall side 6th comprise a further sealing-adhesive strip (not shown), or an upper strip-shaped area of the connecting tape 6th can to Embed in a sealant 20th (e.g. a sealing slurry). There are numerous different types of connection tape 6th . Ultimately, it does not come down to the details of the connecting tape 6th at. It is only important here that the connecting tape 6th so with the vertical plane 1.1 and the wall surface 4th it can be connected that in the connected state there is a watertight transition between the sanitary device 1 and the wall surface 4th forms.

Gemäß Erfindung kommt eine Eckabschlussvorrichtung 10 zum Einsatz, die ein flächiges Trägermaterial 11 (z.B. ein Vlies) und einen Dicht-Klebe-Streifen 12 umfasst. Die Eckabschlussvorrichtung 10 ist bei allen Ausführungsformen so ausgelegt, dass sie mit dem Anschlussband 6 und der Wandfläche 4 verbindbar ist, und

  • - dass sie im Bereich des Ecks 1.3 der Sanitärvorrichtung 1 zwischen der Vertikalfläche 1.1 und der Wandfläche 4 angeordnet ist,
  • - dass sie einen Abschnitt des Anschlussbandes 6 überlappt (d.h. die Eckabschlussvorrichtung 10 sitzt entweder hinter oder vor dem Anschlussband 6),
  • - dass der Dicht-Klebe-Streifen 12 eine Klebeverbindung mit dem Anschlussband 6 bildet, und
  • - dass ein Abschnitt des flächigen Trägermaterials 11 einen Flansch 13 (siehe 3B) bildet, der zum Einbetten in eine Dichtmasse ausgelegt ist.
According to the invention comes a corner closure device 10 used, which is a flat carrier material 11th (e.g. a fleece) and a sealing adhesive strip 12th includes. The corner finishing device 10 is designed in all embodiments so that it connects to the connecting tape 6th and the wall surface 4th is connectable, and
  • - that they are in the area of the corner 1.3 the plumbing fixture 1 between the vertical surface 1.1 and the wall surface 4th is arranged
  • - that they are a section of the connecting tape 6th overlaps (i.e. the corner finishing device 10 sits either behind or in front of the connecting tape 6th ),
  • - that the sealing adhesive strip 12th an adhesive bond with the connecting tape 6th forms, and
  • - That a section of the flat carrier material 11th a flange 13th (please refer 3B ), which is designed for embedding in a sealant.

3C zeigt einen Zwischenschritt der Montage. Es wurde, wie angedeutet, bereits ein Bereich des Anschlussbandes 6 und der Eckabschlussvorrichtung 10 mit der Dichtmasse 20 (z.B. eine Dichtschlämme) überzogen. Das Aufbringen der Dichtmasse 20 kann mit einem (Zahn-)Spachtel 30 erfolgen, wie in 3C angedeutet. 3C shows an intermediate step in assembly. As indicated, an area of the connecting tape has already been formed 6th and the corner finishing device 10 with the sealant 20th (e.g. a sealing slurry) coated. The application of the sealant 20th can be done with a (notched) spatula 30, as in 3C indicated.

Die Vorrichtung 200 umfasst, wie bereits erwähnt, ein Anschlussband 6 (z.B. ein Wannenband) und eine Eckabschlussvorrichtung 10. 4 zeigt das Anschlussband 6 und die Eckabschlussvorrichtung 10 in einer weiteren beispielhaften Ausführungsform. Beide Elemente 6 und 10 sind massstäblich nebeneinander dargestellt, um die relativen Proportionen besser zeigen und beschreiben zu können.The device 200 comprises, as already mentioned, a connecting tape 6th (e.g. a tub band) and a corner closure device 10 . 4th shows the connecting tape 6th and the corner finishing device 10 in a further exemplary embodiment. Both elements 6th and 10 are shown side by side to scale in order to better show and describe the relative proportions.

Das Anschlussband 6 kann bei allen Ausführungsformen auf der Vorderseite (d.h. auf der wandabgewandten Seite) einen Dicht-Klebe-Streifen 6.1 aufweisen, der sich typischerweise entlang der unteren Längskante des Anschlussbandes 6 erstreckt, wie in 4 gezeigt. Die Dimensionen des Anschlussbandes 6 sind durch die Höhe c und die (Streifen-)Länge L definiert. 4 zeigt nur einen kurzen Längenabschnitt.The connecting tape 6th can in all embodiments on the front side (ie on the side facing away from the wall) a sealing adhesive strip 6.1 have, which is typically along the lower longitudinal edge of the connecting tape 6th extends, as in 4th shown. The dimensions of the connecting tape 6th are by the height c and the (strip) length L defines. 4th shows only a short section of length.

Die Eckabschlussvorrichtung 10 kann bei allen Ausführungsformen auf der Vorderseite (d.h. auf der wandabgewandten Seite) einen Dicht-Klebe-Streifen 12 aufweisen, der sich typischerweise horizontal erstreckt. Bei der gezeigten Ausführungsform sind die Dimensionen des Dicht-Klebe-Streifens 12 durch die Höhe a2 und die Länge b2 definiert.The corner finishing device 10 can in all embodiments on the front side (ie on the side facing away from the wall) a sealing adhesive strip 12th which typically extends horizontally. In the embodiment shown, the dimensions of the sealing-adhesive strip are 12th through the height a2 and the length b2 Are defined.

Die Eckabschlussvorrichtung 10 kann bei allen Ausführungsformen eine rechteckige Grundform aufweisen, wobei die Dimensionen des Trägermaterials 11 durch die Höhe a und die Länge b definiert sind.The corner finishing device 10 can have a rectangular basic shape in all embodiments, the dimensions of the carrier material 11th through the height a and the length b are defined.

Das Trägermaterial 11 kann bei allen Ausführungsformen einen horizontalen Schnitt oder eine horizontale Perforierung 14 aufweisen, wie in 4 beispielhaft angedeutet. Dieser Schnitt, bzw. diese Perforierung 14 ermöglichen das Herausklappen eines zweiten Flansches 13.1 aus der Wandebene heraus (siehe auch 5).The carrier material 11th can be a horizontal cut or a horizontal perforation in all embodiments 14th exhibit, as in 4th indicated by way of example. This cut or this perforation 14th allow a second flange to be folded out 13.1 out of the wall plane (see also 5 ).

Vorzugsweise ist die Eckabschlussvorrichtung 10 bei allen Ausführungsformen durch eines oder durch mehrere der folgenden Merkmale charakterisiert (siehe auch 4):

  1. a) das flächige Trägermaterial 11 (z.B. ein Vlies) hat eine Rechteckform, die durch die Kanten a und b definiert ist.
  2. b) das Anschlussband 6 hat eine Höhe c, die kleiner ist als die Höhe a des Trägermaterials 11, d.h. a > c.
  3. c) das Anschlussband 6 hat eine Länge L, die durch die Seitenlänge der wasserführenden oder wasserableitenden Sanitärvorrichtung 1 definiert ist;
  4. d) a ist größer oder kleiner gleich b.
  5. e) L ist größer als b.
  6. f) der Dicht-Klebe-Streifen 12 kann mittig oder aussermittig in Bezug auf die Höhe a am Trägermaterial 11 angebracht sein (4 zeigt beispielhaft eine aussermittige Position).
  7. g) das Trägermaterial 11 hat einen vertikalen Kantenabstand a1 zwischen seiner Unterkante 11.1 und der Unterkante des Dicht-Klebe-Streifens 12 (cf. 4). Der Kantenabstand a1 ist bei allen Ausführungsformen kleiner gleich der Höhe der Abmauerung oder Wannenverkleidung 5.
  8. h) das Trägermaterial 11 hat einen horizontalen Kantenabstand b1 zwischen seiner rechten Seitenkante 11.2 und der rechten Kante des Dicht-Klebe-Streifens 12 (cf. 4). Der Kantenabstand b1 definiert zusammen mit dem Kantenabstand a1 bei allen Ausführungsforinen die Größe des Flansches 13.
  9. i) das Trägermaterial 11 kann bei allen Ausführungsformen einen horizontalen Schnitt oder eine horizontale Perforierung 14 aufweisen. In 4 ist ein solcher Schnitt oder eine solche Perforierung 14 durch einen Doppelstrich angedeutet, der unterhalb des Dicht-Klebe-Streifens 12 verläuft.
  10. j) Die Länge des Schnitts oder der Perforierung 14 ist vorzugsweise kürzer als die Kantenlänge b.
  11. k) Falls das Trägermaterial 11 keinen Schnitt oder keine Perforierung 14 aufweist, so kann es bei allen Ausführungsformen eine horizontal verlaufende Markierung oder ein Raster aufweisen, um das manuelle Einschneiden des Trägermaterials 11 zu vereinfachen.
  12. l) das flächige Trägermaterial 11 ist vorzugsweise beidseitig so beschichtet oder strukturiert, dass es in eine Dichtmasse (z.B. eine Dichtschlämme) eingebettet werden kann.
Preferably the corner closure device is 10 characterized in all embodiments by one or more of the following features (see also 4th ):
  1. a) the flat carrier material 11th (e.g. a fleece) has a rectangular shape, which is due to the edges a and b is defined.
  2. b) the connecting tape 6th has a height c that is smaller than the height a of the carrier material 11th , ie a> c.
  3. c) the connecting tape 6th has a length L. by the length of the side of the water-bearing or water-draining sanitary device 1 is defined;
  4. d) a is greater than or less than or equal to b.
  5. e) L is greater than b.
  6. f) the sealing adhesive strip 12th can be central or eccentric in terms of height a on the carrier material 11th to be appropriate ( 4th shows an example of an eccentric position).
  7. g) the carrier material 11th has a vertical edge distance a1 between its lower edge 11.1 and the lower edge of the sealing adhesive strip 12th (cf. 4th ). The edge distance a1 is less than or equal to the height of the masonry or tub cladding in all embodiments 5 .
  8. h) the carrier material 11th has a horizontal edge distance b1 between its right side edge 11.2 and the right edge of the sealing adhesive strip 12th (cf. 4th ). The edge distance b1 defined together with the edge distance a1 the size of the flange for all execution forms 13th .
  9. i) the carrier material 11th can be a horizontal cut or a horizontal perforation in all embodiments 14th exhibit. In 4th is such a cut or such a perforation 14th indicated by a double line, the one below the sealing adhesive strip 12th runs.
  10. j) The length of the cut or perforation 14th is preferably shorter than the edge length b .
  11. k) If the carrier material 11th no cut or perforation 14th has, it can have a horizontally running marking or a grid in all embodiments in order to manually cut into the carrier material 11th to simplify.
  12. l) the flat carrier material 11th is preferably coated or structured on both sides in such a way that it can be embedded in a sealing compound (e.g. a sealing slurry).

Vorzugsweise umfasst das Verfahren zum Erstellen eines wasserdichten Übergangs zwischen einer Vertikalfläche 1.1 einer Sanitärvorrichtung 1 und einer Gebäudewandfläche 4 die folgenden Schritte. Es wird davon ausgegangen, dass wobei die Sanitärvorrichtung 1 mindestens eine Vertikalfläche 1.1 aufweist. Wie in den Figuren zu erkennen ist, handelt es sich häufig um eine umlaufende Vertikalfläche 1.1, die ein Eck 1.3 (oder im Beispiel einer Dusch- oder Badewanne vier Ecken) bildet. Die folgenden Schritte werden vor der Montage der Sanitärvorrichtung 1 vor der Gebäudewandfläche 4 (um genau zu sein parallel zur dieser) ausgeführt (die genannten Schritte müssen nicht zwingend in der beschriebenen Reihenfolge ausgeführt werden, die Kleinbuchstaben werden hier nur verwendet, um besser auf die einzelnen Schritte Bezug nehmen zu können:

  1. a. Bereitstellen einer Länge L eines Anschlussbandes 6. Wenn die Duschwanne z.B. eine Kantenlänge vom 100cm hat, dann wird z.B. eine Länge L=100cm gewählt. Wenn die Duschwanne z.B. in einer Raumecke montiert werden soll (wie in 1 gezeigt), dann wird das Anschlussband 6 typischerweise ums Eck herum angebracht. In diesem Fall beträgt die Länge L=2 x 100cm.
  2. b. Ankleben des Anschlussbandes 6 entlang der Vertikalfläche 1.1, so, dass dieses im Bereich des Ecks 1.3 endet (wie in 2 gezeigt).
The method preferably comprises creating a watertight transition between a vertical surface 1.1 a plumbing fixture 1 and a building wall surface 4th the following steps. It is assumed that the plumbing fixture 1 at least one vertical surface 1.1 having. As can be seen in the figures, it is often a circumferential vertical surface 1.1 who have favourited a corner 1.3 (or four corners in the example of a shower or bathtub). The following steps are prior to assembling the plumbing fixture 1 in front of the building wall surface 4th (to be precise, parallel to this) (the steps mentioned do not necessarily have to be carried out in the order described, the lower case letters are only used here to better refer to the individual steps:
  1. a. Providing a length L. a connecting tape 6th . If the shower tray has an edge length of 100cm, for example, then it becomes a length L. = 100cm chosen. If the shower tray is to be installed in a corner of the room, for example (as in 1 shown), then the connecting tape 6th typically attached around the corner. In this case the length is L. = 2 x 100cm.
  2. b. Gluing the connection tape 6th along the vertical plane 1.1 so that this is in the area of the corner 1.3 ends (as in 2 shown).

Das Verfahren der Erfindung zeichnet sich insbesondere dadurch aus, dass zusätzlich die folgenden Schritte ausgeführt werden:

  • c. Bereitstellen einer Eckabschlussvorrichtung 10 mit einem flächigen Trägermaterial 11 und einem Dicht-Klebe-Streifen 12. Falls der Dicht-Klebe-Streifen 12 durch eine (peel-off- oder Liner-) Folie geschützt ist, so wird diese Folie abgezogen.
  • d. Ankleben der Eckabschlussvorrichtung 10 mittels des Dicht-Klebe-Streifens 12 im Bereich des Ecks 1.3, so, dass sich die Eckabschlussvorrichtung 10 zwischen der Vertikalfläche 1.1 und der Gebäudewandfläche 4 befindet. Hier werden zwei Möglichkeiten unterschieden. Entweder wird die Eckabschlussvorrichtung 10 zwischen dem Anschlussband 6 und der Gebäudewandfläche 4 positioniert, oder die Eckabschlussvorrichtung 10 wird zwischen der Vertikalfläche 1.1 und dem Anschlussband 6 positioniert. In den 3B, 3C und 5 ist die erste Möglichkeit dargestellt, da diese bevorzugt wird.
  • e. Positionieren der Sanitärvorrichtung 1 entlang der Gebäudewandfläche 4 (oder im Raumeck, cf. 1), so, dass sich die Vertikalfläche 1.1 parallel zu der Gebäudewandfläche 4 erstreckt und dass sich das Anschlussband 6 und die Eckabschlussvorrichtung 10 zwischen der Vertikalfläche 1.1 und der Gebäudewandfläche 4 befinden. Dabei ist darauf zu achten, dass das Anschlussband 6 und die Eckabschlussvorrichtung 10 (respektive das Trägermaterial 11) im Wesentlichen wandparallel verlaufen. Falls ein Anschlussband 6 mit wandseitigem Klebemittel zum Einsatz kommt, so kann das Anschlussband 6 mit diesem an der Gebäudewandfläche 4 fixiert werden.
  • f. Aufbringen einer Dichtmasse 20 auf das Anschlussband 6, die Eckabschlussvorrichtung 10 und mindestens einen Bereich der Gebäudewandfläche 4, um die Gebäudewandfläche 4 gegen eine spätere Wassereinwirkung zu schützen. In 5 ist ein Beispiel während des Auftragens der Dichtmasse 20 mit einem (Zahn-)Spachtel 30 gezeigt. Optional kann auch die Abmauerung, respektive die Wannenverkleidung 5 mit Dichtmasse 20 überzogen werden. Bei Ausführungsformen (wie in 5 gezeigt), die einen 2. Flansch 13.1 (auch Seitenflansch genannt) aufweisen, wird dieser 2. Flansch 13.1 in die Dichtmasse 20 der Abmauerung, respektive der Wannenverkleidung 5 eingebacht (vorzugsweise beidseitig eingebettet).
The method of the invention is particularly characterized in that the following steps are also carried out:
  • c. Providing a corner finishing device 10 with a flat carrier material 11th and a sealing adhesive strip 12th . In case of the sealing-adhesive-strip 12th is protected by a (peel-off or liner) film, this film is peeled off.
  • d. Gluing the corner finishing device 10 by means of the sealing adhesive strip 12th in the area of the corner 1.3 so that the corner finishing device 10 between the vertical surface 1.1 and the building wall area 4th is located. A distinction is made here between two options. Either the corner finishing device becomes 10 between the connecting tape 6th and the building wall area 4th positioned, or the corner finishing device 10 is between the vertical surface 1.1 and the connecting tape 6th positioned. In the 3B , 3C and 5 the first option is shown, as this is preferred.
  • e. Positioning the plumbing fixture 1 along the building wall surface 4th (or in the corner of the room, cf. 1 ) so that the vertical surface 1.1 parallel to the building wall surface 4th extends and that the connecting tape extends 6th and the corner finishing device 10 between the vertical surface 1.1 and the building wall area 4th are located. It is important to ensure that the connecting tape 6th and the corner finishing device 10 (or the carrier material 11th ) run essentially parallel to the wall. If a connecting tape 6th with adhesive on the wall is used, the connecting tape 6th with this on the building wall surface 4th be fixed.
  • f. applying a sealant 20th on the connecting tape 6th , the corner finishing device 10 and at least a portion of the building wall surface 4th to the building wall surface 4th to protect against later exposure to water. In 5 is an example during the application of the sealant 20th with a (notched) spatula 30 shown. The masonry or the tub cladding can also be used as an option 5 with sealant 20th be coated. In embodiments (as in 5 shown), which have a 2nd flange 13.1 (also called side flange), this 2nd flange 13.1 into the sealant 20th the masonry or the tub cladding 5 embedded (preferably embedded on both sides).

Optional kann bei allen Ausführungsformen vor oder während des Anklebens der Eckabschlussvorrichtung 10 (Schritt d.) ein Schnitt 14 parallel zu dem Dicht-Klebe-Streifen 12 erstellt werden (z.B. mit einer Schere), um so einen 2. Flansch 13.1 (Seitenflansch) zu definieren, wie in 4 gezeigt.Optionally, in all embodiments, before or during the gluing of the corner closure device 10 (Step d.) A cut 14th parallel to the sealing adhesive strip 12th created (e.g. with scissors) to create a 2nd flange 13.1 (Side flange) as in 4th shown.

Optional kann bei allen Ausführungsformen vor oder während des Anklebens der Eckabschlussvorrichtung 10 das Trägermaterial 11 ein Stück weit entlang einer vorbestehenden Perforierung 14 aufgerissen werden, um so einen 2. Flansch 13.1 (Seitenflansch) zu definieren.Optionally, in all embodiments, before or during the gluing of the corner closure device 10 the carrier material 11th a little way along a pre-existing perforation 14th be torn open to make a 2nd flange 13.1 (Side flange) to be defined.

Optional kann bei allen Ausführungsformen beim Aufbringen der Dichtmasse 20 (Schritt f.) sowohl Dichtmasse 20 auf der Wandseite des Trägermaterials 11 und/oder auf die Gebäudewandfläche 4, als auch auf einer wandabgewandten Seite des Trägermaterials 11 aufgebracht werden, um die Eckabschlussvorrichtung 10 somit beidseitig in die Dichtmasse 20 einbetten zu können.Optionally, in all embodiments when applying the sealant 20th (Step f.) Both sealant 20th on the wall side of the carrier material 11th and / or on the building wall surface 4th , as well as on a side of the carrier material facing away from the wall 11th applied to the corner finishing device 10 thus into the sealant on both sides 20th to be able to embed.

BezugszeichenReference number

11
Gegenstand, (Sanitär-)Vorrichtung (z.B. Bade- oder Duschwanne) / wasserführende oder wasserableitende SanitärvorrichtungObject, (sanitary) device (e.g. bath or shower tray) / water-bearing or water-draining sanitary device
1.11.1
(Vertikal-)Fläche / Seitenfläche der Zarge(Vertical) surface / side surface of the frame
1.21.2
(Horizontal-)Fläche / Oberseite der Zarge(Horizontal) surface / top of the frame
1.31.3
EckCorner
44th
Wandabschnitt / Wand / gebäudeseitige Wandfläche / GebäudewandflächeWall section / wall / building-side wall area / building wall area
4.14.1
erster Wandabschnitt / erste Wand / erste gebäudeseitige Wandfläche / erste Gebäudewandflächefirst wall section / first wall / first building-side wall surface / first building wall surface
4.24.2
zweiter Wandabschnitt / zweite Wand / zweite gebäudeseitige Wandfläche / zweite Gebäudewandflächesecond wall section / second wall / second building-side wall surface / second building wall surface
4.34.3
Eckecorner
55
Abmauerung / WannenverkleidungMasonry / tub cladding
66th
Anschlussband / WannenbandConnection tape / tub tape
6.16.1
Dicht-Klebe-StreifenSealing adhesive strips
1010
EckabschlussvorrichtungCorner closure device
1111th
TrägermaterialCarrier material
11.111.1
UnterkanteLower edge
11.211.2
rechte Seitenkanteright side edge
1212th
Dicht-Klebe-StreifenSealing adhesive strips
1313th
(Haupt-)Flansch(Main) flange
13.113.1
2. Flansch / Seitenflansch2. Flange / side flange
1414th
Schnitt / PerforierungCut / perforation
2020th
Dichtmasse / DichtschlämmeSealant / sealing slurry
3030th
(Zahn-)Spachtel(Notched) spatula
100100
Vorrichtungcontraption
200200
Vorrichtungcontraption
aa
Höhe des TrägermaterialsHeight of the carrier material
a1a1
Vertikalabstand des Dicht-Klebe-Streifens zur unteren LängskanteVertical distance of the sealing-adhesive strip to the lower longitudinal edge
a2a2
Höhe des Dicht-Klebe-StreifensHeight of the sealing-adhesive strip
bb
Länge des TrägermaterialsLength of the carrier material
b1b1
Horizontalabstand des Dicht-Klebe-Streifens zur rechten VertikalkanteHorizontal distance of the sealing-adhesive strip to the right vertical edge
b2b2
Länge des Dicht-Klebe-StreifensLength of the sealing adhesive strip
cc
Höhe des AnschlussbandesHeight of the connecting tape
kBkB
kritischer (Übergangs-)Bereichcritical (transition) area
LL.
StreifenlängeStrip length

Claims (12)

Vorrichtung (200) die zur Montage zwischen einer Sanitärvorrichtung (1) und einer Gebäudewandfläche (4) ausgelegt ist, wobei die Sanitärvorrichtung (1) eine Vertikalfläche (1.1) umfasst, die ein Eck (1.3) bildet, und wobei die Vorrichtung (200) umfasst: - ein Anschlussband (6), das so mit der Vertikalfläche (1.1) und der Wandfläche (4) verbindbar ist, dass es im verbundenen Zustand einen wasserdichten Übergang zwischen der Sanitärvorrichtung (1) und der Wandfläche (4) bildet, - eine Eckabschlussvorrichtung (10) mit einem flächigen Trägermaterial (11) und einem Dicht-Klebe-Streifen (12), wobei die Eckabschlussvorrichtung (10) so mit dem Anschlussband (6) und der Wandfläche (4) verbindbar ist, ◯ dass sie im Bereich des Ecks (1.3) der Sanitärvorrichtung (1) zwischen der Vertikalfläche (1.1) und der Wandfläche (4) angeordnet ist, ◯ dass sie einen Abschnitt des Anschlussbandes (6) überlappt, ◯ dass der Dicht-Klebe-Streifen (12) eine Klebeverbindung mit dem Anschlussband (6) bildet, und o dass ein Abschnitt des flächigen Trägermaterials (11) einen Flansch (13) bildet, der zum Aufbringen einer Dichtmasse (20) ausgelegt ist.Device (200) which is designed for assembly between a sanitary device (1) and a building wall surface (4), wherein the sanitary device (1) comprises a vertical surface (1.1) which forms a corner (1.3), and wherein the device (200) includes: - A connecting tape (6) which can be connected to the vertical surface (1.1) and the wall surface (4) in such a way that, when connected, it forms a watertight transition between the sanitary device (1) and the wall surface (4), - a corner closure device (10) with a flat carrier material (11) and a sealing adhesive strip (12), the corner closure device (10) being connectable to the connecting tape (6) and the wall surface (4), ◯ that it is arranged in the area of the corner (1.3) of the sanitary device (1) between the vertical surface (1.1) and the wall surface (4), ◯ that it overlaps a section of the connecting tape (6), ◯ that the sealing-adhesive strip (12) forms an adhesive connection with the connecting tape (6), and o that a section of the flat carrier material (11) forms a flange (13) which is designed for applying a sealing compound (20). Vorrichtung (200) nach Anspruch 1, dadurch gekennzeichnet, dass das Anschlussband (6) auf einer wandabgewandten Seite einen Dicht-Klebe-Streifen (6.1) umfasst, der sich parallel zur Längenausdehnung des Anschlussbandes (6) erstreckt und der zum Erstellen des wasserdichten Übergangs zwischen der Sanitärvorrichtung (1) und der Wandfläche (4) ausgelegt ist.Device (200) according to Claim 1 , characterized in that the connecting tape (6) comprises a sealing-adhesive strip (6.1) on a side facing away from the wall, which extends parallel to the longitudinal extension of the connecting tape (6) and which is used to create the watertight transition between the sanitary device (1) and the wall surface (4) is designed. Vorrichtung (200) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass es sich bei dem Trägermaterial (11) um ein flexibles Material handelt, das sowohl auf seiner wandabgewandten Seite als auch auf seiner Wandseite eine Oberfläche und/oder Struktur aufweist, um diese Seiten in eine Dichtmasse (20) einbetten zu können.Device (200) according to Claim 1 or 2 , characterized in that the carrier material (11) is a flexible material which has a surface and / or structure both on its side facing away from the wall and on its wall side in order to be able to embed these sides in a sealing compound (20) . Vorrichtung (200) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass es sich bei dem Trägermaterial (11) um ein flexibles Material handelt, das auf seiner eine Klebeschicht, vorzugsweise eine vollflächige Klebeschicht, aufweist, um die Eckabschlussvorrichtung (10) an der Gebäudewandfläche (4) ankleben zu können.Device (200) according to Claim 1 or 2 , characterized in that the carrier material (11) is a flexible material which has an adhesive layer, preferably a full-surface adhesive layer, on its surface in order to be able to glue the corner closure device (10) to the building wall surface (4). Vorrichtung (200) nach Anspruch 1, 2, 3 oder 4, dadurch gekennzeichnet, dass das Trägermaterial (11) eine quadratische oder rechteckige Grundform aufweist, die durch eine Höhe (a) und Länge (b) definiert ist.Device (200) according to Claim 1 , 2 , 3 or 4th , characterized in that the carrier material (11) has a square or rectangular basic shape which is defined by a height (a) and length (b). Vorrichtung (200) nach Anspruch 1, 2, 3 oder 4, dadurch gekennzeichnet, dass der Dicht-Klebe-Streifen (12) mittig oder aussermittig auf der wandabgewandten Seite des Trägermaterials (11) angebracht ist.Device (200) according to Claim 1 , 2 , 3 or 4th , characterized in that the adhesive sealing strip (12) is attached centrally or eccentrically on the side of the carrier material (11) facing away from the wall. Vorrichtung (200) nach Anspruch 6, dadurch gekennzeichnet, dass der Dicht-Klebe-Streifen (12) zum Bereitstellen einer wasserdichten Klebeverbindung mit einer Wandseite des Anschlussbandes (6) ausgelegt ist.Device (200) according to Claim 6 , characterized in that the adhesive sealing strip (12) is designed to provide a watertight adhesive connection to a wall side of the connecting tape (6). Vorrichtung (200) nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass das Trägermaterial (11) einen Schnitt oder eine Perforierung (14) aufweist, die sich im Wesentlichen parallel zu dem Dicht-Klebe-Streifen (12) erstreckt.Device (200) according to one of the Claims 1 until 7th , characterized in that the carrier material (11) has a cut or a perforation (14) which extends essentially parallel to the sealing-adhesive strip (12). Verfahren zum Erstellen eines wasserdichten Übergangs zwischen einer Vertikalfläche (1.1) einer Sanitärvorrichtung (1) und einer Gebäudewandfläche (4), wobei die Vertikalfläche (1.1) der Sanitärvorrichtung (1) ein Eck (1.3) bildet, umfassend die folgenden Schritte, die vor der Montage der Sanitärvorrichtung (1) vor der Gebäudewandfläche (4) ausgeführt werden: - Bereitstellen einer Länge (L) eines Anschlussbandes (6), - Ankleben des Anschlussbandes (6) entlang der Vertikalfläche (1.1), so, dass dieses im Bereich des Ecks (1.3) endet, dadurch gekennzeichnet, dass zusätzlich die folgenden Schritte ausgeführt werden: - Bereitstellen einer Eckabschlussvorrichtung (10) mit einem flächigen Trägermaterial (11) und einem Dicht-Klebe-Streifen (12), - Ankleben der Eckabschlussvorrichtung (10) mittels des Dicht-Klebe-Streifens (12) im Bereich des Ecks (1.3), so, dass sich die Eckabschlussvorrichtung (10) zwischen der Vertikalfläche (1.1) und der Gebäudewandfläche (4) befindet, - Positionieren der Sanitärvorrichtung (1) entlang der Gebäudewandfläche (4), so, dass sich die Vertikalfläche (1.1) parallel zu der Gebäudewandfläche (4) erstreckt und dass sich das Anschlussband (6) und die Eckabschlussvorrichtung (10) zwischen der Vertikalfläche (1.1) und der Gebäudewandfläche (4) befinden, - Aufbringcn einer Dichtmassc (20) auf das Anschlussband (6), die Eckabschlussvorrichtung (10) und mindestens einen Bereich der Gebäudewandfläche (4), um die Gebäudewandfläche (4) gegen eine spätere Wassereinwirkung zu schützen.A method for creating a watertight transition between a vertical surface (1.1) of a sanitary device (1) and a building wall surface (4), the vertical surface (1.1) of the sanitary device (1) forming a corner (1.3), comprising the following steps, which take place before Installation of the sanitary device (1) in front of the building wall surface (4) is carried out: - Providing a length (L) of a connecting tape (6), - Gluing the connecting tape (6) along the vertical surface (1.1) so that it is in the area of the corner (1.3) ends, characterized in that the following steps are additionally carried out: - providing a corner closure device (10) with a flat carrier material (11) and a sealing adhesive strip (12), - gluing the corner closure device (10) by means of the Sealing-adhesive strip (12) in the area of the corner (1.3) so that the corner closure device (10) is located between the vertical surface (1.1) and the building wall surface (4) Sanitary device (1) along the building wall surface (4) so that the vertical surface (1.1) extends parallel to the building wall surface (4) and that the connecting tape (6) and the corner closure device (10) between the vertical surface (1.1) and the Building wall surface (4) are, - Aufbringcn a Dichtmassc (20) on the connecting tape (6), the corner closure device (10) and at least one area of the building wall surface (4) in order to protect the building wall surface (4) against later exposure to water. Verfahren nach Anspruch 9, dadurch gekennzeichnet, dass vor oder während des Anklebens der Eckabschlussvorrichtung (10) ein Schnitt (14) parallel zu dem Dicht-Klebe-Streifen (12) erstellt wird, um so einen Seitenflansch (13.1) zu definieren.Procedure according to Claim 9 , characterized in that before or during the gluing of the corner closure device (10) a cut (14) is made parallel to the sealing-adhesive strip (12) so as to define a side flange (13.1). Verfahren nach Anspruch 9, dadurch gekennzeichnet, dass vor oder während des Anklebens der Eckabschlussvorrichtung (10) das Trägermaterial (11) ein Stück weit entlang einer vorbestehenden Perforierung (14) aufgerissen wird, um so einen Seitenflansch (13.1) zu definieren.Procedure according to Claim 9 , characterized in that before or during the gluing of the corner closure device (10), the carrier material (11) is torn open a bit along a pre-existing perforation (14) in order to define a side flange (13.1). Verfahren nach einem der Ansprüche 9-11, dadurch gekennzeichnet, dass beim Aufbringen der Dichtmasse (20) sowohl Dichtmasse (20) auf der Wandseite des Trägermaterials (11) und/oder auf die Gebäudewandfläche (4), als auch auf einer wandabgewandten Seite des Trägermaterials (11) aufgebracht wird, um die Eckabschlussvorrichtung (10) beidseitig in die Dichtmasse (20) einbetten zu können.Method according to one of the Claims 9 - 11th , characterized in that when the sealing compound (20) is applied, both sealing compound (20) is applied to the wall side of the carrier material (11) and / or to the building wall surface (4), as well as to a side of the carrier material (11) facing away from the wall to be able to embed the corner closure device (10) on both sides in the sealing compound (20).
DE102020002933.7A 2020-05-15 2020-05-15 Device and method for creating a transition between a sanitary device and a building wall surface Pending DE102020002933A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE102020002933.7A DE102020002933A1 (en) 2020-05-15 2020-05-15 Device and method for creating a transition between a sanitary device and a building wall surface
CH00242/21A CH717414A2 (en) 2020-05-15 2021-03-05 Device and method for creating a transition between a sanitary device and a building wall surface.
ATA50/2021A AT523898A3 (en) 2020-05-15 2021-03-10 Apparatus and method for creating a transition between a plumbing fixture and a building wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102020002933.7A DE102020002933A1 (en) 2020-05-15 2020-05-15 Device and method for creating a transition between a sanitary device and a building wall surface

Publications (1)

Publication Number Publication Date
DE102020002933A1 true DE102020002933A1 (en) 2021-11-18

Family

ID=78280465

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102020002933.7A Pending DE102020002933A1 (en) 2020-05-15 2020-05-15 Device and method for creating a transition between a sanitary device and a building wall surface

Country Status (3)

Country Link
AT (1) AT523898A3 (en)
CH (1) CH717414A2 (en)
DE (1) DE102020002933A1 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011101821A1 (en) * 2010-07-09 2012-03-08 Urs Gassmann Corner input profile for rounded corner of mounting object on e.g. wall, has
DE202010018427U1 (en) * 2010-07-09 2016-07-05 Urs Gassmann Sealing and assembly tape with a cut protection
DE102014103206B4 (en) * 2014-03-11 2019-07-11 Mepa-Pauli Und Menden Gmbh Method and sealing arrangement for sealing a tub rim

Also Published As

Publication number Publication date
AT523898A3 (en) 2022-02-15
CH717414A2 (en) 2021-11-15
AT523898A2 (en) 2021-12-15

Similar Documents

Publication Publication Date Title
EP3548677B1 (en) Method for renovating and reconstructing wet rooms
EP1967107A2 (en) Sealing strip for sanitary devices
DE102014103206A1 (en) Method and sealing arrangement for sealing a tub rim
AT516233A2 (en) Connector corner and mounting kit with such a connector corner to create a horizontal transition in the corner of a sanitary device
CH712746B1 (en) Building area with expansion joint and cut protection as well as assembly or assembly kit for assembly on the room side in an expansion joint of a building.
CH711482A2 (en) <TITLE> Cut protection strips and use of a cut protection strip.
DE102020002933A1 (en) Device and method for creating a transition between a sanitary device and a building wall surface
AT518596B1 (en) Device with cut protection strips and corresponding cut protection strips
AT518597B1 (en) Connecting band, which serves as a transition between a device and a vertical surface, and methods for creating such a transition
AT15705U1 (en) Use of a cut protection strip and method of applying a cut protection strip
CH710981B1 (en) Device with a connecting band, which serves as a transition between a device and a vertical surface, and method for creating such a transition.
EP3372132A1 (en) Frame hinge
DE10114909C1 (en) Sealing and sound insulation strip for upper edge of bath or shower tray, is partly covered by pull-off protective strip
DE102016108070A1 (en) Connecting band, which serves as a transition between a device and a vertical surface, and methods for creating such a transition
EP3777623B1 (en) Sealing tub element for sealing of a bath or shower corner relative to a building part
DE202020100291U1 (en) Arrangement of a baseboard, mounting tape and use of a mounting tape
DE202016102951U1 (en) Apparatus for use in creating a shower area and shower area with such a device
DE102016124456A1 (en) Cut protection strip and method for applying a cut protection strip
DE102019128665A1 (en) Capillary protection tape
DE102016108072A1 (en) Device with cut protection strips and corresponding cut protection strips
CH710980A2 (en) Device with cut protection strips and corresponding cut protection strips.
DE102019008602A1 (en) Carpet tiles for the formation of a textile floor surface
CH711951B1 (en) Cut protection strips, arrangement of a cut protection strip and method for creating an arrangement of a cut protection strip.
CH711949B1 (en) Cut protection strip, use of a cut protection strip and method of applying a cut protection strip.
CH707055B1 (en) Mounting aid and mounting kit with such a mounting aid to create a backsplash, and using a mounting kit.

Legal Events

Date Code Title Description
R081 Change of applicant/patentee

Owner name: SANITAERWERKE GMBH, DE

Free format text: FORMER OWNER: SANITAERWERKE GMBH, 78120 FURTWANGEN, DE

R082 Change of representative

Representative=s name: SKM-IP SCHMID KRAUSS KUTTENKEULER MALESCHA SCH, DE

Representative=s name: BOEHMERT & BOEHMERT ANWALTSPARTNERSCHAFT MBB -, DE

R081 Change of applicant/patentee

Owner name: SANITAERWERKE GMBH, DE

Free format text: FORMER OWNER: RIVAPLAN AG, EBIKON, CH

R082 Change of representative

Representative=s name: SKM-IP SCHMID KRAUSS KUTTENKEULER MALESCHA SCH, DE