DE102018215720A1 - Method and system for determining an overall process duration for charging a hybrid or electric vehicle - Google Patents
Method and system for determining an overall process duration for charging a hybrid or electric vehicle Download PDFInfo
- Publication number
- DE102018215720A1 DE102018215720A1 DE102018215720.0A DE102018215720A DE102018215720A1 DE 102018215720 A1 DE102018215720 A1 DE 102018215720A1 DE 102018215720 A DE102018215720 A DE 102018215720A DE 102018215720 A1 DE102018215720 A1 DE 102018215720A1
- Authority
- DE
- Germany
- Prior art keywords
- charging
- time
- vehicle
- duration
- total
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 135
- 238000004891 communication Methods 0.000 description 9
- 230000001419 dependent effect Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000012805 post-processing Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 241000156302 Porcine hemagglutinating encephalomyelitis virus Species 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 238000004393 prognosis Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Die vorliegende Offenbarung betrifft ein Verfahren zum Bestimmen einer Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs, umfassend ein Bestimmen einer ersten Gesamtvorgangsdauer zum Laden eines ersten Fahrzeugs, wobei die erste Gesamtvorgangsdauer eine erste Ladedauer eines Antriebsenergiespeichers des ersten Fahrzeugs und eine erste Rüstzeit umfasst, ein Bestimmen einer Differenz zwischen der bestimmten ersten Gesamtvorgangsdauer und der ersten Ladedauer, um die erste Rüstzeit zu erhalten, und ein Prognostizieren einer zweiten Gesamtvorgangsdauer zum Laden eines zweiten Fahrzeugs basierend auf der ersten Rüstzeit des ersten Fahrzeugs.The present disclosure relates to a method for determining an overall process duration for charging a hybrid or electric vehicle, comprising determining a first overall process duration for charging a first vehicle, the first overall process duration comprising a first charge duration of a drive energy store of the first vehicle and a first set-up time a difference between the determined first total operation time and the first charging time to obtain the first set-up time, and predicting a second total operation time for charging a second vehicle based on the first set-up time of the first vehicle.
Description
Die vorliegende Offenbarung betrifft ein Verfahren und ein System zum Bestimmen einer Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs. Die vorliegende Offenbarung betrifft insbesondere eine verbesserte Prognose einer Gesamtvorgangsdauer zum Laden eines Antriebsenergiespeichers eines Hybrid- oder Elektrofahrzeugs.The present disclosure relates to a method and system for determining an overall process duration for charging a hybrid or electric vehicle. The present disclosure particularly relates to an improved prognosis of an overall process duration for charging a drive energy store of a hybrid or electric vehicle.
Stand der TechnikState of the art
Hybrid- oder Elektrofahrzeuge werden von einem Elektromotor angetrieben, wobei die nötige elektrische Energie beispielsweise in einem Hochvoltspeicher gespeichert wird. Der Hochvoltspeicher kann an einer Ladestation eines Hauses oder einer speziellen Tankstelle aufgeladen werden. Die physikalische Ladedauer eines Hybrid- oder Elektrofahrzeugs kann beispielsweise mit einer Ladedauerprognose prognostiziert werden. Ein Gesamtzeitaufwand zum Laden des Hybrid- oder Elektrofahrzeugs geht jedoch über die reine physikalische Ladedauer hinaus, beispielsweise durch Wartezeiten, so dass der Gesamtzeitaufwand durch die physikalische Ladedauer nicht zufriedenstellen abgebildet werden kann. Damit kann dem Fahrer vor dem Laden keine zuverlässige Aussage darüber gegeben werden, wie lange das Laden insgesamt dauern wird.Hybrid or electric vehicles are driven by an electric motor, with the necessary electrical energy being stored, for example, in a high-voltage battery. The high-voltage battery can be charged at a charging station in a house or at a special gas station. The physical charging time of a hybrid or electric vehicle can, for example, be predicted with a charging time forecast. However, the total time required to charge the hybrid or electric vehicle goes beyond the mere physical charging time, for example by waiting times, so that the total time required cannot be satisfactorily represented by the physical charging time. This means that the driver cannot be given a reliable statement as to how long the charging process will take before charging.
Offenbarung der ErfindungDisclosure of the invention
Es ist eine Aufgabe der vorliegenden Offenbarung, eine Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs präzise anzugeben. Insbesondere ist es eine Aufgabe der vorliegenden Offenbarung, ein Verfahren und ein System zum Bestimmen einer Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs bereitzustellen, die dem Fahrer vor dem Laden eine präzise Abschätzung darüber liefern können, wieviel Zeit das Laden insgesamt in Anspruch nehmen wird.It is an object of the present disclosure to precisely specify an overall operation time for charging a hybrid or electric vehicle. In particular, it is an object of the present disclosure to provide a method and system for determining an overall process time to charge a hybrid or electric vehicle that can provide the driver with a precise estimate of how much total charging time will take before charging.
Diese Aufgabe wird durch den Gegenstand der unabhängigen Ansprüche gelöst. Vorteilhafte Ausgestaltungen sind in den Unteransprüchen angegeben.This object is achieved by the subject matter of the independent claims. Advantageous configurations are specified in the subclaims.
Gemäß Ausführungsformen der vorliegenden Offenbarung ist ein Verfahren zum Bestimmen einer Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs angegeben. Das Verfahren umfasst ein Bestimmen einer ersten Gesamtvorgangsdauer zum Laden eines ersten Fahrzeugs, wobei die erste Gesamtvorgangsdauer eine (bekannte) erste Ladedauer eines Antriebsenergiespeichers des ersten Fahrzeugs und eine erste Rüstzeit umfasst, ein Bestimmen einer Differenz zwischen der bestimmten ersten Gesamtvorgangsdauer und der (bekannten) ersten Ladedauer, um die erste Rüstzeit zu erhalten, und ein Prognostizieren einer zweiten Gesamtvorgangsdauer zum Laden eines zweiten Fahrzeugs basierend auf der ersten Rüstzeit des ersten Fahrzeugs.According to embodiments of the present disclosure, a method for determining an overall process duration for charging a hybrid or electric vehicle is provided. The method comprises determining a first total process duration for charging a first vehicle, the first total process duration comprising a (known) first charge duration of a drive energy store of the first vehicle and a first set-up time, determining a difference between the determined first total process duration and the (known) first Loading time to obtain the first set-up time and predicting a second total operation time to charge a second vehicle based on the first set-up time of the first vehicle.
Erfindungsgemäß wird die erste Gesamtvorgangsdauer zum Laden des ersten Fahrzeugs gemessen, wobei eine Differenz zwischen der ersten Gesamtvorgangsdauer und der bekannten ersten Ladedauer verwendet wird, um die erste Rüstzeit zu bestimmen. Diese tatsächliche bzw. reale erste Rüstzeit wird dann verwendet, um die Gesamtvorgangsdauer für einen nachfolgenden Ladevorgang präzise zu prognostizieren. Insbesondere kann der durch die Rüstzeit verursachte Offset bei der Prognose der geschätzten Gesamtvorgangsdauer wieder berücksichtigt werden. Damit kann eine genauere Prognose der Gesamtvorgangsdauer erfolgen, wodurch zum Beispiel präzisere Routings ermöglicht werden. Zudem wird eine alternative Routenplanung ermöglicht, beispielsweise um überfüllte Ladestationen zu meiden.According to the invention, the first total process time for charging the first vehicle is measured, a difference between the first total process time and the known first charging time being used to determine the first set-up time. This actual or real first set-up time is then used to precisely predict the total process duration for a subsequent charging process. In particular, the offset caused by the set-up time can be taken into account again when forecasting the estimated total process time. This enables a more precise forecast of the total duration of the operation, which enables, for example, more precise routings. Alternative route planning is also possible, for example to avoid overcrowded charging stations.
Das erste Fahrzeug und das zweite Fahrzeug können Fahrzeuge einer Flotte von gleichen oder ähnlichen Fahrzeugen sein. Die vorliegende Offenbarung ist jedoch nicht hierauf begrenzt, und in einigen Ausführungsformen kann die ermittelte erste Rüstzeit fahrzeugunabhängig sein und für Prognosen für verschiedene Fahrzeugtypen verwendet werden.The first vehicle and the second vehicle can be vehicles of a fleet of the same or similar vehicles. However, the present disclosure is not so limited, and in some embodiments, the determined first set-up time may be vehicle independent and used for predictions for different types of vehicles.
Die zweite Gesamtvorgangsdauer ist eine prognostizierte Gesamtvorgangsdauer, die vor einem Ladevorhaben für eine oder mehrere potentielle Ladestationen ermittelt werden kann. Zum Beispiel kann für eine Vielzahl von potentiellen Ladestationen eine jeweilige Gesamtvorgangsdauer prognostiziert werden. Dem Fahrer können alle potentiellen Ladestationen mit den jeweiligen Gesamtvorgangsdauern angezeigt werden. Ergänzend oder alternativ kann dem Fahrer die Ladestation mit der kleinsten Gesamtvorgangsdauer vorgeschlagen werden. Die vorliegende Offenbarung ist jedoch nicht hierauf begrenzt, und dem Fahrer kann ein Vorschlag für eine Ladestation basierend auf einem oder mehreren Faktoren unterbreitet werden. Der eine oder die mehreren Faktoren können aus der Gruppe ausgewählt sein, welche die zweite Gesamtvorgangsdauer, eine Entfernung zur Ladestation, eine verbleibende Reichweite und eine aktive Routenführung umfasst.The second total process duration is a predicted total process duration that can be determined for one or more potential charging stations before a charging project. For example, an overall duration of the operation can be predicted for a large number of potential charging stations. The driver can be shown all potential charging stations with the respective total process times. In addition or as an alternative, the charging station with the smallest total duration of the operation can be proposed to the driver. However, the present disclosure is not so limited, and a suggestion for a charging station may be made to the driver based on one or more factors. The one or more factors can be selected from the group that includes the second total duration of the operation, a distance to the charging station, a remaining range and active route guidance.
Vorzugsweise umfasst das Bestimmen der ersten Gesamtvorgangsdauer ein Messen einer Zeitspanne zwischen einer Ankunft des ersten Fahrzeugs an einer Ladestation und einer Abfahrt des ersten Fahrzeugs von der Ladestation. Typischerweise kann die Gesamtvorgangsdauer der Zeitspanne zwischen einem ersten Zeitpunkt, zu dem das erste Fahrzeug an der Ladestation ankommt, und einem zweiten Zeitpunkt, zu dem das erste Fahrzeug von der Ladestation wegfährt, entsprechen. Die erste Gesamtvorgangsdauer kann zum Beispiel anhand einer Position des ersten Fahrzeugs bestimmt werden, wie beispielsweise mittels GPS. Die erste Gesamtvorgangsdauer kann einer Zeitspanne entsprechen, während der das erste Fahrzeug an der Ladestation (z.B. unmittelbar an der Ladestation oder in der Nähe der Ladestation) ist. Beispielsweise kann die erste Gesamtvorgangsdauer einer Zeitspanne entsprechen, während der die Position des ersten Fahrzeugs an der Ladestation im Wesentlichen unverändert ist. Damit ist die erste Gesamtvorgangsdauer eine reale bzw. tatsächliche Gesamtvorgangsdauer.Preferably, determining the first total operation duration comprises measuring a time period between an arrival of the first vehicle at a charging station and a departure of the first vehicle from the charging station. Typically, the total duration of the operation may correspond to the time period between a first point in time at which the first vehicle arrives at the charging station and a second point in time at which the first vehicle leaves the charging station. The first Total duration of the operation can be determined, for example, based on a position of the first vehicle, such as using GPS. The first total process duration can correspond to a period of time during which the first vehicle is at the charging station (for example directly at the charging station or in the vicinity of the charging station). For example, the first total process duration can correspond to a time period during which the position of the first vehicle at the charging station is essentially unchanged. The first total process duration is thus a real or actual total process duration.
Die erste Ladedauer kann eine prognostizierte Ladedauer oder eine gemessene Ladedauer sein. Der Begriff „Ladedauer“, wie er im vorliegenden Dokument verwendet wird, kann eine Zeit angeben, die benötigt wird, um einen Ladezustand (State of Charge, SoC) des Antriebsenergiespeichers des Hybrid- oder Elektrofahrzeugs von einem Anfangsladestand (z.B. x% eines maximalen Ladestands, wobei x<100 ist) auf einen Endladestand (z.B. 100%) zu erhöhen.The first charging time can be a predicted charging time or a measured charging time. The term “charging time” as used in the present document can indicate a time that is required to determine a state of charge (SoC) of the drive energy store of the hybrid or electric vehicle from an initial charge level (for example x% of a maximum charge level , where x <100) to a final charge level (eg 100%).
Durch den Abzug der prognostizierten oder gemessenen ersten Ladedauer von der ersten Gesamtvorgangsdauer kann die erste Rüstzeit ermittelt werden. Der Begriff „Rüstzeit“, wie er im vorliegenden Dokument verwendet wird, kann eine Zeit angeben, die zur Vorbereitung und/oder Nachbereitung des physikalischen Ladevorgangs des Antriebsenergiespeichers nötig ist. Die Rüstzeit kann zum Beispiel eine Wartezeit an der Ladestation (z.B., weil die Ladestation noch besetzt ist), eine Zeit für Steckvorgänge zum (elektrischen) Ankoppeln des Fahrzeugs an die Ladestation und/oder (elektrischen) Abkoppeln des Fahrzeugs von der Ladestation, eine Zeit für einen Bezahlvorgang und Ähnliches umfassen.The first set-up time can be determined by subtracting the predicted or measured first charging time from the first total process time. The term “set-up time” as used in the present document can indicate a time which is necessary for the preparation and / or postprocessing of the physical charging process of the drive energy store. The set-up time can be, for example, a waiting time at the charging station (e.g. because the charging station is still occupied), a time for plug-in operations for (electrically) coupling the vehicle to the charging station and / or (electrically) decoupling the vehicle from the charging station, a time for a payment process and the like.
Vorzugsweise umfasst die zweite Gesamtvorgangsdauer eine zweite Ladedauer eines Antriebsenergiespeichers des zweiten Fahrzeugs. Die zweite Ladedauer kann eine prognostizierte Ladedauer sein. Die zweite Gesamtvorgangsdauer kann eine zweite Rüstzeit umfassen, die der ersten Rüstzeit entsprechen kann. Anders gesagt können die prognostizierte zweite Ladedauer und die basierend auf dem Ladevorgang des ersten Fahrzeugs berechnete reale erste Rüstzeit addiert werden, um die zweite Gesamtvorgangsdauer präziser zu prognostizieren.The second overall process duration preferably comprises a second charging duration of a drive energy store of the second vehicle. The second charging time can be a predicted charging time. The second overall process duration can comprise a second set-up time, which can correspond to the first set-up time. In other words, the predicted second charging time and the real first set-up time calculated based on the charging process of the first vehicle can be added in order to predict the second overall process duration more precisely.
Vorzugsweise umfasst das Verfahren ein Bestimmen wenigstens eines ersten Situationsparameters bezüglich des Ladevorgangs des ersten Fahrzeugs und ein Zuordnen des wenigstens einen ersten Situationsparameters zur ersten Rüstzeit. Die erste Rüstzeit ist aufgrund ihres Bezugs zur realen Gesamtvorgangsdauer inhärent situationsabhängig und kann durch den wenigstens einen ersten Situationsparameter entsprechend indiziert werden, so dass eine spätere Prognose einer Gesamtvorgangsdauer beispielsweise an eine aktuelle Situation, die derjenigen der ersten Rüstzeit entspricht, angepasst und damit präzisiert werden kann. Damit kann die Gesamtvorgangsdauer beispielsweise fahrzeug- und/oder infrastrukturspezifisch gelernt werden.The method preferably includes determining at least one first situation parameter with regard to the charging process of the first vehicle and assigning the at least one first situation parameter to the first set-up time. The first set-up time is inherently situation-dependent due to its relation to the real overall process duration and can be indexed accordingly by the at least one first situation parameter, so that a later forecast of a total process duration can be adapted, for example, to a current situation that corresponds to that of the first set-up time and can thus be specified . The entire process duration can thus be learned, for example, in a vehicle-specific and / or infrastructure-specific manner.
Vorzugsweise umfasst das Verfahren weiter ein Bestimmen wenigstens eines zweiten Situationsparameters bezüglich des Ladevorgangs des zweiten Fahrzeugs. Das Prognostizieren der zweiten Gesamtvorgangsdauer kann ein Auswählen der ersten Rüstzeit aus einer Vielzahl von ersten Rüstzeiten basierend auf dem wenigstens einen zweiten Situationsparameter umfassen (z.B. der gleiche Ort und/oder die gleiche Zeit und/oder die gleiche Verkehrsdichte). Insbesondere kann der wenigstens eine zweite Situationsparameter mit einer Vielzahl von ersten Situationsparametern in einer zentralen Einheit (z.B. einem Backend) abgeglichen werden, um eine passende Rüstzeit für die Prognose der Gesamtvorgangsdauer des zweiten Fahrzeugs auszuwählen.The method preferably further comprises determining at least one second situation parameter with regard to the charging process of the second vehicle. The prediction of the second overall process duration may include selecting the first set-up time from a plurality of first set-up times based on the at least one second situation parameter (e.g. the same location and / or the same time and / or the same traffic density). In particular, the at least one second situation parameter can be compared with a plurality of first situation parameters in a central unit (e.g. a backend) in order to select a suitable set-up time for the prediction of the total process duration of the second vehicle.
In einigen Ausführungsformen wird die (erste) Rüstzeit situationsabhängig über eine Vielzahl von Fahrzeuge z.B. einer Flotte in der zentralen Einheit gelernt. Anders gesagt können eine Vielzahl von (ersten) Rüstzeiten für die Vielzahl von Fahrzeugen bestimmt und in der zentralen Einheit hinterlegt werden. Zum Beispiel umfasst das Verfahren (
Vorzugsweise wird für die Prognose der Gesamtvorgangsdauer des zweiten Fahrzeugs (und anderer Fahrzeuge) der Flotte eine den aktuellen Bedingungen (z.B., Ort, Zeit, etc.) des zweiten Fahrzeugs entsprechende erste Rüstzeit aus der Vielzahl von ersten Rüstzeiten ausgewählt, wodurch die Prognose der Gesamtvorgangsdauer zum Laden des zweiten Fahrzeugs präziser erfolgen kann.For the prediction of the total process duration of the second vehicle (and other vehicles) of the fleet, a first set-up time corresponding to the current conditions (eg, location, time, etc.) of the second vehicle is preferably selected from the large number of first set-up times, thereby predicting the total process duration for charging the second vehicle can be done more precisely.
Vorzugsweise ist der wenigstens eine erste Situationsparameter und/oder der wenigstens eine zweite Situationsparameter aus der Gruppe ausgewählt, die einen Ort, eine Zeit und eine Verkehrsdichte umfasst. Der Ort kann GPS-Daten entsprechen, die dem sich an einer Ladestation befindenden (ersten bzw. zweiten) Fahrzeug entsprechen. Zum Beispiel kann die erste Rüstzeit in Abhängigkeit von einer oder mehreren relevanten Einflussgrößen (z.B. Verkehrsdaten) wie Ort, Zeit, Verkehrsfluss und Verkehrsdichte gelernt werden. Die erste Rüstzeit kann dann bei der Prognose der Gesamtvorgangsdauer von Ladevorhaben, die unter denselben oder ähnlichen Bedingungen stattfinden, berücksichtigt werden.The at least one first situation parameter and / or the at least one second situation parameter is preferably selected from the group comprising a location, a time and a traffic density. The location can correspond to GPS data corresponding to the (first or second) vehicle located at a charging station. For example, the first set-up time can be dependent on one or more relevant influencing factors (e.g. Traffic data) such as location, time, traffic flow and traffic density. The first set-up time can then be taken into account when forecasting the total process duration of loading projects that take place under the same or similar conditions.
Die Verkehrsdichte kann eine Verkehrsdichte einer oder mehrerer Streckensegmente an einer Ladestation und/oder in einem Umgebungsbereich der Ladestation des Fahrzeugs sein. Zum Beispiel können das eine oder die mehreren Streckensegmente an relevanten Knotenpunkten liegen und/oder zur Ladestation hinführen (z.B. die letzten Segmente vor dem Erreichen der Ladestation) und/oder Hauptverkehrsrouten sein. Insbesondere kann die Verkehrsdichte einen Hinweis auf eine potentielle Auslastung der Ladestation geben.The traffic density can be a traffic density of one or more route segments at a charging station and / or in a surrounding area of the charging station of the vehicle. For example, the one or more route segments can be located at relevant nodes and / or lead to the charging station (e.g. the last segments before reaching the charging station) and / or main traffic routes. In particular, the traffic density can give an indication of a potential utilization of the charging station.
Gemäß einem weiteren Aspekt der vorliegenden Offenbarung ist ein System zum Bestimmen einer Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs angegeben. Das System umfasst eine erste Recheneinheit, die eingerichtet ist, um eine erste Gesamtvorgangsdauer zum Laden eines ersten Fahrzeugs zu bestimmen, wobei die erste Gesamtvorgangsdauer eine erste Ladedauer eines Antriebsenergiespeichers des ersten Fahrzeugs und eine erste Rüstzeit umfasst, eine zweite Recheneinheit, die eingerichtet ist, um eine Differenz zwischen der ersten Gesamtvorgangsdauer und der ersten Ladedauer zu bestimmen, um die erste Rüstzeit zu erhalten, und eine dritte Recheneinheit, die eingerichtet ist, um eine zweite Gesamtvorgangsdauer zum Laden eines zweiten Fahrzeugs basierend auf der ersten Rüstzeit des ersten Fahrzeugs zu prognostizieren. Das System ist insbesondere eingerichtet, das in diesem Dokument beschriebene Verfahren auszuführen.According to a further aspect of the present disclosure, a system for determining an overall process duration for charging a hybrid or electric vehicle is provided. The system comprises a first arithmetic unit that is configured to determine a first overall process duration for charging a first vehicle, the first overall process duration comprising a first charging duration of a drive energy store of the first vehicle and a first set-up time, a second arithmetic unit that is configured to determine a difference between the first total process duration and the first charge duration to obtain the first set-up time, and a third arithmetic unit that is configured to predict a second total process duration for charging a second vehicle based on the first set-up time of the first vehicle. In particular, the system is set up to carry out the method described in this document.
Die erste Recheneinheit und/oder die zweite Recheneinheit und/oder die dritte Recheneinheit können in einem gemeinsamen Software- und/oder Hardware-Modul realisiert sein. Alternativ dazu können die erste Recheneinheit, die zweite Recheneinheit und die dritte Recheneinheit jeweils in getrennten Software- und/oder Hardware-Modulen realisiert sein.The first computing unit and / or the second computing unit and / or the third computing unit can be implemented in a common software and / or hardware module. Alternatively, the first computing unit, the second computing unit and the third computing unit can each be implemented in separate software and / or hardware modules.
Vorzugsweise umfasst das System eine zentrale Einheit, insbesondere ein Backend. Die zentrale Einheit kann eingerichtet sein, um eine Vielzahl von ersten Rüstzeiten für eine Vielzahl von Ladevorgängen zu sammeln.The system preferably comprises a central unit, in particular a backend. The central unit can be set up to collect a large number of first set-up times for a large number of charging processes.
Gemäß einem weiteren Aspekt wird ein Speichermedium beschrieben. Das Speichermedium kann ein Softwareprogramm umfassen, das eingerichtet ist, um auf einem Prozessor ausgeführt zu werden, und um dadurch das in diesem Dokument beschriebene Verfahren auszuführen.According to a further aspect, a storage medium is described. The storage medium may comprise a software program which is set up to be executed on a processor and thereby to carry out the method described in this document.
FigurenlisteFigure list
Ausführungsbeispiele der Offenbarung sind in den Figuren dargestellt und werden im Folgenden näher beschrieben. Es zeigen:
-
1 ein System zum Bestimmen einer Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs gemäß Ausführungsformen der vorliegenden Offenbarung, -
2 eine Gesamtvorgangsdauer mit einer Ladedauer und einer Rüstzeit gemäß Ausführungsformen der vorliegenden Offenbarung, und -
3 ein Flussdiagram eines Verfahrens zum Bestimmen einer Gesamtvorgangsdauer zum Laden eines Hybrid- oder Elektrofahrzeugs gemäß Ausführungsformen der vorliegenden Offenbarung.
-
1 a system for determining an overall process duration for charging a hybrid or electric vehicle according to embodiments of the present disclosure, -
2nd an overall operation duration with a loading duration and a set-up time according to embodiments of the present disclosure, and -
3rd 10 is a flowchart of a method for determining an overall process duration for charging a hybrid or electric vehicle according to embodiments of the present disclosure.
Ausführungsformen der OffenbarungEmbodiments of the disclosure
Im Folgenden werden, sofern nicht anders vermerkt, für gleiche und gleichwirkende Elemente gleiche Bezugszeichen verwendet.Unless otherwise noted, the same reference numerals are used below for the same and equivalent elements.
Das Hybrid- oder Elektrofahrzeug kann gemäß Ausführungsformen ein reines Elektrofahrzeug (BEV) oder ein Plug-in-Hybridfahrzeug (PHEV) sein. Der Begriff Fahrzeug umfasst PKW, LKW, Busse, Wohnmobile, Krafträder, etc., die der Beförderung von Personen, Gütern, etc. dienen. Insbesondere umfasst der Begriff Kraftfahrzeuge zur Personenbeförderung.According to embodiments, the hybrid or electric vehicle can be a pure electric vehicle (BEV) or a plug-in hybrid vehicle (PHEV). The term vehicle includes cars, trucks, buses, campers, motorcycles, etc., which are used to transport people, goods, etc. In particular, the term includes motor vehicles for the transportation of people.
Ein aufzuladendes Hybrid- oder Elektrofahrzeug kann über eine Verbindungsvorrichtung, z.B. ein Ladekabel bzw. Stromkabel, mit einem an einer Ladesäule vorgesehenen Stromanschluss, z.B. einer Steckdose, verbunden sein. Im Beispiel der
In einigen Ausführungsformen kann das System eine erste Kommunikationsverbindung zwischen dem Hybrid- oder Elektrofahrzeug und der Ladesäule umfassen. Die Kommunikation zwischen dem Hybrid- oder Elektrofahrzeug und der Ladesäule kann drahtlos, beispielsweise mittels WLAN, Bluetooth, Infrarot, GSM, UMTS oder dergleichen erfolgen. Auch ist eine drahtgebundene Kommunikation, beispielsweise über das Ladekabel, möglich. In some embodiments, the system may include a first communication link between the hybrid or electric vehicle and the charging station. Communication between the hybrid or electric vehicle and the charging station can take place wirelessly, for example by means of WLAN, Bluetooth, infrared, GSM, UMTS or the like. Wired communication, for example via the charging cable, is also possible.
Typischerweise umfasst das System
Gemäß der vorliegenden Offenbarung wird eine tatsächliche Gesamtvorgangsdauer zum Laden eines Fahrzeugs bestimmt, und die daraus ermittelte situationsabhängige Rüstzeit bei der Prognose einer Gesamtvorgangsdauer zum Laden eines anderen Fahrzeugs verwendet. Das System
Der Ladevorgang des zweiten Fahrzeugs erfolgt zeitlich nach dem Ladevorgang des ersten Fahrzeugs, so dass die aus dem Ladevorgang des ersten Fahrzeugs ermittelte Rüstzeit bei der Prognose der Gesamtvorgangsdauer des Ladevorgangs des zweiten Fahrzeugs verwendet werden kann. Der Ladevorgang des ersten Fahrzeugs und der Ladevorgang des zweiten Fahrzeugs können an derselben oder an verschiedenen Ladestationen (z.B. Ladesäulen) durchgeführt werden.The charging process of the second vehicle takes place chronologically after the charging process of the first vehicle, so that the set-up time determined from the charging process of the first vehicle can be used in the forecast of the total process duration of the charging process of the second vehicle. The charging process of the first vehicle and the charging process of the second vehicle can be carried out at the same or at different charging stations (e.g. charging stations).
In einigen Ausführungsformen können die erste Gesamtvorgangsdauer und/oder die zweite Gesamtvorgangsdauer fahrzeugseitig ermittelt werden. Insbesondere kann die erste Recheneinheit im ersten Fahrzeug, in der Ladestation oder in der zentralen Einheit
In einigen Ausführungsformen können dem Fahrer vor dem Laden, wie beispielsweise beim Erreichen einer kritischen Reichweite, potentielle Ladestationen mit jeweiligen Gesamtvorgangsdauern angezeigt werden. Ergänzend oder alternativ kann dem Fahrer die Ladestation mit der kleinsten Gesamtvorgangsdauer vorgeschlagen werden. In einer weiteren Ausführungsform kann dem Fahrer ein Vorschlag für eine Ladestation basierend auf einem oder mehreren Faktoren unterbreitet werden. Der eine oder die mehreren Faktoren können aus der Gruppe ausgewählt sein, welche die zweite Gesamtvorgangsdauer, eine Entfernung zur Ladestation, eine verbleibende Reichweite und eine aktive Routenführung umfasst.In some embodiments, potential charging stations with respective total process times can be displayed to the driver before charging, such as when reaching a critical range. In addition or as an alternative, the charging station with the smallest total duration of the operation can be proposed to the driver. In another embodiment, a suggestion for a charging station may be made to the driver based on one or more factors. The one or more factors can be selected from the group that includes the second total duration of the operation, a distance to the charging station, a remaining range and active route guidance.
Die Gesamtvorgangsdauer
Die Ladedauer
Die Rüstzeit kann eine Rüstzeit vor dem physikalischen Ladevorgang mit der Dauer
Das Verfahren
Gemäß der vorliegenden Offenbarung wird bei der Prognose der Gesamtvorgangsdauer zum Laden eines Fahrzeugs die z.B. über Fahrzeuge der Flotte gelernte Rüstzeit verwendet, um die Präzision der prognostizierten Gesamtvorgangsdauer zu erhöhen. Die gelernte Rüstzeit reflektiert das Umfeld, in dem der Ladevorgang stattfindet, wie zum Beispiel individuelle Informationen zum Ladestandort. Insbesondere spiegelt die gelernte Rüstzeit Erfahrungswerte wieder, z.B. um wieviel sich eine theoretische D aufgrund des aktuellen Umfelds ändert. According to the present disclosure, when predicting the total operation time to charge a vehicle, e.g. Set-up time learned from vehicles in the fleet is used to increase the precision of the forecast overall process duration. The set-up time learned reflects the environment in which the charging process takes place, such as individual information about the charging location. In particular, the set-up time learned reflects empirical values, e.g. how much a theoretical D changes due to the current environment.
Beispielsweise können aus einer zeitlich und/oder örtlich vorhandenen Verkehrsdichte längere Rüstzeiten folgen, z.B. aufgrund von Wartezeiten vor dem Laden an der Ladestation und/oder nach dem Laden beim Bezahlen. Eine unter solchen Umständen gelernte Rüstzeit kann für zukünftige Prognosen von Gesamtvorgangsdauern von Ladevorgängen verwendet werden, die in denselben oder ähnlichen Situationen stattfinden. Insbesondere kann eine genaue Aussage zum Anteil von Rüstzeiten an der Gesamtladedauer erfolgen, wodurch die Gesamtvorgangsdauer besser vorhersagbar ist. Zudem sind eine Auslastung und mögliche Wartezeit an einer Ladestation quantifizierbar. Damit können zum Beispiel suboptimale Routingentscheidungen verhindert und/oder ein Einfluss von Wartezeiten auf die Gesamtvorgangsdauer reduziert werden.For example, longer setup times can follow from a temporally and / or locally existing traffic density, e.g. due to waiting times before charging at the charging station and / or after charging when paying. A set-up time learned in such circumstances can be used for future predictions of total charging times that take place in the same or similar situations. In particular, a precise statement can be made regarding the share of set-up times in the total charging time, as a result of which the overall process time is more predictable. Utilization and possible waiting times at a charging station can also be quantified. In this way, for example, suboptimal routing decisions can be prevented and / or the influence of waiting times on the overall process duration can be reduced.
Vorzugsweise umfasst das Verfahren
Zum Beispiel kann wenigstens ein zweiter Situationsparameter (z.B. Zeit, Ort und/oder Verkehrsdichte) bezüglich des Ladevorgangs des zweiten Fahrzeugs bestimmt werden. Das Prognostizieren der zweiten Gesamtvorgangsdauer kann ein Auswählen der ersten Rüstzeit aus einer Vielzahl von ersten Rüstzeiten basierend auf dem wenigstens einen zweiten Situationsparameter umfassen (z.B. der gleiche Ort und/oder die gleiche Zeit und/oder gleiche Verkehrsdichte). Insbesondere kann der wenigstens eine zweite Situationsparameter mit einer Vielzahl von ersten Situationsparametern in einer zentralen Einheit (z.B. Backend) abgeglichen werden, um eine passende Rüstzeit für die Prognose der Gesamtvorgangsdauer des zweiten Fahrzeugs auszuwählen.For example, at least one second situation parameter (e.g. time, location and / or traffic density) can be determined with regard to the charging process of the second vehicle. The prediction of the second overall process duration can include selecting the first set-up time from a plurality of first set-up times based on the at least one second situation parameter (e.g. the same location and / or the same time and / or the same traffic density). In particular, the at least one second situation parameter can be compared with a multiplicity of first situation parameters in a central unit (e.g. backend) in order to select a suitable set-up time for the forecast of the overall process duration of the second vehicle.
Vorzugsweise ist der wenigstens eine erste Situationsparameter und/oder der wenigstens eine zweite Situationsparameter aus der Gruppe ausgewählt, die einen Ort, eine Zeit und eine Verkehrsdichte umfasst. Der Ort kann GPS-Daten entsprechen, die dem sich an einer Ladestation befindenden (ersten bzw. zweiten) Fahrzeug entsprechen. Die Verkehrsdichte kann sich auf Streckensegmente beziehen, die entweder an relevanten Knotenpunkten liegen oder zu dem Ladepunkt hinführen und Hinweise auf eine potentielle Auslastung geben. Zum Beispiel kann die erste Rüstzeit in Abhängigkeit von einer oder mehreren relevanten Einflussgrößen (z.B. Verkehrsdaten) wie Ort, Zeit, Verkehrsfluss und Verkehrsdichte gelernt werden. Die erste Rüstzeit kann dann bei der Prognose der Gesamtvorgangsdauer von Ladevorgängen, die unter denselben oder ähnlichen Bedingungen stattfinden, berücksichtigt werden.The at least one first situation parameter and / or the at least one second situation parameter is preferably selected from the group comprising a location, a time and a traffic density. The location can correspond to GPS data corresponding to the (first or second) vehicle located at a charging station. The traffic density can relate to route segments that are either located at relevant junctions or lead to the charging point and provide information on potential capacity utilization. For example, the first set-up time can be learned depending on one or more relevant influencing factors (e.g. traffic data) such as location, time, traffic flow and traffic density. The first set-up time can then be taken into account when forecasting the total process duration of charging processes that take place under the same or similar conditions.
Erfindungsgemäß wird die erste Gesamtvorgangsdauer zum Laden des ersten Fahrzeugs gemessen, wobei eine Differenz zwischen der ersten Gesamtvorgangsdauer und der bekannten ersten Ladedauer verwendet wird, um die erste Rüstzeit zu bestimmen. Die erste Rüstzeit wird dann verwendet, um die Gesamtvorgangsdauer für einen nachfolgenden Ladevorgang präzise zu prognostizieren. Insbesondere kann der durch die Rüstzeit verursachte Offset bei der Prognose der geschätzten Gesamtvorgangsdauer wieder berücksichtigt werden. Damit kann eine genauere Prognose der Gesamtvorgangsdauer erfolgen, wodurch zum Beispiel präzisere Routings ermöglicht werden. Zudem wird eine alternative Routenplanung ermöglicht, beispielsweise um überfüllte Ladestationen zu meiden.According to the invention, the first total process time for charging the first vehicle is measured, a difference between the first total process time and the known first charging time being used to determine the first set-up time. The first set-up time is then used to precisely predict the total process duration for a subsequent charging process. In particular, the offset caused by the set-up time can be taken into account again when forecasting the estimated total process time. This enables a more precise forecast of the total duration of the operation, which enables, for example, more precise routings. Alternative route planning is also possible, for example to avoid overcrowded charging stations.
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102018215720.0A DE102018215720A1 (en) | 2018-09-14 | 2018-09-14 | Method and system for determining an overall process duration for charging a hybrid or electric vehicle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102018215720.0A DE102018215720A1 (en) | 2018-09-14 | 2018-09-14 | Method and system for determining an overall process duration for charging a hybrid or electric vehicle |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102018215720A1 true DE102018215720A1 (en) | 2020-03-19 |
Family
ID=69646598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102018215720.0A Pending DE102018215720A1 (en) | 2018-09-14 | 2018-09-14 | Method and system for determining an overall process duration for charging a hybrid or electric vehicle |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102018215720A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011214930A (en) * | 2010-03-31 | 2011-10-27 | Honda Motor Co Ltd | Device for providing information on waiting time for charge, and car navigation apparatus |
US20140172282A1 (en) * | 2012-12-14 | 2014-06-19 | Industrial Technology Research Institute | Method and module for estimating after-charge drivable range of electric vehicle and driving assistance device |
US20170043671A1 (en) * | 2014-02-13 | 2017-02-16 | Charge Peak Ltd. | Control system for electric vehicle service network |
-
2018
- 2018-09-14 DE DE102018215720.0A patent/DE102018215720A1/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011214930A (en) * | 2010-03-31 | 2011-10-27 | Honda Motor Co Ltd | Device for providing information on waiting time for charge, and car navigation apparatus |
US20140172282A1 (en) * | 2012-12-14 | 2014-06-19 | Industrial Technology Research Institute | Method and module for estimating after-charge drivable range of electric vehicle and driving assistance device |
US20170043671A1 (en) * | 2014-02-13 | 2017-02-16 | Charge Peak Ltd. | Control system for electric vehicle service network |
Non-Patent Citations (1)
Title |
---|
Maschinenübersetzung JP 2011 / 214 930 (A); DEVICE FOR PROVIDING INFORMATION ON WAITING TIME FOR CHARGE, AND CAR NAVIGATION APPARATUS; EPO Patent Translate, übersetzt am 13.06.2019, Beschreibung und Ansprüche. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3387851B1 (en) | Assigning vehicles to charging stations | |
DE102015114002B4 (en) | Central charging control for a majority of electric vehicles | |
DE112011100624B4 (en) | Power supply control device and information providing device | |
WO2016015990A1 (en) | Charging at charging stations for range extension | |
DE102016217087B4 (en) | Charging-driving assistant for electric vehicles and electric vehicles | |
DE102015208380A1 (en) | Vehicle energy management device | |
DE102013216090A1 (en) | A vehicle operating under renewable energy management system | |
WO2016193362A1 (en) | Method and system for monitoring charging stations | |
DE112017008213T5 (en) | Queuing of electric vehicles for improved fleet availability | |
DE102010039075A1 (en) | Output device and system for information about an amount of electrical energy | |
DE102011086903A1 (en) | Electricity demand estimation device for estimating consumption of electrical power during movement of electric car, has estimation portion provided in vehicle to estimate electricity demand for drive of vehicle | |
DE112018004979T5 (en) | Battery usage monitoring with high coverage | |
EP3678893A1 (en) | Method for reserving an electric charging station, and charging system | |
DE102019129666A1 (en) | PARKING AND MAINTAINING AN AUTONOMOUS VEHICLE USING TERMINALS | |
DE102018131875A1 (en) | Device for charging and discharging a drive energy store of a hybrid or electric vehicle and system for managing a large number of hybrid or electric vehicles | |
DE102017218854A1 (en) | Method for operating a motor vehicle and motor vehicle | |
DE102017213984A1 (en) | Method for operating a navigation device for a motor vehicle | |
DE102014207532A1 (en) | Crowd sourcing for the verification of charging stations | |
DE102018215336A1 (en) | Method for utilizing a parking space for motor vehicles | |
EP3679325A1 (en) | Method, device, computer program and computer program product for route planning for a vehicle | |
WO2023247089A1 (en) | Method and device for predicting the waiting time at a charging station | |
DE102019215246A1 (en) | Method for determining an availability of a charging place for an electric vehicle and device for determining an availability of a charging place for an electric vehicle | |
DE102018215720A1 (en) | Method and system for determining an overall process duration for charging a hybrid or electric vehicle | |
DE102018203392A1 (en) | Driver assistance method for planning a route design of an electric motor vehicle with one or more charging stops at charging stations and corresponding driver assistance device | |
DE102018209066B4 (en) | Concept for supplying highly automated or autonomous means of transportation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R163 | Identified publications notified |