DE102017001359B4 - Method for fine machining a disk-shaped workpiece - Google Patents

Method for fine machining a disk-shaped workpiece Download PDF

Info

Publication number
DE102017001359B4
DE102017001359B4 DE102017001359.4A DE102017001359A DE102017001359B4 DE 102017001359 B4 DE102017001359 B4 DE 102017001359B4 DE 102017001359 A DE102017001359 A DE 102017001359A DE 102017001359 B4 DE102017001359 B4 DE 102017001359B4
Authority
DE
Germany
Prior art keywords
clamping
eccentric
central
workpieces
workpiece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE102017001359.4A
Other languages
German (de)
Other versions
DE102017001359A1 (en
Inventor
Matthias Schmidt
José López
Peter Nüßlein
Achim STEGNER
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Niles Werkzeugmaschinen GmbH
Kapp Werkzeugmaschinen GmbH
Original Assignee
Niles Werkzeugmaschinen GmbH
Kapp Werkzeugmaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Niles Werkzeugmaschinen GmbH, Kapp Werkzeugmaschinen GmbH filed Critical Niles Werkzeugmaschinen GmbH
Priority to DE102017001359.4A priority Critical patent/DE102017001359B4/en
Priority to PCT/EP2018/053377 priority patent/WO2018149767A1/en
Publication of DE102017001359A1 publication Critical patent/DE102017001359A1/en
Application granted granted Critical
Publication of DE102017001359B4 publication Critical patent/DE102017001359B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B31/00Chucks; Expansion mandrels; Adaptations thereof for remote control
    • B23B31/40Expansion mandrels
    • B23B31/4073Gripping the work or tool between planes almost perpendicular to the axis
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B31/00Chucks; Expansion mandrels; Adaptations thereof for remote control
    • B23B31/02Chucks
    • B23B31/025Chucks for gears

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jigs For Machine Tools (AREA)
  • Grinding Of Cylindrical And Plane Surfaces (AREA)

Abstract

Verfahren zum Feinbearbeiten eines scheibenförmigen Werkstücks (1) auf einer Werkzeugmaschine,wobei das Werkstück (1) eine Achse (a) aufweist, wobei das Werkstück (1) eine Zentralbohrung (2) mit der Achse (a) aufweist, wobei das Werkstück (1) mindestens zwei exzentrisch zur Achse (a) liegende Exzenterbohrungen (3, 4, 5) aufweist und wobei das Werkstück (1) an einem Außenumfang eine Profilierung (6) aufweist,dadurch gekennzeichnet, dassdas Verfahren die Schritte aufweist:a) Zuführen des Werkstücks (1) zu einem Spannmittel (7) der Werkzeugmaschine, wobei das Spannmittel (7) einen Zentralspanndorn (8) zum Spannen der Zentralbohrung (2) und mindestens zwei Exzenter-Spanndorne (9, 10, 11) zum Spannen der Exzenterbohrungen (3, 4, 5) aufweist, wobei der Zentralspanndorn (8) und die mindestens zwei Exzenter-Spanndorne (9, 10, 11) axial verschieblich im Spannmittel (7) angeordnet sind;b) Positionieren der mindestens zwei Exzenterbohrungen (3, 4, 5) auf den mindestens zwei Exzenter-Spanndornen (9, 10, 11) und Spannen des Werkstücks (1) über die Exzenterbohrungen (3, 4, 5) auf den Exzenter-Spanndornen (9, 10, 11);c) Feinbearbeiten der Zentralbohrung (2);d) axiales Verschieben des Zentralspanndorns (8) in die Zentralbohrung (2) und Spannen des Werkstücks (1) über die Zentralbohrung (2) auf dem Zentralspanndorn (8);e) Lösen der Spannung der Exzenter-Spanndorne (9, 10, 11) und axiales Verschieben der Exzenter-Spanndorne (9, 10, 11) aus den Exzenterbohrungen (3, 4, 5) heraus;f) Festspannen des Werkstücks (1) auf dem Spannmittel (7) mittels mindestens eines Halteelements (12, 13, 14);g) Feinbearbeiten der Exzenterbohrungen (3, 4, 5);h) Feinbearbeiten der Profilierung (6);i) Lösen der Spannung des Zentralspanndorns (8) und Entnahme des fertig feinbearbeiteten Werkstücks (1) vom Spannmittel (7).Method for fine machining a disk-shaped workpiece (1) on a machine tool, the workpiece (1) having an axis (a), the workpiece (1) having a central bore (2) with the axis (a), the workpiece (1 ) has at least two eccentric bores (3, 4, 5) eccentric to the axis (a) and wherein the workpiece (1) has a profiling (6) on an outer circumference, characterized in that the method comprises the steps of: a) feeding the workpiece (1) to a clamping means (7) of the machine tool, wherein the clamping means (7) has a central clamping mandrel (8) for clamping the central bore (2) and at least two eccentric clamping mandrels (9, 10, 11) for clamping the eccentric bores (3, 4, 5), the central clamping mandrel (8) and the at least two eccentric clamping mandrels (9, 10, 11) being arranged so as to be axially displaceable in the clamping device (7) b) positioning the at least two eccentric bores (3, 4, 5) on the at least two eccentric chip mandrels (9, 10, 11) and clamping the workpiece (1) via the eccentric bores (3, 4, 5) on the eccentric mandrels (9, 10, 11); c) finishing the central bore (2); Moving the central mandrel (8) into the central bore (2) and clamping the workpiece (1) via the central bore (2) on the central mandrel (8) e) releasing the tension of the eccentric mandrels (9, 10, 11) and axial Displacing the eccentric mandrels (9, 10, 11) out of the eccentric bores (3, 4, 5); f) clamping the workpiece (1) on the clamping means (7) by means of at least one retaining element (12, 13, 14); g) fine machining of the eccentric bores (3, 4, 5) h) fine machining of the profiling (6) i) release of the tension of the central mandrel (8) and removal of the finished machined workpiece (1) from the clamping device (7).

Description

Die Erfindung betrifft ein Verfahren zum Feinbearbeiten eines scheibenförmigen Werkstücks auf einer Werkzeugmaschine, wobei das Werkstück eine Achse aufweist, wobei das Werkstück eine Zentralbohrung mit der Achse aufweist, wobei das Werkstück mindestens zwei exzentrisch zur Achse liegende Exzenterbohrungen aufweist und wobei das Werkstück an einem Außenumfang eine Profilierung aufweist. Insbesondere betrifft die Erfindung ein solches Verfahren, bei dem zwei scheibenförmige Werkstücke im Paket bearbeitet werden, wobei speziell bei in Richtung der Achse fluchtender Anordnung der Exzenterbohrungen die Profilierungen der beiden Werkstücke nicht fluchten.The invention relates to a method for fine machining a disc-shaped workpiece on a machine tool, wherein the workpiece has an axis, wherein the workpiece has a central bore with the axis, wherein the workpiece has at least two eccentric eccentric to the axis eccentric holes and wherein the workpiece on an outer circumference Profiling. In particular, the invention relates to such a method in which two disc-shaped workpieces are processed in the package, wherein especially in aligned in the direction of the axis arrangement of the eccentric the profiles of the two workpieces are not aligned.

Werkstücke der genannten Art werden beispielsweise in Zykloiden-Getrieben benötigt und hier als Zykloidenrad bezeichnet. Solche Bauteile weisen an ihrem Außenumfang eine Verzahnung auf; darüber hinaus sind eine Zentralbohrung sowie exzentrisch angeordnete Bohrungen in dem im Wesentlichen scheibenförmig ausgebildeten Werkstück angeordnet, die für die Funktion benötigt werden.Workpieces of the type mentioned are needed, for example, in cycloidal transmissions and referred to here as Cycloid wheel. Such components have a toothing on their outer circumference; In addition, a central bore and eccentrically arranged holes in the substantially disc-shaped workpiece are arranged, which are required for the function.

Derartige scheibenförmige Werkstücke für Zykloiden-Getriebe offenbart beispielsweise die DE 32 06 992 C2 . Ähnliche Lösungen zeigen die DE 195 41 806 C1 , die DE 44 19 432 C2 und die DE 20 2011 001 560 U1 . Ein Beispiel für eine Werkzeugmaschine, auf der besagte Werkstücke gefertigt werden können, offenbart die DE 20 2016 004 284 U1 .Such disk-shaped workpieces for cycloid transmission disclosed, for example, the DE 32 06 992 C2 , Similar solutions show the DE 195 41 806 C1 , the DE 44 19 432 C2 and the DE 20 2011 001 560 U1 , An example of a machine tool on which said workpieces can be manufactured is disclosed by US Pat DE 20 2016 004 284 U1 ,

Problematisch ist dabei, dass für die Lagegenauigkeit der einzelnen Funktionsflächen (Bohrungen und Profilierung) nur sehr kleine Toleranzen im Bereich weniger Mikrometer gefordert werden, was die Herstellung besagter Teile schwierig macht. Ohne besondere Maßnahmen ist es mithin gar nicht möglich, die geforderten Toleranzen bei derartigen Bauteilen zu erreichen.The problem is that for the positional accuracy of the individual functional surfaces (drilling and profiling) only very small tolerances in the range of a few micrometers are required, which makes the production of said parts difficult. Consequently, it is not possible to achieve the required tolerances for such components without special measures.

Der Erfindung liegt die Aufgabe zugrunde, ein gattungsgemäßes Verfahren so auszubilden, dass bei guter Produktivität eine sehr hohe Präzision der Bearbeitung sichergestellt werden kann. Dies soll einmal bereits bei der Bearbeitung einzelner Werkstücke gelten, insbesondere allerdings dann, wenn solche Werkstücke als Paare bearbeitet werden, die bei fluchtenden Exzenterbohrungen nicht fluchtende Profilierungen am Außenumfang aufweisen.The invention has the object of providing a generic method in such a way that with good productivity very high precision machining can be ensured. This should already apply to the processing of individual workpieces, but in particular if such workpieces are machined as pairs which do not have aligned profiles on the outer circumference when the eccentric bores are aligned.

Die Lösung dieser Aufgabe durch die Erfindung sieht für die Fertigung eines einzelnen Werkstücks ein Verfahren vor, das die Schritte aufweist:

  1. a) Zuführen des Werkstücks zu einem Spannmittel der Werkzeugmaschine, wobei das Spannmittel einen Zentralspanndom zum Spannen der Zentralbohrung und mindestens zwei Exzenter-Spanndorne zum Spannen der Exzenterbohrungen aufweist, wobei der Zentralspanndorn und die mindestens zwei Exzenter-Spanndorne axial verschieblich (in Richtung der genannten Achse) im Spannmittel angeordnet sind;
  2. b) Positionieren der mindestens zwei Exzenterbohrungen auf den mindestens zwei Exzenter-Spanndornen und Spannen des Werkstücks über die Exzenterbohrungen auf den Exzenter-Spanndornen;
  3. c) Feinbearbeiten der Zentralbohrung;
  4. d) axiales Verschieben des Zentralspanndorns in die (feinbearbeitete) Zentralbohrung und Spannen des Werkstücks über die Zentralbohrung auf dem Zentralspanndorn;
  5. e) Lösen der Spannung der Exzenter-Spanndorne und axiales Verschieben der Exzenter-Spanndorne aus den Exzenterbohrungen heraus;
  6. f) Festspannen des Werkstücks auf dem Spannmittel mittels mindestens eines Halteelements;
  7. g) Feinbearbeiten der Exzenterbohrungen;
  8. h) Feinbearbeiten der Profilierung;
  9. i) Lösen der Spannung des Zentralspanndorns und Entnahme des fertig feinbearbeiteten Werkstücks vom Spannmittel.
The solution to this problem by the invention provides for the production of a single workpiece, a method comprising the steps:
  1. a) feeding the workpiece to a clamping means of the machine tool, wherein the clamping means comprises a central clamping dome for clamping the central bore and at least two eccentric mandrels for clamping the eccentric holes, wherein the central clamping mandrel and the at least two eccentric mandrels axially displaceable (in the direction of said axis ) are arranged in the clamping means;
  2. b) positioning the at least two eccentric holes on the at least two eccentric mandrels and clamping the workpiece over the eccentric holes on the eccentric mandrels;
  3. c) fine machining of the central bore;
  4. d) axial displacement of the central mandrel in the (fine-machined) central bore and clamping of the workpiece via the central bore on the central mandrel;
  5. e) releasing the tension of the eccentric mandrels and axially displacing the eccentric mandrels from the eccentric bores;
  6. f) clamping the workpiece on the clamping means by means of at least one holding element;
  7. g) fine machining of the eccentric holes;
  8. h) finishing the profiling;
  9. i) release the tension of the central mandrel and remove the finished finished workpiece from the clamping device.

Im Falle der bevorzugten Bearbeitung eines Paares zweier Werkstücke sieht das vorgeschlagene Verfahren die Schritte vor:

  1. a) Zuführen der Werkstücke zu einem Spannmittel der Werkzeugmaschine, wobei das Spannmittel einen Zentralspanndorn zum Spannen der Zentralbohrung und mindestens zwei Exzenter-Spanndorne zum Spannen der Exzenterbohrungen aufweist, wobei der Zentralspanndorn und die mindestens zwei Exzenter-Spanndorne axial verschieblich im Spannmittel angeordnet sind;
  2. b) Positionieren der mindestens zwei Exzenterbohrungen beider Werkstücke auf den mindestens zwei Exzenter-Spanndornen und Spannen der Werkstücke über die Exzenterbohrungen auf den Exzenter-Spanndornen;
  3. c) Feinbearbeiten der Zentralbohrungen der beiden Werkstücke;
  4. d) axiales Verschieben des Zentralspanndorns in die (feinbearbeiteten) Zentralbohrungen der beiden Werkstücke und Spannen der Werkstücke über die Zentralbohrungen auf dem Zentralspanndorn;
  5. e) Lösen der Spannung der Exzenter-Spanndorne und axiales Verschieben der Exzenter-Spanndorne aus den Exzenterbohrungen heraus;
  6. f) Festspannen der Werkstücke auf dem Spannmittel mittels mindestens eines Halteelements;
  7. g) Feinbearbeiten der Exzenterbohrungen beider Werkstücke;
  8. h) Lösen des mindestens einen Halteelements;
  9. i) Reduzierung oder Lösung der Spannung des Zentralspanndorns;
  10. j) Verdrehung des einen Werkstücks um die Achse relativ zum anderen Werkstück, so dass die Profilierungen der beiden Werkstücke fluchten;
  11. k) Erhöhung der Spannung des Zentralspanndorns;
  12. l) Feinbearbeiten der beiden Profilierungen;
  13. m) Lösen des Zentralspanndorns und Entnahme der fertig feinbearbeiteten Werkstücke vom Spannmittel.
In the case of preferred machining of a pair of two workpieces, the proposed method provides the steps:
  1. a) feeding the workpieces to a clamping means of the machine tool, wherein the clamping means comprises a central clamping mandrel for clamping the central bore and at least two eccentric mandrels for clamping the eccentric holes, wherein the central clamping mandrel and the at least two eccentric mandrels are arranged axially displaceable in the clamping means;
  2. b) positioning the at least two eccentric holes of both workpieces on the at least two eccentric mandrels and clamping the workpieces on the eccentric bores on the eccentric mandrels;
  3. c) finishing the central bores of the two workpieces;
  4. d) axial displacement of the central mandrel in the (finely machined) central holes of the two workpieces and clamping the Workpieces via the central bores on the central mandrel;
  5. e) releasing the tension of the eccentric mandrels and axially displacing the eccentric mandrels from the eccentric bores;
  6. f) clamping the workpieces on the clamping means by means of at least one retaining element;
  7. g) finishing the eccentric holes of both workpieces;
  8. h) releasing the at least one retaining element;
  9. i) reduction or release of the tension of the central mandrel;
  10. j) rotation of the one workpiece about the axis relative to the other workpiece, so that the profilings of the two workpieces are aligned;
  11. k) increasing the tension of the central mandrel;
  12. l) fine machining of the two profilings;
  13. m) Release the central clamping mandrel and remove the finished, finished workpieces from the clamping device.

Im letztgenannten Falle der Bearbeitung zweier Werkstücke als Paar ist bevorzugt vorgesehen, dass das Spannen der Werkstücke auf dem Zentralspanndorn und auf den Exzenter-Spanndornen erfolgt, indem separate axiale Abschnitte des Zentralspanndorns und separate axiale Abschnitte der Exzenter-Spanndorne gespannt werden. Demgemäß haben die genannten Spanndorne entlang ihrer Achse axial versetzt verschiedene separate Spannabschnitte die unabhängig voneinander aktiviert werden können.In the latter case, the machining of two workpieces as a pair is preferably provided that the clamping of the workpieces on the central mandrel and on the eccentric mandrels takes place by separate axial sections of the central mandrel and separate axial sections of the eccentric mandrels are tensioned. Accordingly, said mandrels have along their axis axially offset different separate clamping sections which can be activated independently.

In allen Fällen ist bevorzugt vorgesehen, dass das Spannen des Zentralspanndorns und das Spannen der Exzenter-Spanndorne durch Einbringen von Drucköl erfolgen (d. h. vorgesehen ist ein Einsatz von „Hydrodehn-Spanndornen“).In all cases, it is preferably provided that the tensioning of the central clamping mandrel and the clamping of the eccentric mandrels are carried out by introducing pressurized oil (that is, an insert of "hydraulic expansion mandrels" is provided).

Das Feinbearbeiten der Zentralbohrung gemäß obigem Schritt c) kann generell durch Hartdrehen, durch Schleifen, durch Reiben oder durch Honen erfolgen.The fine machining of the central bore according to the above step c) can generally be done by hard turning, by grinding, by rubbing or by honing.

Das Feinbearbeiten der Exzenterbohrungen gemäß obigem Schritt g) kann gleichermaßen generell durch Hartdrehen, durch Schleifen, durch Reiben oder durch Honen erfolgen.The fine machining of the eccentric bores according to the above step g) can equally be done generally by hard turning, by grinding, by rubbing or by honing.

Das oben genannte Feinbearbeiten der Profilierung erfolgt bevorzugt durch Wälzschleifen; hierbei wird insbesondere mit einer Schleifschnecke gearbeitet.The above-mentioned fine machining of the profiling is preferably carried out by Wälzschleifen; In this case, working in particular with a grinding worm.

Um eine präzise Bearbeitung der Profilierung zu ermöglichen, ist bevorzugt daran gedacht, das Werkstück oder die Werkstücke mittels eines glockenförmigen Halteelements auf dem Spannmittel zu spannen.In order to enable a precise machining of the profiling, it is preferably conceived to clamp the workpiece or the workpieces by means of a bell-shaped holding element on the clamping means.

Das Verfahren kommt besonders vorteilhaft für Werkstücke in Form von Zykloidenscheiben eines Zykloidengetriebes in Betracht.The method is particularly advantageous for workpieces in the form of cycloidal disks of a cycloid gear into consideration.

Durch die vorgeschlagene Vorgehensweise wird es möglich, bei guter Produktivität Werkstücke der genannten Art mit sehr hoher Präzision zu bearbeiten.The proposed approach makes it possible to work with good productivity workpieces of the type mentioned with very high precision.

Der Bearbeitungsprozess kann dabei durch Maßnahmen begleitet werden, wie sie an sich bekannt sind. Hierbei ist insbesondere die Durchführung von Messvorgängen nach der Durchführung einzelner Verfahrensschritte vorzusehen. Dies gilt sowohl für die Vermessung der bearbeiteten Bohrungen als auch der bearbeiteten Profilierung.The machining process can be accompanied by measures as they are known per se. In particular, the implementation of measuring processes after the implementation of individual process steps is provided. This applies both to the measurement of the machined holes and the processed profiling.

Die genannten einzelnen Verfahrensschritte werden bevorzugt in der zeitlichen Abfolge durchgeführt, wie sie oben angegeben ist. Allerdings sind hierbei durchaus auch Varianten möglich. Es ist insbesondere möglich, die Bearbeitung der Zentralbohrung auf der einen Seite und die Bearbeitung der Exzenterbohrungen auf der anderen Seite in umgekehrter Reihenfolge durchzuführen. Insoweit ist die oben angegebene Abfolge der einzelnen Verfahrensschritte nicht zwingend in dieser zeitlichen Reihenfolge vorgesehen und zu verstehen.The individual method steps mentioned are preferably carried out in the time sequence as stated above. However, variants are also possible here. It is particularly possible to perform the machining of the central bore on one side and the machining of the eccentric holes on the other side in reverse order. In that regard, the above sequence of the individual process steps is not necessarily provided and understood in this chronological order.

In diesem alternativen Falle würde folglich zunächst ein axiales Verschieben des Zentralspanndorns in die (noch nicht feinbearbeitete) Zentralbohrung des Werkstücks und ein Spannen des Werkstücks auf dem Zentralspanndorn erfolgen. Nach dem Festspannen des Werkstücks auf dem Spannmittel mittels der Halteelemente würde das Feinbearbeiten der Exzenterbohrungen erfolgen. Dann würden die Exzenter-Spanndorne in die Exzenterbohrungen eingefahren und gespannt. Nach Entspannung und Herausfahren des Zentralspanndorns aus der Zentralbohrung würde das Feinbearbeiten der Zentralbohrung erfolgen.In this alternative case, therefore, initially an axial displacement of the central mandrel into the (not yet finished) central bore of the workpiece and a clamping of the workpiece on the central mandrel would take place. After clamping the workpiece on the clamping means by means of the holding elements, the fine machining of the eccentric holes would take place. Then the eccentric mandrels would be retracted and tensioned in the eccentric holes. After relaxation and retraction of the central mandrel from the central bore fine machining of the central bore would take place.

In den Zeichnungen ist ein Ausführungsbeispiel der Erfindung dargestellt. Es zeigen:

  • 1 in perspektivischer Darstellung zwei Werkstücke in Form von Zykloidenrädern eines Zykloidengetriebes, wobei die beiden Werkstücke im dargestellten Paket bearbeitet werden,
  • 2 in perspektivischer Darstellung ein Spannmittel einer (nicht dargestellten) Werkzeugmaschine, wobei das Einlegen der Werkstücke in das Spannmittel angedeutet ist, d. h. es ist ein erstes Verfahrensstadium dargestellt,
  • 3 in perspektivischer Darstellung das geschnitten dargestellte Spannmittel, wobei die beiden Werkstücke nunmehr im Spannmittel aufgenommen sind und über drei Exzenter-Spanndorne an ihren drei Exzenterbohrungen gespannt sind, d. h. es ist ein zweites Verfahrensstadium dargestellt,
  • 4 in perspektivischer Darstellung das geschnitten dargestellte Spannmittel, wobei die beiden Werkstücke nunmehr bei noch eingefahrenen Exzenter-Spanndornen über einen Zentralspanndorn an ihrer Zentralbohrung gespannt sind, d. h. es ist ein drittes Verfahrensstadium dargestellt,
  • 5 in perspektivischer Darstellung das geschnitten dargestellte Spannmittel, wobei die beiden Werkstücke nunmehr über den Zentralspanndorn an ihrer Zentralbohrung gespannt sind, d. h. es ist ein viertes Verfahrensstadium dargestellt,
  • 6 in perspektivischer Darstellung das Spannmittel, wobei bei eingefahrenem Zentralspanndorn die beiden Werkstücke durch Halteelemente auf dem Spannmittel fixiert sind, d. h. es ist ein fünftes Verfahrensstadium dargestellt,
  • 7 in perspektivischer Darstellung das Spannmittel, wobei nunmehr durch ein Verdrehelement das obere Werkstück relativ zum unteren Werkstück um die Achse verdreht wird, d. h. es ist ein sechstes Verfahrensstadium dargestellt,
  • 8 in perspektivischer Darstellung das Spannmittel, wobei nunmehr durch ein glockenförmiges Halteelement die beiden Werkstücke gehalten werden, um die Profilierung feinzubearbeiten, d. h. es ist ein siebtes Verfahrensstadium dargestellt.
In the drawings, an embodiment of the invention is shown. Show it:
  • 1 in perspective view two workpieces in the form of cycloid wheels of a cycloid gear, wherein the two workpieces are processed in the illustrated package,
  • 2 in perspective view a clamping means of a (not shown) machine tool, wherein the insertion of the workpieces in the clamping means is indicated, that is, it is shown a first stage of the process,
  • 3 in perspective view, the clamping means shown cut, the two workpieces are now included in the clamping means and are stretched over three eccentric mandrels at their three eccentric holes, ie it is shown a second stage of the process,
  • 4 in a perspective view of the clamping means shown cut, the two workpieces are now stretched at a retracted eccentric mandrels on a central mandrel at its central bore, ie it is shown a third stage of the process,
  • 5 in a perspective view the clamping means shown cut, wherein the two workpieces are now stretched over the central mandrel at its central bore, ie it is a fourth stage of the process shown,
  • 6 in a perspective view of the clamping means, wherein with retracted central clamping mandrel, the two workpieces are fixed by holding elements on the clamping means, ie, it is shown a fifth stage of the method,
  • 7 in a perspective view of the clamping means, wherein now the upper workpiece is rotated about the axis relative to the lower workpiece by a rotating element, ie it is shown a sixth stage of the method,
  • 8th in a perspective view of the clamping means, now being held by a bell-shaped holding element, the two workpieces to finish the profiling, ie, it is a seventh stage of the process shown.

In 1 sind zwei Werkstücke 1 dargestellt, die scheibenförmige Zykloidenräder eines Zykloidengetriebes sind. Die Werkstücke 1 weisen eine Zentralbohrung 2 auf, durch die die Achse a des Werkstücks verläuft. Exzentrisch zur Achse a sind drei Exzenterbohrungen 3, 4 und 5 angeordnet. Darüber hinaus weist - was für die vorliegende Erfindung ohne größere Relevanz ist - das Werkstück noch drei unrunde Ausnehmungen auf, über die Montagefunktionen des Getriebesystems abgebildet werden. Weiterhin haben die beiden Werkstücke 1 an ihrem zylindrischen Außenumfang jeweils eine Profilierung 6 in Form einer Verzahnung. Wenn die beiden Werkstücke 1 hinsichtlich ihrer Exzenterbohrungen 3, 4 und 5 fluchten, gilt dies nicht für die Profilierung 6; wie aus 1 zu erkennen ist, ist die Profilierung 6 der beiden Verzahnungen in Umfangsrichtung um einen halben Zahn, d. h. um eine halbe Teilung, versetzt.In 1 are two workpieces 1 shown, the disc-shaped cycloidal wheels of a cycloid gear are. The workpieces 1 have a central hole 2 on, through which the axis a of the workpiece runs. Eccentric to the axis a are three eccentric holes 3 . 4 and 5 arranged. In addition - which is of no greater relevance to the present invention - the workpiece still has three non-circular recesses, are imaged via the assembly functions of the transmission system. Furthermore, the two workpieces 1 in each case a profiling on its cylindrical outer circumference 6 in the form of a tooth system. If the two workpieces 1 with regard to their eccentric bores 3 . 4 and 5 This does not apply to the profiling 6 ; like out 1 it can be seen, is the profiling 6 the two teeth in the circumferential direction by half a tooth, ie offset by half a pitch.

Es gilt, die Zentralbohrung 2, die Exzenterbohrungen 3, 4 und 5 sowie die Profilierung 6 präzise zu bearbeiten, wobei sehr hohe Anforderungen an die Präzision gestellt sind. Die zulässige Lageabweichung der genannten Bohrungen bzw. Profilierungen liegt im Bereich weniger Mikrometer.It is the central hole 2 , the eccentric holes 3 . 4 and 5 as well as the profiling 6 Precise machining, with very high demands are placed on the precision. The permissible positional deviation of said bores or profilings is in the range of a few micrometers.

Wie diese Fertigungsaufgabe ökonomisch und mit einem guten Ergebnis hinsichtlich der Anforderungen an die Präzision gelöst wird, ergibt sich aus den 2 bis 8.How this manufacturing task is solved economically and with a good result in terms of precision requirements, results from the 2 to 8th ,

In 2 ist zu erkennen, wie die beiden Werkstücke 1 im Paket angeordnet einer (nicht dargestellten) Werkzeugmaschine und insbesondere einem Spannmittel 7 zugeführt werden. Das Spannmittel 7 weist einen Zentralspanndorn 8 und drei Exzenter-Spanndorne 9, 10 und 11 auf. Alle Spanndorne 8, 9, 10, 11 sind in Richtung der Achse a verschieblich im Spannmittel 7 angeordnet. Wie sich aus 2 ergibt, befindet sich der Zentralspanndorn 8 in einer zurückgezogenen Lage, während sich die drei Exzenter-Spanndorne 9, 10 und 11 in einer herausgeschobenen Position befinden. In dieser Position der Spanndorne werden die beiden Werkstücke 1 in die Spannmittel 7 eingesetzt, d. h. die beiden Werkstücke 1 werden mit ihren Exzenterbohrungen 3, 4, 5 auf die drei Exzenter-Spanndorne 9, 10 und 11 aufgeschoben.In 2 you can see how the two workpieces 1 in the package arranged a (not shown) machine tool and in particular a clamping means 7 be supplied. The clamping device 7 has a central mandrel 8th and three eccentric mandrels 9 . 10 and 11 on. All mandrels 8th . 9 . 10 . 11 are in the direction of the axis a displaceable in the clamping device 7 arranged. As it turned out 2 results, is the central mandrel 8th in a retracted position while the three eccentric mandrels 9 . 10 and 11 in an extended position. In this position, the mandrels are the two workpieces 1 in the clamping device 7 used, ie the two workpieces 1 be with their eccentric holes 3 . 4 . 5 on the three eccentric mandrels 9 . 10 and 11 postponed.

Am Beispiel des Exzenter-Spanndorns 9 ist durch die angebrachten Bezugszeichen zu erkennen (dasselbe gilt auch für die Exzenter-Spanndorne 10 und 11), dass separate axiale Abschnitte 9' und 9" der Exzenter-Spanndorne 9, 10 und 11 vorliegen, mit denen gezielt die jeweiligen Exzenterbohrungen 3, 4, 5 der beiden Werkstücke 1 gespannt werden können.Using the example of the eccentric mandrel 9 can be seen by the attached reference numerals (the same applies to the eccentric mandrels 10 and 11 ) that have separate axial sections 9 ' and 9 " the eccentric mandrels 9 . 10 and 11 present, with which specifically the respective eccentric bores 3 . 4 . 5 of the two workpieces 1 can be stretched.

Die Situation, in der die Werkstücke 1 mittels der drei Exzenter-Spanndorne 9, 10 und 11 auf dem Spannmittel 7 gespannt sind, ist in 3 illustriert. Somit ergibt sich aus 3, dass die Werkstücke 1 dem Spannmittel 7 der Werkzeugmaschine zugeführt wurden. Die drei Exzenterbohrungen 3, 4 und 5 beider Werkstücke 1 wurden auf den drei Exzenter-Spanndornen 9, 10, 11 platziert und es erfolgte ein Spannen der Werkstücke 1 über die Exzenterbohrungen 3, 4, 5 auf den Exzenter-Spanndornen 9, 10, 11.The situation in which the workpieces 1 by means of the three eccentric mandrels 9 . 10 and 11 on the clamping device 7 are curious, is in 3 illustrated. Thus results from 3 that the workpieces 1 the clamping device 7 the machine tool were supplied. The three eccentric holes 3 . 4 and 5 both workpieces 1 were on the three eccentric mandrels 9 . 10 . 11 placed and there was a clamping of the workpieces 1 about the eccentric holes 3 . 4 . 5 on the eccentric mandrels 9 . 10 . 11 ,

Die beiden Werkstücke 1 sind demgemäß nunmehr anhand der Exzenterbohrungen 3, 4, 5 auf dem Spannmittel 7 ausgerichtet. Nun werden die beiden Zentralbohrungen 2 der beiden Werkstücke 1 feinbearbeitet. Dies erfolgt beispielsweise durch Schleifen; auch Hartdrehen hat sich bewährt.The two workpieces 1 are now now based on the eccentric holes 3 . 4 . 5 on the clamping device 7 aligned. Now the two central holes 2 of the two workpieces 1 precision machined. This is done, for example, by grinding; Hartdrehen has also proven itself.

Nach erfolgter Feinbearbeitung der Zentralbohrungen 2 wird, wie es in 4 dargestellt ist, der Zentralspanndorn 8 in die Zentralbohrungen 2 der beiden Werkstücke 1 durch axiales Verschieben in Richtung der Achse a eingefahren. Dann wird der Zentralspanndorn 8 mit seinen beiden axialen Spann-Abschnitten 8' und 8" gespannt, so dass die beiden Werkstücke 1 anhand des Zentralspanndorns 8 auf dem Spannmittel 7 festgelegt sind. After fine machining of the central holes 2 will, as it is in 4 is shown, the central mandrel 8th into the central holes 2 of the two workpieces 1 by axial displacement in the direction of the axis a retracted. Then the central mandrel becomes 8th with its two axial clamping sections 8th' and 8th" excited, so that the two workpieces 1 based on the central mandrel 8th on the clamping device 7 are fixed.

Die drei Exzenter-Spanndorne 9, 10, 11 können nun entspannt und in axialer Richtung zurückgezogen werden, wie es 5 zeigt.The three eccentric mandrels 9 . 10 . 11 can now be relaxed and withdrawn in the axial direction, as it is 5 shows.

Damit für die nachfolgende Bearbeitung die beiden Werkstücke 1 am Spannmittel 7 festliegen, erfolgt nun das Festspannen der Werkstücke 1 auf dem Spannmittel 7 mittels dreier Halteelemente 12, 13 und 14. Dies ist in 6 illustriert. Die beiden Werkstücke 1 sind demgemäß nunmehr anhand der Zentralbohrung 2 präzise justiert und durch die Halteelemente 12, 13 und 14 am Spannmittel 7 fixiert. In diesem Zustand erfolgt das Feinbearbeiten der Exzenterbohrungen 3, 4 und 5 der beiden Werkstücke 1.So for the subsequent processing, the two workpieces 1 on the clamping device 7 are fixed, now takes place the clamping of the workpieces 1 on the clamping device 7 by means of three retaining elements 12 . 13 and 14 , This is in 6 illustrated. The two workpieces 1 are now now based on the central bore 2 precisely adjusted and by the retaining elements 12 . 13 and 14 on the clamping device 7 fixed. In this state, the fine machining of the eccentric holes takes place 3 . 4 and 5 of the two workpieces 1 ,

Nach Durchführung dieses Arbeitsgangs sind somit sowohl die Zentralbohrung 2 als auch die drei Exzenterbohrungen 3, 4, 5 beider Werkstücke 1 präzise bearbeitet. Nunmehr schließt sich die Bearbeitung der Profilierung 6 an.After performing this operation are thus both the central bore 2 as well as the three eccentric holes 3 . 4 . 5 both workpieces 1 precisely edited. Now the editing of the profiling closes 6 at.

Da bei fluchtender Ausrichtung der Exzenterbohrungen 3, 4, 5 die Profilierungen 6 der beiden Werkstücke 1 nicht fluchten (siehe oben), wird nun, wie es in 7 dargestellt ist, mit einem Verdrehelement 16 das obere Werkstück 1 relativ zum unteren Werkstück 1 um die Achse a um einen solchen Winkel verdreht, dass die Profilierungen 6 nunmehr in Achsrichtung fluchten. In 7 sind zwei Winkelmarkierungen 17 und 18 eingetragen, die den erforderlichen Drehwinkel des oberen Werkstücks 1 relativ zum unteren Werkstück 1 illustrieren.As with aligned alignment of the eccentric holes 3 . 4 . 5 the profiles 6 of the two workpieces 1 Do not swear (see above), now, as it is in 7 is shown with a twisting element 16 the upper workpiece 1 relative to the lower workpiece 1 around the axis a twisted at such an angle that the profilings 6 now aligned in the axial direction. In 7 are two angle marks 17 and 18 entered the required angle of rotation of the upper workpiece 1 relative to the lower workpiece 1 illustrate.

Vor besagter relativer Verdrehung der beiden Werkstücke 1 wurden natürlich die Halteelemente 12, 13 und 14 wieder gelöst und in ihre in 7 dargestellte Ausgangsposition zurückgefahren. Im Übrigen wurde auch der Spanndruck im Zentralspanndorn 8 zurückgenommen, so dass die Verdrehung möglich ist.Before said relative rotation of the two workpieces 1 were of course the retaining elements 12 . 13 and 14 solved again and in their in 7 retracted shown starting position. Incidentally, the clamping pressure in the central mandrel was also 8th taken back, so that the rotation is possible.

Ist die fluchtende Positionierung der Profilierungen 6 erreicht, wird der Spanndruck im Zentralspanndorn wieder erhöht und in Vorbereitung der anstehenden Feinbearbeitung der beiden Profilierungen 6 des Werkstücks 1 ein glockenförmiges Halteelement 15 auf die Werkstücke 1 aufgesetzt, um eine axial vorgespannte Halterung der beiden Werkstücke 1 auf dem Spannmittel 7 zu bewerkstelligen. Dies ist in 8 dargestellt. Nunmehr erfolgt - vorzugsweise durch Wälzschleifen mittels einer (nicht dargestellten) Schleifeschnecke die Feinbearbeitung der Profilierungen 6.Is the aligned positioning of the profiles 6 reached, the clamping pressure in the central mandrel is increased again and in preparation for the upcoming fine machining of the two profilings 6 of the workpiece 1 a bell-shaped holding element 15 on the workpieces 1 fitted to an axially biased mounting of the two workpieces 1 on the clamping device 7 to accomplish. This is in 8th shown. Now takes place - preferably by generating grinding by means of a (not shown) worm grinding the fine machining of the profiles 6 ,

Schließlich wird das Halteelement 15 entfernt und der Zentralspanndorn 8 entspannt, so dass die Entnahme der beiden fertig feinbearbeiteten Werkstücke 1 vom Spannmittel 7 erfolgen kann.Finally, the retaining element 15 removed and the central mandrel 8th relaxed, allowing the removal of the two finished fine machined workpieces 1 from the clamping device 7 can be done.

Die erläuterte Vorgehensweise kann durch eine Anzahl verschiedenartiger Zusatzschritte bzw. Zusatzelemente ergänzt, aber auch modifiziert werden: The explained procedure can be supplemented by a number of different additional steps or additional elements, but also modified:

Zur Erleichterung des Rüstens kann das Spannmittel 7 an seinem Außenumfang eine Ausrichtnut 19 aufweisen. Die Drehlage der Ausrichtnut 19 zu den drei Exzenter-Spanndornen 9, 10, 11 ist gemessen worden und auf dem Spannmittel 7 entweder eingraviert oder mittels eines RFID-Elements, eines QR-Codes oder eines funktional vergleichbaren Datenträgers gespeichert. Durch einmaliges Ausrichten der Ausrichtnut 19 mittels eines Messtasters ist dann die Drehlage des Spannmittels 7 zur Achse a bekannt.To facilitate the setup, the clamping device 7 an alignment groove on its outer circumference 19 exhibit. The rotational position of the alignment groove 19 to the three eccentric mandrels 9 . 10 . 11 has been measured and on the clamping device 7 either engraved or stored by means of an RFID element, a QR code or a functionally comparable data carrier. By once aligning the alignment groove 19 By means of a probe is then the rotational position of the clamping device 7 to the axis a known.

Zur Überprüfung der Ausrichtung kann am Spannmittel 7 noch eine Fläche angebracht sein, die im rechten Winkel zur Ausrichtnut 19 angeordnet ist. Diese Fläche kann nach der Ausrichtung mittels einer Messuhr abgefahren werden.To check the alignment can be on the clamping device 7 another surface should be attached at right angles to the alignment groove 19 is arranged. This surface can be traversed after alignment by means of a dial gauge.

Beim Zuführen der Werkstücke 1 auf das Spannmittel 7 müssen die beiden Teile einen Lagebezug zueinander aufweisen. Das Paket bestehend aus den beiden Werkstücken 1 wird daher vorteilhaft bezüglich der Exzenterbohrungen 3, 4, 5 vorausgerichtet. Demgemäß werden die Werkstücke 1 relativ zum Spannmittel 7 so vorpositioniert, dass die Exzenterbohrungen 3, 4, 5 über den Exzenter-Spanndornen 9, 10, 11 stehen.When feeding the workpieces 1 on the clamping device 7 the two parts must have a positional relationship to each other. The package consisting of the two workpieces 1 is therefore advantageous with respect to the eccentric holes 3 . 4 . 5 pre-aligned. Accordingly, the workpieces 1 relative to the clamping device 7 so prepositioned that the eccentric holes 3 . 4 . 5 over the eccentric mandrels 9 . 10 . 11 stand.

Wie oben erläutert, bietet es sich an, dass die Spanndorne - das gilt sowohl für den Zentralspanndorn 8 als auch für die Exzenter-Spanndorne 9, 10, 11 - axial versetzte Spannabschnitte aufweisen, mit denen die entsprechenden Bohrungen der Werkstücke separat und unabhängig voneinander gespannt werden können. Bevorzugt wird beim Spannen der Werkstücke zunächst die untere Ebene, also das untere Werkstück 1, und anschließend die obere Ebene, also das obere Werkstück 1, gespannt.As explained above, it makes sense that the mandrels - this applies to both the central mandrel 8th as well as for the eccentric mandrels 9 . 10 . 11 - Have axially offset clamping sections with which the corresponding holes of the workpieces can be clamped separately and independently. When clamping the workpieces, the lower level, ie the lower workpiece, is preferred 1 , and then the upper level, so the upper workpiece 1 , curious; excited.

Für ein Spannen der Werkstücke 1 ist die axiale Kraft zumeist ausreichend, die über das Eigengewicht der Werkstücke wirkt. Alternativ kann auch beim Spannen der Werkstücke auf dem Spannmittel 7 eine Reitstock-Druckglocke zum axialen Andrücken eingesetzt werden, um eine klar definierte Anlage der Werkstücke am Spannmittel 7 sicherzustellen.For clamping the workpieces 1 the axial force is usually sufficient, which acts on the weight of the workpieces. Alternatively, when clamping the workpieces on the clamping device 7 a tailstock pressure bell used for axial pressing to a clearly defined system of workpieces on the clamping device 7 sure.

Die drei Halteelemente 12, 13 und 14 haben sich in dieser Ausgestaltung bewährt, um eine gute Halterung der Werkstücke am Spannmittel sicherzustellen und dennoch eine minimale Flächenpressung zu erreichen. Im Ausführungsbeispiel greifen die Halteelemente radial von außen auf die Werkstücke zu (siehe 6). Alternativ zu dieser Lösung kann auch vorgesehen werden, dass die Halteelemente durch korrespondierende Aussparungen (siehe hierzu die unrunden Ausnehmungen im Werkstück 1) in den Werkstücken 1 geführt werden. Zum Klemmen schwenken sie dann radial nach außen.The three retaining elements 12 . 13 and 14 have proven themselves in this embodiment, to ensure a good support of the workpieces on the clamping device and yet to achieve a minimum surface pressure. In the embodiment, the holding elements engage radially from the outside to the workpieces (see 6 ). Alternatively to this solution can also be provided that the holding elements by corresponding recesses (see the non-circular recesses in the workpiece 1 ) in the workpieces 1 be guided. For clamping, they then pivot radially outward.

Das Entspannen und axiale Versenken der drei Exzenter-Spanndorne 9, 10, 11 erfolgt bevorzugt erst, nachdem die genannten Halteelemente 12, 13, 14 bereits eine axiale Spannkraft eingeleitet haben.The relaxing and axial countersinking of the three eccentric mandrels 9 . 10 . 11 preferably takes place only after the said holding elements 12 . 13 . 14 already initiated an axial clamping force.

Eine zeitlich kombinierte Bearbeitung der Zentralbohrung 8 sowie der Exzenter-Bohrungen 9, 10, 11 ist möglich, wenn durch die Halteelemente 12, 13, 14 ein zuverlässiger Halt der Werkstücke 1 auf dem Spannmittel 7 sichergestellt ist.A temporally combined machining of the central bore 8th and the eccentric holes 9 . 10 . 11 is possible if through the retaining elements 12 . 13 . 14 a reliable hold of the workpieces 1 on the clamping device 7 is ensured.

Hinsichtlich der relativen Verdrehung der beiden Werkstücke 1 um eine halbe Teilung der Profilierung 6, um diese am Außenumfang der Werkstücke 1 fluchten zu lassen, wird bevorzugt so vorgegangen, dass mittels des genannten Verdrehelements 16 in die Exzenterbohrungen des oberen Werkstücks 1 eingegriffen und dieses somit an einer Rotation gehindert wird. Das Verdrehelement 16 wird dabei bevorzugt von einer Druckglocke axial vorbelastet, nachdem zuvor beide Segmente des Hydrodehn-Spanndorns belastet wurden. Das untere Werkstück 1 wird dann durch Rotation des Rundtisches, welches das Spannmittel 7 hält, entsprechend verdreht.With regard to the relative rotation of the two workpieces 1 by half a division of the profiling 6 to this on the outer circumference of the workpieces 1 To be aligned, it is preferable to proceed by means of said rotating element 16 in the eccentric holes of the upper workpiece 1 intervenes and this is thus prevented from rotation. The twisting element 16 is preferably axially biased by a pressure bell after previously both segments of the hydraulic expansion mandrel were loaded. The lower workpiece 1 is then by rotation of the rotary table, which the clamping means 7 holds, accordingly twisted.

Für das Messen der feinbearbeiteten Flächen können entsprechende Messgeräte vorgesehen werden, die als solche bekannt sind.For measuring the finely machined surfaces corresponding measuring devices can be provided, which are known as such.

Im Zusammenhang mit der Entnahme der fertigen Werkstücke aus der Werkzeugmaschine kann es aus konstruktiven Gründen bzw. aufgrund von ansonsten gegebenen Kollisionen notwendig sein, die genannte Verdrehung der beiden Werkstücke wieder rückgängig zu machen, bevor die Werkstücke entnommen werden.In connection with the removal of the finished workpieces from the machine tool, it may be necessary for structural reasons or due to otherwise given collisions, to reverse the aforementioned rotation of the two workpieces before the workpieces are removed.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Werkstückworkpiece
22
Zentralbohrungcentral bore
33
Exzenterbohrungeccentric hole
44
Exzenterbohrungeccentric hole
55
Exzenterbohrungeccentric hole
66
Profilierungprofiling
77
Spannmittelclamping means
88th
ZentralspanndornCentral mandrel
8'8th'
axialer Abschnitt des Zentralspanndornsaxial section of the central mandrel
8"8th"
axialer Abschnitt des Zentralspanndornsaxial section of the central mandrel
99
Exzenter-SpanndornEccentric mandrel
9'9 '
axialer Abschnitt des Exzenter-Spanndornsaxial portion of the eccentric mandrel
9"9 "
axialer Abschnitt des Exzenter-Spanndornsaxial portion of the eccentric mandrel
1010
Exzenter-SpanndornEccentric mandrel
1111
Exzenter-SpanndornEccentric mandrel
1212
Halteelementretaining element
1313
Halteelementretaining element
1414
Halteelementretaining element
1515
glockenförmiges Halteelementbell-shaped holding element
1616
Verdrehelementtwist element
1717
Winkelmarkierungangle mark
1818
Winkelmarkierungangle mark
1919
Ausrichtnut alignment groove
aa
Achseaxis

Claims (10)

Verfahren zum Feinbearbeiten eines scheibenförmigen Werkstücks (1) auf einer Werkzeugmaschine, wobei das Werkstück (1) eine Achse (a) aufweist, wobei das Werkstück (1) eine Zentralbohrung (2) mit der Achse (a) aufweist, wobei das Werkstück (1) mindestens zwei exzentrisch zur Achse (a) liegende Exzenterbohrungen (3, 4, 5) aufweist und wobei das Werkstück (1) an einem Außenumfang eine Profilierung (6) aufweist, dadurch gekennzeichnet, dass das Verfahren die Schritte aufweist: a) Zuführen des Werkstücks (1) zu einem Spannmittel (7) der Werkzeugmaschine, wobei das Spannmittel (7) einen Zentralspanndorn (8) zum Spannen der Zentralbohrung (2) und mindestens zwei Exzenter-Spanndorne (9, 10, 11) zum Spannen der Exzenterbohrungen (3, 4, 5) aufweist, wobei der Zentralspanndorn (8) und die mindestens zwei Exzenter-Spanndorne (9, 10, 11) axial verschieblich im Spannmittel (7) angeordnet sind; b) Positionieren der mindestens zwei Exzenterbohrungen (3, 4, 5) auf den mindestens zwei Exzenter-Spanndornen (9, 10, 11) und Spannen des Werkstücks (1) über die Exzenterbohrungen (3, 4, 5) auf den Exzenter-Spanndornen (9, 10, 11); c) Feinbearbeiten der Zentralbohrung (2); d) axiales Verschieben des Zentralspanndorns (8) in die Zentralbohrung (2) und Spannen des Werkstücks (1) über die Zentralbohrung (2) auf dem Zentralspanndorn (8); e) Lösen der Spannung der Exzenter-Spanndorne (9, 10, 11) und axiales Verschieben der Exzenter-Spanndorne (9, 10, 11) aus den Exzenterbohrungen (3, 4, 5) heraus; f) Festspannen des Werkstücks (1) auf dem Spannmittel (7) mittels mindestens eines Halteelements (12, 13, 14); g) Feinbearbeiten der Exzenterbohrungen (3, 4, 5); h) Feinbearbeiten der Profilierung (6); i) Lösen der Spannung des Zentralspanndorns (8) und Entnahme des fertig feinbearbeiteten Werkstücks (1) vom Spannmittel (7). Method for fine machining a disk-shaped workpiece (1) on a machine tool, the workpiece (1) having an axis (a), the workpiece (1) having a central bore (2) with the axis (a), the workpiece (1 ) has at least two eccentric bores (3, 4, 5) lying eccentrically to the axis (a) and wherein the workpiece (1) has a profiling (6) on an outer circumference, characterized in that the method comprises the steps of: a) feeding the Workpiece (1) to a clamping means (7) of the machine tool, wherein the clamping means (7) has a central clamping mandrel (8) for clamping the central bore (2) and at least two eccentric clamping mandrels (9, 10, 11) for clamping the eccentric bores (3 , 4, 5), wherein the central mandrel (8) and the at least two eccentric mandrels (9, 10, 11) are arranged axially displaceable in the clamping means (7); b) positioning the at least two eccentric bores (3, 4, 5) on the at least two eccentric mandrels (9, 10, 11) and clamping the workpiece (1) via the eccentric bores (3, 4, 5) on the eccentric mandrels (9, 10, 11); c) finishing the central bore (2); d) axially displacing the central clamping mandrel (8) into the central bore (2) and clamping the workpiece (1) via the central bore (2) on the central clamping mandrel (8); e) releasing the tension of the eccentric mandrels (9, 10, 11) and axially displacing the eccentric mandrels (9, 10, 11) out of the eccentric bores (3, 4, 5); f) clamping the workpiece (1) on the clamping means (7) by means of at least one holding element (12, 13, 14); g) fine machining of the eccentric bores (3, 4, 5); h) finishing the profiling (6); i) releasing the tension of the central mandrel (8) and removing the finished fine machined workpiece (1) from the clamping means (7). Verfahren zum Feinbearbeiten zweier scheibenförmiger Werkstücke (1) im Paket auf einer Werkzeugmaschine, wobei die Werkstücke (1) eine Achse (a) aufweisen, wobei die Werkstücke (1) eine Zentralbohrung (2) mit der Achse (a) aufweisen, wobei die Werkstücke (1) mindestens zwei exzentrisch zur Achse (a) liegende Exzenterbohrungen (3, 4, 5) aufweisen und wobei die Werkstücke (1) an einem Außenumfang eine Profilierung (6) aufweisen, wobei bei in Richtung der Achse (a) fluchtender Anordnung der Exzenterbohrungen (3, 4, 5) die Profilierungen (6) der beiden Werkstücke (1) nicht fluchten, dadurch gekennzeichnet, dass das Verfahren die Schritte aufweist: a) Zuführen der Werkstücke (1) zu einem Spannmittel (7) der Werkzeugmaschine, wobei das Spannmittel (7) einen Zentralspanndorn (8) zum Spannen der Zentralbohrung (2) und mindestens zwei Exzenter-Spanndorne (9, 10, 11) zum Spannen der Exzenterbohrungen (3, 4, 5) aufweist, wobei der Zentralspanndorn (8) und die mindestens zwei Exzenter-Spanndorne (9, 10, 11) axial verschieblich im Spannmittel (7) angeordnet sind; b) Positionieren der mindestens zwei Exzenterbohrungen (3, 4, 5) beider Werkstücke (1) auf den mindestens zwei Exzenter-Spanndornen (9, 10, 11) und Spannen der Werkstücke (1) über die Exzenterbohrungen (3, 4, 5) auf den Exzenter-Spanndornen (9, 10, 11); c) Feinbearbeiten der Zentralbohrungen (2) der beiden Werkstücke (1); d) axiales Verschieben des Zentralspanndorns (8) in die Zentralbohrungen (2) der beiden Werkstücke (1) und Spannen der Werkstücke (1) über die Zentralbohrungen (2) auf dem Zentralspanndorn (8); e) Lösen der Spannung der Exzenter-Spanndorne (9, 10, 11) und axiales Verschieben der Exzenter-Spanndorne (9, 10, 11) aus den Exzenterbohrungen (3, 4, 5) heraus; f) Festspannen der Werkstücke (1) auf dem Spannmittel (7) mittels mindestens eines Halteelements (12, 13, 14); g) Feinbearbeiten der Exzenterbohrungen (3, 4, 5) beider Werkstücke (1); h) Lösen des mindestens einen Halteelements (12, 13, 14); i) Reduzierung oder Lösung der Spannung des Zentralspanndorns (8); j) Verdrehung des einen Werkstücks (1) um die Achse (a) relativ zum anderen Werkstück (1), so dass die Profilierungen (6) der beiden Werkstücke (1) fluchten; k) Erhöhung der Spannung des Zentralspanndorns (8); 1) Feinbearbeiten der beiden Profilierungen (6); m) Lösen des Zentralspanndorns (8) und Entnahme der fertig feinbearbeiteten Werkstücke (1) vom Spannmittel (7).A method of finishing two disc-shaped workpieces (1) in a package on a machine tool, the workpieces (1) having an axis (a), the workpieces (1) having a central bore (2) with the axis (a), the workpieces (1) have at least two eccentric bores (3, 4, 5) which are eccentric to the axis (a) and wherein the workpieces (1) have a profiling (6) on an outer circumference, the arrangement being aligned in the direction of the axis (a) Eccentric bores (3, 4, 5) the profiles (6) of the two workpieces (1) are not aligned, characterized in that the method comprises the steps of: a) feeding the workpieces (1) to a clamping means (7) of the machine tool, wherein the clamping means (7) has a central clamping mandrel (8) for clamping the central bore (2) and at least two eccentric clamping mandrels (9, 10, 11) for clamping the eccentric bores (3, 4, 5), wherein the central clamping mandrel (8) and the at least two eccentric S panndorne (9, 10, 11) axially displaceable in the clamping means (7) are arranged; b) positioning the at least two eccentric bores (3, 4, 5) of both workpieces (1) on the at least two eccentric clamping mandrels (9, 10, 11) and clamping the workpieces (1) via the eccentric bores (3, 4, 5) on the eccentric mandrels (9, 10, 11); c) finishing the central bores (2) of the two workpieces (1); d) axially displacing the central clamping mandrel (8) into the central bores (2) of the two workpieces (1) and clamping the workpieces (1) via the central bores (2) on the central clamping mandrel (8); e) releasing the tension of the eccentric mandrels (9, 10, 11) and axially displacing the eccentric mandrels (9, 10, 11) out of the eccentric bores (3, 4, 5); f) clamping the workpieces (1) on the clamping means (7) by means of at least one holding element (12, 13, 14); g) fine machining of the eccentric bores (3, 4, 5) of both workpieces (1); h) releasing the at least one retaining element (12, 13, 14); i) reduction or release of the tension of the central mandrel (8); j) rotation of the one workpiece (1) about the axis (a) relative to the other workpiece (1), so that the profilings (6) of the two workpieces (1) are aligned; k) increasing the tension of the central mandrel (8); 1) fine machining of the two profilings (6); m) releasing the central mandrel (8) and removing the finished fine machined workpieces (1) from the clamping means (7). Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass das Spannen der Werkstücke (1) auf dem Zentralspanndorn (8) und auf den Exzenter-Spanndornen (9, 10, 11) erfolgt, indem separate axiale Abschnitte (8', 8") des Zentralspanndorns (8) und separate axiale Abschnitte (9', 9") der Exzenter-Spanndorne (9, 10, 11) gespannt werden.Method according to Claim 2 , characterized in that the clamping of the workpieces (1) on the central mandrel (8) and on the eccentric mandrels (9, 10, 11) by separate axial sections (8 ', 8 ") of the central mandrel (8) and separate axial sections (9 ', 9 ") of the eccentric mandrels (9, 10, 11) are tensioned. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass das Spannen des Zentralspanndorns (8) und das Spannen der Exzenter-Spanndorne (9, 10, 11) durch Einbringen von Drucköl erfolgen.Method according to one of Claims 1 to 3 , characterized in that the clamping of the central mandrel (8) and the clamping of the eccentric mandrels (9, 10, 11) by introducing pressurized oil. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass das Feinbearbeiten der Zentralbohrung (2) gemäß Schritt c) von Anspruch 1 oder 2 durch Hartdrehen, durch Schleifen, durch Reiben oder durch Honen erfolgt.Method according to one of Claims 1 to 4 , characterized in that the finishing of the central bore (2) according to step c) of Claim 1 or 2 by hard turning, by grinding, by rubbing or by honing. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass das Feinbearbeiten der der Exzenterbohrungen (3, 4, 5) gemäß Schritt g) von Anspruch 1 oder 2 durch Hartdrehen, durch Schleifen, durch Reiben oder durch Honen erfolgt.Method according to one of Claims 1 to 5 , characterized in that the fine machining of the eccentric bores (3, 4, 5) according to step g) of Claim 1 or 2 by hard turning, by grinding, by rubbing or by honing. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass das Feinbearbeiten der Profilierung (6) gemäß Schritt h) von Anspruch 1 oder gemäß Schritt 1) von Anspruch 2 durch Wälzschleifen erfolgt.Method according to one of Claims 1 to 6 , characterized in that the fine machining of the profiling (6) according to step h) of Claim 1 or according to step 1) of Claim 2 done by Wälzschleifen. Verfahren nach Anspruch 7, dadurch gekennzeichnet, dass das Wälzschleifen mittels einer Schleifschnecke erfolgt.Method according to Claim 7 , characterized in that the Wälzschleifen takes place by means of a grinding worm. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass vor dem Feinbearbeiten der Profilierung (6) gemäß Schritt h) von Anspruch 1 oder vor dem Feinbearbeiten der Profilierungen (6) gemäß Schritt 1) von Anspruch 2 das Werkstück oder die Werkstücke mittels eines glockenförmigen Halteelements (15) auf dem Spannmittel (7) gespannt werden. Method according to one of Claims 1 to 8th , characterized in that before the fine machining of the profiling (6) according to step h) of Claim 1 or before the fine machining of the profilings (6) according to step 1) of Claim 2 the workpiece or the workpieces by means of a bell-shaped holding element (15) on the clamping means (7) are tensioned. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass das Werkstück (1) eine Zykloidenscheibe eines Zykloidengetriebes ist.Method according to one of Claims 1 to 9 , characterized in that the workpiece (1) is a cycloidal disk of a cycloid gear.
DE102017001359.4A 2017-02-14 2017-02-14 Method for fine machining a disk-shaped workpiece Active DE102017001359B4 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102017001359.4A DE102017001359B4 (en) 2017-02-14 2017-02-14 Method for fine machining a disk-shaped workpiece
PCT/EP2018/053377 WO2018149767A1 (en) 2017-02-14 2018-02-12 Method for precision machining a disc-shaped workpiece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102017001359.4A DE102017001359B4 (en) 2017-02-14 2017-02-14 Method for fine machining a disk-shaped workpiece

Publications (2)

Publication Number Publication Date
DE102017001359A1 DE102017001359A1 (en) 2018-08-16
DE102017001359B4 true DE102017001359B4 (en) 2019-02-21

Family

ID=61198856

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102017001359.4A Active DE102017001359B4 (en) 2017-02-14 2017-02-14 Method for fine machining a disk-shaped workpiece

Country Status (2)

Country Link
DE (1) DE102017001359B4 (en)
WO (1) WO2018149767A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111843772A (en) * 2020-07-31 2020-10-30 成都双创时代科技有限公司 High-precision machining device and method for cycloidal gear capable of automatically forming tooth profile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3206992C2 (en) 1982-02-26 1993-07-29 Rudolf 8000 Muenchen De Braren
DE4419432C2 (en) 1993-06-09 1996-04-18 Rudolf Braren Cycloid gear
DE19541806C1 (en) 1995-11-09 1997-01-30 Rudolf Braren Planetary gear
DE202011001560U1 (en) 2011-01-15 2011-03-17 Ginzel, Lothar, Dipl.-Ing. transmission
DE202016004284U1 (en) 2016-07-13 2016-09-02 KAPP Werkzeugmaschinen GmbH Grinding machine for grinding a profile

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2824744A (en) * 1956-03-09 1958-02-25 Gleason Works Flexible collet and chuck employing same
DE4032881A1 (en) * 1990-10-17 1992-04-23 Sew Eurodrive Gmbh & Co Aligning and clamping mandrel for gear blanks, etc. - has expanding collet to centre and clamp blank, with locking spring loaded rods for face support
DE102013217401B3 (en) * 2013-09-02 2014-12-11 Ringspann Gmbh jig

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3206992C2 (en) 1982-02-26 1993-07-29 Rudolf 8000 Muenchen De Braren
DE4419432C2 (en) 1993-06-09 1996-04-18 Rudolf Braren Cycloid gear
DE19541806C1 (en) 1995-11-09 1997-01-30 Rudolf Braren Planetary gear
DE202011001560U1 (en) 2011-01-15 2011-03-17 Ginzel, Lothar, Dipl.-Ing. transmission
DE202016004284U1 (en) 2016-07-13 2016-09-02 KAPP Werkzeugmaschinen GmbH Grinding machine for grinding a profile

Also Published As

Publication number Publication date
DE102017001359A1 (en) 2018-08-16
WO2018149767A1 (en) 2018-08-23

Similar Documents

Publication Publication Date Title
EP3292953B1 (en) Grinding machine for grinding a profile
DE19830903B4 (en) Device and method for machining holes in a workpiece using such a device
WO2006027161A1 (en) Method for machining rotation pieces
EP2213396A2 (en) Method and device for manufacturing a shaft
DE10144644A1 (en) Method and device for grinding central bearings of crankshafts
DE4119162C1 (en)
EP3331663A1 (en) Machining center for machining an elongate workpiece
DE102017001359B4 (en) Method for fine machining a disk-shaped workpiece
DE19959778A1 (en) Method and checking system for safe monitoring of the state of stress in tools in an operating spindle works on machine tools during processing routines.
WO2001098847A2 (en) Method and device for measuring and machining workpieces
EP3398715A1 (en) Grinding device for grinding internally profiled workpieces
WO2007065945A1 (en) Device and method for producing undercuts, and a cutter head
DE3400082A1 (en) Process for machining a workpiece in a lathe between centres, as well as a clamping device for executing said process
DE19646124C1 (en) Gripping device for annular workpiece packs
DE4340465C2 (en) Device for machining a conical ring, in particular a friction ring
DE1777087B1 (en) Gear cutting machine
EP0841116A2 (en) Working method for rotational symmetric workpiece surfaces and tool therefor
EP3658319B1 (en) Cutting tool and method for machining a bearing race
DE19833363A1 (en) Process for turning surfaces on workpieces, preferably crankshafts, and disk-shaped tool for carrying out the process
EP4003629A1 (en) Method for hard fine machining of two toothings on a workpiece, and gear cutting machine, control program, hard fine machining combination tools and sensor assembly therefor
DE19962792C1 (en) Method and device for grinding articulated stars
DE1293640B (en) Method and device for grinding centering cones. Anise: Aktietoolaget Malcus Holmquist, Halmstad (Sweden)
DE102010031607B3 (en) Gleitflächenbearbeitung an elastically deformed plain bearing shell
WO2016198533A1 (en) Machine and method for fine machining of a metal component
DE19950168A1 (en) Cylinder running surface production process, involving final machining using multiple cutting tool with axis coinciding with axis of symmetry of running surface

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final