DE102014225181A1 - Method for operating a combined heat and power plant - Google Patents

Method for operating a combined heat and power plant Download PDF

Info

Publication number
DE102014225181A1
DE102014225181A1 DE102014225181.8A DE102014225181A DE102014225181A1 DE 102014225181 A1 DE102014225181 A1 DE 102014225181A1 DE 102014225181 A DE102014225181 A DE 102014225181A DE 102014225181 A1 DE102014225181 A1 DE 102014225181A1
Authority
DE
Germany
Prior art keywords
max
soc
power plant
combined heat
limit value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102014225181.8A
Other languages
German (de)
Inventor
Wolfgang Friede
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Robert Bosch GmbH
Original Assignee
Robert Bosch GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Robert Bosch GmbH filed Critical Robert Bosch GmbH
Priority to DE102014225181.8A priority Critical patent/DE102014225181A1/en
Publication of DE102014225181A1 publication Critical patent/DE102014225181A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M16/00Structural combinations of different types of electrochemical generators
    • H01M16/003Structural combinations of different types of electrochemical generators of fuel cells with other electrochemical devices, e.g. capacitors, electrolysers
    • H01M16/006Structural combinations of different types of electrochemical generators of fuel cells with other electrochemical devices, e.g. capacitors, electrolysers of fuel cells with rechargeable batteries
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Manufacturing & Machinery (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Die Erfindung betrifft Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10), wobei elektrische Energie mittels einer elektrischen Speichereinheit (12) gespeichert und/oder bereitgestellt wird und die Speicherung und/oder Bereitstellung von elektrischer Energie durch mindestens einen vorgebbaren Grenzwert (GWmin, GWmax), insbesondere einen minimalen und/oder maximalen Grenzwert (GWmin, GWmax), beschränkt wird. Es wird vorgeschlagen, dass der mindestens eine vorgebbare Grenzwert (GWmin, GWmax) an eine Betriebsweise der Kraft-Wärme-Kopplungsanlage (10) angepasst wird. Ferner Betrifft die Erfindung eine Kraft-Wärme-Kopplungsanlage (10).The invention relates to methods for operating a combined heat and power plant (10), wherein electrical energy is stored and / or provided by means of an electrical storage unit (12) and the storage and / or provision of electrical energy by at least one predeterminable limit value (GWmin, GWmax), in particular a minimum and / or maximum limit value (GWmin, GWmax). It is proposed that the at least one predefinable limit value (GWmin, GWmax) be adapted to a mode of operation of the cogeneration plant (10). Furthermore, the invention relates to a combined heat and power plant (10).

Description

Die Erfindung betrifft ein Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage, wobei elektrische Energie mittels einer elektrischen Speichereinheit gespeichert und/oder bereitgestellt wird und die Speicherung und/oder Bereitstellung von elektrischer Energie durch mindestens einen vorgebbaren Grenzwert, insbesondere einen minimalen und/oder maximalen Grenzwert, beschränkt wird. Ferner betrifft die Erfindung eine Kraft-Wärme-Kopplungsanlage.The invention relates to a method for operating a combined heat and power plant, wherein electrical energy is stored and / or provided by means of an electrical storage unit and the storage and / or provision of electrical energy by at least one predeterminable limit value, in particular a minimum and / or maximum Limit value is limited. Furthermore, the invention relates to a combined heat and power plant.

Stand der TechnikState of the art

In GB 2508577 wird ein Stromerzeugungssystem, welches an einem Stromnetz angeschlossen ist, gezeigt. Das Stromerzeugungssystem umfasst eine Batterie, in welcher Strom gespeichert werden kann, wobei die Speicherung von Strom durch Grenzwerte beschränkt wird.In GB 2508577 a power generation system connected to a power grid is shown. The power generation system includes a battery in which power can be stored while limiting the storage of power through limits.

Offenbarung der ErfindungDisclosure of the invention

Das erfindungsgemäße Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage hat demgegenüber den Vorteil, dass der mindestens eine vorgebbare Grenzwert an eine Betriebsweise der Kraft-Wärme-Kopplungsanlage angepasst wird. Dadurch wird sowohl die Lebensdauer der elektrischen Speichereinheit als auch der Wirkungsgrad der Kraft-Wärme-Kopplungsanlage nachhaltig erhöht.The inventive method for operating a cogeneration plant has the advantage that the at least one predetermined limit is adapted to a mode of operation of the cogeneration plant. As a result, both the life of the electric storage unit and the efficiency of the combined heat and power plant is increased sustainably.

Durch die in den Unteransprüchen aufgeführten Merkmale sind vorteilhafte Weiterbildungen der erfindungsgemäßen Brennstoffzellenvorrichtung möglich. So entspricht die Betriebsweise der Kraft-Wärme-Kopplungsanlage einem einer Jahreszeit entsprechenden Betrieb, insbesondere einem Winterbetrieb oder einem Sommerbetrieb oder einem Übergangsbetrieb, wodurch erzeugte elektrische Energie in Abhängigkeit der Jahreszeit effektiv genutzt werden kann.The features listed in the dependent claims advantageous refinements of the fuel cell device according to the invention are possible. Thus, the operation of the combined heat and power plant corresponds to a seasonally appropriate operation, in particular a winter operation or a summer operation or a transitional operation, whereby generated electric energy can be effectively used depending on the season.

In einer vorteilhaften Ausführung wird ein durch den mindestens einen vorgebbaren Grenzwert begrenzter Speicherbereich an die Betriebsweise der Kraft-Wärme-Kopplungsanlage angepasst. So kann der Wirkungsgrad der elektrischen Speichereinheit in Abhängigkeit der Jahreszeit nachhaltig erhöht werden.In an advantageous embodiment, a storage area delimited by the at least one predefinable limit value is adapted to the mode of operation of the cogeneration installation. Thus, the efficiency of the electrical storage unit can be increased sustainably depending on the season.

Bevorzugterweise wird ein durch den mindestens einen vorgebbaren Grenzwert begrenzter Speicherbereich an einen Winterbetrieb oder Sommerbetrieb angepasst, indem der durch den mindestens einen vorgebbaren Grenzwert begrenzte Speicherbereich versetzt wird. Auf diese Weise kann eine Anpassung an einen Winterbetrieb oder einen Sommerbetrieb besonders einfach erfolgen.Preferably, a memory area delimited by the at least one predefinable limit value is adapted to winter operation or summer operation by offsetting the memory area delimited by the at least one predefinable limit value. In this way, an adaptation to a winter operation or a summer operation can be done very easily.

Ferner wird in einer vorteilhaften Ausführung ein durch den mindestens einen vorgebbaren Grenzwert begrenzter Speicherbereich an einen Übergangsbetrieb angepasst, indem der durch den mindestens einen vorgebbaren Grenzwert begrenzte Speicherbereich erweitert wird. So kann die Speicherkapazität der elektrischen Speichereinheit besser genutzt werden.Furthermore, in an advantageous embodiment, a memory area delimited by the at least one predefinable limit value is adapted to transitional operation in that the memory area delimited by the at least one predefinable limit value is extended. Thus, the storage capacity of the electric storage unit can be better utilized.

Vorteilhafterweise wird der mindestens eine vorgebbare Grenzwert auf mindestens einen einem Winterbetrieb entsprechenden Wert oder auf mindestens einen einem Sommerbetrieb entsprechenden Wert festgelegt, wobei vorzugsweise der mindestens eine einem Sommerbetrieb entsprechende Wert betragsmäßig größer ist als der mindestens eine einem Winterbetrieb entsprechende Wert. Auf diese Weise kann das Speichern und/oder Bereitstellen von Energie in der elektrischen Speichereinheit zu verschiedenen Jahreszeiten besonders effizient gestaltet werden, wobei wiederum der Wirkungsgrad erhöht wird.Advantageously, the at least one predeterminable limit value is set to at least one value corresponding to a winter operation or to at least one value corresponding to a summer mode, wherein preferably the at least one summer mode corresponding value is greater in magnitude than the at least one winter mode corresponding value. In this way, the storage and / or provision of energy in the electrical storage unit at different seasons can be made particularly efficient, in turn, the efficiency is increased.

In einer besonders vorteilhaften Ausführung erfolgt das erfindungsgemäße Verfahren durch die nachfolgenden Verfahrensschritten:

  • a) Anpassen des mindestens einen vorgebbaren Grenzwertes an einen Sommerbetrieb, insbesondere Festlegen des mindestens einen vorgebbaren Grenzwertes auf mindestens einen einem Sommerbetrieb entsprechenden minimalen und/oder maximalen Wert,
  • b) Ermitteln ob ein Winterbetrieb erfolgt, b1) Fortfahren mit Verfahrensschritt a), wenn das Ermittelte aus Verfahrensschritt b) nicht zutreffend ist, b2) Fortfahren mit Verfahrensschritt c), wenn das Ermittelte aus Verfahrensschritt b) zutreffend ist,
  • c) Anpassen des mindestens einen vorgebbaren Grenzwertes an einen Winterbetrieb, insbesondere Festlegen des mindestens einen vorgebbaren Grenzwertes auf mindestens einen einem Winterbetrieb entsprechenden minimalen und/oder maximalen Wert,
  • d) Ermitteln ob ein Sommerbetrieb erfolgt, d1) Fortfahren mit Verfahrensschritt c), wenn das Ermittelte aus Verfahrensschritt d) nicht zutreffend ist, d2) Fortfahren mit Verfahrensschritt a), wenn das Ermittelte aus Verfahrensschritt d) zutreffend.
In a particularly advantageous embodiment, the method according to the invention is carried out by the following method steps:
  • a) adapting the at least one predefinable limit value to a summer operation, in particular setting the at least one predefinable limit value to at least one minimum and / or maximum value corresponding to a summer operation,
  • b) determining whether a winter operation takes place, b1) proceeding with method step a), if the determined from method step b) is not applicable, b2) proceeding with method step c), if the ascertained from method step b) is correct,
  • c) adapting the at least one predefinable limit value to a winter operation, in particular setting the at least one predefinable limit value to at least one minimum and / or maximum value corresponding to a winter operation,
  • d) determining whether a summer operation takes place, d1) proceeding with method step c), if the determined from method step d) is not applicable, d2) proceeding with method step a), if the determined from method step d) applies.

So kann eine Anpassung an einen einer Jahreszeit entsprechenden Betrieb besonders effektiv erfolgen.Thus, an adaptation to a season corresponding operation can be done very effectively.

In einer weiteren vorteilhaften Ausführung wird der mindestens eine vorgebbare Grenzwert an die Betriebsweise der Kraft-Wärme-Kopplungsanlage angepasst, wenn die Betriebsweise länger als eine vorgegebene Zeit, vorzugsweise 1 bis 3 Tage, insbesondere 2 Tage, ununterbrochen erfolgt. So kann sichergestellt werden, dass der mindestens eine vorgebbare Grenzwert nur dann an eine einer Jahreszeit entsprechenden Betriebsweise, wie beispielsweise einen Winterbetrieb oder einen Sommerbetrieb, angepasst wird, wenn diese auch tatsächlich vorliegt.In a further advantageous embodiment, the at least one predefinable limit value is adapted to the mode of operation of the combined heat and power plant, if the operation is continued for a longer time than a predetermined time, preferably 1 to 3 days, in particular 2 days, uninterrupted. So can it is ensured that the at least one predefinable limit value is only adapted to a mode of operation corresponding to a season, such as, for example, a winter operation or a summer operation, if this actually exists.

In einer besonders vorteilhaften Ausführung erfolgt das erfindungsgemäße Verfahren so, dass anstelle des Verfahrensschritts b) ein Verfahrensschritt

  • e) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt, und/oder dass anstelle des Verfahrensschritts d) ein Verfahrensschritt
  • f) Ermitteln ob ein Sommerbetrieb erfolgt und/oder ein Sommerbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt.
In a particularly advantageous embodiment, the inventive method is carried out so that instead of the process step b) a process step
  • e) determining whether a winter operation takes place and / or whether a winter operation is continuous for a predetermined time continuously, and / or that instead of the method step d) a method step
  • f) Determine whether a summer operation is taking place and / or a summer operation is taking place continuously for a predetermined time without interruption.

Auf diese Weise kann das erfindungsgemäße Verfahren besonders wirksam erweitert werden.In this way, the inventive method can be extended particularly effective.

In einer weiteren vorteilhaften Ausführung wird der mindestens eine vorgebbare Grenzwert an die Betriebsweise der Kraft-Wärme-Kopplungsanlage angepasst, wenn ein vorgebbarer minimaler Schwellenwert der elektrischen Speichereinheit unterschritten oder ein vorgebbarer maximaler Schwellenwert der elektrischen Speichereinheit überschritten wird. Auf diese Weise kann sichergestellt werden, dass der mindestens eine vorgebbare Grenzwert nur dann angepasst wird, wenn eine Speicherung und/oder Bereitstellung von elektrischer Energie tatsächlich erfolgt.In a further advantageous embodiment, the at least one predefinable limit value is adapted to the mode of operation of the combined heat and power plant, if a predeterminable minimum threshold value of the electrical storage unit is exceeded or a predefinable maximum threshold value of the electrical storage unit is exceeded. In this way, it can be ensured that the at least one predefinable limit value is only adapted if storage and / or provision of electrical energy actually takes place.

In einer besonders vorteilhaften Ausführung erfolgt das erfindungsgemäße Verfahren so, dass anstelle des Verfahrensschritts b) ein Verfahrensschritt

  • g) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt und ob ein vorgegebener maximaler Schwellenwert der elektrischen Speichereinheit überschritten wurde, und/oder dass anstelle des Verfahrensschritts d) ein Verfahrensschritt
  • h) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt und ob ein vorgegebener minimaler Schwellenwert der elektrischen Speichereinheit unterschritten wurde.
In a particularly advantageous embodiment, the inventive method is carried out so that instead of the process step b) a process step
  • g) determining whether a winter operation takes place and / or whether a winter operation is continuous for a predetermined time and whether a predetermined maximum threshold value of the electrical storage unit has been exceeded, and / or that instead of the method step d) a method step
  • h) Determining whether a winter operation takes place and / or whether a winter operation for a longer time than a predetermined time takes place continuously and whether a predetermined minimum threshold value of the electrical storage unit was exceeded.

Auf diese Weise kann das erfindungsgemäße Verfahren ebenfalls besonders wirksam erweitert werden.In this way, the inventive method can also be extended particularly effective.

In einer weiteren vorteilhaften Ausführung wird im Falle eines Netzausfalls die Speicherung von elektrischer Energie durch den mindestens einen vorgebbaren Grenzwert nicht beschränkt. Dadurch kann bei einem Netzausfall die volle Kapazität der elektrischen Speichereinheit genutzt werden.In a further advantageous embodiment, in the event of a power failure, the storage of electrical energy is not limited by the at least one predeterminable limit value. As a result, the full capacity of the electrical storage unit can be used in the event of a power failure.

Die Erfindung betrifft auch eine Kraft-Wärme-Kopplungsanlage, umfassend mindestens eine elektrische Speichereinheit, welche dazu vorgesehen ist elektrische Energie, vorzugsweise mittels der Kraft-Wärme-Kopplungsanlage erzeugte elektrische Energie, zu speichern und/oder bereitzustellen, mindestens ein Heizsystem, welches dazu vorgesehen ist Wärme zu erzeugen, mindestens eine Regeleinheit, welche der mindestens einen elektrischen Speichereinheit zugeordnet ist, und mindestens eine Regeleinheit, welche dem mindestens einen Heizsystem zugeordnet ist. Die Kraft-Wärme-Kopplungsanlage zeichnet sich dadurch aus, dass die mindestens eine Regeleinheit, welche der mindestens einen elektrischen Speichereinheit zugeortnet ist, und die mindestens eine Regeleinheit, welche dem mindestens einen Heizsystem zugeordnet ist, kommunikationstechnisch miteinander verbunden sind. So kann die Speicherung und/oder Bereitstellung von elektrischer Energie besonders vorteilhaft an den Betrieb des mindestens einen Heizsystems angepasst werden. The invention also relates to a combined heat and power plant comprising at least one electric storage unit which is provided to store and / or provide electrical energy, preferably electrical energy generated by the cogeneration plant, at least one heating system provided therefor is to generate heat, at least one control unit, which is associated with the at least one electrical storage unit, and at least one control unit which is associated with the at least one heating system. The combined heat and power plant is characterized in that the at least one control unit, which is assigned to the at least one electrical storage unit, and the at least one control unit, which is assigned to the at least one heating system, are communicatively connected with each other. Thus, the storage and / or provision of electrical energy can be adapted particularly advantageously to the operation of the at least one heating system.

In vorteilhafter Weise wird eine Kraft-Wärme-Kopplungsanlage, insbesondere die im vorhergehenden Absatz beschriebene Kraft-Wärme-Kopplungsanlage, mit einem erfindungsgemäßen Verfahren betrieben.Advantageously, a combined heat and power plant, in particular the combined heat and power plant described in the preceding paragraph, operated by a method according to the invention.

Zeichnungendrawings

In den Zeichnungen sind Ausführungsbeispiele der Erfindung schematisch dargestellt und in der nachfolgenden Beschreibung näher erläutert. Es zeigenIn the drawings, embodiments of the invention are shown schematically and explained in more detail in the following description. Show it

1 eine schematische Darstellung einer erfindungsgemäßen Kraft-Wärme-Kopplungsanlage; und 1 a schematic representation of a combined heat and power plant according to the invention; and

2 eine schematische Darstellung einer elektrischen Speichereinheit einer Kraft-Wärme-Kopplungsanlage; und 2 a schematic representation of an electrical storage unit of a cogeneration plant; and

3 ein Flussdiagramm eines Ausführungsbeispiels des erfindungsbemäßen Verfahrens zum Betreiben einer Kraft-Wärme-Kopplungsanlage. 3 a flowchart of an embodiment of erfindungsbemäßen method for operating a cogeneration plant.

Beschreibungdescription

In 1 ist eine schematische Darstellung einer erfindungsgemäßen Kraft-Wärme-Kopplungsanlage 10 gezeigt. Die Kraft-Wärme-Kopplungsanlage 10 umfasst eine elektrische Speichereinheit 12, welche dazu vorgesehen ist elektrische Energie, im Ausführungsbeispiel mittels der Kraft-Wärme-Kopplungsanlage erzeugte elektrische Energie, zu speichern und/oder bereitzustellen, ein Heizsystem 14, welches dazu vorgesehen ist Wärme zu erzeugen, eine Regeleinheit 16, welche der mindestens einen elektrischen Speichereinheit 12 zugeordnet ist, und eine Regeleinheit 18, welche dem mindestens einen Heizsystem 24 zugeordnet ist. In 1 is a schematic representation of a combined heat and power plant according to the invention 10 shown. The combined heat and power plant 10 includes an electrical storage unit 12 which is intended to store and / or provide electrical energy, in the exemplary embodiment by means of the cogeneration plant, electrical energy, a heating system 14 which is intended to generate heat, a control unit 16 which of the at least one electrical storage unit 12 is assigned, and a control unit 18 which the at least one heating system 24 assigned.

Erfindungsgemäß zeichnet sich die Kraft-Wärme-Kopplungsanlage 10 dadurch aus, dass die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, und die Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, zur Übertragung eines vorgebbaren Grenzwertes GWmin, GWmax kommunikationstechnisch miteinander verbunden sind. Dadurch wird ermöglicht, dass die Speicherung und/oder Bereitstellung von elektrischer Energie mittels der elektrischen Speichereinheit 12 an eine Betriebsweise der Kraft-Wärme-Kopplungsanlage 10, im gezeigten Ausführungsbeispiel an die Betriebsweise des Heizsystems 14, angepasst wird.According to the invention, the combined heat and power plant is characterized 10 characterized in that the control unit 16 , which is the electrical storage unit 12 is assigned, and the control unit 18 which the heating system 14 is assigned to transmit a predetermined limit GW min , GW max communication technology are connected to each other. This makes it possible for the storage and / or provision of electrical energy by means of the electrical storage unit 12 to a mode of operation of the combined heat and power plant 10 , In the illustrated embodiment of the operation of the heating system 14 , is adjusted.

Unter einer Speicherung und/oder Bereitstellung von elektrischer Energie mittels der elektrischen Speichereinheit 12 kann auch als Laden und/oder Entladen der elektrischen Speichereinheit 12 verstanden werden.Under storage and / or provision of electrical energy by means of the electrical storage unit 12 Can also be used as charging and / or discharging the electrical storage unit 12 be understood.

Die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem 14 umfasst eine Mikro-Kraft-Wärme-Kopplungsanlage 20 zur Erzeugung von elektrischer Energie und Wärme. Die Mikro-Kraft-Wärme-Kopplungsanlage 20 umfasst wiederum einen Brennstoffzellenstack 22, durch welchen mittels mindestens einer Brennstoffzelle sowohl Wärme als auch elektrische Energie erzeugt wird. Die Kraft-Wärme-Kopplungsanlage 10 kann auch als eine Brennstoffzellenanlage verstanden werden.The combined heat and power plant 10 or the heating system 14 includes a micro combined heat and power plant 20 for generating electrical energy and heat. The micro combined heat and power plant 20 again comprises a fuel cell stack 22 , by means of which at least one fuel cell both heat and electrical energy is generated. The combined heat and power plant 10 can also be understood as a fuel cell system.

Des Weiteren umfasst das Heizsystem 14 einen Pufferspeicher 24 zum Speichern und/oder Bereitstellen von Heizungswasser und einen Brauchwassertank 26 zum Speichern und/oder Bereitstellen von Brauchwasser. Darüber hinaus umfasst das Heizungssystem 14 einen Spitzenlastkessel 28, welcher die Mikro-Kraft-Wärme-Kopplungsanlage 20 bei der Erzeugung von Wärme unterstützt, wenn ein hoher Wärmebedarf vorliegt. Die im Heizsystem 14 erzeugte Wärme wird einem Heizkreis 30 zur Verfügung gestellt.Furthermore, the heating system includes 14 a buffer memory 24 for storing and / or providing heating water and a hot water tank 26 for storing and / or providing service water. In addition, the heating system includes 14 a peak load boiler 28 , which is the micro-cogeneration plant 20 assisted in the generation of heat when there is a high heat demand. The in the heating system 14 generated heat becomes a heating circuit 30 made available.

Das in dem Brauchwassertank 26 gespeicherte Brauchwasser bzw. Warmwasser wird einem Benutzer über eine Brauchwasserleitung 32 zur Verfügung gestellt. Über eine Kaltwasserleitung 34 wird dem Heizsystem 14 zu erwärmendes Kaltwasser für den Brauchwasserbedarf zugeführt.The in the water tank 26 stored hot water or hot water is a user via a service water pipe 32 made available. About a cold water pipe 34 gets the heating system 14 supplied to be heated cold water for domestic water use.

Die Kraft-Wärme-Kopplungsanlage 10 wird in der Regel wärmegeführt betrieben. Die Erzeugung von Wärme durch das Heizsystem 14 wird mit Hilfe der Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, geregelt. So ist das Heizsystem 14 mit der Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, über eine Datenverbindung 36 verbunden.The combined heat and power plant 10 is usually operated by heat. The generation of heat by the heating system 14 is using the control unit 18 which the heating system 14 is assigned, regulated. That's the heating system 14 with the control unit 18 which the heating system 14 is assigned via a data connection 36 connected.

Die Erzeugung von elektrischer Energie richtet sich nach der Erzeugung von Wärme. Die erzeugte elektrische Energie kann, sofern sie nicht durch einen Verbraucher 38 genutzt wird, in ein Stromnetz 40 eingespeist werden. The generation of electrical energy depends on the generation of heat. The generated electrical energy can, if not by a consumer 38 is used in a power grid 40 be fed.

Durch die im Ausführungsbeispiel gezeigte Kraft-Wärme-Kopplungs-Anlage 10 wird es nun aber auch ermöglicht die erzeugte elektrische Energie in der elektrischen Speichereinheit 12 zwischenzuspeichern und zu einem späteren Zeitpunkt für einen Verbraucher 38 bereitzustellen, anstatt die erzeugte elektrische Energie in das Stromnetz 40 einzuspeisen. Dadurch kann die erzeugte elektrische Energie ökonomisch sinnvoll genutzt werden.By the power-heat coupling system shown in the embodiment 10 But now it also allows the generated electrical energy in the electrical storage unit 12 caching and at a later time for a consumer 38 provide, rather than the electrical energy generated in the power grid 40 feed. As a result, the electrical energy generated can be used economically meaningful.

Die Speicherung und/oder Bereitstellung von elektrischer Energie mittels der elektrischen Speichereinheit 12 wird durch die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, geregelt. So ist die elektrische Speichereinheit 12 mit der Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, über eine Datenverbindung 42 verbunden.The storage and / or provision of electrical energy by means of the electrical storage unit 12 is through the control unit 16 , which is the electrical storage unit 12 is assigned, regulated. So is the electric storage unit 12 with the control unit 16 , which is the electrical storage unit 12 is assigned via a data connection 42 connected.

Im gezeigten Ausführungsbeispiel handelt es sich bei der elektrische Speichereinheit 12 um eine Batterie 44 mit einem Batterie-Management-System 46. So wird die erzeugte elektrische Energie mittels der Batterie 44 gespeichert und/oder bereitgestellt. Es ist aber auch denkbar, dass die elektrische Speichereinheit mehrere Batterien aufweist.In the exemplary embodiment shown, the electrical storage unit is 12 to a battery 44 with a battery management system 46 , Thus, the generated electric energy by means of the battery 44 stored and / or provided. However, it is also conceivable that the electrical storage unit has a plurality of batteries.

Das Batterie-Management-System 46 liefert Informationen bzw. Daten über den Ladezustand SOC (State Of Charge) der Batterie 44 und übermittelt sie an die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist. Der Ladezustand kann beispielsweise über eine Messung der an der Batterie 44 anliegenden Spannung oder über eine Bilanzierung des in die Batterie 44 fließenden Stroms ermittelt werden.The battery management system 46 provides information or data on the state of charge SOC of the battery 44 and transmits them to the control unit 16 , which is the electrical storage unit 12 assigned. The state of charge can, for example, via a measurement of the battery 44 voltage or over the balance of the battery 44 flowing current can be determined.

Im gezeigten Ausführungsbeispiel handelt es sich bei der Batterie 44 um eine Lithium-Ionen-Batterie. Es ist aber auch denkbar, dass es sich bei der Batterie 44 um eine Blei-, Nickel-Cadmuim-, Metall-Hydrid-, Natrium-Schwefel- oder sonstige Batterie handelt.In the embodiment shown, it is the battery 44 to a lithium-ion battery. But it is also conceivable that it is the battery 44 is a lead, nickel-cadmium, metal-hydride, sodium-sulfur or other battery.

Darüber hinaus weist die Kraft-Wärme-Kopplungsanlage 10 einen Energieflussrichtungssensor 48 auf. Dieser ist, bezogen auf eine Einspeisung von elektrischer Energie ins Stromnetz 40, stromtechnisch vor einem Hausanschlusskasten 49 angeordnet, wobei der Hausanschlusskasten 49 eine stromtechnische Schnittstelle zwischen der Kraft-Wärme-Kopplungsanlage 10 und dem Stromnetz 40 darstellt. In addition, the combined heat and power plant exhibits 10 an energy flow direction sensor 48 on. This is, based on an input of electrical energy into the power grid 40 , Electricity in front of a service connection box 49 arranged, with the house connection box 49 a Electricity interface between the combined heat and power plant 10 and the power grid 40 represents.

Der Energieflussrichtungssensor 48 misst die Energieflussrichtung zwischen der Kraft-Wärme-Kopplungsanlage 10 und dem Stromnetz 40. Zudem ist der Energieflussensor 48 kommunikationstechnisch über eine Datenverbindung 50 mit der Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, verbunden. The energy flow direction sensor 48 measures the direction of energy flow between the combined heat and power plant 10 and the power grid 40 , In addition, the energy flow sensor 48 communication technology via a data connection 50 with the control unit 16 , which is the electrical storage unit 12 is associated, connected.

Je nach Signal des Energieflussrichtungssensors 48 wird elektrische Energie mittels der elektrischen Speichereinheit 12 gespeichert oder nicht. Wird elektrische Energie, welche in der Mikro-Kraft-Wärme-Kopplungsanlage 20 erzeugt wird, in das Stromnetz 40 eingespeist, so wird die Leistung der Batterie 44 so lange im Rahmen ihres Leistungsvermögens und ihrer SOC-Begrenzung abgesenkt, bis der Energieflussrichtungssensor 48 wieder den Wert null misst. Wird elektrische Energie aus dem Stromnetz 40 bezogen, wird die Leistung der Batterie 44 im Rahmen ihres Leistungsvermögens und ihrer SOC-Begrenzung angehoben, bis der Energieflussrichtungssensor 48 wieder den Wert null misst. Dabei wird unter einer positive Leistung der Batterie 44 eine Bereitstellung von elektrischer Energie, also ein Entladen, verstanden, während unter einer negativen Leistung eine Speicherung von elektrischer Energie, also ein Ladenvorgang, verstanden wird. Anstelle des Wertes null kann auch ein anderer definierter Sollwert für den Energieflussrichtungssensor 48 eingestellt werden.Depending on the signal of the energy flow direction sensor 48 becomes electrical energy by means of the electric storage unit 12 saved or not. Will electrical energy used in the micro-cogeneration system 20 is generated in the power grid 40 fed, so will the performance of the battery 44 as long as their power capability and their SOC limit lowered until the energy flow direction sensor 48 again measures the value zero. Will electrical energy from the mains 40 related, the power of the battery 44 raised within their capacity and their SOC limit until the energy flow direction sensor 48 again measures the value zero. It will be under a positive power of the battery 44 a provision of electrical energy, ie a discharge understood, while a negative power storage of electrical energy, ie a charging process is understood. Instead of the value zero, another defined setpoint for the energy flow direction sensor can also be used 48 be set.

Des Weiteren ist die elektrische Speichereinheit 12 für eine Speicherung und/oder Bereitstellung von elektrischer Energie stromtechnisch mit einem Wechselrichter 52 verbunden. Der positive und der negative Anschluss der Batterie 44 sind durch zwei Leitungen 54, 56 mit dem Wechselrichter 52 verbunden.Furthermore, the electric storage unit 12 for storage and / or provision of electrical energy in terms of electricity with an inverter 52 connected. The positive and negative connection of the battery 44 are through two wires 54 . 56 with the inverter 52 connected.

Der Wechselrichter 52 ist wiederum stromtechnisch über weitere Leitungen 58, 59, 60 mit der Mikro-Kraft-Wärme-Kopplungsanlage 20 und einem möglichen Verbraucher 38 verbunden. Wenn nun elektrische Energie mittels der Batterie 44 gespeichert werden soll, dann kann eine zu speichernde elektrische Energie von einem Wechselstrom auf einen Gleichstrom umgewandelt werden. Soll aber für einen Verbraucher 38, beispielsweise in einem Gebäude, elektrische Energie bereitgestellt werden, so kann die bereitzustellende elektrische Energie von einem Gleichstrom auf einen Wechselstrom umgewandelt werden. Dementsprechend ist die Regelungseinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, kommunikationstechnisch über eine Datenverbindung 62 mit dem Wechselrichter 52 verbunden.The inverter 52 is in turn current-technical over further lines 58 . 59 . 60 with the micro-cogeneration system 20 and a potential consumer 38 connected. If now electrical energy by means of the battery 44 is to be stored, then an electrical energy to be stored can be converted from an alternating current to a direct current. But for a consumer 38 For example, in a building, electrical energy may be provided, the electrical energy to be supplied may be converted from a direct current to an alternating current. Accordingly, the control unit 16 , which is the electrical storage unit 12 is assigned, communication technology via a data connection 62 with the inverter 52 connected.

Wie schon erwähnt ist die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, erfindungsgemäß mit der Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, kommunikationstechnisch verbunden. Die Verbindung zwischen der Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, und der Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, wird mittels einer Datenverbindung 64 bewerkstelligt. As already mentioned, the control unit 16 , which is the electrical storage unit 12 is assigned, according to the invention with the control unit 18 which the heating system 14 is assigned, communication technology connected. The connection between the control unit 16 , which is the electrical storage unit 12 is assigned, and the control unit 18 which the heating system 14 is assigned, by means of a data connection 64 accomplished.

Anstelle der vorgebbaren Grenzwerte GWmin, GWmax ist es auch denkbar, dass Informationen übertragen werden, die die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, in die Lage versetzt, die vorgebbaren Grenzwerte GWmin, GWmax zu bestimmen. Insbesondere können Informationen über die Jahreszeit (Sommer, Winter, Frühling, Herbst) übermittelt werden, die die Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, auf Basis eines integrierten Kalenders oder einer Außentemperatur ermittelt hat. Des Weiteren kann auch die Außentemperatur selbst oder das aktuelle Datum übertragen werden, so dass die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, für die elektrische Speichereinheit 12 die Jahreszeit ermitteln kann.Instead of the predefinable limit values GW min , GW max , it is also conceivable that information is transferred that the control unit 16 , which is the electrical storage unit 12 is enabled to determine the predetermined limit values GW min , GW max . In particular, information about the season (summer, winter, spring, autumn) can be transmitted, which is the control unit 18 which the heating system 14 has been determined on the basis of an integrated calendar or an outside temperature. Furthermore, the outside temperature itself or the current date can be transmitted, so that the control unit 16 , which is the electrical storage unit 12 assigned to the electrical storage unit 12 can determine the season.

Es ist auch denkbar, dass es sich bei den Regeleinheiten 16, 18 um Steuereinheiten handelt.It is also conceivable that it is in the control units 16 . 18 is about control units.

Im gezeigten Ausführungsbeispiel werden die Datenverbindungen 36, 42, 50, 64 durch jeweils einen Datenbus realisiert. Es ist aber auch denkbar, dass die Datenverbindungen 36, 42, 50, 64 durch mindestens eine herkömmliche Signalleitungen, Netzwerkverbindungen, Internetverbindungen, schnurlose Verbindungen (Funk, WLAN, NFC, Buetooth, etc.) oder sonstige Verbindungen, welche eine Übertragung gewünschter Daten ermöglichen, realisiert werden. Ebenso ist es denkbar, dass einzelne Bauteile, wie beispielsweise die Regeleinheiten 16, 18, auf mindestens einer Platine angeordnet sind und die Datenverbindungen 36, 42, 50, 64, insbesondere die Datenverbindung 64 zwischen den Regeleinheiten 16, 18, auf der mindestens einen Platine verlaufen. Es ist auch eine hochintegrierte Lösung denkbar, in der die Regeleinheiten 16, 18 miteinander verschmolzen sind und ggf. in einem Computer-artigen System als Software-Lösung realisiert sind.In the exemplary embodiment shown, the data connections 36 . 42 . 50 . 64 realized by a respective data bus. It is also conceivable that the data connections 36 . 42 . 50 . 64 be realized by at least one conventional signal lines, network connections, Internet connections, wireless connections (radio, WLAN, NFC, Bluetooth, etc.) or other connections that allow transmission of desired data. It is also conceivable that individual components, such as the control units 16 . 18 , are arranged on at least one circuit board and the data connections 36 . 42 . 50 . 64 , in particular the data connection 64 between the control units 16 . 18 on which at least one board run. It is also a highly integrated solution conceivable in which the control units 16 . 18 are merged together and possibly realized in a computer-like system as a software solution.

In 2 ist eine schematische Darstellung der elektrischen Speichereinheit 12 der Kraft-Wärme-Kopplungsanlage 10 gezeigt. Die Kraft-Wärme-Kopplungsanlage 10 wird so betrieben, dass elektrische Energie mittels der elektrischen Speichereinheit 12 gespeichert und/oder bereitgestellt wird und die Speicherung und/oder Bereitstellung von elektrischer Energie durch mindestens einen vorgebbaren Grenzwert, im Ausführungsbeispiel einen minimalen und maximalen Grenzwert GWmin, GWmax, beschränkt wird. In 2 is a schematic representation of the electrical storage unit 12 the combined heat and power plant 10 shown. The combined heat and power plant 10 is operated so that electrical energy by means of the electric storage unit 12 stored and / or provided and the storage and / or provision of electrical energy by at least one predetermined limit, in the embodiment a minimum and maximum limit GW min , GW max , is limited.

Erfindungsgemäß zeichnet sich das Verfahren dadurch aus, dass die vorgebbaren Grenzwerte GWmin, GWmax, d.h. der minimale und maximale vorgebbare Grenzwert GWmin, GWmax, an eine Betriebsweise der Kraft-Wärme-Kopplungsanlage angepasst werden. Dadurch wird sowohl die Lebensdauer der elektrischen Speichereinheit 12 als auch der Wirkungsgrad der Kraft-Wärme-Kopplungsanlage 10 nachhaltig erhöht.According to the invention, the method is characterized in that the predefinable limit values GW min , GW max , ie the minimum and maximum predefinable limit values GW min , GW max , are adapted to a mode of operation of the combined heat and power plant. This will both the life of the electrical storage unit 12 as well as the efficiency of the combined heat and power plant 10 sustained increase.

Die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 entspricht einem einer Jahreszeit entsprechenden Betrieb, im Ausführungsbeispiel einem Winterbetrieb oder einem Sommerbetrieb oder einem Übergangsbetrieb. Eine Umschaltung in einen jeweiligen Betrieb kann entweder manuell erfolgen, indem ein Benutzer der Kraft-Wärme-Kopplungsanlage 10 vorgibt, dass ein bestimmter Betrieb vorliegt, oder automatisch, wenn eine gemessene Außentemperatur einen vorgegebenen Temperaturwert, beispielsweise von 22 °C, überschreitet oder unterschreitet.The operation of the combined heat and power plant 10 or the heating system 14 corresponds to an operation corresponding to a season, in the exemplary embodiment a winter operation or a summer operation or a transitional operation. A switch to a particular operation can either be done manually by a user of the cogeneration system 10 specifies that a certain operation is present, or automatically, when a measured outside temperature exceeds or falls below a predetermined temperature value, for example, 22 ° C.

Unterschreitet die Außentemperatur den vorgegebenen Temperaturwert, so wird die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem 14 in einem Winterbetrieb betrieben. Überschreitet die Außentemperatur den vorgegebenen Temperaturwert, so wird die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem 14 in einem Sommerbetrieb betrieben. Wenn jedoch zu einer Jahreszeit nicht auf Dauer unterschieden werden kann ob ein Winterbetrieb oder ein sommerbetrieb vorliegt, beispielsweise im Herbst oder im Frühling, wenn nachts, aufgrund niedrigerer Temperaturen, ein Winterbetrieb und tagsüber, aufgrund höherer Temperaturen, ein Sommerbetrieb vorliegen würde, so wird die Kraft-Wärme-Kopplungsanlage in einem Übergangsbetrieb betrieben.If the outside temperature falls below the predetermined temperature value, then the cogeneration plant is 10 or the heating system 14 operated in a winter operation. If the outside temperature exceeds the preset temperature value, then the combined heat and power plant 10 or the heating system 14 operated in a summer operation. However, if it is not possible to make a long-term distinction between winter and summer operation, for example in autumn or spring, when at night, due to lower temperatures, winter operation and during the day, due to higher temperatures, a summer operation, the Combined heat and power plant operated in a transitional operation.

Wenn sich die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem 14 in einem Winterbetrieb befindet, dann ist unter Anderem sowohl die Brauchwasserbereitung als auch die Erzeugung von Wärme für den Heizkreis 30 aktiv. Befindet sich die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem in einem Sommerbetrieb, so ist unter Anderem nur die Brauchwasserbereitung aktiv.When the combined heat and power plant 10 or the heating system 14 is in a winter operation, then, among other things, both the hot water production and the generation of heat for the heating circuit 30 active. Is the combined heat and power plant 10 or the heating system in a summer operation, so among other things only the dhw is active.

Befindet sich die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem 14 in einem Winterbetrieb, so wird im Vergleich zu einem Sommerbetrieb eine größere Menge an Wärme erzeugt. Dementsprechend wird dann auch bei einem Winterbetreib eine größere Menge an elektrischer Energie erzeugt als bei einem Sommerbetrieb.Is the combined heat and power plant 10 or the heating system 14 in a winter operation, a larger amount of heat is generated compared to a summer operation. Accordingly, a larger amount of electrical energy is then generated in a winter operation than in a summer operation.

Die Regelung der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 auf einen Winterbetrieb, einen Sommerbetrieb oder einen Übergangsbetrieb wird durch die Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, vorgenommen. Alternativ ist es aber auch denkbar, dass die Regelung durch die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, vorgenommen wird.The regulation of the combined heat and power plant 10 or the heating system 14 on a winter operation, a summer operation or a transitional operation is by the control unit 18 which the heating system 14 is assigned. Alternatively, it is also conceivable that the regulation by the control unit 16 , which is the electrical storage unit 12 is assigned is made.

Die Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist, überträgt der Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, mittels der Datenverbindung 64 Informationen darüber, mit welcher Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 betrieben wird. Es ist aber auch denkbar, dass Informationen übertragen werden, welche eine Aussage darüber enthalten, ob sich das Heizsystem 14 in einem Heizbetrieb befindet oder nicht. Weiterhin ist es denkbar, dass Informationen über einen Status der Brauchwasseraufbereitung übertragen werden. Ebenso ist es denkbar, dass Informationen übertragen werden, ob sich die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem 14 in einem Urlaubsmodus befindet.The control unit 18 which the heating system 14 is assigned, transmits the control unit 16 , which is the electrical storage unit 12 is assigned, by means of the data connection 64 Information about the operation of the combined heat and power plant 10 or the heating system 14 is operated. But it is also conceivable that information is transmitted, which contain a statement about whether the heating system 14 is in a heating mode or not. Furthermore, it is conceivable that information about a status of the process water treatment can be transmitted. It is also conceivable that information is transmitted, whether the combined heat and power plant 10 or the heating system 14 is in a vacation mode.

Im gezeigten Ausführungsbeispiel erfolgt die Übertragung von Informationen mittels der Datenverbindung 64 dann, wenn eine Umstellung der Betriebsweise erfolgt. Beispielsweise wenn die Kraft-Wärme-Kopplungsanlage 10 bzw. das Heizsystem 14 von einem Sommerbetrieb auf einen Winterbetrieb umgeschaltet wird. Es ist aber auch denkbar, dass eine Informationsübertragung in regelmäßigen Abständen, beispielsweise stündlich, erfolgt.In the embodiment shown, the transmission of information takes place by means of the data connection 64 then, when a change of the mode of operation takes place. For example, if the combined heat and power plant 10 or the heating system 14 is switched from a summer mode to a winter mode. However, it is also conceivable that an information transmission takes place at regular intervals, for example every hour.

Die Anpassung der vorgebbaren Grenzwerte GWmin, GWmax an die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 erfolgt durch die Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist. The adaptation of the predefinable limit values GW min , GW max to the mode of operation of the cogeneration plant 10 or the heating system 14 done by the control unit 16 , which is the electrical storage unit 12 assigned.

Die Anpassung der vorgebbaren Grenzwerte GWmin, GWmax an eine Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 wird dadurch bewerkstelligt, dass ein durch die vorgebbaren Grenzwerte GWmin, GWmax begrenzter Speicherbereich 70 an die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 angepasst wird, wodurch der Wirkungsgrad der elektrischen Speichereinheit 12 in Abhängigkeit der Jahreszeit nachhaltig erhöht wird.The adaptation of the predefinable limit values GW min , GW max to a mode of operation of the combined heat and power plant 10 is accomplished by a memory area bounded by the predefinable limit values GW min , GW max 70 to the mode of operation of the combined heat and power plant 10 is adjusted, reducing the efficiency of the electrical storage unit 12 is sustainably increased depending on the season.

So wird der Speicherbereich 70 an einen Winterbetrieb oder Sommerbetrieb angepasst, indem der durch die vorgebbaren Grenzwerte GWmin, GWmax begrenzte Speicherbereich 70, im Ausführungsbeispiel ein einem Sommerbetrieb entsprechender Speicherbereich 72 oder ein einem Winterbetrieb entsprechender Speicherbereich 74, versetzt wird. Dadurch kann eine Anpassung an einen Sommerbetrieb oder einen Winterbetrieb besonders einfach erfolgen.This is how the memory area becomes 70 adapted to a winter operation or summer operation by the memory area limited by the predefinable limit values GW min , GW max 70 in the exemplary embodiment, a memory area corresponding to a summer mode 72 or a storage area corresponding to a winter operation 74 , is offset. Thereby An adaptation to a summer operation or a winter operation can be done particularly easily.

Wenn zu einer Jahreszeit jedoch nicht klar unterschieden werden kann, ob ein Sommerbetrieb oder ein Winterbetrieb vorliegt, dann wird der durch die vorgebbaren Grenzwerte GWmin, GWmax begrenzte Speicherbereich 70 an einen Übergangsbetrieb angepasst, im Ausführungsbeispiel an einen Übergangsbetrieb entsprechenden Speicherbereich 76, indem der durch die vorgebbaren Grenzwerte GWmin, GWmax begrenzte Speicherbereich 70 erweitert wird. Durch die Erweiterung kann die Speicherkapazität der elektrischen Speichereinheit 12 für einen Übergangsbetrieb effektiver genutzt werden.However, if it can not be clearly distinguished at a season, whether a summer operation or a winter operation is present, then the limited by the predetermined limits GW min , GW max memory area 70 adapted to a transition operation, in the exemplary embodiment of a transition operation corresponding memory area 76 in that the memory area limited by the predefinable limit values GW min , GW max 70 is extended. Due to the expansion, the storage capacity of the electrical storage unit 12 be used more effectively for a transitional operation.

Im Ausführungsbeispiel wird, wie schon erwähnt, die Anpassung an einen Übergangsbetrieb dann vorgenommen, wenn nachts, aufgrund niedrigerer Temperaturen, ein Winterbetrieb und tagsüber, aufgrund höherer Temperaturen, ein Sommerbetrieb vorliegen würde. Dies kann beispielsweise im Herbst oder im Frühling der Fall sein.In the embodiment, as already mentioned, the adaptation to a transitional operation is then made when at night, due to lower temperatures, a winter operation and during the day, due to higher temperatures, a summer operation would be present. This can be the case, for example, in autumn or spring.

Die Regeleinheit 16, welche der elektrischen Speichereinheit zugeordnet ist, wertet die Informationen, welche sie über die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 erhält, aus und passt die vorgebbaren Grenzwerte GWmin, GWmax an die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 an. The control unit 16 , which is associated with the electrical storage unit, evaluates the information that they have on the operation of the cogeneration system 10 or the heating system 14 receives, and adapts the specifiable limits GW min , GW max to the operation of the cogeneration plant 10 or the heating system 14 at.

Die Anpassung der vorgebbaren Grenzwerte GWmin, GWmax an eine Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 wird erfindungsgemäß dadurch bewerkstelligt, dass mindestens einer der vorgebbaren Grenzwerte GWmin, GWmax auf mindestens einen einem Winterbetrieb entsprechenden Wert, im Ausführungsbeispiel auf einen von zwei einem Winterbetrieb entsprechenden Werten SOCmin,W, SOCmax,W, oder auf mindestens einen einem Sommerbetrieb entsprechenden Wert, im Ausführungsbeispiel auf einen von zwei einem Sommerbetrieb entsprechenden Werten SOCmin,S, SOCmax,S, festgelegt wird, wobei die einem Sommerbetrieb entsprechenden Werte SOCmin,S, SOCmax,S betragsmäßig größer sind als die einem Winterbetrieb entsprechenden Werte SOCmin,W, SOCmax,W. Daher gilt, SOCmin,W ≤ SOCmin,S und SOCmax,W ≤ SOCmax,S.The adaptation of the predefinable limit values GW min , GW max to a mode of operation of the combined heat and power plant 10 According to the invention, at least one of the predefinable limit values GW min , GW max to at least one value corresponding to winter operation, in the exemplary embodiment to one of two values corresponding to a winter operation SOC min, W , SOC max, W , or at least one summer operation corresponding value, in the exemplary embodiment to one of two summer operation corresponding values SOC , S , SOC max, S , is set, wherein the summer operation corresponding values SOC min, S , SOC max, S in terms of magnitude are greater than the winter operation corresponding values SOC min, W , SOC max, W. Therefore, SOC min, W ≦ SOC min, S and SOC max, W ≦ SOC max, S.

Unter einem vorgebbaren Grenzwert GWmin, GWmax ist daher einer der Werte SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W zu verstehen, welche der Kraft-Wärme-Kopplungsanlage vorgebbar sind bzw. vorgegeben werden. Diese werden durch einen Wartungstechniker oder einen Benutzer vorgegeben. Beispielsweise können die vorgebbaren Werte SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W über ein Bedienfeld der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14, welches nicht bildlich dargestellt ist, vorgegeben werden. Es ist aber auch denkbar, dass die Werte SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W während der Herstellung oder auch während der Installation der Kraft-Wärme-Kopplungsanlage 10 vorgegeben werden. Ebenso ist es aber auch denkbar, dass die Werte SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W automatisch aufgrund sich ändernder durchschnittlicher Außentemperaturen vorgegeben werden. Eine Vorgabe der Werte SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W kann beispielsweise durch eine der Regeleinheiten 16, 18 innerhalb der Kraft-Wärme-Kopplungsanlage 10 und/oder mittels einer Internetverbindung, mittels einer Telefonverbindung oder mittels eines Computers erfolgen. Die vorgebbaren Grenzwert GWmin, GWmax bzw. die Werte SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W können entsprechend auch als Parameter verstanden werden.Under a predefinable limit GW min , GW max is therefore one of the values SOC min, S , SOC min, W , SOC max, S , SOC max, W to understand which of the combined heat and power plant can be specified or specified. These are specified by a maintenance technician or a user. For example, the specifiable values SOC min, S , SOC min, W , SOC max, S , SOC max, W via a control panel of the cogeneration plant 10 or the heating system 14 , which is not depicted, can be specified. However, it is also conceivable that the values SOC min, S , SOC min, W , SOC max, S , SOC max, W during manufacture or during the installation of the cogeneration plant 10 be specified. However, it is also conceivable that the values SOC min, S , SOC min, W , SOC max, S , SOC max, W are automatically given due to changing average outside temperatures. A specification of the values SOC min, S , SOC min, W , SOC max, S , SOC max, W can, for example, by one of the control units 16 . 18 within the combined heat and power plant 10 and / or by means of an internet connection, by means of a telephone connection or by means of a computer. The predefinable limit values GW min , GW max and the values SOC min, S , SOC min, W , SOC max, S , SOC max, W can also be understood accordingly as parameters.

Die Werte SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W sind, nachdem sie der Kraft-Wärme-Kopplungsanlage 10 vorgegeben werden, in der Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, gespeichert. Es ist aber auch denkbar, dass sie in einer anderen Regeleinheit der Kraft-Wärme-Kopplungsanlage 10, beispielsweise in der Regeleinheit 18, welche dem Heizsystem zugeordnet ist, gespeichert sind. Ebenso ist auch denkbar, dass sie in einer separaten Speichereinheit gespeichert werden und/oder über eine Internetverbindung und/oder eine Telefonverbindung an eine Regeleinheit der Kraft-Wärme-Kopplungsanlage 10 übertragen werden.The values SOC min, S , SOC min, W , SOC max, S , SOC max, W are, after the cogeneration plant 10 be specified, in the control unit 16 , which is the electrical storage unit 12 is assigned stored. But it is also conceivable that they are in another control unit of the combined heat and power plant 10 , for example in the control unit 18 , which is assigned to the heating system, are stored. Likewise, it is also conceivable that they are stored in a separate memory unit and / or via an Internet connection and / or a telephone connection to a control unit of the combined heat and power plant 10 be transmitted.

Wie schon angedeutet handelt es sich bei den Werten SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W um zwei minimale Werte SOCmin,S, SOCmin,W und zwei maximale Werte SOCmax,S, SOCmax,W, Diese entsprechen jeweils einem Sommerbetrieb oder einem Winterbetrieb, was hier durch die entsprechenden Indizes kenntlich gemacht ist.As already indicated, the values SOC , S , SOC , W , SOC , S , SOC , W are two minimum values SOC , S , SOC , W and two maximum values, SOC , S , SOC max, W , These each correspond to a summer operation or a winter operation, which is indicated here by the corresponding indices.

Zur Veranschaulichung ist in 2 eine vertikale Achse zur schematischen Skalierung des Ladezustandes SOC der elektrischen Speichereinheit 12 dargestellt.By way of illustration is in 2 a vertical axis for schematically scaling the state of charge SOC of the electrical storage unit 12 shown.

Es handelt sich bei den Grenzwerten GWmin, GWmax bzw. bei den Werten SOCmin,S, SOCmin,W, SOCmax,S, SOCmax,W um prozentuale Werte, bezogen auf die maximale Speicherkapazität der elektrischen Speichereinheit 12. The limit values GW min , GW max and the values SOC min, S , SOC min, W , SOC max, S , SOC max, W are percentage values, based on the maximum storage capacity of the electrical storage unit 12 ,

Der maximale Grenzwert GWmax bzw. die maximalen Werte SOCmax,S, SOCmax,W liegen üblicherweise zwischen 70% und 100% der maximalen Speicherkapazität der elektrischen Speichereinheit 12. Im gezeigten Ausführungsbeispiel liegt der maximale einem Sommerbetrieb entsprechende Wert SOCmax,S bei 100% und der maximale einem Winterbetrieb entsprechende Wert SOCmax,W bei 80%.The maximum limit value GW max or the maximum values SOC max, S , SOC max, W are usually between 70% and 100% of the maximum storage capacity of the electrical storage unit 12 , In the exemplary embodiment shown, the maximum value SOC max, S corresponding to a summer mode lies at 100% and the maximum value corresponding to a winter operation SOC max, W at 80%.

Der minimale Grenzwert GWmin bzw. die minimalen Werte SOCmin,S, SOCmin,W liegen üblicherweise zwischen 0% und 30% der maximalen Speicherkapazität der elektrischen Speichereinheit 12. Im gezeigten Ausführungsbeispiel liegt der minimale einem Sommerbetrieb entsprechende Wert SOCmin,S bei 30% und der minimale einem Winterbetrieb entsprechende Wert SOCmin,W bei 10%.The minimum limit value GW min or the minimum values SOC min, S , SOC min, W are usually between 0% and 30% of the maximum storage capacity of the electrical storage unit 12 , In the exemplary embodiment shown, the minimum value SOC min, S corresponding to a summer mode is 30% and the minimum value SOC min, W corresponding to winter mode is 10%.

Der maximale Grenzwert GWmax bzw. die maximalen Werte SOCmax,S, SOCmax,W entsprechen jeweils einem Ladezustand SOCmax,S, SOCmax,W der elektrischen Speichereinheit 12, oberhalb dessen keine Speicherung von elektrischer Energie erlaubt wird. Ist bei einem entsprechenden Ladezustand SOCmax,S, SOCmax,W die Erzeugung elektrischer Energie 12 durch die Kraft-Wärme-Kopplungsanlage 10 größer als der Verbrauch elektrischer Energie durch den Verbraucher 38, so wird die überschüssige elektrische Energie ins Stromnetz 40 eingespeist.The maximum limit value GW max or the maximum values SOC max, S , SOC max, W respectively correspond to a state of charge SOC max, S , SOC max, W of the electrical storage unit 12 above which no storage of electrical energy is allowed. Is at a corresponding state of charge SOC max, S , SOC max, W is the generation of electrical energy 12 through the combined heat and power plant 10 greater than the consumption of electrical energy by the consumer 38 So the excess electrical energy gets into the power grid 40 fed.

Der minimale Grenzwert GWmin bzw. die minimale Werte SOCmin,S, SOCmin,W entsprechen jeweils einem Ladezustand SOCmin,S, SOCmin,W der elektrischen Speichereinheit 12, unterhalb dessen keine Bereitstellung von elektrischer Energie erlaubt wird. Ist bei einem entsprechenden Ladezustand SOCmin,S, SOCmin,W die Erzeugung elektrischer Energie 12 durch die Kraft-Wärme-Kopplungsanlage 10 geringer als der Verbrauch elektrischer Energie durch den Verbraucher 38, so wird die benötigte elektrische Energie aus dem Stromnetz 40 bezogen.The minimum limit value GW min and the minimum values SOC min, S , SOC min, W respectively correspond to a state of charge SOC min, S , SOC min, W of the electrical storage unit 12 below which no provision of electrical energy is allowed. Is at a corresponding state of charge SOC min, S , SOC min, W is the generation of electrical energy 12 through the combined heat and power plant 10 less than the consumption of electrical energy by the consumer 38 So the needed electrical energy is taken from the power grid 40 based.

Eine Versetzung des Speicherbereichs 70 wird gemäß dem in 2 gezeigten Ausführungsbeispiel dadurch bewerkstelligt, dass die vorgebbaren Grenzwerte GWmin, GWmax von den einem Winterbetrieb entsprechenden Werten SOCmin,W, SOCmax,W auf die einem Sommerbetrieb entsprechenden Werte SOCmin,S, SOCmax,S festgelegt bzw. geändert werden oder umgekehrt. Demzufolge ist der einem Sommerbetrieb entsprechende Speicherbereich 72 zu dem einem Winterbetrieb entsprechenden Speicherbereich 74 versetzt. Auf diese Weise kann eine Anpassung an einen Sommerbetrieb oder einen Winterbetrieb besonders einfach erfolgen.A displacement of the memory area 70 will be used according to the 2 The exemplary embodiment shown achieves that the predefinable limit values GW min , GW max are set or changed from the values SOC min, W , SOC max, W corresponding to a winter mode to the values SOC min, S , SOC max, S corresponding to a summer mode or vice versa. As a result, the memory area corresponding to a summer operation is 72 to the storage area corresponding to a winter operation 74 added. In this way, an adaptation to a summer or winter operation can be done very easily.

Eine Erweiterung des Speicherbereichs 70 wird gemäß dem in 1 gezeigten Ausführungsbeispiel dadurch bewerkstelligt, dass die vorgebbaren Grenzwerte GWmin, GWmax auf die Werte SOCmin,W, SOCmax,S festgelegt werden, welche betragsmäßig weitestgehend auseinander liegen. D.h. es werden der minimale vorgebbare Grenzwert GWmin auf den einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W und der maximale vorgebbare Grenzwert GWmax auf den einem Sommerbetrieb entsprechenden maximalen Wert SOCmax,S festgelegt. Demzufolge ist ein einem Übergangsbetrieb entsprechender Speicherbereich 76 gegenüber dem einem Sommerbetrieb entsprechenden Speicherbereich 72 und dem einem Winterbetrieb entsprechenden Speicherbereich 74 erweitert. Alternativ ist es aber auch denkbar, dass für einen Übergangsbetrieb die vorgebbaren Grenzwerte GWmin, GWmax stufenweise und/oder kontinuierlich angepasst werden, indem der minimale Grenzwert GWmin auf Werte festgelegt wird, welche betragsmäßig zwischen dem einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W und dem einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S liegen, und/oder der maximale Grenzwert GWmax auf Werte festgelegt wird, welche betragsmäßig zwischen dem einem Winterbetrieb entsprechenden maximalen Wert SOCmax,W und dem einem Sommerbetrieb entsprechenden maximalen Wert SOCmax,S liegen.An extension of the memory area 70 will be used according to the 1 shown embodiment accomplished in that the predetermined limits GW min , GW max are set to the values SOC min, W , SOC max, S , which are largely far apart in terms of amount. This means that the minimum predefinable limit value GW min is set to the minimum value SOC min, W corresponding to winter operation and the maximum predefinable limit value GW max to the maximum value SOC max, S corresponding to a summer mode. As a result, a memory area corresponding to a transient mode 76 opposite the storage area corresponding to a summer operation 72 and the storage area corresponding to a winter operation 74 extended. Alternatively, however, it is also conceivable that for a transient operation the predefinable limit values GW min , GW max are adjusted stepwise and / or continuously by setting the minimum limit value GW min to values which amount between the minimum value SOC min corresponding to a winter operation , W and the minimum value SOC min, S corresponding to a summer mode, and / or the maximum limit value GW max is set to values which amount between the maximum value SOC max, W corresponding to a winter mode and the maximum value SOC max corresponding to a summer mode, S are lying.

In 3 ist ein Flussdiagramm eines Ausführungsbeispiels des erfindungsbemäßen Verfahrens zum Betreiben einer Kraft-Wärme-Kopplungsanlage 10 im Detail gezeigt. Das erfindungsgemäße Verfahren erfolgt mit den nachfolgenden Verfahrensschritten:

  • a) Anpassen der vorgebbaren Grenzwerte GWmin, GWmax an einen Sommerbetrieb bzw. Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S,
  • b) Ermitteln ob ein Winterbetrieb erfolgt, b1) Fortfahren mit Verfahrensschritt a), wenn das Ermittelte aus Verfahrensschritt b) nicht zutreffend ist, b2) Fortfahren mit Verfahrensschritt c), wenn das Ermittelte aus Verfahrensschritt b) zutreffend ist,
  • c) Anpassen der vorgebbaren Grenzwerte GWmin, GWmax an einen Winterbetrieb bzw. Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W und maximalen Wert SOCmax,W,
  • d) Ermitteln ob ein Sommerbetrieb erfolgt, d1) Fortfahren mit Verfahrensschritt c), wenn das Ermittelte aus Verfahrensschritt d) nicht zutreffend ist, d2) Fortfahren mit Verfahrensschritt a), wenn das Ermittelte aus Verfahrensschritt d) zutreffend ist.
In 3 is a flowchart of an embodiment of erfindungsbemäßen method for operating a cogeneration plant 10 shown in detail. The process according to the invention takes place with the following process steps:
  • a) adaptation of the predefinable limit values GW min , GW max to a summer operation or determination of the predefinable limit values GW min , GW max to the minimum value SOC min, S and maximum value SOC max, S corresponding to summer operation
  • b) determining whether a winter operation takes place, b1) proceeding with method step a), if the determined from method step b) is not applicable, b2) proceeding with method step c), if the ascertained from method step b) is correct,
  • c) adaptation of the predefinable limit values GW min , GW max to a winter operation or definition of the predefinable limit values GW min , GW max to the minimum value SOC min, W corresponding to winter operation and maximum value SOC max, W ,
  • d) determining whether a summer operation takes place, d1) proceeding with method step c), if the determined from method step d) is not applicable, d2) proceeding with method step a), if the determined from method step d) is correct.

So kann eine Anpassung an eine einer Jahreszeit entsprechenden Betriebsweise besonders effektiv erfolgen, da stets eine Abfrage der Betriebsweise erfolgt.Thus, an adaptation to a mode of operation corresponding to a season can be carried out particularly effectively, since there is always a query of the mode of operation.

Das Festlegen des minimalen vorgebbaren Grenzwerts GWmin auf einen einem Sommerbetrieb entsprechenden Wert SOCmin,S oder einen einem Winterbetrieb entsprechenden Wert SOCmin,W erfolgt in einem Verfahrensablauf gemäß 3. Das Festlegen des maximalen vorgebbaren Grenzwerts GWmax auf einen einem Sommerbetrieb entsprechenden Wert SOCmax,S oder einen einem Winterbetrieb entsprechenden Wert SOCmax,W erfolgt in einem Verfahrensablauf gemäß 3. So werden der minimale vorgebbare Grenzwert GWmin und der der maximale vorgebbare Grenzwert GWmax in zwei voneinander getrennten, d.h. unabhängigen, Verfahrensabläufen festgelegt. Dadurch wird es ermöglicht, dass sich ein Übergangsbetrieb einstellen kann.Setting the minimum predefinable limit value GW min to a value SOC min, S corresponding to a summer mode or a value SOC min, W corresponding to a winter mode takes place in a method sequence according to FIG 3 , The Setting the maximum predefinable limit value GW max to a summer operation corresponding value SOC max, S or a winter operation corresponding value SOC max, W takes place in a procedure according to 3 , Thus, the minimum predefinable limit value GW min and the maximum predefinable limit value GW max are defined in two separate, ie independent, procedures. This allows a transitional operation to be established.

Gemäß Verfahrensschritt a) werden die vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S festgelegt. Es ist aber auch denkbar, dass nur einer der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S oder maximalen Wert SOCmax,S festgelegt wird. Das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S erfolgt in zwei voneinander getrennten, d.h. unabhängigen, Verfahrensabläufen gemäß eines Verfahrensablaufs aus 3.According to method step a), the predefinable limit values GW min , GW max are set to the minimum value SOC min, S and maximum value SOC max, S corresponding to a summer mode. However, it is also conceivable that only one of the predefinable limit values GW min , GW max is set to the minimum value SOC min, S or maximum value SOC max, S corresponding to a summer operation. The specification of the predefinable limit values GW min , GW max on the minimum value SOC min, S and maximum value SOC max, S corresponding to a summer mode takes place in two separate, ie independent, process sequences according to a method sequence 3 ,

Ebenso werden gemäß Verfahrensschritt d) die vorgebbaren Grenzwerte GWmin, GWmax auf den einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W und maximalen Wert SOCmax,W festgelegt. Es ist aber auch denkbar, dass nur einer der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W oder maximalen Wert SOCmax,W festgelegt wird. Das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W und maximalen Wert SOCmax,W erfolgt, wie schon für den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S gemäß Verfahrensschritt a), in zwei voneinander getrennten, d.h. unabhängigen, Verfahrensabläufen gemäß eines Verfahrensablaufs aus 3.Likewise, according to method step d), the predefinable limit values GW min , GW max are set to the minimum value SOC min, W and maximum value SOC max, W corresponding to winter operation. However, it is also conceivable that only one of the predefinable limit values GW min , GW max is set to the minimum value SOC min, W or maximum value SOC max, W corresponding to a winter operation. The determination of the predefinable limit values GW min , GW max on the minimum value SOC min, W and maximum value SOC max, W corresponding to a winter operation takes place, as already for the minimum value SOC min, S and maximum value SOC max, S corresponding to summer operation in accordance with method step a), in two separate, ie independent, process sequences according to a method sequence 3 ,

Das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S erfolgt parallel. So erfolgt das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S in zwei voneinander getrennten Verfahrensabläufen gemäß eines Verfahrensablaufs aus 3. Im gezeigten Ausführungsbeispiel erfolgt das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S gleichzeitig. Es ist aber auch denkbar, dass das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S zeitlich versetzt erfolgt.The specification of the predefinable limit values GW min , GW max on the minimum value SOC min, S and maximum value SOC max, S corresponding to a summer mode takes place in parallel. Thus, the setting of the predefinable limit values GW min , GW max on the minimum value SOC min, S and maximum value SOC max, S corresponding to a summer mode takes place in two separate process sequences according to a method sequence 3 , In the exemplary embodiment shown, the predefinable limit values GW min , GW max are set to the minimum value SOC min, S and maximum value SOC max, S corresponding to a summer mode at the same time. However, it is also conceivable that the setting of the predefinable limit values GW min , GW max takes place with a time offset to the minimum value SOC min, S and maximum value SOC max, S corresponding to summer operation.

Ebenso erfolgt das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W und maximalen Wert SOCmax,W parallel. So erfolgt auch das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Winterbetrieb entsprechenden minimalen Wert SOCmin,W und maximalen Wert SOCmax,W in zwei voneinander getrennten Verfahrensabläufen gemäß eines Verfahrensablaufs aus 3. Im gezeigten Ausführungsbeispiel erfolgt das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S gleichzeitig. Es ist aber auch denkbar, dass das Festlegen der vorgebbaren Grenzwerte GWmin, GWmax auf den einem Sommerbetrieb entsprechenden minimalen Wert SOCmin,S und maximalen Wert SOCmax,S zeitlich versetzt erfolgt.Likewise, the predefinable limit values GW min , GW max are set to the minimum value SOC min, W and maximum value SOC max, W corresponding to a winter operation in parallel. Thus, also the setting of the predefinable limit values GW min , GW max on the minimum value SOC min, W and maximum value SOC max, W corresponding to a winter operation takes place in two separate process sequences according to a method sequence 3 , In the exemplary embodiment shown, the predefinable limit values GW min , GW max are set to the minimum value SOC min, S and maximum value SOC max, S corresponding to a summer mode at the same time. However, it is also conceivable that the setting of the predefinable limit values GW min , GW max takes place with a time offset to the minimum value SOC min, S and maximum value SOC max, S corresponding to summer operation.

Das erfindungsgemäße Verfahren erfolgt unabhängig davon ob die elektrische Speichereinheit 12 an ein Wechselstromnetz angeschlossen ist oder an ein Gleichstromnetz. Ebenfalls ist das erfindungsgemäße Verfahren für ein- und dreiphasige Systeme anwendbar.The inventive method is independent of whether the electrical storage unit 12 is connected to an AC mains or to a DC mains. Likewise, the inventive method for single and three-phase systems is applicable.

In einem weiteren Ausführungsbeispiel welches von 3 ausgeht, werden die vorgebbaren Grenzwerte GWmin, GWmax an die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 angepasst, wenn die Betriebsweise länger als eine vorgegebene Zeit, vorzugsweise 1 bis 3 Tage, im Ausführungsbeispiel 2 Tage, ununterbrochen erfolgt. So kann sichergestellt werden, dass die vorgebbaren Grenzwerte GWmin, GWmax nur dann an einen Winterbetrieb oder einen Sommerbetrieb angepasst werden, wenn ein entsprechender Betrieb auch tatsächlich vorliegt. In der verbleibenden Zeit ergibt sich ein Übergangsbetrieb, mit den Einstellungen GWmax = SOCmax,S und GWmin = SOCmin,W, welcher als Speicherbereich 76 schematisch in 2 dargestellt ist.In a further embodiment which of 3 goes out, the predetermined limits GW min , GW max to the operation of the combined heat and power plant 10 adjusted if the operation longer than a predetermined time, preferably 1 to 3 days, in the exemplary embodiment 2 days, continuously. Thus it can be ensured that the predefinable limit values GW min , GW max are only adapted to a winter operation or a summer operation, if a corresponding operation is actually present. In the remaining time results in a transition operation, with the settings GW max = SOC max, S and GW min = SOC min, W , which as a memory area 76 schematically in 2 is shown.

Das erfindungsgemäße Verfahren erfolgt dann so, dass ausgehend von 2 anstelle des Verfahrensschritts b) ein Verfahrensschritt

  • e) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt, und/oder dass anstelle des Verfahrensschritts d) ein Verfahrensschritt
  • f) Ermitteln ob ein Sommerbetrieb erfolgt und/oder ein Sommerbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt.
The inventive method is then such that starting from 2 instead of the process step b) a process step
  • e) determining whether a winter operation takes place and / or whether a winter operation is continuous for a predetermined time continuously, and / or that instead of the method step d) a method step
  • f) Determine whether a summer operation is taking place and / or a summer operation is taking place continuously for a predetermined time without interruption.

Auf diese Weise kann das erfindungsgemäße Verfahren besonders wirksam erweitert werden.In this way, the inventive method can be extended particularly effective.

Wird über die vorgegebene Zeit, vorzugsweise 1 bis 3 Tage, im Ausführungsbeispiel 2 Tage, nicht festgestellt, dass ein Sommerbetrieb oder Winterbetrieb ununterbrochen vorliegt, was beispielsweise im Herbst oder im Frühling der Fall sein kann, so werden vorgebbaren Grenzwerte GWmin, GWmax an einen einem Übergangsbetrieb entsprechenden Betrieb angepasst, wie durch den Speicherbereich 76 in 2 dargestellt. Dies kann beispielsweise ebenfalls durch einen Verfahrensablauf gemäß 3 erfolgen. If it is not found over the given time, preferably 1 to 3 days, in the exemplary embodiment 2 days, that a summer or winter operation is uninterrupted, which may be the case in autumn or spring for example, predeterminable limit values GW min , GW max will apply adapted to transitional operation, such as memory area 76 in 2 shown. This can for example also by a procedure according to 3 respectively.

In einem weiteren Ausführungsbeispiel welches von 2 ausgeht, werden die vorgebbaren Grenzwerte GWmin, GWmax an die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 angepasst, wenn ein vorgebbarer minimaler Schwellenwert SWmin der elektrischen Speichereinheit unterschritten oder ein vorgebbarer maximaler Schwellenwert SWmax der elektrischen Speichereinheit überschritten wird. Auf diese Weise kann sichergestellt werden, dass die vorgebbaren Grenzwerte GWmin, GWmax nur dann angepasst werden, wenn eine Speicherung und/oder Bereitstellung von elektrischer Energie tatsächlich erfolgt ist.In a further embodiment which of 2 goes out, the predetermined limits GW min , GW max to the operation of the combined heat and power plant 10 adapted if a predeterminable minimum threshold value SW min of the electrical storage unit is exceeded or a predefinable maximum threshold value SW max of the electrical storage unit is exceeded. In this way, it can be ensured that the predefinable limit values GW min , GW max are only adapted when storage and / or provision of electrical energy has actually taken place.

Das erfindungsgemäße Verfahren erfolgt dann so, dass ausgehend von 2 anstelle des Verfahrensschritts b) ein Verfahrensschritt

  • g) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt und ob ein vorgegebener maximaler Schwellenwert SWmax der elektrischen Speichereinheit überschritten wurde, und/oder dass anstelle des Verfahrensschritts d) ein Verfahrensschritt
  • h) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt und ob ein vorgegebener minimaler Schwellenwert SWmin der elektrischen Speichereinheit unterschritten wurde.
The inventive method is then such that starting from 2 instead of the process step b) a process step
  • g) determining whether a winter operation takes place and / or whether a winter operation is continuous for a predetermined time and whether a predetermined maximum threshold SW max of the electrical storage unit has been exceeded, and / or that instead of the method step d) a method step
  • h) Determining whether a winter operation takes place and / or whether a winter operation for a longer time than a predetermined time takes place continuously and whether a predetermined minimum threshold value SW min of the electrical storage unit has been undershot.

Auf diese Weise kann das erfindungsgemäße Verfahren ebenfalls wirksam erweitert werden.In this way, the inventive method can also be effectively extended.

Der vorgebbare minimale Schwellenwert SWmin und der vorgebbare maximale Schellenwert SWmax sind in 2 veranschaulicht. Im gezeigten Ausführungsbeispiel liegt der vorgebbare maximale Schwellenwert SWmax betragsmäßig leicht unterhalb des vorgebbaren maximalen Grenzwerts GWmax und der vorgebbare minimale Schwellenwert SWmin betragsmäßig leicht oberhalb des vorgebbaren minimalen Grenzwerts GWmin. Es gilt GWmax ≥ SWmax, SWmin ≥ GWmin, wobei SWmax ≥ SWmin.The predeterminable minimum threshold value SW min and the predefinable maximum threshold value SW max are in 2 illustrated. In the exemplary embodiment shown, the predefinable maximum threshold value SW max is slightly below the predefinable maximum limit value GW max and the predefinable minimum threshold value SW min is slightly above the predefinable minimum limit value GW min . GW max ≥ SW max , SW min ≥ GW min , where SW max ≥ SW min .

Üblicherweise liegt der vorgebbare minimale Schwellenwert SWmin zwischen 5% und 30% und der vorgebbare maximale Schwellenwert SWmax zwischen 60% und 100%. Im gezeigten Ausführungsbeispiel liegt der vorgebbare minimale Schwellenwert SWmin bei 25% und der vorgebbare maximale Schwellwert bei 90%.Usually, the predeterminable minimum threshold SW min is between 5% and 30% and the predefinable maximum threshold SW max is between 60% and 100%. In the exemplary embodiment shown, the predefinable minimum threshold value SW min is 25% and the predefinable maximum threshold value is 90%.

Wird der vorgebbare maximale Schwellenwert SWmax überschritten oder der vorgebbare minimale Schwellenwert SWmin unterschritten, so kann man davon ausgehen, dass entsprechend eine Speicherung oder Bereitstellung von elektrischer Energie mittels der elektrischen Speichereinheit 12 tatsächlich erfolgt ist.If the predefinable maximum threshold value SW max is exceeded or the predefinable minimum threshold value SW min is undershot, then it can be assumed that storage or provision of electrical energy by means of the electrical storage unit correspondingly takes place 12 actually done.

Des Weiteren wird im Falle eines Netzausfalls die Speicherung von elektrischer Energie durch die vorgebbaren Grenzwerte GWmin, GWmax nicht beschränkt. Dadurch kann bei einem Netzausfall die volle Kapazität der elektrischen Speichereinheit genutzt werden.Furthermore, in the event of a power failure, the storage of electrical energy is not limited by the predefinable limit values GW min , GW max . As a result, the full capacity of the electrical storage unit can be used in the event of a power failure.

In einem alternativen Ausführungsbeispiel, welches von den Figuren ausgeht, ist es denkbar, dass im Falle eines Netzausfalls die vorgebbaren Grenzwerte GWmin, GWmax an einen Notstrombetrieb angepasst werden. So kann zumindest einer der vorgebbaren Grenzwerte GWmin, GWmax auf einen von zwei einem Notstrombetrieb entsprechenden vorgebbaren Werten SOCmax,Not, SOCmin,Not festgelegt werden. In diesem Fall liegen die einem Notstrombetrieb entsprechenden vorgebbaren Werte SOCmax,Not, SOCmin,Not betragsmäßig weitestgehend auseinander, wobei idealerweise gilt SOCmax,Not ≥ SOCmax,S und SOCmin,Not ≤ SOCmin,W. Üblicherweise liegt der einem Notstrombetrieb entsprechende vorgebbare minimale Wert SOCmin,Not zwischen 0% und 5% und der einem Notstrombetrieb entsprechende vorgebbare maximale Wert SOCmax,Not zwischen 95% und 100%, idealerweise jedoch liegt der einem Notstrombetrieb entsprechende vorgebbare minimale Wert SOCmin,Not bei 2% und der der einem Notstrombetrieb entsprechende vorgebbare maximale Wert SOCmax,Not bei 98%.In an alternative embodiment, which proceeds from the figures, it is conceivable that in the case of a power failure, the predefinable limit values GW min , GW max are adapted to an emergency power operation. Thus, at least one of the predefinable limit values GW min , GW max can be set to one of two predefinable values SOC max, emergency , SOC min, emergency, corresponding to emergency power operation. In this case, the predefinable values SOC max, emergency , SOC min, emergency corresponding to an emergency operation differ as far as possible in absolute terms, ideally SOC max, emergency ≥ SOC max, S and SOC min, emergency ≤ SOC min, W. Normally, the predefinable minimum value SOC min, Not between 0% and 5% and the emergency operation corresponding predefinable maximum value SOC max, Not between 95% and 100%, ideally, however, is an emergency operation corresponding predetermined minimum value SOC min , Emergency at 2% and the maximum power SOC max, emergency at 98%.

In einem weiteren alternativen Ausführungsbeispiel, welches von den Figuren ausgeht, ist es denkbar, dass der vorgebbare maximale Schwellenwert SWmax gleich dem vorgebbaren maximalen Grenzwert GWmax bzw. einem der vorgebbaren Werte SOCmax,S, SOCmax,W ist und der minimale Schwellenwert SWmin gleich dem vorgebbaren minimalen Grenzwert GWmin bzw. einem der vorgebbaren Werte SOCmin,S, SOCmax,W ist, wobei in diesem Fall eine Anpassung der Grenzwerte GWmin, GWmax an die Betriebsweise der Kraft-Wärme-Kopplungsanlage 10 dann erfolgt, wenn einer der vorgebbaren Schwellenwerte SWmax, SWmin erreicht wird.In a further alternative embodiment, which proceeds from the figures, it is conceivable that the predefinable maximum threshold value SW max is equal to the predefinable maximum limit value GW max or one of the predefinable values SOC max, S , SOC max, W and the minimum threshold value SW min is equal to the predefinable minimum limit value GW min or one of the predefinable values SOC min, S , SOC max, W , in which case an adaptation of the limit values GW min , GW max to the mode of operation of the cogeneration plant 10 then takes place when one of the predefinable thresholds SW max , SW min is reached.

In einem weiteren alternativen Ausführungsbeispiel, welches von den Figuren ausgeht, ist es denkbar, dass der Ladezustand SOC der elektrischen Speichereinheit 12 auf einen für eine Lagerung der elektrischen Speichereinheit 12 günstigen Wert SOCL eingestellt wird. Dies kann beispielsweise dann erfolgen, wenn ein Benutzer abwesend ist. Eine Informationen über die Abwesenheit eines Benutzers können beispielsweise an die Regeleinheit 16, welche der elektrischen Speichereinheit zugeordnet ist, übermittelt werden, welche daraufhin das Speichern und/oder Bereitstellen von elektrischer Energie mittels der elektrischen Speichereinheit 12 gezielt so beeinflusst, dass der Ladezustand SOCL erreicht wird. Entsprechende Informationen können über die erfindungsgemäße Datenverbindung 64 übertragen werden. Es können auch beispielsweise Informationen darüber übertragen werden, ob ein Urlaubsbetrieb der Kraft-Wärme-Kopplungsanlage 10 vorliegt. Die vorgebbaren Grenzwerte GWmin, GWmax können dann auf den für eine Lagerung der elektrischen Speichereinheit 12 günstigen Wert SOCL festgelegt werden. Üblicherweise liegt der für eine Lagerung der elektrischen Speichereinheit 12 günstige Wert zwischen 10% und 40%, idealerweise jedoch bei 30%. Der für eine Lagerung der elektrischen Speichereinheit 12 günstige Wert kann je nach Art der elektrischen Speichereinheit 12 angepasst werden bzw. kann auch vorgegeben werden.In a further alternative embodiment, which starts from the figures, it is conceivable that the state of charge SOC of the electrical storage unit 12 to one for storage of the electric storage unit 12 Great Value SOC L is set. This can be done, for example, when a user is absent. For example, information about the absence of a user may be sent to the control unit 16 , which is associated with the electrical storage unit, are transmitted, which then storing and / or providing electrical energy by means of the electrical storage unit 12 specifically influenced so that the state of charge SOC L is reached. Corresponding information can be obtained via the data connection according to the invention 64 be transmitted. It may also be transmitted, for example, information on whether a holiday operation of the cogeneration plant 10 is present. The predefinable limit values GW min , GW max can then be applied to the storage of the electrical storage unit 12 favorable value SOC L be set. Usually, this is for storage of the electrical storage unit 12 favorable value between 10% and 40%, but ideally at 30%. The for storage of the electrical storage unit 12 favorable value may vary depending on the type of electrical storage unit 12 be adapted or can also be specified.

In einem weiteren alternativen Ausführungsbeispiel, welches von den Figuren ausgeht, ist es denkbar, dass die erfindungsgemäße Datenverbindung 64 dazu genutzt wird Betriebsdaten, wie beispielsweise ein aktueller Ladezustand, aktuelle Leistung, Zyklenzahl, Alterungszustand, etc., zu übertragen. Die Betriebsdaten können an die Regeleinheit 18, welche dem Heizsystem 14 zugeordnet ist übermittelt werden. Diese kann die Betriebsdaten zumindest an ein Anzeigegerät oder ein Netzwerk zur Anzeige, beispielsweise auf einem Computer, einem Tablet oder einem Smartphone, übertragen. Entsprechende Daten können auch für eine Fehlerdiagnose zur Verfügung gestellt oder gespeichert werden.In a further alternative embodiment, which proceeds from the figures, it is conceivable that the data connection according to the invention 64 used to transfer operating data, such as a current state of charge, current power, number of cycles, aging state, etc., to transfer. The operating data can be sent to the control unit 18 which the heating system 14 is assigned to be transmitted. This can transmit the operating data at least to a display device or a network for display, for example on a computer, a tablet or a smartphone. Corresponding data can also be provided or stored for a fault diagnosis.

In einem weiteren alternativen Ausführungsbeispiel, ist es denkbar, dass anstelle der Mikro-Kraft-Wärme-Kopplungsanlage 20 oder zusätzlich zur Mikro-Kraft-Wärme-Kopplungseinheit 20 eine andere Anlage, welche elektrische Energie erzeugt, beispielsweise eine Photovoltaik-Anlage und/oder eine Stirling-Anlage, eingesetzt wird. Wird eine entsprechende Anlage eingesetzt, kann zusätzlich ermittelt werden, ob die zu erwartende Menge an erzeugter elektrischer Energie für einen nächsten Bilanzzeitraum, beispielsweise den nächsten Tag oder die nächste Woche, über oder unter einem erwarteten Verbrauch von elektrischer Energie liegt. Liegt die erwartete Menge an erzeugter elektrischer Energie über dem erwarteten Verbrauch, werden die vorgebbaren Grenzwerte GWmin, GWmax auf einem Winterbetrieb entsprechende Werte SOCmin,W, SOCmax,W angepasst, sonst werden die vorgebbaren Grenzwerte auf einem Sommerbetrieb entsprechende Werte SOCmin,S, SOCmax,S angepasst. Dadurch kann die erzeugte elektrische Energie effizient genutzt bzw. gespeichert und/oder bereitgestellt werden.In a further alternative embodiment, it is conceivable that instead of the micro cogeneration system 20 or in addition to the micro-cogeneration unit 20 another system which generates electrical energy, for example a photovoltaic system and / or a Stirling system, is used. If a corresponding system is used, it can additionally be determined whether the expected amount of generated electrical energy for a next balance period, for example the next day or the next week, is above or below an expected consumption of electrical energy. If the expected amount of generated electrical energy is above the expected consumption, the predefinable limit values GW min , GW max are adjusted to values corresponding to winter operation SOC min, W , SOC max, W , otherwise the predefinable limit values on a summer operation are corresponding values SOC min , S , SOC max, S adjusted. As a result, the generated electrical energy can be efficiently used or stored and / or provided.

In einem weiteren alternativen Ausführungsbeispiel, welches von den Figuren ausgeht, werden die vorgebbaren Grenzwerte GWmin, GWmax an einen Winterbetrieb angepasst, wenn bei Überschreiten eines Leistungswertes der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 über eine vorgebbare Zeit davon ausgegangen werden kann, dass ein Winterbetrieb vorliegt. Analog ist es denkbar, dass die vorgebbaren Grenzwerte GWmin, GWmax an einen Sommerbetrieb angepasst werden, wenn bei Unterschreiten eines Leistungswertes der Kraft-Wärme-Kopplungsanlage 10 bzw. des Heizsystems 14 über eine vorgebbare Zeit davon ausgegangen werden kann, dass ein Sommerbetrieb vorliegt. Ebenso ist es denkbar, dass die vorgebbaren Grenzwerte GWmin, GWmax auf Basis einer Prognose des Heizwärmebedarfs, einer Prognose des Trinkwasserbedarfs, einer Analyse der historischen Daten der Heizleistung, und/oder einer Analyse der historischen oder aktuellen Daten des Ladezustandes der elektrischen Speichereinheit 12 an einen Sommerbetrieb oder einen Winterbetrieb angepasst werden. Es ist denkbar, dass die zugrundeliegenden Algorithmen jeweils in der Regeleinheit 16, welche der elektrischen Speichereinheit 12 zugeordnet ist, oder in der Regeleinheit 18, welche dem elektrischen Heizsystem zugeordnet ist, integriert sind.In a further alternative embodiment, which starts from the figures, the predefinable limit values GW min , GW max are adapted to a winter operation, when a power value of the cogeneration plant is exceeded 10 or the heating system 14 over a predeterminable time can be assumed that a winter operation is present. Analogously, it is conceivable that the predefinable limit values GW min , GW max be adapted to a summer operation, when falling below a power value of the cogeneration plant 10 or the heating system 14 can be assumed over a predeterminable time that there is a summer operation. It is likewise conceivable for the predefinable limit values GW min , GW max to be based on a prognosis of the heating requirement, a prognosis of the drinking water requirement, an analysis of the historical data of the heating output, and / or an analysis of the historical or current data of the state of charge of the electrical storage unit 12 be adapted to a summer operation or a winter operation. It is conceivable that the underlying algorithms are each in the control unit 16 , which is the electrical storage unit 12 is assigned, or in the control unit 18 , which is associated with the electrical heating system, are integrated.

Für eine Ermittlung einer erwarteten Menge an erzeugter elektrischer Energie ist es denkbar eine Ertragsprognose, vorzugsweise für eine Photovoltaik-Anlage, beispielsweise basierend auf Wetterdaten, Wettervorhersagen, Vorhersagen solarer Einstrahlung bzw. von Sonnenstunden und/oder Vorhersagen von typischen jahreszeitlichen Verläufen, zu verwenden. Es ist auch denkbar eine Ertragsprognose, vorzugsweise bei KWK-Anlagen mit Stirlingtechnologie, Motortechnologie und/oder Brennstoffzellentechnologie, auf Basis einer Außentemperatur, von Informationen über das Gebäudeverhalten, wie beispielsweise einer thermischen Trägheit, und/oder von Informationen über die Anwesenheit der Bewohner, beispielsweise von Urlaubsfunktionen oder Informationen aus einer Smartphone-Anwendung, zu verwenden. Ebenso ist es denkbar, eine Vorhersage über eine Menge an elektrischer Energie, welche aus dem Stromnetz 40 bezogen werden soll, auf Basis einer Information eines Netzbetreibers oder Energieversorgers, beispielsweise in Form von Fahrplänen oder zeitabhängigen Preisen, zu verwenden, wodurch günstige elektrische Energie ausgenutzt werden kann oder elektrische Energie zur Netzstützung aufgenommen werden kann.For a determination of an expected amount of generated electrical energy, it is conceivable to use a yield forecast, preferably for a photovoltaic system, for example based on weather data, weather forecasts, predictions of solar irradiation or hours of sunshine and / or predictions of typical seasonal processes. It is also conceivable a yield forecast, preferably in CHP plants with Stirling technology, engine technology and / or fuel cell technology, based on an outside temperature, information about the behavior of buildings, such as a thermal inertia, and / or information about the presence of the residents, for example from vacation features or information from a smartphone application. Likewise, it is possible to make a prediction about a lot of electrical energy coming from the power grid 40 is to be based on information from a network operator or energy supplier, for example in the form of timetables or time-dependent prices to use, so that cheap electrical energy can be exploited or electrical energy can be added to the network support.

Für eine Ermittlung eines erwarteten Verbrauchs von elektrischer Energie ist es denkbar eine Verbrauchsprognose, vorzugsweise für Wärmepumpen und/oder elektrische Speicher- oder Direktheizungen, auf Basis einer Außentemperatur, von Wettervorhersagen, von Informationen über das Gebäudeverhalten, wie beispielsweise einer thermischen Trägheit, von Informationen über die Anwesenheit der Bewohner, beispielsweise von Urlaubsfunktionen oder Informationen aus einer Smartphone-Anwendung, und/oder von typischen jahreszeitlichen Verläufen zu verwenden. Es ist auch denkbar eine Verbrauchsprognose, vorzugsweise für Haushaltsgeräte und/oder Elektro-Fahrzeuge, auf Basis von Informationen eines Nutzerverhaltens, wie beispielsweise eines Jahres- und/oder Wochenrythmuses bestimmter Nutzungen, von Erfahrungswerten und/oder von Nutzereingaben zu verwenden. Ebenso ist es denkbar, eine Vorhersage über eine Menge an elektrischer Energie, welche in das Stromnetz 40 eingespeist werden soll, auf Basis einer Information eines Netzbetreibers oder Energieversorgers, beispielsweise in Form von Fahrplänen oder zeitabhängigen Preisen, zu verwenden, wodurch günstige elektrische Energie ausgenutzt werden kann oder elektrische Energie zur Netzstützung aufgenommen werden kann.For a determination of an expected consumption of electrical energy, it is conceivable a consumption forecast, preferably for Heat pumps and / or electric storage or direct heating, based on an outdoor temperature, weather forecasts, information about the building behavior, such as a thermal inertia, information about the presence of the residents, such as holiday functions or information from a smartphone application, and / or to use typical seasonal processes. It is also conceivable to use a consumption forecast, preferably for household appliances and / or electric vehicles, on the basis of information of a user behavior, such as an annual and / or weekly rhythm of certain uses, empirical values and / or user input. Likewise, it is conceivable to make a prediction about an amount of electrical energy that is in the power grid 40 is to be fed on the basis of information from a network operator or energy supplier, for example in the form of timetables or time-dependent prices to use, so that cheap electrical energy can be exploited or electrical energy can be added to the network support.

In einem weiteren alternativen Ausführungsbeispiel, welches von den Figuren ausgeht, aber nicht bildlich dargestellt ist, ist es denkbar, dass die Regeleinheiten 16, 18 in einer Regeleinheit zusammengefasst sind.In a further alternative embodiment, which starts from the figures, but is not illustrated, it is conceivable that the control units 16 . 18 are summarized in a control unit.

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • GB 2508577 [0002] GB 2508577 [0002]

Claims (14)

Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10), wobei elektrische Energie mittels einer elektrischen Speichereinheit (12) gespeichert und/oder bereitgestellt wird und die Speicherung und/oder Bereitstellung von elektrischer Energie durch mindestens einen vorgebbaren Grenzwert (GWmin, GWmax), insbesondere einen minimalen und/oder maximalen Grenzwert (GWmin, GWmax), beschränkt wird, dadurch gekennzeichnet, dass der mindestens eine vorgebbare Grenzwert (GWmin, GWmax) an eine Betriebsweise der Kraft-Wärme-Kopplungsanlage (10) angepasst wird.Method for operating a combined heat and power plant ( 10 ), wherein electrical energy by means of an electrical storage unit ( 12 Is stored) and / or provided and the storage and / or provision of electrical energy by at least a predeterminable limit value (GW min, GW max), in particular a minimum and / or maximum limit value (GW min, GW max), is limited, characterized in that the at least one predefinable limit value (GW min , GW max ) corresponds to a mode of operation of the cogeneration plant ( 10 ) is adjusted. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach Anspruch 1, dadurch gekennzeichnet, dass die Betriebsweise der Kraft-Wärme-Kopplungsanlage (10) einem einer Jahreszeit entsprechenden Betrieb, insbesondere einem Winterbetrieb oder einem Sommerbetrieb oder einem Übergangsbetrieb, entspricht.Method for operating a combined heat and power plant ( 10 ) according to claim 1, characterized in that the operation of the cogeneration plant ( 10 ) corresponds to a season corresponding operation, in particular a winter operation or a summer operation or a transitional operation. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage nach einem der Ansprüche 1 und 2, dadurch gekennzeichnet, dass ein durch den mindestens einen vorgebbaren Grenzwert (GWmin, GWmax) begrenzter Speicherbereich (70) an die Betriebsweise der Kraft-Wärme-Kopplungsanlage (10) angepasst wird. Method for operating a combined heat and power plant according to one of claims 1 and 2, characterized in that a by the at least one predetermined limit value (GW min , GW max ) limited memory area ( 70 ) on the operation of the cogeneration plant ( 10 ) is adjusted. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass ein durch den mindestens einen vorgebbaren Grenzwert (GWmin, GWmax) begrenzter Speicherbereich (70) an einen Winterbetrieb oder Sommerbetrieb angepasst wird, indem der durch den mindestens einen vorgebbaren Grenzwert (GWmin, GWmax) begrenzte Speicherbereich (70) versetzt wird.Method for operating a combined heat and power plant ( 10 ) according to one of claims 1 to 3, characterized in that a by the at least one predetermined limit value (GW min , GW max ) limited memory area ( 70 ) is adapted to a winter operation or summer operation by the memory area bounded by the at least one predefinable limit value (GW min , GW max ) ( 70 ). Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass ein durch den mindestens einen vorgebbaren Grenzwert (GWmin, GWmax) begrenzter Speicherbereich an einen Übergangsbetrieb angepasst wird, indem der durch den mindestens einen vorgebbaren Grenzwert begrenzte Speicherbereich erweitert wird.Method for operating a combined heat and power plant ( 10 ) according to one of claims 1 to 4, characterized in that a by the at least one predetermined limit value (GW min , GW max ) limited memory area is adapted to a transition operation by the limited by the at least one predetermined limit memory area is extended. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass der mindestens eine vorgebbare Grenzwert (GWmin, GWmax) auf mindestens einen einem Winterbetrieb entsprechenden Wert (SOCmin,W, SOCmax,W) oder auf mindestens einen einem Sommerbetrieb entsprechenden Wert (SOCmin,S, SOCmax,S) festgelegt wird, wobei vorzugsweise der mindestens eine einem Sommerbetrieb entsprechende Wert (SOCmin,S, SOCmax,S) betragsmäßig größer ist als der mindestens eine einem Winterbetrieb entsprechende Wert (SOCmin,W, SOCmax,W).Method for operating a combined heat and power plant ( 10 ) according to one of claims 1 to 5, characterized in that the at least one predefinable limit value (GW min , GW max ) to at least one winter operation corresponding value (SOC min, W , SOC max, W ) or at least one summer operation corresponding Value (SOC min, S , SOC max, S ) is determined, wherein preferably the at least one summer operation corresponding value (SOC min, S , SOC max, S ) is greater in magnitude than the at least one winter operation corresponding value (SOC min, W , SOC max, W ). Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach einem der Ansprüche 1 bis 6 mit nachfolgenden Verfahrensschritten: a) Anpassen des mindestens einen vorgebbaren Grenzwertes (GWmin, GWmax) an einen Sommerbetrieb, insbesondere Festlegen des mindestens einen vorgebbaren Grenzwertes (GWmin, GWmax) auf mindestens einen einem Sommerbetrieb entsprechenden minimalen und/oder maximalen Wert (SOCmin,S, SOCmax,S), b) Ermitteln ob ein Winterbetrieb erfolgt, b1) Fortfahren mit Verfahrensschritt a), wenn das Ermittelte aus Verfahrensschritt b) nicht zutreffend ist, b2) Fortfahren mit Verfahrensschritt c), wenn das Ermittelte aus Verfahrensschritt b) zutreffend ist, c) Anpassen des mindestens einen vorgebbaren Grenzwertes (GWmin, GWmax) an einen Winterbetrieb, insbesondere Festlegen des mindestens einen vorgebbaren Grenzwertes (GWmin, GWmax) auf mindestens einen einem Winterbetrieb entsprechenden minimalen und/oder maximalen Wert (SOCmin,S, SOCmax,S), d) Ermitteln ob ein Sommerbetrieb erfolgt, d1) Fortfahren mit Verfahrensschritt c), wenn das Ermittelte aus Verfahrensschritt d) nicht zutreffend ist, d2) Fortfahren mit Verfahrensschritt a), wenn das Ermittelte aus Verfahrensschritt d) zutreffend ist.Method for operating a combined heat and power plant ( 10 ) according to one of claims 1 to 6 with the following method steps: a) adapting the at least one predefinable limit value (GW min , GW max ) to a summer operation, in particular setting the at least one predefinable limit value (GW min , GW max ) to at least one summer operation corresponding minimum and / or maximum value (SOC.sub.min , S , SOC.sub.max , S ), b) determining whether a winter operation is taking place, b1) proceeding with method step a) if the result obtained from method step b) is not true, b2) proceeding with C) adjusting the at least one predefinable limit value (GW min , GW max ) to a winter operation, in particular setting the at least one predefinable limit value (GW min , GW max ) to at least one process step c) a minimum and / or maximum value corresponding to a winter operation (SOC min, S , SOC max, S ), d) determining whether a summer operation is taking place, d1) proceeding with Verf step c) if the determined from method step d) is not applicable, d2) proceeding with method step a), if the determined from method step d) is correct. Verfahren zum Betreiben einer Kraft-Wärme Kopplungsanlage (10) nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass der mindestens eine vorgebbare Grenzwert (GWmin, GWmax) an die Betriebsweise der Kraft-Wärme-Kopplungsanlage (10) angepasst wird, wenn die Betriebsweise länger als eine vorgegebene Zeit, vorzugsweise 1 bis 3 Tage, insbesondere 2 Tage, ununterbrochen erfolgt.Method for operating a cogeneration plant ( 10 ) according to one of claims 1 to 7, characterized in that the at least one predefinable limit value (GW min , GW max ) to the operation of the cogeneration plant ( 10 ) is adjusted if the mode of operation is longer than a predetermined time, preferably 1 to 3 days, in particular 2 days, continuously. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach Anspruch 7, dadurch gekennzeichnet, dass anstelle des Verfahrensschritts b) ein Verfahrensschritt e) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt, und/oder dass anstelle des Verfahrensschritts d) ein Verfahrensschritt f) Ermitteln ob ein Sommerbetrieb erfolgt und/oder ein Sommerbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt, erfolgt.Method for operating a combined heat and power plant ( 10 ) according to claim 7, characterized in that instead of the process step b) a process step e) determining whether a winter operation is carried out and / or winter operation for more than a predetermined time continuously, and / or that instead of the process step d) a process step f) Determining whether a summer operation takes place and / or a summer operation for more than a predetermined time takes place uninterrupted takes place. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass der mindestens eine vorgebbare Grenzwert (GWmin, GWmax) an die Betriebsweise der Kraft-Wärme-Kopplungsanlage (10) angepasst wird, wenn ein vorgebbarer minimaler Schwellenwert (SWmin) der elektrischen Speichereinheit (12) unterschritten oder ein vorgebbarer maximaler Schwellenwert (SWmax) der elektrischen Speichereinheit (12) überschritten wird.Method for operating a combined heat and power plant ( 10 ) according to any one of claims 1 to 9, characterized in that the at least one predefinable limit value (GW min , GW max ) to the operation of the power-heat Coupling system ( 10 ) is adjusted if a specifiable minimum threshold (SW min ) of the electrical storage unit ( 12 ) or a predefinable maximum threshold value (SW max ) of the electrical storage unit ( 12 ) is exceeded. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach Anspruch 7, dadurch gekennzeichnet, dass anstelle des Verfahrensschritts b) ein Verfahrensschritt g) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt und ob ein vorgegebener maximaler Schwellenwert (SWmax) der elektrischen Speichereinheit (12) überschritten wurde, und/oder dass anstelle des Verfahrensschritts d) ein Verfahrensschritt h) Ermitteln ob ein Winterbetrieb erfolgt und/oder ob ein Winterbetrieb länger als eine vorgegebene Zeit ununterbrochen erfolgt und ob ein vorgegebener minimaler Schwellenwert (SWmin) der elektrischen Speichereinheit (12) unterschritten wurde, erfolgt.Method for operating a combined heat and power plant ( 10 ) according to claim 7, characterized in that instead of the method step b) a method step g) determining whether a winter operation takes place and / or winter operation for a predetermined time continuously and whether a predetermined maximum threshold (SW max ) of the electrical storage unit ( 12 ), and / or that, instead of process step d), a method step h) determines whether a winter operation takes place and / or winter operation continues uninterrupted for a predetermined time and if a predetermined minimum threshold value (SW min ) of the electrical storage unit ( 12 ) is below. Verfahren zum Betreiben einer Kraft-Wärme-Kopplungsanlage (10) nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass im Falle eines Netzausfalls die Speicherung von elektrischer Energie durch den mindestens einen vorgebbaren Grenzwert (GWmin, GWmax) nicht beschränkt wird.Method for operating a combined heat and power plant ( 10 ) according to one of claims 1 to 11, characterized in that in the case of a power failure, the storage of electrical energy by the at least one predetermined limit value (GW min , GW max ) is not limited. Kraft-Wärme-Kopplungsanlage (10) umfassend – mindestens eine elektrische Speichereinheit (12), welche dazu vorgesehen ist elektrische Energie, vorzugsweise mittels der Kraft-Wärme-Kopplungsanlage (10) erzeugte elektrische Energie, zu speichern und/oder bereitzustellen, – mindestens ein Heizsystem (14), welches dazu vorgesehen ist Wärme zu erzeugen, – mindestens eine Regeleinheit (16), welche der mindestens einen elektrischen Speichereinheit (12) zugeordnet ist, und – mindestens eine Regeleinheit (18), welche dem mindestens einen Heizsystem (14) zugeordnet ist, dadurch gekennzeichnet, dass die mindestens eine Regeleinheit (16), welche der mindestens einen elektrischen Speichereinheit (12) zugeordnet ist, und die mindestens eine Regeleinheit (18), welche dem mindestens einen Heizsystem (14) zugeordnet ist, kommunikationstechnisch miteinander verbunden sind. Combined heat and power plant ( 10 ) - at least one electrical storage unit ( 12 ), which is provided for electrical energy, preferably by means of the cogeneration plant ( 10 ) generated electrical energy to store and / or provide, - at least one heating system ( 14 ), which is intended to generate heat, - at least one control unit ( 16 ), which of the at least one electrical storage unit ( 12 ), and - at least one control unit ( 18 ), which the at least one heating system ( 14 ), characterized in that the at least one control unit ( 16 ), which of the at least one electrical storage unit ( 12 ), and the at least one control unit ( 18 ), which the at least one heating system ( 14 ), communication technology are interconnected. Kraft-Wärme-Kopplungsanlage (10), insbesondere Kraft-Wärme-Kopplungsanlage (10) nach Anspruch 13, welche mit einem Verfahren nach einem der Ansprüche 1 bis 12 betrieben wird.Combined heat and power plant ( 10 ), in particular combined heat and power plant ( 10 ) according to claim 13, which is operated by a method according to one of claims 1 to 12.
DE102014225181.8A 2014-12-09 2014-12-09 Method for operating a combined heat and power plant Pending DE102014225181A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102014225181.8A DE102014225181A1 (en) 2014-12-09 2014-12-09 Method for operating a combined heat and power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102014225181.8A DE102014225181A1 (en) 2014-12-09 2014-12-09 Method for operating a combined heat and power plant

Publications (1)

Publication Number Publication Date
DE102014225181A1 true DE102014225181A1 (en) 2016-06-09

Family

ID=55974700

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102014225181.8A Pending DE102014225181A1 (en) 2014-12-09 2014-12-09 Method for operating a combined heat and power plant

Country Status (1)

Country Link
DE (1) DE102014225181A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017100639A1 (en) * 2017-01-13 2018-08-02 Hochschule Landshut Storage-controlled system control for a combined heat and power plant

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012007614A1 (en) * 2012-04-18 2013-10-24 Deutsche Energieversorgung GmbH Smart energy system for storage of electrical power in house, has sensor supplying specific signals to program, where signals serve for controlling cooperation among storage element, generation device and line for tapping power from line
DE102012212321A1 (en) * 2012-07-13 2014-01-16 Robert Bosch Gmbh Device for determining and / or controlling an operating time of a consumer coupled to a power plant, in particular a photovoltaic power plant, and an energy store, and method for operating an energy store coupled to a power plant
EP2700802A1 (en) * 2012-08-20 2014-02-26 Vaillant GmbH Combined heat and power plant with integrated power storage system
GB2508577A (en) 2012-09-12 2014-06-11 Hybrid Energy Solutions Ltd DC power system including DC alternator and renewable energy sources

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012007614A1 (en) * 2012-04-18 2013-10-24 Deutsche Energieversorgung GmbH Smart energy system for storage of electrical power in house, has sensor supplying specific signals to program, where signals serve for controlling cooperation among storage element, generation device and line for tapping power from line
DE102012212321A1 (en) * 2012-07-13 2014-01-16 Robert Bosch Gmbh Device for determining and / or controlling an operating time of a consumer coupled to a power plant, in particular a photovoltaic power plant, and an energy store, and method for operating an energy store coupled to a power plant
EP2700802A1 (en) * 2012-08-20 2014-02-26 Vaillant GmbH Combined heat and power plant with integrated power storage system
GB2508577A (en) 2012-09-12 2014-06-11 Hybrid Energy Solutions Ltd DC power system including DC alternator and renewable energy sources

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017100639A1 (en) * 2017-01-13 2018-08-02 Hochschule Landshut Storage-controlled system control for a combined heat and power plant
DE102017100639B4 (en) * 2017-01-13 2020-05-14 Hochschule Landshut Storage-guided system control for a combined heat and power system

Similar Documents

Publication Publication Date Title
EP3381102B1 (en) Domestic energy generation installation and operating method for operating a domestic energy generation installation
EP3267549B1 (en) Isolated unit of an isolated energy network for communicating energy requests with a further isolated unit
EP3590169B1 (en) Energy management method for an energy system, and energy system
DE102012105029A1 (en) Electric power supply system
DE102012202465A1 (en) Power supply system for supplying electric current to e.g. house to charge battery of hybrid car, has storage device storing surplus of electric solar when amount of electricity is larger than amount of electric current consumed by load
EP2688171B1 (en) Energy storage for photovoltaic facility, energy storage power plant, control device and method for operating an energy storage device
DE102013214287A1 (en) Control device for electrical energy
DE112017001108T5 (en) Power system
DE102019112270A1 (en) Arrangement and method for energy consumption control
EP2528183B1 (en) Method and device for energy transfer
WO2016138885A1 (en) Method for controlling the energy consumption of a building unit, and decentralized energy supply unit
DE102012202441A1 (en) Power supply system for controlling quantity of electricity in battery in hybrid car, has load controlling device controlling amount of electric current such that excess of current is provided back or made to flow to power supply system
DE102011010791A1 (en) Grid-connected system for local production of renewable electric energy, has power management unit having local energy storage connected to local load and external power supply system
DE102014200385A1 (en) Method for buffering electrical energy of a power supply system and regenerative energy storage device
EP3284155A1 (en) Precautionary feeding of temporarily stored power into a power suppy nework based on a prediction of power availability and power supply security
DE102010001874A1 (en) Storage e.g. lithium ion accumulator, for storing electrical power in e.g. wind power station for supplying electrical power to consumer in single family house, has control controlling delivery and receiving of energy from/by mains
EP3284152B1 (en) Energy transmission control between an energy supply network and end-user facilities on the basis of energy flow and network quality
DE102013003469B4 (en) Method for heating rooms or buildings using renewable, volatile electrical energy
DE102012011119A1 (en) Local energy system
Haberschusz et al. Are PV battery systems causing ramping problems in the German power grid?
WO2016005047A1 (en) System and method for determining the power of a plurality of electrical producers and loads, which are operated in a network as a virtual power plant
EP2685580A2 (en) Device for determining and/or controlling an operating time of a consumer coupled to a power plant, in particular photovoltaic power plant, and an energy storage device, and method for operating an energy storage device coupled to a power plant
DE102015102430A1 (en) Autonomous and cooperatively controlled energy feeding in a virtual power plant
DE102014225181A1 (en) Method for operating a combined heat and power plant
DE102010036087A1 (en) Method for supplying electrical load i.e. lithium-ion battery, with electrical energy in electric car, involves partially transmitting electrical energy to electrical load that is supplied with energy without immediate loading of supply net

Legal Events

Date Code Title Description
R163 Identified publications notified
R012 Request for examination validly filed