DE102012108643A1 - Pilgrim rolling mill - Google Patents

Pilgrim rolling mill Download PDF

Info

Publication number
DE102012108643A1
DE102012108643A1 DE102012108643.5A DE102012108643A DE102012108643A1 DE 102012108643 A1 DE102012108643 A1 DE 102012108643A1 DE 102012108643 A DE102012108643 A DE 102012108643A DE 102012108643 A1 DE102012108643 A1 DE 102012108643A1
Authority
DE
Germany
Prior art keywords
rolling mill
buffer
tubes
tube
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102012108643.5A
Other languages
German (de)
Inventor
wird später genannt werden Erfinder
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alleima GmbH
Original Assignee
Sandvik Materials Technology Deutschland GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sandvik Materials Technology Deutschland GmbH filed Critical Sandvik Materials Technology Deutschland GmbH
Priority to DE102012108643.5A priority Critical patent/DE102012108643A1/en
Priority to CN201380048071.2A priority patent/CN104781020B/en
Priority to PCT/EP2013/069023 priority patent/WO2014041127A1/en
Priority to JP2015531573A priority patent/JP6093018B2/en
Priority to EP13765682.3A priority patent/EP2895280B1/en
Priority to KR1020157009333A priority patent/KR102110003B1/en
Priority to ES13765682.3T priority patent/ES2619127T3/en
Priority to US14/426,403 priority patent/US9776228B2/en
Publication of DE102012108643A1 publication Critical patent/DE102012108643A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B21/00Pilgrim-step tube-rolling, i.e. pilger mills
    • B21B21/04Pilgrim-step feeding mechanisms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B21/00Pilgrim-step tube-rolling, i.e. pilger mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/78Control of tube rolling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B39/00Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B39/00Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B39/002Piling, unpiling, unscrambling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/004Heating the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D3/00Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0006Details, accessories not peculiar to any of the following furnaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/004Heating the product
    • B21B2045/006Heating the product in vacuum or in inert atmosphere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Metal Rolling (AREA)
  • Heat Treatment Of Articles (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

Walzstraßen zum Fertigen eines Rohrs mit einer Pilgerwalzanlage zum Reduzieren des Durchmessers einer Luppe zu einem Rohr sind aus dem Stand der Technik bekannt. Dabei sind die einzelnen Arbeitsschritte des Walzens in der Pilgerwalzanlage und beispielsweise des Glühens in einem Ofen nach dem Walzen zeitlich voneinander getrennt, und die fertig gewalzten Rohre werden zunächst gebündelt, als Bund gelagert und zeitlich deutlich später in einem geschlossenen Ofen geglüht. Diese als Bundfertigung bezeichnete Vorgehensweise führt dazu, dass die Fertigung eines Rohrs vom Reduzieren der Pilgerwalzanlage bis zum Verpacken etwa zwei Wochen dauert, wobei die eigentliche Bearbeitung in diesen zwei Wochen nur etwa zwei Stunden in Anspruch nimmt. Dem gegenüber ist es Aufgabe der vorliegenden Erfindung, eine Walzstraße bereitzustellen, die kontinuierlich arbeitet. Zu Lösung dieser Aufgabe wird eine Pilgerwalzstraße vorgeschlagen zum Fertigen eines Rohrs mit einer Pilgerwalzanlage zum Reduzieren des Durchmessers einer Luppe zu dem Rohr, einem ersten Puffer für eine Mehrzahl von Rohren, wobei der erste Puffer eine Einrichtung zum Bündeln einer Mehrzahl von Rohren in einem Bund aufweist, einem Glühofen zum gleichzeitigen Glühen einer Mehrzahl von Rohren, einem zweiten Puffer für eine Mehrzahl von Rohren, wobei der zweite Puffer für die Rohre eine Einrichtung zum Vereinzeln der Mehrzahl von Rohren aus einem Bund aufweist, und einer Richtmaschine zum Richten der vereinzelten Rohre nacheinander, wobei die Einrichtungen in Flussrichtung des Rohrs in der vorgenannten Reihenfolge angeordnet sind und wobei zwischen der Pilgerwalzanlage, dem ersten Puffer, dem Glühofen, dem zweiten Puffer und der Richtmaschine jeweils eine automatisierte Transporteinrichtung für das Rohr vorgesehen ist.Rolling mills for producing a pipe with a pilger rolling mill for reducing the diameter of a billet into a pipe are known from the prior art. The individual steps of rolling in the pilgrim rolling mill and, for example, annealing in an oven after rolling are separated in time, and the finished rolled tubes are first bundled, stored as a bundle and annealed much later in a closed furnace. This procedure, known as the bundle production, means that the production of a tube from reducing the pilger rolling mill to packaging takes about two weeks, with the actual processing only taking about two hours in these two weeks. In contrast, it is an object of the present invention to provide a rolling mill that works continuously. To solve this problem, a pilger rolling mill is proposed for producing a tube with a pilger rolling mill for reducing the diameter of a billet to the tube, a first buffer for a plurality of tubes, the first buffer having a device for bundling a plurality of tubes in a bundle an annealing furnace for the simultaneous annealing of a plurality of tubes, a second buffer for a plurality of tubes, the second buffer for the tubes having a device for separating the plurality of tubes from a bundle, and a straightening machine for aligning the separated tubes in succession, wherein the devices are arranged in the flow direction of the pipe in the aforementioned order and wherein an automated transport device for the pipe is provided between the pilger rolling mill, the first buffer, the annealing furnace, the second buffer and the straightening machine.

Description

Die vorliegende Erfindung betrifft eine Walzstraße zum Fertigen eines Rohrs mit einer Pilgerwalzanlage zum Reduzieren des Durchmessers einer Luppe zu einem Rohr.The present invention relates to a rolling line for manufacturing a pipe with a pilger rolling mill for reducing the diameter of a billet to a pipe.

Zur Herstellung von präzisen Metallrohren, insbesondere aus Edelstahl, wird ein ausgedehnter hohlzylindrischer Rohling im vollständig erkalteten Zustand durch Druckspannungen kalt reduziert. Dabei wird der Rohling zu einem Rohr mit definiertem reduziertem Außendurchmesser und einer definierten Wanddicke umgeformt.For the production of precise metal tubes, in particular made of stainless steel, an extended hollow cylindrical blank is cold-reduced in the fully cooled state by compressive stresses. In this case, the blank is formed into a tube with a defined reduced outer diameter and a defined wall thickness.

Das am weitesten verbreitete Reduzierverfahren für Rohre ist als Kaltpilgern bekannt, wobei der Rohling Luppe genannt wird. Die Luppe wird beim Walzen über einen kalibrierten, d.h. den Innendurchmesser des fertigen Rohrs aufweisenden, Walzdorn geschoben und dabei von außen von zwei kalibrierten, d.h. den Außendurchmesser des fertigen Rohrs definierenden, Walzen umfasst und in Längsrichtung über den Walzdorn ausgewalzt.The most common pipe reduction method is known as cold pilgering, the blank being called a billet. The billet is rolled over a calibrated, i. the inner diameter of the finished tube, rolling mandrel pushed while calibrated from the outside of two calibrated, i. comprising the outer diameter of the finished tube defining rollers and rolled in the longitudinal direction over the rolling mandrel.

In der Produktion müssen die fertig ausgewalzten Rohre nach dem Walzen eine Anzahl von Nachbearbeitungsschritten erfahren. Insbesondere ist es erforderlich, die fertig gewalzten Rohre zur Verfestigung zu glühen. Beim Glühen werden eine Mehrzahl von gebündelten Rohren in einen Ofen eingeführt und dort bei den notwendigen Temperaturen geglüht.In production, the finished rolled tubes must undergo a number of post-processing steps after rolling. In particular, it is necessary to anneal the finished rolled tubes for solidification. During annealing, a plurality of bundled tubes are introduced into an oven and annealed there at the necessary temperatures.

Dabei sind die Arbeitsschritte des Walzens in der Pilgerwalzanlage und des Glühens im Ofen zeitlich voneinander getrennt, und die fertig gewalzten Rohre werden zunächst gebündelt, als Bund gelagert und zeitlich deutlich später in einem geschlossenen Ofen geglüht. Diese als Bundfertigung bezeichnete Vorgehensweise führt dazu, dass die Fertigung eines Rohrs vom Reduzieren der Pilgerwalzanlage bis zum Verpacken etwa zwei Wochen dauert, wobei die eigentliche Bearbeitung in diesen zwei Wochen nur etwa zwei Stunden in Anspruch nimmt. The steps of rolling in the pilger rolling mill and annealing in the oven are temporally separated from each other, and the finished rolled tubes are initially bundled, stored as a bundle and annealed significantly later in a closed furnace. This procedure, referred to as collar production, means that the production of a pipe from reducing the pilger rolling mill to packaging takes about two weeks, with the actual processing only taking about two hours in these two weeks.

Dem gegenüber ist es Aufgabe der vorliegenden Erfindung, eine Walzstraße bereitzustellen, die kontinuierlich arbeitet.On the other hand, it is an object of the present invention to provide a rolling mill which operates continuously.

Dazu wird erfindungsgemäß eine Pilgerwalzstraße vorgeschlagen zum Fertigen eines Rohrs mit einer Pilgerwalzanlage zum Reduzieren des Durchmessers einer Luppe zu dem Rohr, einem ersten Puffer für eine Mehrzahl von Rohren, wobei der erste Puffer eine Einrichtung zum Bündeln einer Mehrzahl von Rohren in einem Bund aufweist, einem Glühofen zum gleichzeitigen Glühen einer Mehrzahl von Rohren, einem zweiten Puffer für eine Mehrzahl von Rohren, wobei der zweite Puffer für die Rohre eine Einrichtung zum Vereinzeln der Mehrzahl von Rohren aus einem Bund aufweist, und einer Richtmaschine zum Richten der vereinzelten Rohre nacheinander, wobei die Einrichtungen in Flussrichtung des Rohrs in der vorgenannten Reihenfolge angeordnet sind und wobei zwischen der Pilgerwalzanlage, dem ersten Puffer, dem Glühofen, dem zweiten Puffer und der Richtmaschine jeweils eine automatisierte Transporteinrichtung für das Rohr vorgesehen ist. To this end, according to the invention, a pilger rolling mill is proposed for manufacturing a pipe with a pilger rolling mill for reducing the diameter of a billet to the pipe, a first buffer for a plurality of pipes, the first buffer having means for bundling a plurality of pipes in a collar An annealing furnace for simultaneously annealing a plurality of tubes, a second buffer for a plurality of tubes, the second buffer for the tubes having means for separating the plurality of tubes from a collar, and a straightening machine for straightening the separated tubes one by one, wherein the Arrangements are arranged in the flow direction of the tube in the aforementioned order and wherein between the pilger rolling mill, the first buffer, the annealing furnace, the second buffer and the straightening machine is provided in each case an automated transport device for the pipe.

Entscheidend für die erfindungsgemäße Walzstraße ist, dass diese kontinuierlich arbeitet, d.h. dass vorzugsweise im eingefahrenen Zustand im Wesentlichen gleichzeitig eine Luppe in der Pilgerwalzanlage ausgewalzt wird, während am Ende der Walzstraße hinter der Richtmaschine ein fertiges Rohr aus der Straße entnommen und verpackt werden kann.It is crucial for the rolling mill according to the invention that it operates continuously, i. that preferably in the retracted state substantially simultaneously a billet in the pilger rolling mill is rolled, while at the end of the rolling mill behind the straightening machine, a finished tube can be removed from the street and packaged.

Für die kontinuierliche Bearbeitung von Rohren in der erfindungsgemäßen Walzstraße ist es notwendig, dass diese zwischen den einzelnen Einrichtungen, d.h. beispielsweise zwischen der Pilgerwalzanlage und dem ersten Puffer, Transporteinrichtungen aufweist, die das Rohr automatisiert zwischen den einzelnen Bearbeitungsstationen bewegen.For the continuous processing of tubes in the rolling mill according to the invention, it is necessary that these be between the individual devices, i. for example, between the pilger rolling mill and the first buffer, transporting means that move the tube between the automated processing stations automatically.

In einer Ausführungsform der Erfindung weist die Walzstraße eine Steuerung auf, die es ermöglicht, den gesamten Produktionsprozess in der Walzstraße zu steuern und diese so automatisiert zu betreiben. In one embodiment of the invention, the rolling train has a control which makes it possible to control the entire production process in the rolling train and thus to operate it in an automated manner.

Schaut man sich die notwendigen Bearbeitungszeiten in den zentralen Bearbeitungseinrichtungen der Walzstraße, nämlich der Pilgerwalzanlage, dem Glühofen und der Richtmaschine an, so ergibt sich die folgende Situation: Die Transportgeschwindigkeit der gewalzten Rohre im Ofen ist deutlich langsamer als die Transportgeschwindigkeit der Luppe bzw. des Rohrs beim Pilgern in der Walzanlage. Ebenso ist die Transportgeschwindigkeit der gewalzten Rohre durch den Ofen deutlich langsamer als die Transportgeschwindigkeit des Rohrs in der Richtmaschine. Allerdings können anders als in der Walzanlage und in der Richtmaschine im Ofen in Abhängigkeit von der Dimension der zu glühenden Rohre mehrere Rohre auf einmal geglüht werden. Dabei gilt, dass je größer die Masse eines einzelnen zu glühenden Rohrabschnitts ist, desto weniger Rohrabschnitte gleicher Länge geglüht werden können. If one looks at the necessary processing times in the central processing facilities of the rolling mill, namely the pilger rolling mill, the annealing furnace and the straightening machine, the following situation arises: The transport speed of the rolled tubes in the furnace is significantly slower than the transport speed of the billet or the tube while pilgrimage in the rolling mill. Likewise, the transport speed of the rolled tubes through the furnace is significantly slower than the transport speed of the tube in the leveler. However, unlike the rolling mill and straightener in the furnace, depending on the dimension of the pipes to be annealed, several tubes may be annealed at once. It is true that the larger the mass of a single tube section to be glowed, the less tube sections of the same length can be annealed.

Um die unterschiedlichen Zeitdauern der Bearbeitung im Glühofen einerseits und in der Walzanlage und in der Richtmaschine andererseits ausgleichen zu können, bilden die beiden Puffer ein zentrales Element der Walzstraße. To be able to compensate for the different time periods of processing in the annealing furnace on the one hand and in the rolling mill and in the straightening machine on the other hand, the two buffers form a central element of the rolling mill.

Dabei dienen die beiden Puffer nicht nur der Lagerung, sondern in ihnen wirdggf. eine Mehrzahl von Rohren zu einem Bund gebündelt (erster Puffer) bzw. eine Mehrzahl von Rohren aus einem Bund vereinzelt (zweiter Puffer).The two buffers serve not only storage, but in them is ggf. a plurality of tubes bundled into a bundle (first buffer) or a plurality of tubes from a bundle isolated (second buffer).

Dabei wird unter einem Bund von Rohren bzw. Rohrabschnitten im Sinne der vorliegenden Anmeldung eine Anzahl von Rohren verstanden, die gemeinsam eine Ofenauflage bilden, d.h. gleichzeitig in bzw. durch den Ofen gefahren und geglüht werden. In the context of the present application, a bundle of pipes or pipe sections is understood to mean a number of pipes which together form a furnace lining, i. simultaneously driven into and through the furnace and annealed.

Ein solches Bund kann, muss aber, nicht mit Hilfe von Rödeldrähten zusammengebunden werden. Ein solches Zusammenbinden erfolgt in einer Ausführungsform ggf. automatisiert.Such a covenant can not, however, be bound together with the help of tie wires. Such linking takes place in one embodiment, possibly automated.

Auch eine Mehrzahl von nicht zusammengebundenen Rohren wird im Sinne der vorliegenden Anmeldung als Bund verstanden. Eine Einrichtung zum Bündeln der Rohre ist in diesem Sinne dann beispielsweise eine gemeinsame Lagerbank für eine Mehrzahl von Rohren, die dann zusammen dem Ofen zugeführt werden.Also, a plurality of unconnected pipes is understood in the context of the present application as a federal government. A device for bundling the tubes is in this sense, for example, a common storage bank for a plurality of tubes, which are then fed together to the furnace.

Zur Erläuterung werden im Folgenden zwei Extremfälle betrachtet: Von einem dickwandigen Rohr mit großem Innendurchmesser, welches eine entsprechend große Masse aufweist, kann im Ofen, der eine feste maximal gleichzeitig zu glühende Masse aufweist, nur ein einziger Rohrabschnitt geglüht werden. Da die Transportgeschwindigkeit deutlich langsamer ist als die Transportgeschwindigkeit der Walzanlage, laufen die nachfolgend in der Walzanlage gepilgerten Rohrabschnitte auf und müssen im ersten Puffer gelagert werden, bis sie nacheinander geglüht werden können. Der zweite Puffer hingegen ist in dieser Situation leer, da die Rohrabschnitte, welche den Ofen verlassen mit einer Geschwindigkeit weiterbearbeitet werden, die größer ist als die Transportgeschwindigkeit des Ofens. For explanation, two extreme cases are considered below: From a thick-walled pipe with a large inner diameter, which has a correspondingly large mass, only a single pipe section can be annealed in the furnace, which has a solid maximum mass to be glowed simultaneously. Since the transport speed is significantly slower than the transport speed of the rolling mill, the subsequently piled in the rolling mill pipe sections run on and must be stored in the first buffer until they can be successively annealed. The second buffer, on the other hand, is empty in this situation as the tube sections leaving the oven continue to be processed at a speed greater than the transport speed of the oven.

Von einem dünnwandigen Rohr mit geringem Innendurchmesser kann hingegen gleichzeitig eine Mehrzahl von Rohrabschnitten im Ofen geglüht werden. Dabei können etwa so viele Rohrabschnitte gleichzeitig geglüht werden, dass ihre Gesamtmasse der Masse eines einzigen Rohrabschnitts mit einer Dimensionierung, die maximal im Ofen geglüht werden kann, entspricht. In diesem Fall werden die einzelnen fertig gepilgerten und abgestochenen Rohrabschnitte in dem ersten Puffer gesammelt, bis die maximal in einer Ofenauflage zu glühende Anzahl von Rohren erreicht ist und dann gemeinsam in den Ofen eingeführt. Hinter dem Ofen erfolgt in diesem Fall eine Zwischenpufferung in dem zweiten Puffer, um die den Ofen gleichzeitig verlassenden Rohrabschnitte zu vereinzeln und einzeln der Richtmaschine zuzuführen.From a thin-walled tube with a small inner diameter, however, at the same time a plurality of pipe sections can be annealed in the oven. In this case, about as many pipe sections can be annealed simultaneously that their total mass of the mass of a single pipe section with a dimension that can be annealed in the maximum furnace corresponds. In this case, the individual finished piled and tapped pipe sections are collected in the first buffer until the maximum number of pipes to be glowed in a furnace lining is reached and then introduced together into the furnace. In this case, an intermediate buffering in the second buffer takes place behind the furnace in order to separate the pipe sections leaving the furnace at the same time and feed them individually to the leveler.

Dabei ist eine Ausführungsform des ersten Puffers zweckmäßig, der es erlaubt, an dieser Stelle in der Walzstraße fertig gepilgerte Rohre bzw. Rohrabschnitte aus der Walzstraße auszuschleusen und/oder an dieser Stelle zu einem anderen Zeitpunkt und/oder auf einer anderen Walzanlage gepilgerte Rohre bzw. Rohrabschnitte in die Walzstraße zur Nachbearbeitung einzuschleusen.In this case, an embodiment of the first buffer is expedient, which allows auszuschleusen at this point in the rolling mill finished pilgrim pipes or pipe sections from the rolling mill and / or piloted at this point at another time and / or on another rolling mill pipes or Pipe sections into the rolling mill for post-processing.

In einer Ausführungsform der Erfindung definiert die Transportrichtung der Luppe in der Pilgerwalzanlage eine erste Richtung, wobei der erste Puffer eine Transporteinrichtung für einen Transport der Rohre in einer zu der ersten Richtung senkrechten zweiten Richtung aufweist. Dieser Transport in einer Richtung senkrecht zur Transportrichtung der Luppe in der Walzanlage ermöglicht zum Einen die Bündelung der einzelnen Rohre, welche die Walzanlage verlassen haben und eine Zwischenspeicherung bzw. einen Puffer der Rohre, bevor diese im Bund in den Ofen eingespeist werden. Die Transporteinrichtung in einer Richtung senkrecht zur Transportrichtung der Luppe in der Pilgerwalzanlage ermöglicht es aber zum Anderen auch, die Transportrichtung des Rohrs in der Anlage umzudrehen.In one embodiment of the invention, the transport direction of the billet in the pilger rolling mill defines a first direction, the first buffer having a transport means for transporting the tubes in a second direction perpendicular to the first direction. This transport in a direction perpendicular to the transport direction of the billet in the rolling mill allows on the one hand the bundling of the individual tubes which have left the rolling plant and an intermediate storage or buffer of the tubes before they are fed into the furnace in the bundle. On the other hand, the transport device in a direction perpendicular to the transport direction of the billet in the pilger rolling mill also makes it possible to turn over the transport direction of the pipe in the system.

In einer Ausführungsform der Erfindung ist es zweckmäßig, wenn die Walzstraße so eingerichtet ist, dass das Rohr in der Walzstraße abschnittsweise auch in einer zu der ersten Richtung parallelen, aber entgegengesetzten Richtung transportiert wird. Auf diese Weise kann die Walzstraße, die in einer Ausführungsform auch linear aufgebaut sein könnte, gefaltet werden, sodass die Gesamtlänge der Walzstraße auf mehrere kürzere Stücke verteilt wird. Dies reduziert zwar nicht den Gesamtplatzbedarf der Walzstraße, wohl aber ihre Gesamtlänge und damit die Gebäudelänge, in der die Walzstraße untergebracht ist.In one embodiment of the invention, it is expedient if the rolling train is set up such that the pipe in the rolling train is also transported in sections in a direction parallel but opposite to the first direction. In this way, the rolling train, which in one embodiment could also be constructed linearly, can be folded so that the total length of the rolling train is distributed over several shorter pieces. Although this does not reduce the total space requirement of the rolling mill, but rather their total length and thus the building length, in which the rolling mill is housed.

Aus dem gleichen Grund ist es vorteilhaft, wenn in einer Ausführungsform der Erfindung der zweite Puffer eine Transporteinrichtung für einen Transport der Rohre in einer zu der ersten Richtung senkrechten zweiten Richtung aufweist. Insbesondere ist es zweckmäßig, wenn der zweite Puffer über Teile der Walzstrasse übergreift, so dass die Rohre diese Teile der Walzstrasse überqueren.For the same reason, it is advantageous if, in one embodiment of the invention, the second buffer has a transport device for transporting the tubes in a second direction perpendicular to the first direction. In particular, it is expedient if the second buffer engages over parts of the rolling train, so that the pipes cross these parts of the rolling train.

In einer Ausführungsform der Erfindung sind die Einrichtung zum Bündeln einer Mehrzahl von Rohren und/oder die Einrichtung zum Vereinzeln der Mehrzahl von Rohren aus einem Bund so eingerichtet, dass sie eine automatisierte Bündelung bzw. Vereinzelung ermöglichen. In one embodiment of the invention, the means for bundling a plurality of tubes and / or the means for separating the plurality of tubes from a collar are arranged so as to enable automated bundling or singulation.

In einer Ausführungsform der Erfindung weist die Pilgerwalzanlage ein Walzgerüst, ein Schwungrad auf einer Antriebswelle, welches um eine Drehachse drehbar gelagert ist, und eine Schubstange mit einem ersten und einem zweiten Ende auf, wobei das erste Ende der Schubstange in einem radialen Abstand von der Drehachse an dem Schwungrad befestigt ist und wobei das zweite Ende der Schubstange an dem Walzgerüst befestigt ist, sodass im Betrieb der Anlage eine Drehbewegung des Schwungrades in eine Translationsbewegung des Walzgerüsts umgesetzt wird. An dem Walzgerüst sind kalibrierte Walzen drehbar gelagert. Die Walzen erhalten ihre Drehbewegung vorzugsweise durch eine relativ zum Walzgerüst feststehende Zahnstange, in die fest mit den Walzenachsen verbundene Zahnräder eingreifen.In one embodiment of the invention, the pilger rolling mill comprises a rolling stand, a flywheel on a drive shaft, which is rotatably mounted about a rotation axis, and a push rod having a first and a second end, wherein the first end of the push rod at a radial distance from the axis of rotation on the flywheel is attached and wherein the second end of the push rod is attached to the rolling stand, so that during operation of the system, a rotational movement of the flywheel is converted into a translational movement of the rolling stand. Calibrated rollers are rotatably mounted on the rolling stand. The rollers preferably receive their rotational movement by means of a toothed rack fixed relative to the roll stand, into which toothed wheels fixedly connected to the roll axes engage.

Während des Pilgerns erfährt die Luppe einen schrittweisen Vorschub in Richtung auf den Walzdorn zu bzw. über diesen hinweg, während die Walzen drehend über den Dorn und damit über die Luppe horizontal hin- und herbewegt werden.During the pilgrimage, the billet undergoes incremental advancement in the direction of the mandrel towards or beyond it, while the rolls are rotationally reciprocated over the mandrel and thus horizontally across the billet.

Der Vorschub der Luppe über den Dorn erfolgt mit Hilfe eines Vorschubspannschlittens, welcher eine Translationsbewegung in einer Richtung parallel zur Achse des Walzdorns ermöglicht. Der lineare Vorschub des Vorschubspannschlittens in der Pilgerwalzanlage wird beispielsweise mit Hilfe eines Kugelgewindetriebs erreicht. Dabei besteht der Kugelgewindetrieb aus einem Servomotor, einem Getriebe, einer Trapezgewindespindel, den zugehörigen Lagerpunkten und entsprechender Schmierung sowie einer Trapezgewindespindelmutter. Der Servomotor ist über eine Kupplung mit dem Getriebe und dieses über eine weitere Kupplung mit der Trapezgewindespindel selbst verbunden. Die Drehbewegung der Gewindespindel wird mit Hilfe der Trapezgewindespindelmutter in eine Translationsbewegung umgesetzt. In einer alternativen Ausführungsform kann der lineare Vorschub des Vorschubspannschlittens auch mit einem Linearantrieb bewirkt werden.The feed of the billet over the mandrel is carried out by means of a feed tension slide, which allows a translational movement in a direction parallel to the axis of the rolling mandrel. The linear feed of the feed tension slide in the pilger rolling mill is achieved for example by means of a ball screw. The ball screw consists of a servo motor, a gear, a trapezoidal screw, the associated bearing points and appropriate lubrication and a trapezoidal threaded spindle nut. The servomotor is connected via a coupling with the gearbox and this via a further coupling with the trapezoidal thread spindle itself. The rotational movement of the threaded spindle is converted into a translational movement by means of the trapezoidal threaded spindle nut. In an alternative embodiment, the linear feed of the feed tension slide can also be effected with a linear drive.

Zum Antrieb des Kurbeltriebs für die Linearbewegung des Walzgerüsts stehen alternativ Getriebeantriebe oder auch ein Direktantrieb über eine Kupplung zwischen der Drehachse des Schwungrades und der Motorwelle eines Torquemotors bereit. To drive the crank mechanism for the linear movement of the rolling stand are alternatively gear drives or a direct drive via a coupling between the axis of rotation of the flywheel and the motor shaft of a torque motor ready.

Die im Walzgerüst übereinander angeordneten konisch kalibrierten Walzen drehen sich entgegen der Vorschubrichtung des Vorschubspannschlittens. Das von den Walzen gebildete sogenannte Pilgermaul erfasst die Luppe und die Walzen drücken von außen eine kleine Werkstoffwelle ab, die vom Glättkaliber der Walzen und dem Walzdorn zu einer vorgesehenen Wanddicke ausgestreckt wird, bis das Leerlaufkaliber der Walzen das fertige Rohr freigibt. Während des Walzens bewegt sich das Walzgerüst mit den daran befestigten Walzen entgegen der Vorschubrichtung der Luppe. Mit Hilfe des Vorschubspannschlittens wird die Luppe nach dem Erreichen des Leerlaufkalibers der Walzen einen weiteren Schritt auf den Walzdorn hin vorgeschoben, während die Walzen mit dem Walzgerüst in ihre horizontale Ausgangslage zurückkehren. Gleichzeitig erfährt die Luppe eine Drehung um ihre Achse, um eine gleichmäßige Form des fertigen Rohres in Umfangsrichtung zu erreichen. Durch mehrfaches Überwalzen jedes Rohrabschnitts werden eine gleichmäßige Wanddicke und Rundheit des Rohrs sowie gleichmäßige Innen- und Außendurchmesser erreicht. The superimposed conically calibrated rollers in the rolling stand rotate counter to the feed direction of the feed tension slide. The so-called pilgrim's mouth formed by the rollers captures the billet and the rollers press from the outside a small material shaft, which is stretched by the smoothing caliber of the rollers and the mandrel to an intended wall thickness until the idling caliber of the rollers releases the finished tube. During rolling, the roll stand moves with the rolls attached thereto against the feed direction of the billet. With the aid of the feed tension slide, the billet, after reaching the idling caliber of the rolls, is advanced a further step towards the rolling mandrel, while the rolls return to their horizontal starting position with the rolling stand. At the same time, the billet undergoes a rotation about its axis to achieve a uniform shape of the finished tube in the circumferential direction. By multiple rolling over each pipe section a uniform wall thickness and roundness of the tube and uniform inner and outer diameter are achieved.

In einer Ausführungsform ist hinter der Walzanlage, in deren Auslaufbereich ein Bodeneinlauf für das fertig gepilgerte Rohr vorgesehen. Beim Pilgerwalzen von Rohren werden Luppen zu Rohrabschnitten bis zu Längen von 20 m und darüber ausgewalzt, sodass deren Unterbringung in voller Länge in einer Halle oft nur schwer möglich ist. Daher ist es erfindungsgemäß möglich, das Rohr nach dem Auslauf aus der Walzanlage leicht zu krümmen und in etwa vertikal nach unten in den Boden der Halle einlaufen zu lassen. Dies spart Fläche für die Anlage in der Halle.In one embodiment, behind the rolling mill, in the outlet region of a bottom inlet for the finished pillared pipe is provided. In pilgrim rolling of tubes, billets are rolled into tube sections up to lengths of 20 m and above, so that their full length placement in a hall is often difficult. Therefore, it is possible according to the invention to easily bend the tube after the exit from the rolling mill and to let run in approximately vertically down into the floor of the hall. This saves space for the system in the hall.

In einer Ausführungsform der Erfindung ist der Glühofen ein kontinuierlich arbeitender Ofen, dessen Muffel bei einer im Wesentlichen konstanten Temperatur gehalten wird. Dazu ist in einer Ausführungsform der Erfindung der Glühofen ein Bandofen, vorzugsweise ein Maschenbandofen. Bei einem solchen Maschenbandofen werden die zu glühenden Rohre auf einem metallenen Band durch den Ofen bzw. dessen Muffel bewegt. Dazu weist der Maschenbandofen zwei Schleusen auf, durch welche das zu glühende Rohr in den Ofen bzw. aus diesem heraus bewegt werden kann, ohne dass die Muffel dabei nennenswerten Temperaturschwankungen ausgesetzt wäre.In one embodiment of the invention, the annealing furnace is a continuous furnace whose muffle is maintained at a substantially constant temperature. For this purpose, in one embodiment of the invention, the annealing furnace is a belt furnace, preferably a mesh belt furnace. In such a mesh belt furnace, the pipes to be annealed are moved on a metal belt through the furnace or its muffle. For this purpose, the mesh belt furnace on two locks, through which the tube to be glowed in the oven or out of this can be moved without the muffle would be exposed to significant temperature fluctuations.

Der Glühofen ist in einer Ausführungsform so eingerichtet, dass das Glühen unter Schutzatmosphäre, beispielsweise unter Wasserstoff, Stickstoff oder Argon erfolgt. In einer Ausführungsform liegt die Glühtemperatur des Ofens zwischen 400°C und 1300°C, vorzugsweise zwischen 1000°C und 1200°C und besonders bevorzugt bei 1150°C.In one embodiment, the annealing furnace is set up so that the annealing takes place under a protective atmosphere, for example under hydrogen, nitrogen or argon. In one embodiment, the annealing temperature of the furnace is between 400 ° C and 1300 ° C, preferably between 1000 ° C and 1200 ° C, and more preferably 1150 ° C.

Die automatisierten Transporteinrichtungen zwischen den einzelnen Bearbeitungsstationen der erfindungsgemäßen Walzstraße sind in einer Ausführungsform Rollenförderer, auf denen das Rohr in Längsrichtung bewegbar ist. Dazu ist in einer Ausführungsform eine oder mehrere Rollen des Rollenförderers motorisch angetrieben. The automated transport devices between the individual processing stations of the rolling train according to the invention are in one embodiment roller conveyors on which the tube is movable in the longitudinal direction. For this purpose, one or more rollers of the roller conveyor is driven by a motor in one embodiment.

Die Transporteinrichtungen zwischen den einzelnen Bearbeitungsstationen können aber auch Greiferanlagen sein, insbesondere, wenn das Rohr in seiner Querrichtung, d.h. senkrecht zur Transportrichtung der Luppe in der Pilgerwalzanlage, bewegt werden muss. Andere Transporteinrichtungen sind beispielsweise schräge Rampen, auf denen das Rohr in Querrichtung abrollen kann und sich so in einer Richtung senkrecht zur Transportrichtung der Luppe in der Pilgerwalzanlage bewegt. However, the transport devices between the individual processing stations can also be gripper systems, in particular if the pipe has to be moved in its transverse direction, ie perpendicular to the transport direction of the billet in the pilger rolling mill. Other transport devices are for example inclined ramps on which the tube can roll in the transverse direction and thus in one Direction moved perpendicular to the transport direction of the billet in the pilgrim rolling mill.

In einer Ausführungsform der Erfindung weist die Walzstraße zwischen der Pilgerwalzanlage und dem ersten Puffer eine Abstecheinheit zum Ablängen des Rohrs auf. Beim Abstechen des Rohrs wird dieses in zwei Rohrabschnitte geteilt. In one embodiment of the invention, the rolling line between the pilger rolling mill and the first buffer on a Abstecheinheit for cutting to length of the tube. When parting off the pipe this is divided into two pipe sections.

In einer Ausführungsform der Erfindung ist zwischen der Pilgerwalzanlage und dem Glühofen, vorzugsweise zwischen der Pilgerwalzanlage und der Abstecheinheit zum Ablängen des Rohrs eine Prüfeinrichtung, welche eine Prüfung der Rohrinnenwand ermöglicht, vorgesehen. In einer Ausführungsform ist eine solche Prüfeinrichtung eine Wirbelstromsonde, welche an einem Auslegearm in das Rohr einführbar und aus diesem herausziehbar ist. In one embodiment of the invention, between the pilger rolling mill and the annealing furnace, preferably between the pilger rolling mill and the Abstecheinheit for cutting the tube, a testing device which allows an examination of the pipe inner wall, is provided. In one embodiment, such a test device is an eddy current probe which can be inserted into and pulled out of the tube on a delivery arm.

In einer Ausführungsform, bei welcher die Prüfeinrichtung zwischen der Pilgerwalzanlage und der Abstecheinheit vorgesehen ist, ist es möglich, Rohrabschnitte, die bei der Prüfung durchgefallen sind, mit der Abstecheinheit aus dem Rohr herauszuschneiden und nur solche Rohrabschnitte weiter zu bearbeiten, welche die Prüfung bestanden haben. In an embodiment in which the testing device is provided between the pilger rolling mill and the staking unit, it is possible to cut out pipe sections which have failed in the test with the staking unit from the pipe and to further process only those pipe sections which have passed the test ,

In einer Ausführungsform weist die Walzstraße zwischen der Pilgerwalzanlage und dem ersten Puffer, vorzugsweise zwischen der Pilgerwalzanlage und einer Abstecheinheit zum Ablängen Rohrs, eine Einrichtung zum Entfetten einer Rohraußenwand auf.In one embodiment, the rolling train between the pilger rolling mill and the first buffer, preferably between the pilger rolling mill and a Abschnecheinheit for cutting tube, a device for degreasing a tube outer wall.

In einer weiteren Ausführungsform ist zwischen der Pilgerwalzanlage und dem ersten Puffer, vorzugsweise zwischen einer Abstecheinheit zum Ablängen des Rohrs und dem ersten Puffer, eine Einrichtung zum Entfetten einer Rohrinnenwand vorgesehen. In a further embodiment, a device for degreasing a pipe inner wall is provided between the pilger rolling mill and the first buffer, preferably between a cutting unit for cutting the pipe to length and the first buffer.

In einer Ausführungsform ist die Richtmaschine eine Schrägwalzen-Richtmaschine. In one embodiment, the straightening machine is a skew-roll straightening machine.

Es versteht sich, dass hinter der Richtmaschine in Ausführungsformen der Erfindung weitere Bearbeitungseinrichtungen zum Ausführen weiterer Bearbeitungsschritte für die fertigen Rohrabschnitte angeordnet sein können. Solche weiteren Bearbeitungseinrichtungen sind Beispielsweise eine Einrichtung zum Fertigschneiden der Rohre, eine Prüfeinrichtung oder eine Einrichtung zum Verpacken der Rohre.It is understood that behind the leveler in embodiments of the invention further processing means for performing further processing steps for the finished pipe sections can be arranged. Such further processing devices are, for example, a device for finishing the tubes, a test device or a device for packaging the tubes.

Weitere Vorteile, Merkmale und Anwendungsmöglichkeiten der vorliegenden Erfindung werden anhand der folgenden Beschreibung einer Ausführungsform und der dazugehörigen Figur deutlich.Further advantages, features and applications of the present invention will become apparent from the following description of an embodiment and the associated figure.

1 zeigt eine schematische Draufsicht auf eine Ausführungsform der erfindungsgemäßen Walzstraße. 1 shows a schematic plan view of an embodiment of the rolling mill according to the invention.

Die in 1 gezeigte Walzstraße verfügt über folgende Bearbeitungsstationen zum Herstellen eines hochwertigen Edelstahlrohrs: eine Kaltpilgerwalzanlage 1, eine Einrichtung zum Entfetten 2 der Außenwand des Rohrs, eine Abstecheinrichtung 3 zum Ablängen des Rohrs, eine Einrichtung zum Entfetten 4 der Rohrinnenwand sowie zur Endenbearbeitung des Rohrs, einen ersten Puffer 5 für die Rohre, einen Glühofen 6, einen zweiten Puffer 7 für die Rohre sowie eine Richtmaschine 8.In the 1 The rolling mill shown has the following processing stations for producing a high-quality stainless steel tube: a cold pilger rolling mill 1 , a degreasing facility 2 the outer wall of the tube, a parting device 3 for cutting the pipe to length, a degreasing device 4 the pipe inner wall as well as the end processing of the tube, a first buffer 5 for the pipes, an annealing furnace 6 , a second buffer 7 for the pipes as well as a straightening machine 8th ,

In der Walzstraße ist die Flussrichtung bzw. Transportrichtung der Luppe bzw. hinter der Kaltpilgerwalzanlage 1 des Rohrs von der Kaltpilgerwalzanlage 1 hin zum Auslass der Richtmaschine 8. In the rolling train is the flow direction or transport direction of the billet or behind the cold pilger rolling mill 1 of the pipe from the cold pilger rolling mill 1 to the outlet of the leveler 8th ,

Zwischen den einzelnen Bearbeitungsstationen 1, 2, 3, 4, 6, 8 sind automatisierte Transporteinrichtungen 9a, 9b, 9c, 9d, 9e, 9f angeordnet, welche dafür sorgen, dass das Rohr vollautomatisch von einer Bearbeitungsstation zur nächsten transportiert wird, ohne dass ein menschlicher Eingriff notwendig wäre. Between the individual processing stations 1 . 2 . 3 . 4 . 6 . 8th are automated transport facilities 9a . 9b . 9c . 9d . 9e . 9f arranged, which ensure that the tube is fully automatically transported from one processing station to the next, without human intervention would be necessary.

Diese Transporteinrichtungen 9a, 9b, 9c, 9d, 9e, 9f sind zum Einen die in 1 gezeigten Rollenförderer 9a, 9b, 9c, 9d, 9e, 9f. Diese weisen Rollen auf, auf denen das Rohr in seiner Längsrichtung verfahren bzw. transportiert wird. Dabei ist in der dargestellten Ausführungsform bei jedem der Rollenförderer jede zweite Rolle 10 mit einem motorischen Antrieb versehen, der die Rolle in eine Drehbewegung versetzt und so den Transport der auf den Rollen 10 aufliegenden Rohre bewirkt. These transport facilities 9a . 9b . 9c . 9d . 9e . 9f are on the one hand in 1 shown roller conveyor 9a . 9b . 9c . 9d . 9e . 9f , These have rollers on which the tube is moved or transported in its longitudinal direction. In the illustrated embodiment, every second roller is in each of the roller conveyors 10 provided with a motor drive, which sets the role in a rotary motion and so the transport on the rollers 10 resting tubes causes.

Die gezeigte Ausführungsform der Walzstraße verfügt über die Rollenförderer hinaus an drei Stellen über Transporteinrichtungen 11, 12, 13, welche die Rohre in ihrer Querrichtung transportieren. The shown embodiment of the rolling train has the roller conveyors at three points via transport means 11 . 12 . 13 which transport the tubes in their transverse direction.

Auf diese Weise gelingt es, die Gesamtlänge der Walzstraße trotz der großen Anzahl von Bearbeitungsstationen 1, 3, 4, 6, 8 zu begrenzen. Die Walzstraße weist, wenn man den Transportweg bzw. Materialfluss innerhalb der Walzstraße betrachtet, eine Faltung des Weges auf. Dabei ändert sich die Transportrichtung des Rohrs in der Walzstraße insgesamt dreimal. Die erste Richtungsänderung erfolgt zwischen dem Entfetter 2 für die Rohraußenwand und der Abstecheinrichtung 3, die zweite Richtungsänderung erfolgt zwischen dem Entfetter für die Rohrinnenwand 4 und dem Glühofen 6 und die dritte Richtungsänderung erfolgt zwischen dem Glühofen 6 und der Richtmaschine 8. In this way, it is possible, the total length of the mill despite the large number of processing stations 1 . 3 . 4 . 6 . 8th to limit. The rolling mill has, when considering the transport path or material flow within the rolling line, a convolution of the path. In this case, the transport direction of the tube in the rolling mill changes a total of three times. The first change of direction takes place between the degreaser 2 for the pipe outer wall and the parting device 3 , the second change of direction occurs between the degreaser for the pipe inner wall 4 and the annealing furnace 6 and the third change of direction occurs between the annealing furnace 6 and the leveler 8th ,

Dabei sind die Transportrichtungen des Rohrs auf den einzelnen Strecken einander um 180° entgegengesetzt, während zwischen den vier Transportstrecken in Längsrichtung jeweils ein Transport in Querrichtung des Rohrs, d.h. im Wesentlichen senkrecht zu seiner Längsrichtung, erfolgt. The transport directions of the tube on the individual routes are opposite each other by 180 °, while between the four transport paths in the longitudinal direction in each case a transport in Transverse direction of the tube, that is, substantially perpendicular to its longitudinal direction, takes place.

Die Transporteinrichtungen 11, 12, 13 für den Transport des Rohrs in der Walzstraße in einer Querrichtung senkrecht zur Transportrichtung der Luppe in der Kaltpilgerwalzanlage 1 weisen ganz unterschiedliche Ausgestaltungen auf. The transport facilities 11 . 12 . 13 for the transport of the tube in the rolling train in a transverse direction perpendicular to the transport direction of the billet in the cold pilger rolling mill 1 have very different configurations.

Die erste dieser Transporteinrichtungen 11 besteht aus einer schrägen Rampe, welche zwei Rollenförderer verbindet. Dabei rollt das Rohr, welches den Entfetter 2 verlassen hat, von einem oberen Rollenförderer 9a über eine Schräge auf einen unteren Rollenförderer 9b. The first of these transport facilities 11 consists of an inclined ramp connecting two roller conveyors. It rolls the tube, which is the degreaser 2 left from an upper roller conveyor 9a over a slope on a lower roller conveyor 9b ,

Die zweite Transporteinrichtung 12 für einen Transport des Rohrs in einer Richtung senkrecht zur Transportrichtung der Luppe in der Kaltpilgerwalzanlage 1 ist in den Puffer 5 für die Rohre integriert. Bei der Transporteinrichtung 12 handelt es sich um einen Brückenkran, dessen Brücke 14 zwischen zwei aufgeständerten Schienen 15 in einer Richtung im Wesentlichen senkrecht zur Transportrichtung 16 der Luppe in der Kaltpilgerwalzanlage 1 verfahrbar ist. Die Brücke 14 weist eine Reihe von Greifern (nicht dargestellt) auf, mit denen ein Rohr, das den Rollenförderer 9c vor dem Puffer 5 verlassen hat, gegriffen wird.The second transport device 12 for transporting the pipe in a direction perpendicular to the transport direction of the billet in the cold pilger rolling mill 1 is in the buffer 5 integrated for the pipes. At the transport facility 12 it is a bridge crane, its bridge 14 between two raised rails 15 in a direction substantially perpendicular to the transport direction 16 the doll in the cold pilger rolling mill 1 is movable. The bridge 14 has a series of grippers (not shown), with which a tube, the roller conveyor 9c in front of the buffer 5 has left, is seized.

Bei der dritten Transporteinrichtung 13 für einen Transport des Rohrs in einer Richtung senkrecht zur ersten Richtung 22 handelt es sich wieder um eine Rampe, auf der die Rohre selbstständig in ihrer Querrichtung abrollen. At the third transport device 13 for transporting the tube in a direction perpendicular to the first direction 22 again it is a ramp on which the pipes roll independently in their transverse direction.

Die Kaltpilgerwalzanlage 1 besteht aus einem Walzgerüst 16 mit Walzen, einem kalibrierten Walzdorn sowie einem Antrieb 17 für das Walzgerüst 16. Der Antrieb für das Walzgerüst 16 verfügt über eine Schubstange, einen Antriebsmotor und ein Schwungrad. Ein erstes Ende der Schubstange ist exzentrisch zur Drehachse der Antriebswelle an dem Schwungrad befestigt. The cold pilger rolling mill 1 consists of a rolling stand 16 with rollers, a calibrated rolling mandrel and a drive 17 for the rolling stand 16 , The drive for the rolling stand 16 has a push rod, a drive motor and a flywheel. A first end of the push rod is mounted eccentrically to the axis of rotation of the drive shaft to the flywheel.

In der dargestellten Ausführungsform fällt die Drehachse der Motorwelle mit der Drehachse der Antriebswelle des Schwungrads zusammen. Dreht sich der Rotor des Antriebsmotors, so bildet sich ein Drehmoment aus, das auf die mit dem Rotor verbundene Motorwelle übertragen wird. Die Motorwelle ist mit dem Schwungrad des Antriebstrangs derart verbunden, dass das Drehmoment auf das Schwungrad übertragen wird. In Folge des Drehmoments rotiert das Schwungrad um seine Drehachse. Die mit ihrem ersten Ende in einem radialen Abstand von der Drehachse angeordnete Schubstange erfährt eine tangentiale Kraft und überträgt diese auf das zweite Schubstangenende. Das mit dem zweiten Schubstangenende verbundene Walzgerüst 16 wird entlang der durch eine Führungsschiene des Walzgerüsts 16 festgelegten Verfahrrichtung 22 hinund herbewegt.In the illustrated embodiment, the axis of rotation of the motor shaft coincides with the axis of rotation of the drive shaft of the flywheel. If the rotor of the drive motor rotates, a torque is generated which is transmitted to the motor shaft connected to the rotor. The motor shaft is connected to the flywheel of the drive train such that the torque is transmitted to the flywheel. As a result of the torque, the flywheel rotates about its axis of rotation. The push rod, which is arranged with its first end at a radial distance from the axis of rotation, experiences a tangential force and transmits it to the second push rod end. The rolling stand connected to the second push rod end 16 is along the through a guide rail of the rolling stand 16 fixed travel direction 22 moved back and forth.

Während des Kaltpilgerns auf der in 1 schematisch gezeigten Kaltpilgerwalzanlage 1 erfährt eine in die Kaltpilgerwalzanlage 1 in der Richtung 22 eingeführte Luppe, d.h. ein Rohrohr, einen schrittweisen Vorschub in Richtung auf den Walzdorn zu bzw. über diesen hinweg, während die Walzen des Walzgerüsts 16 drehend über dem Dorn und damit über die Luppe horizontal hinund herbewegt werden. Dabei wird die Horizontalbewegung der Walzen durch das Walzgerüst 16 selbst vorgegeben, an dem die Walzen drehbar gelagert sind. Das Walzgerüst 16 wird in einer Richtung parallel zum Walzdorn hin- und herbewegt, während die Walzen selbst ihre Drehbewegung durch eine relativ zum Walzgerüst 16 feststehende Zahnstange erhalten, in welche fest mit den Walzenachsen verbundene Zahnräder eingreifen. During the cold pilgrimage on the in 1 schematically shown cold pilger rolling mill 1 experiences one in the cold pilger rolling mill 1 in that direction 22 introduced billet, ie a tube, a gradual feed towards the mandrel to or beyond this, while the rollers of the mill stand 16 rotating over the mandrel and thus horizontally back and forth over the doll. In this case, the horizontal movement of the rollers through the rolling stand 16 itself specified, on which the rollers are rotatably mounted. The rolling stand 16 is reciprocated in a direction parallel to the rolling mandrel while the rollers themselves are rotating by a relative to the rolling stand 16 obtained fixed rack, which engage fixedly connected to the roller axes gears.

Der Vorschub der Luppe über den Dorn erfolgt mit Hilfe des Vorschubspannschlittens 18, welcher eine Translationsbewegung in einer Richtung 16 parallel zur Achse des Walzdorns ermöglicht. Die im Walzgerüst 16 übereinander angeordneten konisch kalibrierten Walzen drehen sich entgegen der Vorschubrichtung 16 des Vorschubspannschlittens 18. Das von den Walzen gebildete sogenannte Pilgermaul erfasst die Luppe und die Walzen drücken von außen eine kleine Werkstoffwelle ab, die von einem Glättkaliber der Walzen und dem Walzdorn zu der vorgesehenen Wanddicke ausgestreckt wird, bis ein Leerlaufkaliber der Walzen das fertige Rohr freigibt. Während des Walzens bewegt sich das Walzgerüst 16 mit den daran befestigten Walzen entgegen der Vorschubrichtung 22 der Luppe. Mit Hilfe des Vorschubspannschlittens 18 wird die Luppe nach dem Erreichen des Leerlaufkalibers der Walzen um einen weiteren Schritt auf den Walzdorn hin vorgeschoben, während die Walzen mit dem Walzgerüst 16 in ihre horizontale Ausgangslage zurückkehren. Gleichzeitig erfährt die Luppe eine Drehung um ihre Längsachse, um eine gleichmäßige Form des fertigen Rohrs zu erreichen. Durch mehrfaches Überwalzen jedes Rohrabschnitts wird eine gleichmäßige Wanddicke und Rundheit des Rohrs sowie gleichmäßige Innenund Außendurchmesser erreicht.The feed of the billet over the mandrel takes place with the aid of the feed tension slide 18 which translates in one direction 16 parallel to the axis of the rolling mandrel allows. The in the rolling stand 16 stacked conically calibrated rollers rotate counter to the feed direction 16 of the feed tension slide 18 , The so-called pilgrim's mouth formed by the rollers captures the billet and the rollers press from the outside a small material shaft, which is stretched by a Glättkaliber the rollers and the mandrel to the intended wall thickness until an idling caliber of the rollers releases the finished tube. During rolling, the rolling stand moves 16 with the rollers attached thereto against the feed direction 22 the doll. With the help of the feed tension slide 18 After the idler caliber of the rolls has been reached, the billet is advanced by a further step onto the rolling mandrel, while the rolls are fed with the rolling stand 16 return to their horizontal starting position. At the same time, the billet undergoes a rotation about its longitudinal axis to achieve a uniform shape of the finished tube. By repeatedly rolling over each pipe section a uniform wall thickness and roundness of the tube and uniform inside and outside diameter is achieved.

Eine zentrale Ablaufsteuerung der Walzstraße steuert alle zunächst unabhängigen Bearbeitungsstationen, so auch die Antriebe der Kaltpilgerwalzanlage 1 selbst. Die Steuerung für die Kaltpilgerwalzanlage 1 beginnt mit dem Auslösen eines Vorschubschrittes des Antriebs des Vorschubspannschlittens 18 zum Vorschieben der Luppe. Nach Erreichen der Vorschubposition wird der Antrieb so angesteuert, dass er den Vorschubspannschlitten 18 statisch hält. Die Drehgeschwindigkeit des Antriebsmotors für das Walzgerüst 16 wird so gesteuert, dass gleichzeitig mit dem Vorschubschritt des Vorschubspannschlittens 18 das Walzgerüst 16 in seine Ausgangslange zurückgeführt wird, während nach dem Abschluss des Vorschubschritts das Walzgerüst 16 horizontal über die Luppe verschoben wird, wobei die Walzen die Luppe erneut auswalzen. Beim Erreichen des Umkehrpunkts des Walzgerüsts 16 wird der Antrieb des Spannfutters derart angesteuert, dass die Luppe um den Dorn gedreht wird. A central sequence control of the rolling mill controls all initially independent processing stations, including the drives of the cold pilger rolling mill 1 itself. The control for the cold pilger rolling mill 1 begins with the triggering of a feed step of the drive of the feed tension slide 18 to advance the doll. After reaching the feed position, the drive is controlled so that it the feed clamping slide 18 static holds. The rotational speed of the drive motor for the rolling stand 16 is controlled so that simultaneously with the feed step of the feed tension slide 18 the rolling stand 16 is returned to its initial length, while after completion of the advancing step the rolling stand 16 is moved horizontally over the billet, with the rollers roll out the doll again. Upon reaching the reversal point of the mill stand 16 the drive of the chuck is controlled such that the billet is rotated around the mandrel.

Nach dem Auslauf aus der Kaltpilgerwalzanlage 1 wird das fertig reduzierte Rohr in einem Entfetter 2 an seiner Außenwand entfettet. Dabei wird dasjenige Fett entfernt, das in der Kaltpilgerwalzanlage als Schmierstoff zwischen den Walzen des Walzgerüsts 16 und der Luppe eingebracht wird. After leaving the cold pilger rolling mill 1 is the finished reduced pipe in a degreaser 2 degreased on its outer wall. In this case, that fat is removed in the cold pilger rolling mill as a lubricant between the rolls of the mill stand 16 and the doll is introduced.

In der dargestellten Ausführungsform der Erfindung läuft das fertig gepilgerte und außen entfettete Rohr mit einem Teil seiner Länge in eine trichterförmige Anordnung 23, sodass ein Teil des fertig gepilgerten Rohrs in ein im Wesentlichen vertikales Loch 25 eingeschoben wird, um Platz in der Halle, in der die Walzstraße steht, zu sparen. Für den Einlauf eines Teils des fertig gepilgerten Rohrs in das Loch 25 ist eine Mehrzahl von Rollen 24 vorgesehen, die so angeordnet sind, dass ihre Oberflächenabschnitte, welche mit dem fertig gepilgerten Rohr in Eingriff stehen, eine Krümmung beschreiben, entlang derer das Rohrende in das Loch 25 einläuft.In the illustrated embodiment of the invention, the finished piloted and externally defatted tube runs with a portion of its length in a funnel-shaped arrangement 23 so that a part of the finished pilgered pipe into a substantially vertical hole 25 is pushed in to save space in the hall where the rolling mill stands. For the inlet of a part of the finished pilgered pipe into the hole 25 is a plurality of roles 24 provided, which are arranged so that their surface portions, which are engaged with the fertiggilgerten pipe, describe a curvature along which the pipe end in the hole 25 enters.

Durch die Transporteinrichtung 11 erfährt das Rohr hinter dem Entfetter 2 einen Versatz in einer Richtung senkrecht zur Transportrichtung 16 der Luppe in der Kaltpilgerwalzanlage 1. Der weitere Transport des Rohrs erfolgt verglichen mit der Transportrichtung der Luppe in der Kaltpilgerwalzanlage 1 um 180° gedreht in eine Abstecheinrichtung 3 hinein. Beim Abstechen wird ein Drehmeißel um die Längsachse des Rohrs gedreht und gleichzeitig radial auf bzw. in das Rohr zugestellt, sodass das Rohr aufgetrennt wird und zwei Rohrabschnitte entstehen. Der Abstechprozess kann dabei als Fräsen betrachtet werden, da das Rohr fest eingespannt ist, während sich der Abstechmeißel um das Rohr herum dreht und radial zugestellt wird.By the transport device 11 experiences the pipe behind the degreaser 2 an offset in a direction perpendicular to the transport direction 16 the doll in the cold pilger rolling mill 1 , The further transport of the tube is compared with the transport direction of the billet in the cold pilger rolling mill 1 rotated by 180 ° in a parting device 3 into it. When parting a turning tool is rotated about the longitudinal axis of the tube and simultaneously delivered radially on or in the pipe, so that the pipe is separated and two pipe sections. The parting process can be considered as milling, since the tube is firmly clamped while the Abstechmeißel rotates around the tube and is delivered radially.

Das abgestochene, d.h. auf die eingestellte Länge abgelängte Rohr, verlässt die Abstecheinrichtung 3 auf einem Rollenförderer 9c und wird von diesem in Querrichtung entnommen und in einen Entfetter 4 zum Entfetten der Innenwand des Rohrs eingelegt. In der dargestellten Ausführungsform findet in dem Entfetter 4 auch ein Planfräsen der Stirnseiten des Rohrs (Endenbearbeitung) statt, sodass diese eine Planität aufweisen, so wie sie für ein späteres Orbitalschweißen mehrerer Rohrabschnitte aneinander erforderlich ist.The tapped, ie cut to the set length tube leaves the parting device 3 on a roller conveyor 9c and is taken from this in the transverse direction and into a degreaser 4 for degreasing the inner wall of the tube inserted. In the illustrated embodiment takes place in the degreaser 4 Also, a face milling of the end faces of the tube (end machining) instead, so that they have a planarity, as it is required for a subsequent orbital welding of several pipe sections together.

Nachdem das Rohr in seinem Inneren entfettet und an seinen Enden geplant ist, wird es zurück auf den Rollenförderer 9c verschwenkt und mit diesem in den Puffer 5 eingespeist. After the pipe is degreased inside and planned at its ends, it gets back onto the roller conveyor 9c pivoted and with this in the buffer 5 fed.

In der dargestellten Ausführungsform verfügt der Puffer 5 über eine Einlaufbank 19 sowie fünf Speicherbänke 20. Mit Hilfe des Brückenkrans 12 wird das Rohr von der Einlaufbank 19 gegriffen und auf einer der Speicherbänke 20 abgelegt. Jedes folgende Rohr wird ebenfalls auf der gleichen Speicherbank 20 abgelegt, bis eine gewünschte Anzahl von Rohren auf einer Speicherbank 20 liegt, die dann ein Bund, d.h. eine Ofenauflage, bilden. In the illustrated embodiment, the buffer has 5 via an inlet bank 19 as well as five memory banks 20 , With the help of the bridge crane 12 gets the pipe from the inlet bank 19 grabbed and on one of the storage benches 20 stored. Each following tube will also be on the same memory bank 20 filed until a desired number of tubes on a memory bank 20 lies, which then form a covenant, ie a furnace pad.

In einer alternativen, hier nicht dargestellten Ausführungsform werden die Rohre eines Bunds zusammengebunden, wobei das Zusammenbinden des Bunds aus Rohren auf der Speicherbank 20 automatisiert erfolgt. In an alternative embodiment, not shown here, the tubes of a collar are tied together, wherein the tying of the collar of tubes on the memory bank 20 automated.

Ist das Bund fertig zusammen gestellt, so wird das Bund mit Hilfe des Brückengreifers 14 gegriffen und auf den Rollenförderer 9d aufgelegt, der das Bund von Rohren dem Maschenbandofen 6 zuführt. Once the bundle has been put together, the bundle is made with the help of the bridge grab 14 gripped and on the roller conveyor 9d hung up, the bunch of pipes the mesh belt furnace 6 supplies.

In der dargestellten Ausführungsform weist der erste Puffer 5 die Möglichkeit auf, in der Pilgerwalzanlage 1 gepilgerte und mit der Abstecheinrichtung 3 abgestochene Rohre aus der Walzstraße auszuschleusen, um sie gegebenenfalls zu einem späteren Zeitpunkt und in einer anderen Anlage weiter bearbeiten zu können. Darüber hinaus können auf einer anderen Walzanlage gepilgerte Rohre in den Puffer 5 eingeschleust werden, um sie in dem Ofen 6 und der Richtmaschine 8 weiter zu bearbeiten.In the illustrated embodiment, the first buffer 5 the possibility on, in the pilgrim rolling mill 1 pilgrimage and with the cut-off device 3 remove tapped pipes from the rolling mill, in order to be able to process them at a later date and in another plant. In addition, on another rolling mill, pilgered pipes can be placed in the buffer 5 be introduced to them in the oven 6 and the leveler 8th continue to edit.

In dem Ofen 6 wird das Bund von Rohren zur Verfestigung geglüht, d.h. auf eine Temperatur von 1080°C gebracht. Um eine kontinuierliche Fertigung, d.h. den kontinuierlichen Einlauf von Rohren in den Ofen, zu ermöglichen, ist der Ofen als Maschenbandofen 6 ausgestaltet, bei dem sich ein Förderband 21 aus Edelstahldrahtgeflecht als Endlosband durch die Muffe des Ofens erstreckt und einen Rohrbund kontinuierlich durch die Muffel hindurchbewegt. An den Enden der Muffel ist je eine H2--gespülte Schleuse vorgesehen. Diese Schleusen verhindern, dass während des Betriebs des Ofens Sauerstoff in die Muffel gelangt, welcher dann unter Temperatur mit den Rohren reagieren würde. In the oven 6 the bundle is annealed by solidification tubes, ie brought to a temperature of 1080 ° C. To enable a continuous production, ie the continuous inlet of pipes into the furnace, the furnace is a mesh belt furnace 6 designed, in which a conveyor belt 21 stainless steel wire mesh extends as an endless belt through the sleeve of the furnace and continuously moves a tube collar through the muffle. At the ends of the muffle each H 2 flushed sluice is provided. These locks prevent oxygen from entering the muffle during operation of the furnace, which would then react with the pipes under temperature.

Das Glühen der Rohre im Maschenbandofen 6 führt zu einer Verfestigung des Edelstahls der Rohre. Als nachteilig erweist sich allerdings, dass sich die Rohre aufgrund der hohen Temperaturen im Glühofen 6 verziehen und nach dem Verlassen des Ofens nicht mehr gerade sind, sondern insbesondere Wellen in ihrem Längsverlauf aufweisen. Daher ist noch ein finaler Bearbeitungsschritt notwendig, in welchem die Rohre, welche den Ofen 6 verlassen haben, gerichtet werden. The glow of the pipes in the mesh belt furnace 6 leads to a hardening of the stainless steel of the pipes. However, it proves to be disadvantageous that the tubes are due to the high temperatures in the annealing furnace 6 warp and after leaving the oven are no longer straight, but in particular have waves in their longitudinal course. Therefore, a final processing step is necessary, in which the pipes, which the oven 6 have been judged.

Die Rohre werden dem Ofen zunächst mit Hilfe eines Rollenförderers 9e entnommen und von dort mit einem Brückenkran (in 1 nicht gezeigt) in einer Richtung senkrecht zur Transportrichtung 16 der Luppe in der Kaltpilgerwalzanlage in den zweiten Rohrpuffer 7 verfahren. Hier wird das Bund, in welchem die Rohre durch den Ofen 6 transportiert wurden, durch Aufschneiden der Rödeldrähte wieder aufgelöst und die Rohre vereinzelt. Jedes einzelne Rohr wird dann in die Richtmaschine 8 eingeführt und dort gerichtet.The pipes are first fed to the furnace by means of a roller conveyor 9e taken from there and with a bridge crane (in 1 not shown) in a direction perpendicular to the transport direction 16 the billet in the cold pilger rolling mill in the second pipe buffer 7 method. Here is the bundle in which the pipes pass through the furnace 6 were transported by breaking the Rödeldrähte dissolved again and the tubes singulated. Each single tube is then placed in the leveler 8th introduced and directed there.

Die Richtmaschine 8 ist eine sogenannte Schrägwalzen-Richtmaschine, im vorliegenden Fall mit zehn Walzen. Die Drehachsen der einzelnen Walzen sind unter einem Winkel („schräg”) zur Längsachse der Anlage, die im Wesentlichen mit der Längsachse des zu richtenden Rohrs zusammenfällt, angeordnet. Die einzelnen Walzen weisen eine hyperbolische Form ihrer Mantelflächen, mit denen die Walzen mit dem zu richtenden Rohr in Eingriff treten, auf. Aus der hyperbolischen Form der Mantelflächen der Walzen folgt eine lange Anlagefläche jeder Walze an dem zu richtenden Rohr, sodass die Biegekräfte von den Walzen als Streckenlast auf das zu richtende Rohr eingeleitet werden.The leveler 8th is a so-called Schrägwalzen straightening machine, in the present case with ten rolls. The axes of rotation of the individual rolls are arranged at an angle ("oblique") to the longitudinal axis of the plant, which coincides substantially with the longitudinal axis of the pipe to be straightened. The individual rollers have a hyperbolic shape of their lateral surfaces, with which the rollers engage with the pipe to be straightened on. From the hyperbolic shape of the lateral surfaces of the rollers follows a long contact surface of each roller on the pipe to be straightened, so that the bending forces are introduced by the rollers as a line load on the pipe to be straightened.

Von den insgesamt zehn Walzen der Richtmaschine sind jeweils zwei Walzen paarweise übereinander angeordnet, sodass die eine von oben mit dem zu richtenden Rohr in Eingriff kommt und die andere Walze des Paars von unten. Die Walzen sind motorisch angetrieben und die Ausrichtung ihrer Drehachsen unter einem Winkel zur Achse des zu richtenden Rohrs bewirkt, dass dem zu richtenden Rohr eine Drehbewegung und eine Vorschubbewegung aufgezwungen wird. Von der unteren Walze eines Paars wird das Rohr plastisch in die konkave Kontur der Oberwalze hineingebogen. Diese plastische Längsbiegung wird durch eine plastische Ovalverformung des Rohrquerschnitts überlagert, wodurch die Gradheit, insbesondere an den Rohrenden, weiter verbessert wird. Der Transportpfad des zu richtenden Rohrs in der Richtmaschine 8 wird durch in Längsrichtung verlaufende Führungsbleche oder -lineale begrenzt. Of the total of ten rolls of the leveler, two rolls are arranged in pairs one above the other, so that one comes from above with the pipe to be straightened and the other roll of the pair from below. The rollers are motor driven and the alignment of their axes of rotation at an angle to the axis of the pipe to be straightened causes the pipe to be straightened to be forced to rotate and to advance. From the bottom roll of a pair, the pipe is plastically bent into the concave contour of the top roll. This plastic longitudinal bend is superimposed by a plastic oval deformation of the tube cross-section, whereby the degree of detail, in particular at the tube ends, is further improved. The transport path of the pipe to be straightened in the leveler 8th is limited by longitudinal guide plates or rulers.

Hinter der Richtmaschine 8 ist in der dargestellten Ausführungsform eine Einrichtung zum Richtpolieren vorgesehen, bei welcher zwei rotierende Vliesscheiben 26 polierend mit dem fertigen Rohr in Reibeingriff kommen. Für Zwecke der ursprünglichen Offenbarung wird darauf hingewiesen, dass sämtliche Merkmale, wie sie sich aus der vorliegenden Beschreibung, den Zeichnungen und den Ansprüchen für einen Fachmann erschließen, auch wenn sie konkret nur im Zusammenhang mit bestimmten weiteren Merkmalen beschrieben wurden, sowohl einzeln als auch in beliebigen Zusammenstellungen mit anderen der hier offenbarten Merkmale oder Merkmalsgruppen kombinierbar sind, soweit dies nicht ausdrücklich ausgeschlossen wurde oder technische Gegebenheiten derartige Kombinationen unmöglich oder sinnlos machen. Auf die umfassende, explizite Darstellung sämtlicher denkbarer Merkmalskombinationen wird hier nur der Kürze und der Lesbarkeit der Beschreibung wegen verzichtet. Während die Erfindung im Detail in den Zeichnungen und er vorangehenden Beschreibung dargestellt und beschrieben wurde, erfolgt diese Darstellung und Beschreibung lediglich beispielhaft und ist nicht als Beschränkung des Schutzbereichs gedacht, so wie er durch die Ansprüche definiert wird. Die Erfindung ist nicht auf die offenbarten Ausführungsformen beschränkt. Behind the straightener 8th In the illustrated embodiment, a device for directional polishing is provided, in which two rotating fleece discs 26 Polishing come frictionally with the finished tube. For purposes of the original disclosure, it is to be understood that all such features as will become apparent to those skilled in the art from the present description, drawings, and claims, even if concretely described only in connection with certain other features, both individually and separately any combination with other of the features or feature groups disclosed herein are combinable, unless this has been expressly excluded or technical conditions make such combinations impossible or pointless. On the comprehensive, explicit representation of all conceivable combinations of features is omitted here only for the sake of brevity and readability of the description. While the invention has been illustrated and described in detail in the drawings and the foregoing description, such illustration and description are exemplary only and are not intended to limit the scope of the protection as defined by the claims. The invention is not limited to the disclosed embodiments.

Abwandlungen der offenbarten Ausführungsformen sind für den Fachmann aus den Zeichnungen, der Beschreibung und den beigefügten Ansprüchen offensichtlich. In den Ansprüchen schließt das Wort „aufweisen” nicht andere Elemente oder Schritte aus, und der unbestimmte Artikel „eine” oder „ein” schließt eine Mehrzahl nicht aus. Die bloße Tatsache, dass bestimmte Merkmale in unterschiedlichen Ansprüchen beansprucht sind, schließt ihre Kombination nicht aus. Bezugszeichen in den Ansprüchen sind nicht als Beschränkung des Schutzbereichs gedacht. Variations of the disclosed embodiments will be apparent to those skilled in the art from the drawings, the description and the appended claims. In the claims, the word "comprising" does not exclude other elements or steps, and the indefinite article "a" or "an" does not exclude a plurality. The mere fact that certain features are claimed in different claims does not exclude their combination. Reference signs in the claims are not intended to limit the scope of protection.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Kaltpilgerwalzanlage Cold pilger rolling mill
2, 42, 4
Entfetter degreaser
33
Abstecheinrichtung Abstecheinrichtung
55
erster Puffer first buffer
66
Glühofen annealing furnace
77
zweiter Puffer second buffer
88th
Richtmaschine straightener
9a, b, c, d, e, f9a, b, c, d, e, f
Rollenförderer roller conveyors
1010
angetriebene Rolle driven roller
11, 12, 1311, 12, 13
Transporteinrichtungen transport equipment
1414
Brückengreifer bridge gripper
1515
Schienen rails
1616
Walzgerüst rolling mill
1717
Antrieb drive
1818
Vorschubspannschlitten Feed clamping slide
1919
Einlaufbank inlet Bank
2020
Speicherbänke memory banks
2121
Förderband conveyor belt
2222
Transportrichtung in der Walzanlage 1 Transport direction in the rolling mill 1
2323
Bodeneinlauf floor drain
2424
Walze roller
2525
Loch hole
2626
Vliesscheiben fleece discs

Claims (10)

Walzstraße zum Fertigen eines Rohrs mit einer Pilgerwalzanlage (1) zum Reduzieren des Durchmessers einer Luppe zu dem Rohr, einem ersten Puffer (5) für eine Mehrzahl von Rohren, wobei der erste Puffer (5) eine Einrichtung zum Bündeln einer Mehrzahl von Rohren in einem Bund aufweist, einem Glühofen (6) zum gleichzeitigen Glühen einer Mehrzahl von Rohren, einem zweiten Puffer (7) für eine Mehrzahl von Rohren, wobei der zweite Puffer (7) für die Rohre eine Einrichtung zum Vereinzeln der Mehrzahl von Rohren aus einem Bund aufweist, und einer Richtmaschine (8) zum Richten der vereinzelten Rohre nacheinander, wobei die Einrichtungen in Transportrichtung des Rohrs in der vorgenannten Reihenfolge angeordnet sind und wobei zwischen der Pilgerwalzanlage (1), dem ersten Puffer (5), dem Glühofen (6), dem zweiten Puffer (7) und der Richtmaschine (8) jeweils eine automatisierte Transporteinrichtung (9a, 9b, 9c, 9d, 9e, 9f, 11, 12, 13) für das Rohr vorgesehen ist.Rolling mill for making a pipe with a pilger rolling mill ( 1 ) for reducing the diameter of a billet to the pipe, a first buffer ( 5 ) for a plurality of tubes, the first buffer ( 5 ) comprises means for bundling a plurality of tubes in a collar, an annealing furnace ( 6 ) for simultaneously annealing a plurality of tubes, a second buffer ( 7 ) for a plurality of tubes, the second buffer ( 7 ) has for the tubes a means for separating the plurality of tubes from a collar, and a straightening machine ( 8th ) for directing the separated tubes one after the other, wherein the devices are arranged in the transport direction of the tube in the aforementioned order and wherein between the pilger rolling mill ( 1 ), the first buffer ( 5 ), the annealing furnace ( 6 ), the second buffer ( 7 ) and the straightening machine ( 8th ) an automated transport device ( 9a . 9b . 9c . 9d . 9e . 9f . 11 . 12 . 13 ) is provided for the tube. Walzstraße nach Anspruch 1, dadurch gekennzeichnet, dass die Transportrichtung (16) der Luppe in der Pilgerwalzanlage (1) eine erste Richtung definiert, und dass der erste Puffer (5) eine Transporteinrichtung (11, 12, 13) für einen Transport der Rohre in einer zu der ersten Richtung senkrechten zweiten Richtung aufweist.Rolling train according to claim 1, characterized in that the transport direction ( 16 ) of the billet in the pilger rolling mill ( 1 ) defines a first direction, and that the first buffer ( 5 ) a transport device ( 11 . 12 . 13 ) for transporting the tubes in a second direction perpendicular to the first direction. Walzstraße nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Transportrichtung (16) der Luppe in der Pilgerwalzanlage (1) eine erste Richtung definiert, und dass der zweite Puffer (7) eine Transporteinrichtung (11, 12, 13) für einen Transport der Rohre in einer zu der ersten Richtung senkrechten zweiten Richtung aufweist.Rolling train according to claim 1 or 2, characterized in that the transport direction ( 16 ) of the billet in the pilger rolling mill ( 1 ) defines a first direction, and that the second buffer ( 7 ) a transport device ( 11 . 12 . 13 ) for transporting the tubes in a second direction perpendicular to the first direction. Walzstraße nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass die Transportrichtung (16) der Luppe in der Pilgerwalzanlage (1) eine erste Richtung definiert, und dass die Walzstrasse so eingerichtet ist, dass das Rohr in der Walzstrasse abschnittsweise in einer zu der ersten Richtung parallelen, aber entgegen gesetzten Richtung transportiert wird.Rolling train according to one of claims 1 to 3, characterized in that the transport direction ( 16 ) of the billet in the pilger rolling mill ( 1 ) defines a first direction, and that the rolling train is arranged so that the tube is transported in the rolling line in sections in a direction parallel to the first direction, but opposite direction. Walzstraße nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass der Glühofen ein Bandofen (6) ist. Rolling train according to one of claims 1 to 4, characterized in that the annealing furnace is a belt furnace ( 6 ). Walzstraße nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass sie zwischen der Pilgerwalzanlage (1) und dem ersten Puffer (5) eine Abstecheinheit (3) zum Ablängen des Rohrs aufweist.Rolling train according to one of claims 1 to 5, characterized in that it is located between the pilger rolling mill ( 1 ) and the first buffer ( 5 ) a staking unit ( 3 ) for cutting the tube to length. Walzstraße nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass sie zwischen der Pilgerwalzanlage (1) und dem ersten Puffer (5), vorzugsweise zwischen der Pilgerwalzanlage (1) und einer Abstecheinheit (3) zum Ablängen des Rohrs, eine Einrichtung (2) zum Entfetten einer Rohraußenwand aufweist.Rolling train according to one of claims 1 to 6, characterized in that it is located between the pilger rolling mill ( 1 ) and the first buffer ( 5 ), preferably between the pilger rolling mill ( 1 ) and a staking unit ( 3 ) for cutting the pipe, a device ( 2 ) for degreasing a tube outer wall. Walzstraße nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass sie zwischen der Pilgerwalzanlage (1) und dem ersten Puffer (5), vorzugsweise zwischen einer Abstecheinheit (3) zum Ablängen des Rohrs und dem ersten Puffer (5), eine Einrichtung (4) zum Entfetten einer Rohrinnenwand aufweist.Rolling train according to one of claims 1 to 7, characterized in that it is located between the pilger rolling mill ( 1 ) and the first buffer ( 5 ), preferably between a staking unit ( 3 ) for cutting the tube and the first buffer ( 5 ), An institution ( 4 ) for degreasing a tube inner wall. Walzstraße nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass sie zwischen der Pilgerwalzanlage (1) und dem ersten Puffer (5), vorzugsweise zwischen der Pilgerwalzanlage (1) und einer Abstecheinheit (3) zum Ablängen des Rohrs, eine Prüfeinrichtung zur Prüfung der Rohrinnenwand aufweist. Rolling train according to one of claims 1 to 8, characterized in that it is located between the pilger rolling mill ( 1 ) and the first buffer ( 5 ), preferably between the pilger rolling mill ( 1 ) and a staking unit ( 3 ) for cutting the tube, having a test device for testing the pipe inner wall. Walzstraße nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass sie eine Steuerung aufweist, die so eingerichtet ist, dass sie alle Bearbeitungsschritte in der Walzstraße steuert.Rolling train according to one of claims 1 to 9, characterized in that it comprises a control which is arranged so that it controls all processing steps in the rolling train.
DE102012108643.5A 2012-09-14 2012-09-14 Pilgrim rolling mill Withdrawn DE102012108643A1 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
DE102012108643.5A DE102012108643A1 (en) 2012-09-14 2012-09-14 Pilgrim rolling mill
CN201380048071.2A CN104781020B (en) 2012-09-14 2013-09-13 Pilger rolling train
PCT/EP2013/069023 WO2014041127A1 (en) 2012-09-14 2013-09-13 Pilger rolling train
JP2015531573A JP6093018B2 (en) 2012-09-14 2013-09-13 Pilger rolling train
EP13765682.3A EP2895280B1 (en) 2012-09-14 2013-09-13 Pilger rolling train
KR1020157009333A KR102110003B1 (en) 2012-09-14 2013-09-13 Pilger rolling train
ES13765682.3T ES2619127T3 (en) 2012-09-14 2013-09-13 Pilgrim's rolling mill
US14/426,403 US9776228B2 (en) 2012-09-14 2013-09-13 Pilger rolling train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102012108643.5A DE102012108643A1 (en) 2012-09-14 2012-09-14 Pilgrim rolling mill

Publications (1)

Publication Number Publication Date
DE102012108643A1 true DE102012108643A1 (en) 2014-03-20

Family

ID=49226142

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102012108643.5A Withdrawn DE102012108643A1 (en) 2012-09-14 2012-09-14 Pilgrim rolling mill

Country Status (8)

Country Link
US (1) US9776228B2 (en)
EP (1) EP2895280B1 (en)
JP (1) JP6093018B2 (en)
KR (1) KR102110003B1 (en)
CN (1) CN104781020B (en)
DE (1) DE102012108643A1 (en)
ES (1) ES2619127T3 (en)
WO (1) WO2014041127A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108883448A (en) * 2016-04-01 2018-11-23 山特维克原料技术德国公开股份有限公司 Pierre's format cold-rolling mill and method for manufacturing pipe fitting
DE102022103820A1 (en) 2022-02-17 2023-08-17 Sandvik Materials Technology Deutschland Gmbh Apparatus and method for inspecting an inner wall surface of a pipe

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016106035A1 (en) 2016-04-01 2017-10-05 Sandvik Materials Technology Deutschland Gmbh Cold pilger rolling mill and method of making a pipe
CN108723122B (en) * 2018-04-23 2019-10-08 绍兴市晟途环保科技有限公司 Driving motor for electric automobile axis process units
CN109396198B (en) * 2018-11-14 2023-09-19 浙江中达新材料股份有限公司 Cold-rolled tube device with automatic oiling function
IT201900011559A1 (en) * 2019-07-12 2021-01-12 Danieli Off Mecc HIGH PRODUCTIVITY STEEL BAR HARDENING PLANT, HARDENING MACHINE AND RELATIVE METHOD FOR HARDENING STEEL BARS
CN112620388B (en) * 2020-12-01 2022-08-02 中色科技股份有限公司 Online continuous rolling annealing stretching production line for copper alloy pipe

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1772065A (en) * 1927-02-28 1930-08-05 Bangert Heinrich Metal-bar-heating furnace
US2023776A (en) * 1933-01-13 1935-12-10 Tubus A G Production of seamless tubes and other elongate articles
DE3042538A1 (en) * 1980-11-12 1982-07-15 Untertage Maschinenfabrik Dudweiler Gmbh, 6602 Dudweiler TRANSPORTATION DEVICE, ESPECIALLY FOR TRANSPORTATION AND INTERIM STORAGE OF ROD-SHAPED ROLLING MATERIAL
DE3149647A1 (en) * 1980-12-16 1982-08-12 Nippon Kokan K.K., Tokyo DEVICE FOR PRODUCING SEAMLESS STEEL
DE4008979C1 (en) * 1990-03-21 1991-08-01 Mahler Dienstleistungs-Gmbh Loeten-Haerten-Anlagenbau, 7300 Esslingen, De
DE10261632B4 (en) * 2002-01-09 2004-09-09 Sms Meer Gmbh Process and rolling plant for the production of wire, bars or seamless tubes

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1617936A (en) * 1925-04-06 1927-02-15 Bamberger Otto Tube mill and process
US1971829A (en) * 1931-06-18 1934-08-28 Youngstown Sheet And Tube Co Method of making tubes
US1983934A (en) * 1931-07-18 1934-12-11 John U Devine Method and apparatus for making seamless tubes
US1970570A (en) * 1931-10-02 1934-08-21 Jones & Laughlin Steel Corp Method and apparatus for tube manufacture
GB687283A (en) * 1950-01-23 1953-02-11 Stewarts & Lloyds Ltd Improvements in or relating to a method of and apparatus for the manufacture of seamless metal tubes
US3234055A (en) * 1962-11-06 1966-02-08 Selas Corp Of America Method of uniformly heating metal pieces
DE1952180A1 (en) 1969-10-10 1971-04-22 Mannesmann Meer Ag Transport device for pipe mills, especially for multiple cold pilger mills, consisting of a loading and unloading device
JPS61159214A (en) * 1984-12-28 1986-07-18 Sumitomo Metal Ind Ltd Method for controlling operation of automatic conveyor
JPH04154944A (en) * 1990-10-16 1992-05-27 Mitsubishi Materials Corp Manufacture of zirconium alloy clad tube excellent in stress corrosion cracking resistance
JP2623058B2 (en) * 1993-03-03 1997-06-25 ユシロ化学工業株式会社 Water-soluble lubricant for cold pilger rolling and lubrication method in cold pilger rolling mill
DE4342858C2 (en) * 1993-12-13 1996-01-11 Mannesmann Ag Cold pilger rolling mill for rolling long blanks
JP2003342761A (en) * 2002-05-27 2003-12-03 Sanyo Special Steel Co Ltd Method for manufacturing seamless steel pipe for pilger rolling mill structure of excellent surface condition
AR048214A1 (en) * 2004-02-05 2006-04-12 Sumitomo Metal Ind COOLED ENDLESS STEEL PIPES ENDED
BRPI0712244B1 (en) * 2006-04-28 2020-02-11 Nippon Steel Corporation PROCESS FOR THE PRODUCTION OF STAINLESS STEEL PIPES
US20100037976A1 (en) * 2007-03-14 2010-02-18 Shinko Products Co., Ltd. Seamless steel pipe, hollow spring utilizing seamless steel pipe, and process for manufacturing the same
BRPI0704944A8 (en) * 2007-11-30 2017-08-15 V & M Do Brasil S/A FORGED SEAMLESS TUBE AXLE FOR RAILWAY VEHICLES AND MANUFACTURING PROCESS OF FORGED SEAMLESS TUBE AXLE FOR RAILWAY VEHICLES
IT1395510B1 (en) * 2009-09-08 2012-09-28 Sms Innse Spa PLANT FOR TUBE ROLLING.
DE102010025028A1 (en) * 2010-01-29 2011-08-04 SMS Meer GmbH, 41069 Hot pilger rolling mill or hot pilger rolling mill and method for operating a hot pilger rolling mill
CN101890432A (en) * 2010-07-02 2010-11-24 衡阳华菱钢管有限公司 Production method of large-caliber high-pressure boiler tube
CN101956137B (en) * 2010-10-12 2013-03-20 衡阳华菱钢管有限公司 Seamless steel tube for manufacturing hollow core rod and production method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1772065A (en) * 1927-02-28 1930-08-05 Bangert Heinrich Metal-bar-heating furnace
US2023776A (en) * 1933-01-13 1935-12-10 Tubus A G Production of seamless tubes and other elongate articles
DE3042538A1 (en) * 1980-11-12 1982-07-15 Untertage Maschinenfabrik Dudweiler Gmbh, 6602 Dudweiler TRANSPORTATION DEVICE, ESPECIALLY FOR TRANSPORTATION AND INTERIM STORAGE OF ROD-SHAPED ROLLING MATERIAL
DE3149647A1 (en) * 1980-12-16 1982-08-12 Nippon Kokan K.K., Tokyo DEVICE FOR PRODUCING SEAMLESS STEEL
DE4008979C1 (en) * 1990-03-21 1991-08-01 Mahler Dienstleistungs-Gmbh Loeten-Haerten-Anlagenbau, 7300 Esslingen, De
DE10261632B4 (en) * 2002-01-09 2004-09-09 Sms Meer Gmbh Process and rolling plant for the production of wire, bars or seamless tubes

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108883448A (en) * 2016-04-01 2018-11-23 山特维克原料技术德国公开股份有限公司 Pierre's format cold-rolling mill and method for manufacturing pipe fitting
US10946424B2 (en) * 2016-04-01 2021-03-16 Sandvik Materials Technology Deutschland Gmbh Cold pilger rolling mill and method for producing a pipe
DE102022103820A1 (en) 2022-02-17 2023-08-17 Sandvik Materials Technology Deutschland Gmbh Apparatus and method for inspecting an inner wall surface of a pipe

Also Published As

Publication number Publication date
WO2014041127A1 (en) 2014-03-20
EP2895280B1 (en) 2017-01-18
CN104781020B (en) 2017-05-10
JP6093018B2 (en) 2017-03-08
JP2015532891A (en) 2015-11-16
CN104781020A (en) 2015-07-15
EP2895280A1 (en) 2015-07-22
ES2619127T3 (en) 2017-06-23
US20150258590A1 (en) 2015-09-17
US9776228B2 (en) 2017-10-03
KR20150067195A (en) 2015-06-17
KR102110003B1 (en) 2020-05-12

Similar Documents

Publication Publication Date Title
EP2895280B1 (en) Pilger rolling train
DE102013104806A1 (en) belt furnace
DE102013109218A1 (en) Cold pilger rolling mill and method of forming a billet into a tube
DE102014101150B4 (en) Process for forging, especially stretch forging, of metallic workpieces
EP3436206A1 (en) Cold pilger rolling mill and method for producing a pipe
EP2640532B1 (en) Method for producing seamless hot-rolled pipes in continuous pipe rolling mills
EP2429730B1 (en) Feed drive for a cold-pilgering mill
EP2488313B1 (en) Winding device, roller system having a winding device and related method
EP2750816B1 (en) Manufacturing system for producing products consisting of cylindrical metal bars
EP1463591B1 (en) Method and rolling stand for producing rods, bar stock or seamless tubes
DE102014101151B4 (en) Process for forging, in particular stretch forging, of metal workpieces
DE2528850C3 (en) Pilgrim step mill for pipe cold rolling
DE4101941C2 (en) Cold forming of wires
EP3436205A1 (en) Cold pilger rolling mill and method for producing a pipe
EP0601680B1 (en) Method of guiding a rough-pierced tube blank
EP2121208B1 (en) Method and device for rolling a product to be rolled in a rolling mill having a cross-rolling mill
DE3536046C2 (en)
EP0659494A2 (en) Device for discharging of cold rolled tubes after a cold pilger mill
DE2403686C2 (en) Process for the production of metal pipes from easily deformable materials, in particular from non-ferrous metals, by means of cold pilgrimages
EP3083092A2 (en) Method and device for transforming longitudinally oriented semi-finished products and blanks made of metal materials, in particular of steel
AT404803B (en) METHOD FOR PROCESSING MOLDED METAL PRODUCTS
EP4196297B1 (en) Device and method for handling mandrel rods in a tube rolling mill
DE3335942A1 (en) METHOD AND DEVICE FOR RETURNING THE PINS OF A PLUG ROLLING MILL FOR PRODUCING SEAMLESS TUBES
DE275435C (en)
DE19811409A1 (en) Wire forming process for wire with periodically changing diameter

Legal Events

Date Code Title Description
R163 Identified publications notified
R082 Change of representative

Representative=s name: WSL PATENTANWAELTE PARTNERSCHAFT MBB, DE

R120 Application withdrawn or ip right abandoned