DE102010053148A1 - Method of fixing cables to train track safety systems - Google Patents

Method of fixing cables to train track safety systems Download PDF

Info

Publication number
DE102010053148A1
DE102010053148A1 DE201010053148 DE102010053148A DE102010053148A1 DE 102010053148 A1 DE102010053148 A1 DE 102010053148A1 DE 201010053148 DE201010053148 DE 201010053148 DE 102010053148 A DE102010053148 A DE 102010053148A DE 102010053148 A1 DE102010053148 A1 DE 102010053148A1
Authority
DE
Germany
Prior art keywords
sensor
threshold
holes
car
rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE201010053148
Other languages
German (de)
Inventor
Anmelder Gleich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE201010053148 priority Critical patent/DE102010053148A1/en
Priority to EP11009357A priority patent/EP2460710A2/en
Publication of DE102010053148A1 publication Critical patent/DE102010053148A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L3/00Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal
    • B61L3/16Continuous control along the route
    • B61L3/22Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation
    • B61L3/225Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation using separate conductors along the route
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L3/00Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal
    • B61L3/16Continuous control along the route
    • B61L3/22Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation
    • B61L3/225Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation using separate conductors along the route
    • B61L2003/226German inductive continuous train control, called 'Linienzugbeeinflussung' [LZB]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L3/00Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal
    • B61L3/16Continuous control along the route
    • B61L3/22Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation
    • B61L2003/228Constructional details

Abstract

Ein Verfahren zum Bohren von Löchern 4 und/oder zum Anbringen von Befestigungseinrichtungen in diesen Löchern 4 für die Befestigung von Kabeln bei Zugsicherungssystemen bei Gleisstrecken sieht einen auf den Schienen 1 verfahrbaren Wagen 6 vor. Dieser weist wenigstens einen Sensor 7, 7' auf, welcher zur Erkennung der Position der zu bearbeitenden Schwelle 2 auf die Schwellenschraube 3 anspricht.A method for drilling holes 4 and / or for attaching fastening devices in these holes 4 for fastening cables in train protection systems on track sections provides a carriage 6 that can be moved on rails 1. This has at least one sensor 7, 7 ′ which responds to the sleeper screw 3 to detect the position of the sleeper 2 to be processed.

Description

Die Erfindung betrifft ein Verfahren zum Bohren von Löchern und/oder zum Anbringen von Befestigungseinrichtungen in diesen Löchern für die Befestigung von Kabeln bei Zugsicherungssystemen bei Gleisstrecken nach dem Oberbegriff des Anspruchs 1.The invention relates to a method for drilling holes and / or for attaching fastening devices in these holes for the attachment of cables in train control systems in track sections according to the preamble of claim 1.

Bei Gleisstrecken für den Zug- oder Bahnverkehr werden in zunehmenden Maße Zugsicherungssysteme als Punkt-Zug-Beeinflussung PZB sowie Linien-Zug-Beeinflussung LZB eingesetzt. Alle diese Einrichtungen benötigen ein Signalkabel, welches in dem zu prüfenden Gleisabschnitt in der Mitte zwischen den beiden Schienen des Gleises verläuft.Train tracks for train or rail traffic increasingly use train control systems as point-to-point influence PZB and line-train-influencing LZB. All these devices require a signal cable which runs in the track section to be tested in the middle between the two rails of the track.

Zum Befestigen dieser Kabel zwischen den beiden Schienen werden die Schwellen des Gleises verwendet. Dabei werden die Kabel mittels einer entsprechenden, clipsartigen Befestigungseinrichtung auf jeder zweiten Schwelle befestigt. Zum Anbringen dieser Befestigungseinrichtung auf den Schwellen ist es zunächst notwendig, daß in die Schwelle von oben her ein Loch gebohrt wird. In diese Bohrung wird dann die Befestigungseinrichtung für das Kabel eingesetzt.To attach these cables between the two rails, the sleepers of the track are used. The cables are fastened by means of a corresponding, clip-like fastening device on every second threshold. To attach this fastener on the threshold, it is first necessary that in the threshold from above a hole is drilled. In this hole then the fastening device for the cable is used.

Zum Einbringen der Bohrungen in die Schwellen wird bislang ein Wagen verwendet, der auf den Schienen verfahrbar ist. Der Wagen weist dabei eine Bohreinrichtung auf. Eine Bedienungsperson fährt den Wagen an die gewünschte Stelle der Schwelle, so daß dann die Bohrung eingebracht werden kann. Der Nachteil bei diesem Verfahren besteht darin, daß immer eine Bedienungsperson notwendig ist, um den Wagen von Schwelle zu Schwelle verfahren zu können und um außerdem die Bohreinrichtung zu betätigen.To introduce the holes in the thresholds so far a car is used, which is movable on the rails. The carriage has a drilling device. An operator drives the car to the desired location of the threshold, so that then the bore can be introduced. The disadvantage of this method is that always an operator is necessary to be able to move the car from threshold to threshold and also to operate the drilling device.

Davon ausgehend liegt der Erfindung die Aufgabe zugrunde, ein automatisches Verfahren zum Bohren von Löchern und/oder zum Anbringen von Befestigungseinrichtungen in diesen Löchern für die Befestigung von Kabeln bei Zugsicherungssystemen bei Gleisstrecken zu schaffen.Based on this, the object of the invention is to provide an automatic method for drilling holes and / or for attaching fastening devices in these holes for fastening cables in train control systems in the case of track sections.

Die technische Lösung ist gekennzeichnet durch die Merkmale im Kennzeichen des Anspruchs 1.The technical solution is characterized by the features in the characterizing part of claim 1.

Dadurch ist ein Verfahren zum automatischen Bohren von Löchern und/oder zum automatischen Anbringen von Befestigungseinrichtungen in diesen Löchern für die Befestigung von Kabeln bei Zugsicherungssystemen bei Gleisstrecken geschaffen. Der Grundgedanke der Erfindung liegt dabei darin, daß der Wagen mit seinen Arbeitsgerätschaften mit einer Positioniereinrichtung unter Verwendung von wenigstens einem Sensor ausgestattet ist. Der Wagen bewegt sich auf der zu bearbeitenden Gleisstrecke selbständig fort und findet selbständig seine Arbeitsposition, nämlich Bohrposition und/oder Position zum Einbringen der Befestigungseinrichtungen. Durch den wenigstens einen Sensor ist ein insbesondere berührungslose Erkennung der Schwellen bzw. eines Bauteiles dieser Schwellen möglich. Dadurch kann die Fortbewegung des Wagens mit seinen Arbeitsgerätschaften sowie die Arbeitsposition abgeleitet und gesteuert werden. Durch diese Positioniermethode kann der Wagen mit seinen Arbeitsgerätschaften nicht die Zielposition überfahren, auch wenn die Schwellenabstände nicht ganz exakt sind.This provides a method of automatically drilling holes and / or automatically attaching fasteners in these holes for attachment of cables to train track protection systems. The basic idea of the invention lies in the fact that the vehicle is equipped with its working equipment with a positioning device using at least one sensor. The carriage moves on the track to be processed independently and finds its own working position, namely drilling position and / or position for introducing the fasteners. By means of the at least one sensor, a contactless detection of the thresholds or of a component of these thresholds is possible. As a result, the movement of the carriage can be derived and controlled with his work equipment and the working position. This positioning method prevents the car from overrunning the target position with its implements, even if the threshold distances are not exactly accurate.

Gemäß der Weiterbildung in Anspruch 2 wird vorzugsweise als Sensor ein berührungsloser Sensor, insbesondere ein induktiver Sensor verwendet. Dies hat den Vorteil, daß der Sensor verschleißfrei arbeitet.According to the embodiment in claim 2 is preferably used as a sensor, a non-contact sensor, in particular an inductive sensor. This has the advantage that the sensor operates wear-free.

Gemäß der Weiterbildung in Anspruch 3 werden zum Erkennen der Positionen der Schwellen die Schwellenschrauben verwendet. Diese Schwellenschrauben dienen dazu, die Schienen auf den Schwellen zu befestigen. Diese Schwellenschrauben bestehen aus Metall und sind daher für die Verwendung von induktiven Sensoren bestens geeignet.According to the embodiment in claim 3, the threshold screws are used to detect the positions of the thresholds. These sleepers are used to secure the rails to the sleepers. These sleeper screws are made of metal and are therefore ideally suited for the use of inductive sensors.

Gemäß einer bevorzugten Weiterbildung in Anspruch 4 werden in Fahrtrichtung gesehen zwei Sensoren hintereinander verwendet. Diese beiden Sensoren bewegen sich mit einem bestimmten Schaltabstand über die Schwellenschrauben hinweg. Das Grundprinzip besteht dabei darin, daß der vordere Sensor zunächst einmal für die grobe Ersterkennung der Schwellenschraube verwendet wird. Dies bedeutet, daß dann mit verringerter Geschwindigkeit der Wagen weiter bewegt wird, bis der hintere Sensor die Schwellenschraube detektiert und damit der Wagen sich in der Arbeitsposition befindet und anhält.According to a preferred embodiment in claim 4 seen in the direction of travel, two sensors are used one behind the other. These two sensors move over the sleeper screws with a specific operating distance. The basic principle consists in the fact that the front sensor is first used once for the rough initial recognition of the sleeper screw. This means that the carriage is then moved further at reduced speed until the rear sensor detects the sleeper screw and thus the carriage is in the working position and stops.

Die Weiterbildung gemäß Anspruch 5 schlägt ein spezielles Bewegungsmanagement des Wagens vor, und zwar für den Fall, daß nur jede zweite Schwelle für die Befestigung des Signalkabels verwendet wird. Das Grundprinzip besteht darin, daß nach Beendigung der Arbeit an einer bestimmten Schwelle der Wagen zunächst beschleunigt wird, bis die nächste Schwelle erreicht wird. Diese nächste Schwelle wird von dem Sensor erkannt. Das entsprechende Signal wird verwendet, daß der Wagen nunmehr abgebremst wird, bis die nächste Schwelle, nämlich bezüglich der ursprünglichen Ausgangsschwelle die übernächste Schwelle erreicht wird. Somit ist eine ausreichende Strecke vorhanden, um den Wagen abzubremsen und – insbesondere bei der Verwendung von zwei Sensoren – eindeutig die nächste Position aufzufinden, ohne diese Position zu überfahren.The development according to claim 5 proposes a special movement management of the car, in the event that only every second threshold for the attachment of the signal cable is used. The basic principle is that after completion of work at a certain threshold, the car is first accelerated until the next threshold is reached. This next threshold is detected by the sensor. The corresponding signal is used, that the car is now decelerated until the next threshold, namely with respect to the original output threshold, the threshold after next is reached. Thus, there is a sufficient distance to decelerate the car and - especially when using two sensors - clearly locate the next position without overriding this position.

Ein Ausführungsbeispiel zum Bohren von Löchern zum Anbringen von Befestigungseinrichtungen in diesen Löchern für die Befestigung von Kabeln bei Zugsicherungssystemen bei Gleisstrecken wird nachfolgend anhand der Zeichnungen beschrieben. In diesen zeigt:An embodiment for drilling holes for attaching fasteners in these holes for the attachment of cables in train track safety systems will be described below with reference to the drawings. In these shows:

1 eine Vorderansicht des Bohrwagens; 1 a front view of the drill truck;

2 einen Schnitt entlang der Linie A-A in 1; 2 a section along the line AA in 1 ;

3 ein Detailausschnitt B aus der Darstellung in 2; 3 a detail B from the illustration in 2 ;

4a bis 4d der Verfahrensablauf in einer Draufsicht; 4a to 4d the process flow in a plan view;

5 ein Diagramm zur Darstellung der Bewegungsabläufe. 5 a diagram illustrating the movement sequences.

Eine Gleisstrecke für den Zug- oder Bahnverkehr weist zwei Schienen 1 auf, welche auf Schwellen 2 befestigt sind. Zum Befestigen dienen Schwellenschrauben 3.A rail track for train or rail traffic has two rails 1 which is on sleepers 2 are attached. Threshold screws are used for fastening 3 ,

Um in der Mitte zwischen den beiden Schienen 1 – nicht dargestellte – Signalkabel für Zugsicherungssysteme verlegen und befestigen zu können, werden diese Kabel auf den Schwellen 2 mittels entsprechenden – ebenfalls nicht dargestellten – Befestigungseinrichtungen befestigt. Diese Befestigungseinrichtungen werden dabei in Löchern 4 verankert, welche sich in der Mitte der Schwellen 2 befinden. Die Befestigung der Signalkabel auf den Schwellen 2 erfolgt dabei auf jeder zweiten Schwelle 2.To be in the middle between the two rails 1 - not shown - to lay signal cables for train protection systems and secure, these cables are on the thresholds 2 fastened by means of corresponding - also not shown - fasteners. These fasteners will be in holes 4 anchored, which is in the middle of the thresholds 2 are located. The attachment of the signal cables on the sleepers 2 takes place on every second threshold 2 ,

Zum Bohren der Löcher 4 dient eine Bohreinrichtung 5. Diese ist auf einem Wagen 6 befestigt. Dieser Wagen 6 ist auf den Schienen 1 mittels eines motorischen Antriebs verfahrbar.For drilling the holes 4 serves a drilling device 5 , This is on a cart 6 attached. This car 6 is on the rails 1 movable by means of a motor drive.

Der Wagen 6 weist auf seiner einen Seite hintereinander zwei induktive Sensoren 7, 7' auf. Diese Sensoren 7, 7' sind so ausgebildet, daß sie ein Signal abgeben, wenn sie sich im Bereich der Schwellenschrauben 3 befinden.The car 6 has on its one side in succession two inductive sensors 7 . 7 ' on. These sensors 7 . 7 ' are designed to give a signal when they are in the area of the sleeper screws 3 are located.

Die Funktionsweise ist wie folgt:
Die Ausgangssituation sei in 4a dargestellt. In dieser Position befindet sich der hintere Sensor 7' im Bereich einer Schwellenschraube 3. In dieser Position des Wagens 6 hat die Bohreinrichtung 5 zuvor ein Loch 4 in die Schwelle 2 gebohrt.
The operation is as follows:
The starting situation is in 4a shown. In this position is the rear sensor 7 ' in the area of a sleeper screw 3 , In this position of the car 6 has the drilling device 5 previously a hole 4 into the threshold 2 drilled.

Um in der übernächsten Schwelle 2 wieder ein Loch 4 zu bohren, wird der Wagen 6 rechnergesteuert in Bewegung gesetzt und insgesamt mit der Beschleunigung a1 beschleunigt, bis der vordere Sensor 7 ein Signal von der Schwellenschraube 3 der nächsten Schwelle 2 erhält (4b).In the next but one threshold 2 again a hole 4 to drill, the car is 6 computer-controlled set in motion and accelerated in total with the acceleration a1 until the front sensor 7 a signal from the sleeper screw 3 the next threshold 2 receives ( 4b ).

Ab diesem Signal wird nicht mehr weiter beschleunigt, sondern die erreichte Geschwindigkeit vmax wird beibehalten, bis der hintere Sensor 7' die Schwellenschraube 3 überfährt (4c).From this signal is no longer accelerated, but the achieved speed vmax is maintained until the rear sensor 7 ' the sleeper screw 3 passes over ( 4c ).

Mit diesem Signal des hinteren Sensors 7' wird die Verzögerung a2 aktiv. Der Wagen 6 wird bis zu der festgelegten Geschwindigkeit v1 abgebremst. In dieser Position befindet sich der vordere Sensor 7 im Bereich der Schwellenschraube 3. Der Wagen 6 behält diese Geschwindigkeit v1 bei, bis der hintere Sensor 7' von der Schwellenschraube 3 geschaltet wird. Damit bleibt der Wagen 6 auf der neuen Position stehen (4d). In dieser kann die Bohreinrichtung 5 ein neues Loch 4 bohren. Danach beginnt der Zyklus von Neuem.With this signal of the rear sensor 7 ' the delay a2 becomes active. The car 6 is decelerated up to the specified speed v1. In this position is the front sensor 7 in the area of the sleeper screw 3 , The car 6 maintains this speed v1 until the rear sensor 7 ' from the sleeper screw 3 is switched. This leaves the car 6 standing in the new position ( 4d ). In this, the drilling device 5 a new hole 4 drill. Then the cycle starts again.

Das dargestellte Ausführungsbeispiel beschreibt das Bohren von Löchern 4. Diese Löcher 4 dienen der Aufnahme von Befestigungseinrichtungen für die Kabel der Signalleitung. Mit dem Wagen 6 ist es grundsätzlich gleichermaßen denkbar, nicht nur mittels der Bohreinrichtung 5 Löcher 4 zu bohren. Es ist auch denkbar, stattdessen (oder aber auch zusätzlich) die Befestigungseinrichtungen für die Signalleitungen automatisch mittels einer entsprechenden Einrichtung in die Löcher 4 einzubringen.The illustrated embodiment describes the drilling of holes 4 , These holes 4 serve to accommodate fastening devices for the cables of the signal line. With the car 6 It is basically equally conceivable, not only by means of the drilling device 5 holes 4 to drill. It is also conceivable, instead (or additionally), the fastening means for the signal lines automatically by means of a corresponding device in the holes 4 contribute.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Schienerail
22
Schwellethreshold
33
Schwellenschraubesleeper screw
44
Lochhole
55
Bohreinrichtungdrilling
66
Wagendare
7, 7'7, 7 '
Sensorsensor

Claims (5)

Verfahren zum Bohren von Löchern (4) und/oder zum Anbringen von Befestigungseinrichtungen in diesen Löchern (4) für die Befestigung von Kabeln bei Zugsicherungssystemen bei Gleisstrecken, wobei sich die Löcher (4) für die Befestigungseinrichtungen auf den Schwellen (2) in der Mitte zwischen den Schienen (1) des Gleises befinden, wobei auf den Schienen (1) ein Wagen (6) zu den jeweiligen Positionen der Schwellen (2) vorwärtsbewegt wird und wobei der Wagen eine Bohreinrichtung (5) und/oder eine Anbringeinrichtung für die Befestigungseinrichtungen aufweist, dadurch gekennzeichnet, daß der Wagen (6) einen motorischen Antrieb zur Vorwärtsbewegung auf den Schienen (1) sowie wenigstens einen Sensor (7, 7') zum Erkennen der Position der Schwellen (2) aufweist, wobei bei der Vorwärtsbewegung des Wagens (6) dieser dann angehalten wird und anschließend seine Arbeiten verrichtet, wenn der Sensor (7, 7') die entsprechende Schwelle (2) detektiert hat.Method for drilling holes ( 4 ) and / or for attaching fasteners in these holes ( 4 ) for the attachment of cables to train track safety systems, the holes ( 4 ) for the fastening devices on the sleepers ( 2 ) in the middle between the rails ( 1 ) of the track, whereby on the rails ( 1 ) a car ( 6 ) to the respective positions of the thresholds ( 2 ) and wherein the carriage is a drilling device ( 5 ) and / or attachment means for the attachment means, characterized in that the carriage ( 6 ) a motor drive for advancing on the rails ( 1 ) such as at least one sensor ( 7 . 7 ' ) for detecting the position of the thresholds ( 2 ), wherein during the forward movement of the carriage ( 6 ) is then stopped and then performs his work when the sensor ( 7 . 7 ' ) the corresponding threshold ( 2 ) has detected. Verfahren nach dem vorhergehenden Anspruch, dadurch gekennzeichnet, daß als Sensor (7, 7') ein berührungsloser Sensor (7, 7'), insbesondere ein induktiver Sensor (7, 7') verwendet wird.Method according to the preceding claim, characterized in that as a sensor ( 7 . 7 ' ) a non-contact sensor ( 7 . 7 ' ), in particular an inductive sensor ( 7 . 7 ' ) is used. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß zum Erkennen der Position der Schwelle (2) mittels des Sensors (7, 7') Schwellenschrauben (3) verwendet werden, mittels denen die Schienen (1) auf den Schwellen (2) befestigt sind.Method according to one of the preceding claims, characterized in that for detecting the position of the threshold ( 2 ) by means of the sensor ( 7 . 7 ' ) Sleeper screws ( 3 ), by means of which the rails ( 1 ) on the thresholds ( 2 ) are attached. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß in Fahrtrichtung gesehen zwei Sensoren (7, 7') hintereinander verwendet werden, wobei der vordere Sensor (7) für die Ersterkennung der Schwelle (2) verwendet wird und wobei der hintere Sensor (7') für die Feinpositionierung des Wagens (6) verwendet wird.Method according to one of the preceding claims, characterized in that seen in the direction of travel two sensors ( 7 . 7 ' ) are used one behind the other, with the front sensor ( 7 ) for the first recognition of the threshold ( 2 ) and the rear sensor ( 7 ' ) for the fine positioning of the car ( 6 ) is used. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß bei jeder zweiten Schwelle (2) Löcher (4) gebohrt und/oder Befestigungseinrichtungen angebracht werden, daß ausgehend von einer gerade bearbeiteten Schwelle (2) der Wagen (6) bis zur nächsten Schwelle (2) beschleunigt wird und daß nach dem Detektieren dieser nächsten Schwelle (2) durch den Sensor (7, 7') der Wagen (6) bis Erreichen der wiederum nächsten Schwelle (2) abgebremst wird.Method according to one of the preceding claims, characterized in that at every other threshold ( 2 ) Holes ( 4 ) and / or fasteners are attached, starting from a threshold ( 2 ) the car ( 6 ) to the next threshold ( 2 ) and that after detecting this next threshold ( 2 ) through the sensor ( 7 . 7 ' ) the car ( 6 ) until reaching the next threshold ( 2 ) is slowed down.
DE201010053148 2010-12-01 2010-12-01 Method of fixing cables to train track safety systems Withdrawn DE102010053148A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE201010053148 DE102010053148A1 (en) 2010-12-01 2010-12-01 Method of fixing cables to train track safety systems
EP11009357A EP2460710A2 (en) 2010-12-01 2011-11-25 Method for fastening line cables in line-rail influencing train control systems in railway tracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE201010053148 DE102010053148A1 (en) 2010-12-01 2010-12-01 Method of fixing cables to train track safety systems

Publications (1)

Publication Number Publication Date
DE102010053148A1 true DE102010053148A1 (en) 2012-06-06

Family

ID=45065608

Family Applications (1)

Application Number Title Priority Date Filing Date
DE201010053148 Withdrawn DE102010053148A1 (en) 2010-12-01 2010-12-01 Method of fixing cables to train track safety systems

Country Status (2)

Country Link
EP (1) EP2460710A2 (en)
DE (1) DE102010053148A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012219161B3 (en) * 2012-10-19 2014-03-20 Bombardier Transportation Gmbh Method for preparing installation of beacons to tracks for rail vehicles, involves determining induced voltage by evaluating measured value, if conductive object is placed on beacon at vicinity of track bed

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1327567A1 (en) * 2002-01-09 2003-07-16 Siemens Aktiengesellschaft Device for automatic installation of beacons in a railroad bed
EP1338702A1 (en) * 2002-02-21 2003-08-27 Intermetric Gesellschaft für Ingenieurmessung und raumbezogene Informationssysteme mbH Method for accurate spacial positioning of rail fixing bodies or of tool equipments and measurement apparatus to this effect

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1327567A1 (en) * 2002-01-09 2003-07-16 Siemens Aktiengesellschaft Device for automatic installation of beacons in a railroad bed
EP1338702A1 (en) * 2002-02-21 2003-08-27 Intermetric Gesellschaft für Ingenieurmessung und raumbezogene Informationssysteme mbH Method for accurate spacial positioning of rail fixing bodies or of tool equipments and measurement apparatus to this effect

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012219161B3 (en) * 2012-10-19 2014-03-20 Bombardier Transportation Gmbh Method for preparing installation of beacons to tracks for rail vehicles, involves determining induced voltage by evaluating measured value, if conductive object is placed on beacon at vicinity of track bed

Also Published As

Publication number Publication date
EP2460710A2 (en) 2012-06-06

Similar Documents

Publication Publication Date Title
EP2858875B1 (en) Locating of rail vehicles
EP1679279A1 (en) Elevator with control system
EP3013662B1 (en) Method for controlling platform doors and platform-door control device
EP2903879B1 (en) Locating of vehicles
DE1904125C3 (en) Device for treating tracks
EP2138822A2 (en) Device and method for providing near collision or collision-free situations between a test vehicle and a collision object and device for testing the function of a driver assist system
DE102014006023A1 (en) Rail system, in particular for an electric pallet rail
DE8027231U1 (en) DEVICE FOR WELDING RAIL BRACKETS TO BASE OR RIB PANELS
DE69718139T2 (en) METHOD FOR AUTOMATICALLY CONTROLLING VEHICLES DURING THE DRIVE
WO1995001900A1 (en) System for releasing the opening of the doors of rail vehicles
DE102013221138A1 (en) Method and device for monitoring a return cable of a railway track
DE102012214777A1 (en) Breakpoint indicator
EP3102476B1 (en) Method for conducting traffic on a rail network and rail network with a train maintenance facility
DE102010053148A1 (en) Method of fixing cables to train track safety systems
EP3153281B1 (en) Tool analysis device and method for analysis of the processing of a workpiece with a tool
EP1319751A2 (en) Working vehicle and method for operating without driver
WO2016008468A1 (en) Drilling and anchor-setting tool with transversal displacement
EP3141337B1 (en) Device for processing rod-shaped workpieces, such as window or door profiles
EP3428749B1 (en) Method for operating a workpiece machining system and workpiece machining system
DE102011088891A1 (en) Method for increasing positioning accuracy of moving object i.e. rail vehicle, involves detecting metal strips of object when sensor falls below response threshold spacing, and generating and utilizing output signal as locating criterion
EP3577006B1 (en) Device for determining at least one measurement value related to a location and/or at least one movement variable of a track-bound vehicle, and method for operating such a device
EP0989408A1 (en) Method for determining deceleration and standstill of a moved body, apparatus for performing the method, and use thereof
DE102012219901A1 (en) Method for increasing positioning accuracy of moving object e.g. rail-mounted vehicle to predetermined stop point, involves approaching optical detection device of moving object to stop to detect generation of output signal
EP1170420A3 (en) Apparatus for measuring the track location during the laying of railway tracks and method for performing such measurement
DE102014000865B4 (en) Conveyor

Legal Events

Date Code Title Description
R016 Response to examination communication
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee