DE102005032864A1 - Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators - Google Patents
Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators Download PDFInfo
- Publication number
- DE102005032864A1 DE102005032864A1 DE102005032864A DE102005032864A DE102005032864A1 DE 102005032864 A1 DE102005032864 A1 DE 102005032864A1 DE 102005032864 A DE102005032864 A DE 102005032864A DE 102005032864 A DE102005032864 A DE 102005032864A DE 102005032864 A1 DE102005032864 A1 DE 102005032864A1
- Authority
- DE
- Germany
- Prior art keywords
- operating point
- generator
- maximum
- power
- regulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/66—Regulating electric power
- G05F1/67—Regulating electric power to the maximum power available from a generator, e.g. from solar cell
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10S—TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10S323/00—Electricity: power supply or regulation systems
- Y10S323/906—Solar cell systems
Abstract
Ein Verfahren zum Auffinden eines Maximums eines Photovoltaik-Generators, bei dem eine MPP-Regelung eines Photovoltaik-Wechselrichters eingesetzt wird, mit der eine maximale Generatorleistung bei einem Arbeitspunkt der Generatorkennlinie eingestellt wird, soll bei Teilverschattung des Generators einen verbesserten Wirkungsgrad liefern. Dies wird dadurch erreicht, dass die MPP-Regelung abgeschaltet wird, um den Generator anschließend zu be- und/oder entlasten, damit sich ein neuer Arbeitspunkt der Generatorkennlinie einstellen kann, und dass die MPP-Regelung anschließend wieder eingeschaltet wird.
Description
- Die Erfindung betrifft ein Verfahren nach dem Oberbegriff des Anspruches 1.
- Photovoltaik-Generatoren haben charakteristische Leistungskennlinien, bei denen in der Regel ein Arbeitspunkt maximaler Leistung vorhanden ist. Diesem Arbeitspunkt ist ein bestimmter Generator-Strom und eine bestimmte Generatorspannung zugeordnet.
- Bekannt sind Verfahren, bei denen die Generatorbelastung, z.B. der Generatorstrom, so eingestellt wird, dass der Photovoltaik-Generator mit maximaler Leistung betrieben wird.
- Derartige Verfahren bezeichnet man als Maximum-Power-Point-Tracking (MPPT).
- Ein Verfahren, das in der
DE 199 04 561 C1 vorgestellt wird, besteht darin, dass ein zusätzlicher Sensor eingesetzt wird, der die eintreffende Strahlung misst und über eine Kennlinienmessschaltung und einen Mikrorechner ein Leistungsmaximum einstellt. Fällt auf den Sensor ein Schatten oder wird ein Teil des Generators abgeschattet, dann stellt sich ein Arbeitspunkt ein, der nicht die größte Leistung liefert, wodurch die Energieausbeute des Gesamtsystems abfällt. - Ein anderes Verfahren ist aus der
DE 199 09 609 C1 bekannt. Hier wird kein Sensor eingesetzt, sondern die Generatorkennlinie über das Einschalten eines Kondensators direkt gemessen. Durch einen Mikrorechner wird der ermittelte optimale Arbeitspunkt eingestellt. Bei Abschattung eines Generatorteils jedoch können sich mehrere lokale Leistungsmaxima einstellen, die verschieden hoch sein können. Daher kann es bei Teil-Abschattung vorkommen, dass der Generator nicht die maximale Leistung liefert und ein Teil der Solarenergie nicht genutzt wird. - Ein weiteres Verfahren zur Einstellung des Punktes maximaler Leistung eines Solargenerators einer Photovoltaikanlage ist in der
DE 100 60 108 A1 beschrieben. Über eine einmalige Vermessung der physikalischen Parameter des Generators wird der maximale Punkt maximaler Leistung eingestellt, solange dieser nicht teilverschattet ist. - Die
DE 4325436 C2 beschreibt ein Verfahren, bei dem der Generator zyklisch kurzgeschlossen und entlastet wird. Nachteilig ist auch hier, dass eine Teilverschattung nicht erkannt wird. - Der Erfindung liegt die Aufgabe zugrunde, einen PV-Genrator so zu betreiben, dass er ein Maximum an Energie abgeben kann.
- Diese Aufgabe wird durch einen Stromrichter mit den kennzeichnenden Merkmalen des Anspruches 1 in Verbindung mit seinen Oberbegriffsmerkmalen gelöst.
- Durch die Erfindung ist es möglich, die Energieausbeute eines Systems bestehend aus einem Photovoltaikgenerator und einem Stromrichter zu erhöhen, wenn eine Teilverschattung des Generators eintritt und eine herkömmliche Maximumregelung MPPT aufgrund mehrerer Maximain der Generatorkennlinie versagen würde.
- Die Erfindung beruht auf der Erkenntnis, dass sich auch mehrere lokale Leistungsmaxima unterschiedlicher Höhe bei Teilverschattungseffekten einstellen können.
- Hierbei liegt der Gedanke zugrunde, dass ein gezieltes Herstellen einer instabilen Regelung und Wiederherstellen einer stabilen Regelung sowie eine Auswertung der so erfolgten Messergebnisse zur Lösung des Problems der Teilverschattung führt. Grundsätzlich ist jede Regelung geeignet, die sich zwischen einer stabilisierenden und einer nicht stabilisierenden Wirkung umschalten lässt. Die erfindungsgemäße Lösung kann grundsätzlich auch ohne ein Standard-MPP-Tracking realisiert werden, und sogar eine MPP-Trackingvollwertung ersetzen.
- Durch einen gezielten Eingriff in die Regelschleifen des Stromrichters wird eine Instabilität erzeugt, so dass sich nahezu verzögerungsfrei ein neuer Arbeitspunkt einstellt, der im Nahbereich eines lokalen oder globalen Maximums liegt, falls dieses Maximum eine höhere Leistung aufweist als das zuvor erkannte Leistungsmaximum.
- Liegt zwischen dem sich neu einstellenden stabilen Arbeitspunkt und dem Arbeitspunkt vor dem Herstellen der Instabilität eine hinreichend große Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich eines Maximums mit höherer Leistung, was jedoch erkannt wird.
- Das Verfahren dient zum Auffinden des linksseitigen Maximums. Nach einem gezielten Eingriff in die Regelschleifen kann die zuletzt gemessene Leistung mit einem Faktor größer Eins multipliziert und als Sollwert für die Regelung vorgegeben werden. Dadurch wird die Instabilität erzeugt. Liegt weiterhin eine Stabilität vor, wird die Leistung so lange erhöht bis die Instabilität eintritt. Um ein weiteres linksseitiges Maximum zu finden, kann die zuvor durchgeführte Prozedur wiederholt werden. Die Anzahl der Wiederholungen entspricht der Anzahl der linksseitigen Maxima mit höherer Leistung und kann begrenzt werden. Liegt zwischen dem sich jeweils neu einstellenden stabilen Arbeitspunkt und dem letzten stabilen Arbeitspunkt eine hinreichend große Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich eines Maximums mit höherer Leistung, was jedoch erkannt wird.
- Das Verfahren dient auch zum Auffinden eines rechtsseitigen Leistungsmaximums, in dem eine Instabilität hergestellt wird. Nach dem gezielten Eingriff in die Regelschleifen wird die zuletzt gemessene Leistung mit einem Faktor nahe Null multipliziert und als Sollwert für eine Zeitdauer von z.B. kleiner einer Sekunde vorgegeben. So kann das System entlastet werden. Anschließend wird eine Leistung als Sollwert vorgegeben, die in einem Wertebereich vor dem Eingriff in die Regelschleifen liegt. Liegt zwischen dem sich neu einstellenden stabilen Arbeitspunkt und dem Arbeitspunkt vor dem Herstellen der Instabilität eine hinreichend große Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich eines Maximums mit höherer Leistung, was erkannt wird. Liegt zwischen dem sich neu einstellenden stabilen Arbeitspunkt und dem Arbeitspunkt vor dem Herstellen der Instabilität eine hinreichend kleine Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich des ursprünglichen Leistungsmaximums, und es ist rechtsseitig kein weiteres Maximum vorhanden, was jedoch erkannt wird.
- Wird ein neuer Arbeitspunkt mit höherer Leistung erkannt, wird der neue Arbeitspunkt als Startwert an die Regelung übergeben, und die ursprünglichen Regelschleifen werden hergestellt, wodurch das System nahezu schwingungsfrei den neuen Arbeitspunkt mit höherer Leistung stabil einstellen kann.
- Durch Einstellung der Anzahl der zu suchenden linksseitigen Maxima kann die Suche an die Verschattungsempfindlichkeit des Generators angepasst werden.
- Ein weitere vorteilhafte Ausgestaltung des erfindungsgemäßen Verfahrens zeichnet sich dadurch aus, dass nach dem Eingriff in die Regelschleifen die Leistung des Stromrichters erhöht wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe des Nullpunktes der Kennlinie liegt. Dieses Verfahren ist bei einem linksseitigen lokalen Maximum günstig.
- Vorteilhaft ist auch, dass nach dem Eingriff in die Regelschleifen die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt. Hierdurch kann eine Einstellung auf ein rechtsseitiges lokales Leistungsmaximum erfolgen.
- In einer vorteilhaften Weiterbildung der Erfindung ist vorgesehen, dass nach dem Eingriff in die Regelschleifen die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem lokalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt, wobei sich ein dritter Arbeitspunkt nach Erhöhen der Leistung einstellt, der in der Höhe des ersten Arbeitspunktes liegt und in der Nähe eines vierten Arbeitspunktes liegt, der ein Leistungsmaximum ist. Dieses Verfahren berücksichtigt ein rechtsseitiges Maximum höherer Leistung.
- Weitere vorteilhafte Ausgestaltungen der Erfindung sind in den Unteransprüchen gekennzeichnet.
- Ein Ausführungsbeispiel für den Betrieb eines Wechselrichters wird anhand der Zeichnungen näher erläutert, wobei weitere vorteilhafte Weiterbildungen der Erfindung und Vorteile derselben beschrieben sind.
- Es zeigen:
-
1 eine Generator-Leistungskennlinie bei einem linksseitigen globalen Maximum, -
2 eine Generator-Leistungskennlinie bei einem linksseitigen lokalen Maximum, -
3 eine Generator-Leistungskennlinie bei einem rechtsseitigen lokalen Maximum, -
4 eine Generator-Leistungskennlinie bei einem rechtsseitigen globalen Maximum, -
5 ein Ablaufdiagramm bei einer Detektion eines linksseitigen Maximums, -
6 ein Ablaufdiagramm bei einer Detektion eines rechtsseitigen Maximums, -
7 eine Darstellung eines an einem Netz betriebenen PV-Generators, und -
8 ein Ablaufdiagramm für eine kombinierte „rechts links" MPP-Suche. -
1 zeigt eine Kennlinie eines teilverschatteten Photovoltaik-Generators bzw. einer Generatoranlage. Hierbei fällt auf einen Flächenanteil des Generators eine geringere Sonneneinstrahlung infolge eines Schattens oder einer anderen Ursache. - Die Kennlinie weist zwei Maxima (
1 ) und (3 ) auf. Das rechte Maximum (1 ) wird als lokales Maximum bezeichnet, während das linke Maximum (3 ) als globales Maximum bezeichnet wird. Das linke (globale) Maximum (3 ) ist größer als das rechte (lokale) Maximum. - Bei Anwendung eines herkömmlichen MPP-Trackings kann es vorkommen, dass sich ein lokales Leistungsmaximum (
1 ) einstellt, da nicht zwischen verschiedenen Leistungsmaxima unterschieden werden kann. Dadurch wird ein Teil der Sonnenenergie nicht genutzt, und die Energieausbeute der Anlage sinkt erheblich. - Herkömmliche MPPT arbeiten vorzugsweise in ständiger Suchbewegung und bewegen sich um ein lokales Leistungsmaximum herum.
- Linksseitiges globales Maximum
- Dieser eben erläuterte Fall und die Wirkungsweise der Erfindung werden nun näher erläutert.
- Die Erfindung nutzt ein Verfahren zum Auffinden eines Leistungsmaximums des Photovoltaik-Generators, bei dem ein MPP-Tracking eingesetzt wird, mit dem eine maximale Generatorleistung bei einem Arbeitspunkt der Generatorkennlinie eingestellt wird.
- Durch das MPP-Tracking befindet sich der Arbeitspunkt bei (
1 ) und kann sich ohne eine Änderung der Sonneneinstrahlung, Zellentemperatur und dergleichen nicht verschieben. - Erfindungsgemäß wird das eigentliche MPP-Tracking abgeschaltet. Das MPP-Tracking und eine Spannungsregelung werden praktisch deaktiviert. Dadurch ist es überhaupt möglich, den Arbeitspunkt zu verschieben. Anschließend wird der Generator belastet, damit sich ein neuer Arbeitspunkt der Generatorkennlinie einstellen kann. Der AC-Stromsollwert wird beispielsweise um den Faktor 1,05 erhöht. Dadurch entsteht eine Instabilität. Der Arbeitspunkt wandert sehr schnell in Richtung des globalen Maximums eines Arbeitspunktes (
2 ) und ist dann wieder stabil. Wenn das MPP-Tracking wieder eingeschaltet wird, führt es das System zum optimalen Arbeitspunkt bzw. dem globalen Maximum (3 ). - Dadurch wird das höchste Maximum erreicht.
- Linksseitiges lokales Maximum
-
2 zeigt einen Fall, bei dem sich der aktuelle Arbeitspunkt bereits im globalen Maximum (1 ) befindet, aber links davon ein weiteres (kleineres) Maximum existiert. - Das MPP-Tracking wird auch hier zunächst abgeschaltet. Durch eine Belastung bewegt sich jedoch der Arbeitspunkt sehr schnell auf der Kennlinie in Richtung des Arbeitspunktes (
2 ), bei dem zwar der Strom höher ist, die Spannung jedoch zusammenbricht, so dass praktisch der Generator keine Leistung mehr liefert. - Da die hohe vorgegebene Sollleistung nicht eingestellt werden kann, ergibt sich kein stabiler Arbeitspunkt.
- Vorzugsweise ist vorgesehen, dass eine Spannungsgrenze festgelegt wird, bei deren Unterschreitung der Sprung rückgängig gemacht wird bzw. der Generator sofort wieder entlastet wird.
- Dadurch wird das höchste Maximum erreicht.
- Rechtsseitiges lokales Maximum
-
3 zeigt den Fall, bei dem das MPP-Tracking sich bereits auf das globale Maximum (1 ) eingestellt hat. Der aktuelle Arbeitspunkt befindet sich bereits bei (1 ). Durch Deaktivieren des MPP-Trackings und anschließender Entlastung des Generators bewegt sich der Arbeitspunkt sehr schnell auf der Kennlinie zum Arbeitspunkt (2 ), der nahezu Leerlaufspannung aufweist. Bei einer erneuten Belastung mit einem Strom, der der Leistung im Arbeitspunkt (1 ) entspricht, kehrt der Arbeitspunkt wieder in seine Ausgangsposition (1 ) zurück. - Dadurch wird das höchste Maximum beibehalten.
- Rechtsseitiges globales Maximum
-
4 veranschaulicht einen Fall, bei dem ein lokales Maximum (1 ) links vorhanden ist, wobei das MPP-Tracking diesen Arbeitspunkt fixiert. Durch Deaktivieren des MPP-Trackings und anschließende Entlastung stellt sich der neue Arbeitspunkt (2 ) ein, der in der Nähe der Leerlaufspannung ist. Bei einer erneuten Belastung mit einem Strom, der der Leistung im Arbeitspunkt (1 ) entspricht, bewegt sich der Arbeitspunkt zum Punkt (3 ). Ein Wiedereinschalten des MPP-Trackers bewirkt, dass sich das globale Maximum (4 ) einstellt. - Dadurch wird das größte Leistungsmaximum erreicht.
-
5 veranschaulicht ein Ablaufdiagramm zur Detektion eines linksseitigen Maximums. Ausgangspunkt ist der Arbeitspunkt (1 ) gemäß (1 ) bzw. gemäß3 . Im Schritt10 wird das MPP-Tracking deaktiviert. Es wird also auf Netzstromregelung „Ikonst-Betrieb" umgestellt. Zuvor werden die Wertepaare für die PV-Spannung UDC und den Netzstrom IAC gespeichert (Schritt9 ). Im Schritt20 wird der Netzstrom bzw. der AC-Strom (des Wechselrichters) erhöht, so dass sich beispielsweise gemäß1 der Arbeitspunkt von (1 ) nach (2 ) bewegen kann. Nach einer Pause (Schritt30 ) wird geprüft, ob der sich einstellende neue Arbeitspunkt im Nahbereich des alten Arbeitspunktes liegt (Abfrage50 ). Stellt sich ein stabiler Arbeitspunkt ein, dann gilt z.B. eine Kennlinie nach1 (Schritt60 ). Wird aber kein stabiler Arbeitspunkt erreicht, dann bricht die Spannung zusammen und ein Fall gemäß3 ist gegeben. Dieser wird erkannt, indem die Spannung UDCmin erreicht wird (Abfrage60 ). Wenn kein neuer stabiler Arbeitspunkt gemäß1 sich einstellt, dann besteht eine Instabilität und die Spannung erreicht die DC-Unterspannungsgrenze. Dieser Vorgang läuft sehr schnell ab, da der Arbeitspunkt den instabilen Bereich überschreitet. - Liegt der neue Arbeitspunkt oberhalb der DC-Unterspannungsgrenze so wurde ein neues Maximum detektiert und der Spannungswert wird gespeichert (Schritt
71 ) und ein Zähler inkrementiert. Mit Hilfe einer Abfrage im Schritt130 kann die Anzahl der zu suchenden Maxima begrenzt werden. - Liegt der neue Arbeitspunkt weit rechts des Maximums (
3 ), so führt die nächste Stromerhöhung (Schritt20 ) nicht zu einer weiteren Instabilität, was durch die Abfrage (Schritt50 ) erkannt wird. Der Zyklus (Schritt20 ,30 ,40 ,50 ) setzt sich so lange fort bis das Maximum (3 ) überschritten wird. - Mit dem erfindungsgemäßen Verfahren wird der Arbeitspunkt (
1 ) gemäß3 beibehalten. Nach der erfindungsgemäßen Stromerhöhung (Schritt20 ) wird kein weiterer stabiler Arbeitspunkt gefunden. Die Spannung sinkt rasch bis auf die unterste Spannungsgrenze ab, was durch die Abfrage im Schritt60 erkannt wird. Ist dies der Fall, dann muss das System durch Sperren des Wechselrichters (Schritt90 ) entlastet werden. Dadurch steigt die DC-Spannung nun rasch wieder an. Erreicht die PV-Spannung den zuletzt gespeicherten Spannungswert, wird die Spannungsregelung wieder zugeschaltet und das MPP-Tracking aktiviert. - Wird die linksseitige Suche durch den Zähler (
130 ) abgebrochen, dann wird der letzte gespeicherte stabile PV-Spannungswert (40 ) als Sollwert für die Spannungsregelung (110 ) vorgegeben, die zusammen mit dem MPP-Tracking aktiviert wird. Das System spielt sich auf das globale Maximum (1 ) der Generatorkennlinie (Schritt120 ) ein. - Weiterhin kann auch eine linkseitige Suche wie folgt beschrieben werden.
- Zunächst werden aktuelle Messwerte für die DC-Spannung und den AC- Strom (IAC) gemäß
7 mittels Abtastglieder bzw. einer ersten S&H-Stufe (Sample & Hold) für IAC und einer zweiten S&H-Stufe für UDC gespeichert. Dies entspricht Schritt09 . Anschließend wird der Regelkreis auf einen Konstantbetrieb beispielsweise mittels eines Schalters umgeschaltet (Schritt10 ). Der Sollwert für die Leistung wird erhöht. Hierzu wird in der ersten S&H-Stufe (IAC) mit einem Faktor größer Eins multipliziert und an den Stromregler übergeben (Schritt20 ). Nach einer Pause wird überprüft, ob die DC-Spannung am Generator unter die minimal zugelassene Grenze abgefallen ist. Dieser Vorgang läuft sehr schnell ab, da die DC-Spannungsregelung und der MPP-Tracker nicht mehr aktiv sind und so die DC-Spannung nicht mehr stabil gehalten werden kann. Mit Hilfe der S&H-Stufen, einem Proportionalglied (0,9 < K < 1), einer Summationsstelle und einem Komparator (nicht gezeigt) wird festgestellt, ob sich der neue Arbeitspunkt in der Nähe des alten Arbeitspunktes befindet (Schritt50 ). Ist dies nicht der Fall, liegt der neue Arbeitspunkt im Nahbereich eines lokalen oder globalen Maximums, das größer ist als das lokale Maximum, auf dem sich der Arbeitspunkt zuvor befand und der Komparatorausgang inkrementiert einen nicht dargestellten Zähler (MPP links). Falls die Anzahl der suchenden linksseitigen Maxima begrenzt wird, d.h. der maximale Zählerstand des Zählers „MPP links" ist erreicht, wird der in der zweiten S&H-Stufe (UDC) gespeicherter Wert durch Umschalten des Schalters an die Spannungsregelung und an den MPP-Tracker übergeben. Durch einen weiteren Umschaltvorgang des Schalters wird dann der Regelkreis wieder hergestellt. In dieser Schaltung kann jeder Arbeitspunkt auf der Generatorkennlinie stabil eingestellt werden. - In den Schritten gemäß
5 wird also Folgendes durchgeführt: - Schritt
9 : Erste und zweite S&H-Stufe (IAC, UDC) werden aktiviert. - Schritt
10 : Schalter befindet sich in einer Schalterstellung „B". - Schritt
40 : Zweite S&H-Stufe (UDC) wird aktiviert. - Schritt
20 : Netzstrom IAC wird erhöht bzw. der Wert der ersten S&H- - Stufe (IAC) wird mit z.B. K = 1,05 multipliziert.
- Schritt
50 : Der Wert, der in der zweiten S&H-Stufe (UDC) gespeichert ist, wird durch den Komparator verglichen. - Schritt
71 : Die zweite S&H-Stufe wird aktiviert. - Schritt
100 : Der Schalter wird umgeschaltet (z.B. Schalterstellung „A"). - Schritt
110 : Der Schalter wird zu einer dritten Stellung umgeschaltet (z.B. Schalterstellung „F") -
6 veranschaulicht die Detektion eines rechtsseitigen Maximums gemäß2 und4 . Auch hier wird das MPP-Tracking und die Spannungsregelung zunächst deaktiviert, damit der stabile Arbeitspunkt (1 ) verlassen werden kann. Es wird auch hier auf Netzstromregelung „Ikonst" umgestellt, jedoch ist der Strom geringer, insbesondere 0–0,4 IAC. Zuvor werden die Wertepaare für die PV-Spannung UDC und den Netzstrom IAC gespeichert. Wie2 veranschaulicht, erreicht der Generator den Leerlaufpunkt (2 ), wenn ein kleiner Strom nahe Null vorgegeben wird. Im Schritt50 wird der Generator wieder belastet, so dass sich im Fall der2 der Arbeitspunkt (1 ) wieder einstellt. - Damit ist kein weiteres Maximum vorhanden und die rechtsseitige Suche wird abgebrochen.
- Andernfalls wird im stromgeregelten Betrieb das System mit nahezu dem im Arbeitspunkt (
1 ) gemessenen Strom belastet (Schritt50 ). Wird ein Maximum gefunden, welches größer als das alte lokale Maximum ist, wird der Zähler gesetzt (Schritt110 ) und die Spannungsregelung bzw. das MPPT wird aktiviert (Schritt100 ). Wenn sich ein neuer Arbeitspunkt nahe dem alten Arbeitspunkt (1 ) einstellt, dann ist rechtsseitig kein weiteres Maximum vorhanden, und der Zähler wird zurückgesetzt. - Weiterhin kann auch eine rechtsseitige Suche bezugnehmend auf
6 wie folgt beschrieben werden. - Der MPP-Tracker befindet sich zunächst in einem lokalen oder globalen Maximum. Anschließend wird eine Instabilität erzeugt. Aktuelle Messwerte für die DC-Spannung (UDC) und den AC-Strom (IAC) werden ebenfalls in den Abtasthaltegliedern bzw. S&H-Stufen für IAC und IDC gespeichert (Schritt
10 , MPPSuche „rechts"). Nun wird der Regelkreis auf Konstantstrombetrieb mittels eines Schalters umgeschaltet. Der Sollwert für die Leistung wird nun deutlich gesenkt. Hierzu wird der in der S&H-Stufe für IAC gespeicherte Wert mit einem Faktor nahe Null multipliziert und an einen Stromregler übergeben (Schritt20 ). Falls der Faktor K2 = 0 gewählt wird, kann im folgenden die Leerlaufspannung gespeichert werden. - Der Sollwert für die Leistung wird nun in etwa auf den alten Wert gebracht. Hierzu wird der in der S&H-Stufe gespeicherte Wert mit einem Faktor nahe Eins multipliziert und an den Stromregler übergeben (Schritt
50 ). - Nach einer weiteren Pause wird überprüft, ob die sich einstellende neue DCSpannung am Generator sich weit vom alten Arbeitspunkt entfernt hat. Befindet sich der neue Spannungswert im Nahbereich des alten Spannungswertes, so gibt es kein weiteres rechtsseitiges Maximum, das größer ist als das zuvor gefundene alte Maximum. Dies wird mit Hilfe einer Schaltungskombination aus der S&H Stufe für UDC, einem nicht dargestellten Proportionalglied mit einem Proportionalbeiwert 0,9 < K < 1,1, einer Summationsstelle und einem Komparator erkannt (Schritt
70 ) im Flussdiagramm gemäß6 MPP-Suche "rechts"). - Andernfalls, d.h. der neue Arbeitspunkt befindet sich nicht im Nahbereich des alten Arbeitspunktes, ergibt sich ein neuer Arbeitspunkt im Nahbereich eines neuen Leistungsmaximums, das größer ist als das zuvor. Dies wird mit Hilfe der Kombination aus der S&H Stufe, dem Proportionalglied mit dem Proportionalbeiwert 0,9 < K5 < 1,1, der Summationsstelle und dem Komparator erkannt (vgl. Schritt
70 im Flussdiagramm MPP-Suche „rechts",6 ). Der Komparatorausgang inkrementiert einen Zähler „MPP-rechts" (vgl. Schritt110 ). Abschließend wird der Schalter umgeschaltet und der neue Spannungswert an die Spannungsregelung und den MPP-Tracker übergeben. Der ursprüngliche Regelkreis wird durch Umschalten in eine andere Schalterstellung wieder hergestellt. In dieser Schalterstellung kann jeder Arbeitspunkt der Generatorkennlinie stabil eingestellt werden. -
8 zeigt eine Variante, bei der eine MPP-Suche „rechts" und eine MPP-Suche „links" mit einer einzigen Regelungsstruktur realisiert ist.
Claims (7)
- Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators, bei dem eine MPP-Regelung eines Stromrichters eingesetzt wird, mit der eine maximale Generatorleistung bei einem Arbeitspunkt der Generatorkennlinie eingestellt wird, dadurch gekennzeichnet, dass die MPP-Regelung abgeschaltet wird, um den Generator anschließend zu be- und/oder entlasten und dass die MPP-Regelung anschließend wieder eingeschaltet wird, um den Arbeitspunkt der Generatorkennlinie von einem stabilen Zustand in einen instabilen Zustand oder umgekehrt zu überführen.
- Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters erhöht wird, so dass ein erster zu einem lokalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der zwischen dem ersten Arbeitspunkt und einem dritten Arbeitspunkt liegt sowie in Nähe des dritten Arbeitspunktes liegt, wobei der dritte Arbeitspunkt ein globales Maximum ist.
- Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters erhöht wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe des Nullpunktes der Kennlinie liegt.
- Verfahren nach Anspruch 3, dadurch gekennzeichnet, dass bei Unterschreiten einer Spannungsgrenze der Generator wieder entlastet wird.
- Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt.
- Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem lokalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt, wobei sich ein dritter Arbeitspunkt nach Erhöhen des Stromes einstellt, der in der Höhe des ersten Arbeitspunktes liegt und in Nähe eines vierten Arbeitspunktes liegt, der ein globales Maximum ist.
- Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Generatorspannung gespeichert wird.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102005032864A DE102005032864B4 (de) | 2005-07-14 | 2005-07-14 | Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators |
EP06009916.5A EP1750193B1 (de) | 2005-07-14 | 2006-05-13 | Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators |
US11/484,407 US7471073B2 (en) | 2005-07-14 | 2006-07-11 | Method of finding a maximum power of a photovoltaic generator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102005032864A DE102005032864B4 (de) | 2005-07-14 | 2005-07-14 | Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102005032864A1 true DE102005032864A1 (de) | 2007-01-25 |
DE102005032864B4 DE102005032864B4 (de) | 2011-04-14 |
Family
ID=36942414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102005032864A Expired - Fee Related DE102005032864B4 (de) | 2005-07-14 | 2005-07-14 | Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators |
Country Status (3)
Country | Link |
---|---|
US (1) | US7471073B2 (de) |
EP (1) | EP1750193B1 (de) |
DE (1) | DE102005032864B4 (de) |
Cited By (54)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102008022582A1 (de) | 2008-05-07 | 2009-11-12 | Bayerische Motoren Werke Aktiengesellschaft | Elektrisches Energiebordnetz für ein Kraftfahrzeug |
DE102010060784A1 (de) | 2010-11-24 | 2012-05-24 | Tim Frey | Hyperadapter |
DE102013104940A1 (de) | 2013-05-14 | 2014-11-20 | Norbert Danneberg | Wandlerschaltung |
US9088178B2 (en) | 2006-12-06 | 2015-07-21 | Solaredge Technologies Ltd | Distributed power harvesting systems using DC power sources |
US9112379B2 (en) | 2006-12-06 | 2015-08-18 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US9130401B2 (en) | 2006-12-06 | 2015-09-08 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9235228B2 (en) | 2012-03-05 | 2016-01-12 | Solaredge Technologies Ltd. | Direct current link circuit |
US9291696B2 (en) | 2007-12-05 | 2016-03-22 | Solaredge Technologies Ltd. | Photovoltaic system power tracking method |
US9318974B2 (en) | 2014-03-26 | 2016-04-19 | Solaredge Technologies Ltd. | Multi-level inverter with flying capacitor topology |
US9362743B2 (en) | 2008-05-05 | 2016-06-07 | Solaredge Technologies Ltd. | Direct current power combiner |
US9368964B2 (en) | 2006-12-06 | 2016-06-14 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US9401599B2 (en) | 2010-12-09 | 2016-07-26 | Solaredge Technologies Ltd. | Disconnection of a string carrying direct current power |
US9407161B2 (en) | 2007-12-05 | 2016-08-02 | Solaredge Technologies Ltd. | Parallel connected inverters |
US9537445B2 (en) | 2008-12-04 | 2017-01-03 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US9543889B2 (en) | 2006-12-06 | 2017-01-10 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9548619B2 (en) | 2013-03-14 | 2017-01-17 | Solaredge Technologies Ltd. | Method and apparatus for storing and depleting energy |
US9590526B2 (en) | 2006-12-06 | 2017-03-07 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
DE102015116455A1 (de) | 2015-09-29 | 2017-03-30 | Endress+Hauser Flowtec Ag | Energieversorgung von Messgeräten aus leistungsinstabilen Energiequellen |
US9647442B2 (en) | 2010-11-09 | 2017-05-09 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US9644993B2 (en) | 2006-12-06 | 2017-05-09 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
CN106774612A (zh) * | 2017-03-01 | 2017-05-31 | 电子科技大学 | 局部阴影下基于梯度法极值搜索的光伏最大功率跟踪方法 |
US9673711B2 (en) | 2007-08-06 | 2017-06-06 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US9680304B2 (en) | 2006-12-06 | 2017-06-13 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US9812984B2 (en) | 2012-01-30 | 2017-11-07 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US9819178B2 (en) | 2013-03-15 | 2017-11-14 | Solaredge Technologies Ltd. | Bypass mechanism |
US9831824B2 (en) | 2007-12-05 | 2017-11-28 | SolareEdge Technologies Ltd. | Current sensing on a MOSFET |
US9853538B2 (en) | 2007-12-04 | 2017-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9853565B2 (en) | 2012-01-30 | 2017-12-26 | Solaredge Technologies Ltd. | Maximized power in a photovoltaic distributed power system |
US9866098B2 (en) | 2011-01-12 | 2018-01-09 | Solaredge Technologies Ltd. | Serially connected inverters |
US9869701B2 (en) | 2009-05-26 | 2018-01-16 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US9876430B2 (en) | 2008-03-24 | 2018-01-23 | Solaredge Technologies Ltd. | Zero voltage switching |
US9923516B2 (en) | 2012-01-30 | 2018-03-20 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US9941813B2 (en) | 2013-03-14 | 2018-04-10 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US9960667B2 (en) | 2006-12-06 | 2018-05-01 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US9966766B2 (en) | 2006-12-06 | 2018-05-08 | Solaredge Technologies Ltd. | Battery power delivery module |
US10115841B2 (en) | 2012-06-04 | 2018-10-30 | Solaredge Technologies Ltd. | Integrated photovoltaic panel circuitry |
US10230310B2 (en) | 2016-04-05 | 2019-03-12 | Solaredge Technologies Ltd | Safety switch for photovoltaic systems |
US10396662B2 (en) | 2011-09-12 | 2019-08-27 | Solaredge Technologies Ltd | Direct current link circuit |
US10673222B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10673229B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
CN111949065A (zh) * | 2020-08-25 | 2020-11-17 | 深圳市英威腾电气股份有限公司 | 一种光伏水泵系统及其功率调控方法、装置、设备及介质 |
US10931119B2 (en) | 2012-01-11 | 2021-02-23 | Solaredge Technologies Ltd. | Photovoltaic module |
US11018623B2 (en) | 2016-04-05 | 2021-05-25 | Solaredge Technologies Ltd. | Safety switch for photovoltaic systems |
US11177663B2 (en) | 2016-04-05 | 2021-11-16 | Solaredge Technologies Ltd. | Chain of power devices |
US11264947B2 (en) | 2007-12-05 | 2022-03-01 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US11296650B2 (en) | 2006-12-06 | 2022-04-05 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US11309832B2 (en) | 2006-12-06 | 2022-04-19 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11569659B2 (en) | 2006-12-06 | 2023-01-31 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11687112B2 (en) | 2006-12-06 | 2023-06-27 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11728768B2 (en) | 2006-12-06 | 2023-08-15 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US11735910B2 (en) | 2006-12-06 | 2023-08-22 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11855231B2 (en) | 2006-12-06 | 2023-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11881814B2 (en) | 2005-12-05 | 2024-01-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US11888387B2 (en) | 2006-12-06 | 2024-01-30 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7288921B2 (en) * | 2004-06-25 | 2007-10-30 | Emerson Process Management Power & Water Solutions, Inc. | Method and apparatus for providing economic analysis of power generation and distribution |
EP2212983B1 (de) | 2007-10-15 | 2021-04-07 | Ampt, Llc | Systeme für hocheffiziente solarenergie |
WO2009055474A1 (en) | 2007-10-23 | 2009-04-30 | And, Llc | High reliability power systems and solar power converters |
US10512769B2 (en) * | 2009-03-20 | 2019-12-24 | Electrocore, Inc. | Non-invasive magnetic or electrical nerve stimulation to treat or prevent autism spectrum disorders and other disorders of psychological development |
US9442504B2 (en) | 2009-04-17 | 2016-09-13 | Ampt, Llc | Methods and apparatus for adaptive operation of solar power systems |
WO2011049985A1 (en) | 2009-10-19 | 2011-04-28 | Ampt, Llc | Novel solar panel string converter topology |
US7990743B2 (en) * | 2009-10-20 | 2011-08-02 | General Electric Company | System and method for decreasing solar collector system losses |
US7855906B2 (en) * | 2009-10-26 | 2010-12-21 | General Electric Company | DC bus voltage control for two stage solar converter |
US20110184583A1 (en) * | 2010-01-22 | 2011-07-28 | General Electric Company | Model-based power estimation of photovoltaic power generation system |
DE102010000350B4 (de) | 2010-02-10 | 2023-10-05 | Adkor Gmbh | Energieversorgungssystem mit regenerativer Stromquelle und Verfahren zum Betrieb eines Energieversorgungssystems |
US8050062B2 (en) * | 2010-02-24 | 2011-11-01 | General Electric Company | Method and system to allow for high DC source voltage with lower DC link voltage in a two stage power converter |
US8922061B2 (en) * | 2010-03-22 | 2014-12-30 | Tigo Energy, Inc. | Systems and methods for detecting and correcting a suboptimal operation of one or more inverters in a multi-inverter system |
US9502904B2 (en) | 2010-03-23 | 2016-11-22 | Eaton Corporation | Power conversion system and method providing maximum efficiency of power conversion for a photovoltaic system, and photovoltaic system employing a photovoltaic array and an energy storage device |
US9312399B2 (en) | 2010-04-02 | 2016-04-12 | Tigo Energy, Inc. | Systems and methods for mapping the connectivity topology of local management units in photovoltaic arrays |
EP2390751B1 (de) * | 2010-05-28 | 2013-09-04 | Nxp B.V. | Verfahren zur Verfolgung des maximalen Leistungspunkts, Fotovoltaiksystemsteuerung und Fotovoltaiksystem |
CN102315794B (zh) * | 2010-07-02 | 2013-12-11 | 扬光绿能股份有限公司 | 控制太阳能发电系统的方法 |
JP5928736B2 (ja) * | 2010-08-31 | 2016-06-01 | エスエムエー ソーラー テクノロジー アーゲー | Acモジュール接続用acインターフェースを備えたインバータ |
DE102011110677A1 (de) | 2011-08-19 | 2012-10-11 | Tobias Gädeke | Vorrichtung und Verfahren zur energieoptimierten Ankopplung von Solarzellen an einen Energiespeicher |
CN102566646A (zh) * | 2012-01-13 | 2012-07-11 | 冶金自动化研究设计院 | 一种光伏系统局部遮荫条件下的最大功率点跟踪方法 |
CN102624285B (zh) * | 2012-03-23 | 2014-12-03 | 浙江工业大学 | 光伏阵列最大功率点跟踪控制方法 |
US9397497B2 (en) | 2013-03-15 | 2016-07-19 | Ampt, Llc | High efficiency interleaved solar power supply system |
CN106771561B (zh) * | 2016-12-13 | 2019-08-13 | 国家电网公司 | 高压避雷线取电最大功率点检测系统 |
EP3852145A1 (de) | 2020-01-15 | 2021-07-21 | Siemens Aktiengesellschaft | Abkoppelung einer perowskit-solarzelle bei dunkelheit |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4325436C2 (de) * | 1993-07-29 | 2000-06-29 | Inst Luft & Kaeltetechnik Ggmbh | Schaltungsanordnung zur MPP-Regelung photovoltaischer Solaranlagen und Schaltungsanordnung zur Durchführung des Verfahrens |
DE19904561C1 (de) * | 1999-02-04 | 2000-08-24 | Rossendorf Forschzent | Verfahren und Schaltungsanordnung zur Maximum-Power-Point-Steuerung von Solargeneratoren |
DE19909609C1 (de) * | 1999-03-05 | 2000-09-21 | Thomas Wunram | Verfahren und Vorrichtung zur Ermittlung der Kennlinie und des Punktes maximaler Energieausbeute von Gleichstromquellen |
DE10060108A1 (de) * | 2000-11-27 | 2002-06-27 | Univ Dresden Tech | Verfahren zur Einstellung des Punktes maximaler Leistung eines Solargenerators einer photovoltaischen Solaranlage |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4794272A (en) * | 1987-01-20 | 1988-12-27 | The Aerospace Corporation | Power regulator utilizing only battery current monitoring |
JPH07225624A (ja) * | 1994-02-15 | 1995-08-22 | Kansai Electric Power Co Inc:The | 太陽光発電システムの最大電力出力制御方法 |
US6316925B1 (en) * | 1994-12-16 | 2001-11-13 | Space Systems/Loral, Inc. | Solar array peak power tracker |
JP3554116B2 (ja) * | 1996-09-06 | 2004-08-18 | キヤノン株式会社 | 電力制御装置及びそれを用いた太陽光発電システム |
JP3732944B2 (ja) * | 1998-03-30 | 2006-01-11 | 三洋電機株式会社 | 太陽光発電装置 |
CN1161678C (zh) * | 1998-03-30 | 2004-08-11 | 三洋电机株式会社 | 太阳能发电装置 |
JP3394996B2 (ja) * | 2001-03-09 | 2003-04-07 | 独立行政法人産業技術総合研究所 | 最大電力動作点追尾方法及びその装置 |
US7091707B2 (en) * | 2003-09-29 | 2006-08-15 | Xantrex Technology, Inc. | Method and apparatus for controlling power drawn from an energy converter |
-
2005
- 2005-07-14 DE DE102005032864A patent/DE102005032864B4/de not_active Expired - Fee Related
-
2006
- 2006-05-13 EP EP06009916.5A patent/EP1750193B1/de active Active
- 2006-07-11 US US11/484,407 patent/US7471073B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4325436C2 (de) * | 1993-07-29 | 2000-06-29 | Inst Luft & Kaeltetechnik Ggmbh | Schaltungsanordnung zur MPP-Regelung photovoltaischer Solaranlagen und Schaltungsanordnung zur Durchführung des Verfahrens |
DE19904561C1 (de) * | 1999-02-04 | 2000-08-24 | Rossendorf Forschzent | Verfahren und Schaltungsanordnung zur Maximum-Power-Point-Steuerung von Solargeneratoren |
DE19909609C1 (de) * | 1999-03-05 | 2000-09-21 | Thomas Wunram | Verfahren und Vorrichtung zur Ermittlung der Kennlinie und des Punktes maximaler Energieausbeute von Gleichstromquellen |
DE10060108A1 (de) * | 2000-11-27 | 2002-06-27 | Univ Dresden Tech | Verfahren zur Einstellung des Punktes maximaler Leistung eines Solargenerators einer photovoltaischen Solaranlage |
Non-Patent Citations (3)
Title |
---|
K.Kobayashi u.a.: A Study on a Two Stage Maximum Power Point-Tracking Control of a Photovoltaic System under Partially Shaded Insolation Conditi- ons. In: IEEE Power Engineering Society General Meeting, Vol.4, S.2613-2617, Juli 2003 * |
M.Miyatake u.a.: Response of Fibonaccisearch-based Maximum Power Point Tracker when a Photovoltaic Array is Parially Shaded. In: Proceeding Power and Energy Systems, EuroPES 2003, ISBN: 0-88986-366-5, September 2003 |
M.Miyatake u.a.: Response of Fibonaccisearch-basedMaximum Power Point Tracker when a Photovoltaic Array is Parially Shaded. In: Proceeding Power andEnergy Systems, EuroPES 2003, ISBN: 0-88986-366-5,September 2003 * |
Cited By (126)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11881814B2 (en) | 2005-12-05 | 2024-01-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US11594881B2 (en) | 2006-12-06 | 2023-02-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9543889B2 (en) | 2006-12-06 | 2017-01-10 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9088178B2 (en) | 2006-12-06 | 2015-07-21 | Solaredge Technologies Ltd | Distributed power harvesting systems using DC power sources |
US9112379B2 (en) | 2006-12-06 | 2015-08-18 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US9130401B2 (en) | 2006-12-06 | 2015-09-08 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11031861B2 (en) | 2006-12-06 | 2021-06-08 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US11043820B2 (en) | 2006-12-06 | 2021-06-22 | Solaredge Technologies Ltd. | Battery power delivery module |
US11888387B2 (en) | 2006-12-06 | 2024-01-30 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11063440B2 (en) | 2006-12-06 | 2021-07-13 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US9368964B2 (en) | 2006-12-06 | 2016-06-14 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11962243B2 (en) | 2006-12-06 | 2024-04-16 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US11073543B2 (en) | 2006-12-06 | 2021-07-27 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US11183922B2 (en) | 2006-12-06 | 2021-11-23 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11002774B2 (en) | 2006-12-06 | 2021-05-11 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US11855231B2 (en) | 2006-12-06 | 2023-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9590526B2 (en) | 2006-12-06 | 2017-03-07 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11735910B2 (en) | 2006-12-06 | 2023-08-22 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11728768B2 (en) | 2006-12-06 | 2023-08-15 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US10673253B2 (en) | 2006-12-06 | 2020-06-02 | Solaredge Technologies Ltd. | Battery power delivery module |
US9644993B2 (en) | 2006-12-06 | 2017-05-09 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US11687112B2 (en) | 2006-12-06 | 2023-06-27 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11296650B2 (en) | 2006-12-06 | 2022-04-05 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US9680304B2 (en) | 2006-12-06 | 2017-06-13 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US11682918B2 (en) | 2006-12-06 | 2023-06-20 | Solaredge Technologies Ltd. | Battery power delivery module |
US11309832B2 (en) | 2006-12-06 | 2022-04-19 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10637393B2 (en) | 2006-12-06 | 2020-04-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9853490B2 (en) | 2006-12-06 | 2017-12-26 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11476799B2 (en) | 2006-12-06 | 2022-10-18 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11598652B2 (en) | 2006-12-06 | 2023-03-07 | Solaredge Technologies Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US11594882B2 (en) | 2006-12-06 | 2023-02-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10447150B2 (en) | 2006-12-06 | 2019-10-15 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11569659B2 (en) | 2006-12-06 | 2023-01-31 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11579235B2 (en) | 2006-12-06 | 2023-02-14 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11961922B2 (en) | 2006-12-06 | 2024-04-16 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11658482B2 (en) | 2006-12-06 | 2023-05-23 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9948233B2 (en) | 2006-12-06 | 2018-04-17 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9960731B2 (en) | 2006-12-06 | 2018-05-01 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US9960667B2 (en) | 2006-12-06 | 2018-05-01 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US9966766B2 (en) | 2006-12-06 | 2018-05-08 | Solaredge Technologies Ltd. | Battery power delivery module |
US11569660B2 (en) | 2006-12-06 | 2023-01-31 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11594880B2 (en) | 2006-12-06 | 2023-02-28 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10097007B2 (en) | 2006-12-06 | 2018-10-09 | Solaredge Technologies Ltd. | Method for distributed power harvesting using DC power sources |
US11575261B2 (en) | 2006-12-06 | 2023-02-07 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11575260B2 (en) | 2006-12-06 | 2023-02-07 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US10230245B2 (en) | 2006-12-06 | 2019-03-12 | Solaredge Technologies Ltd | Battery power delivery module |
US10116217B2 (en) | 2007-08-06 | 2018-10-30 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US11594968B2 (en) | 2007-08-06 | 2023-02-28 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US9673711B2 (en) | 2007-08-06 | 2017-06-06 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US10516336B2 (en) | 2007-08-06 | 2019-12-24 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US9853538B2 (en) | 2007-12-04 | 2017-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9291696B2 (en) | 2007-12-05 | 2016-03-22 | Solaredge Technologies Ltd. | Photovoltaic system power tracking method |
US11183969B2 (en) | 2007-12-05 | 2021-11-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US10644589B2 (en) | 2007-12-05 | 2020-05-05 | Solaredge Technologies Ltd. | Parallel connected inverters |
US9831824B2 (en) | 2007-12-05 | 2017-11-28 | SolareEdge Technologies Ltd. | Current sensing on a MOSFET |
US11894806B2 (en) | 2007-12-05 | 2024-02-06 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US9407161B2 (en) | 2007-12-05 | 2016-08-02 | Solaredge Technologies Ltd. | Parallel connected inverters |
US11693080B2 (en) | 2007-12-05 | 2023-07-04 | Solaredge Technologies Ltd. | Parallel connected inverters |
US9979280B2 (en) | 2007-12-05 | 2018-05-22 | Solaredge Technologies Ltd. | Parallel connected inverters |
US11264947B2 (en) | 2007-12-05 | 2022-03-01 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US10693415B2 (en) | 2007-12-05 | 2020-06-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US11183923B2 (en) | 2007-12-05 | 2021-11-23 | Solaredge Technologies Ltd. | Parallel connected inverters |
US9876430B2 (en) | 2008-03-24 | 2018-01-23 | Solaredge Technologies Ltd. | Zero voltage switching |
US10468878B2 (en) | 2008-05-05 | 2019-11-05 | Solaredge Technologies Ltd. | Direct current power combiner |
US9362743B2 (en) | 2008-05-05 | 2016-06-07 | Solaredge Technologies Ltd. | Direct current power combiner |
US11424616B2 (en) | 2008-05-05 | 2022-08-23 | Solaredge Technologies Ltd. | Direct current power combiner |
DE102008022582A1 (de) | 2008-05-07 | 2009-11-12 | Bayerische Motoren Werke Aktiengesellschaft | Elektrisches Energiebordnetz für ein Kraftfahrzeug |
US9537445B2 (en) | 2008-12-04 | 2017-01-03 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US10461687B2 (en) | 2008-12-04 | 2019-10-29 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US9869701B2 (en) | 2009-05-26 | 2018-01-16 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US10969412B2 (en) | 2009-05-26 | 2021-04-06 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US11867729B2 (en) | 2009-05-26 | 2024-01-09 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US9647442B2 (en) | 2010-11-09 | 2017-05-09 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US11489330B2 (en) | 2010-11-09 | 2022-11-01 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10931228B2 (en) | 2010-11-09 | 2021-02-23 | Solaredge Technologies Ftd. | Arc detection and prevention in a power generation system |
US11070051B2 (en) | 2010-11-09 | 2021-07-20 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10673229B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10673222B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US11349432B2 (en) | 2010-11-09 | 2022-05-31 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
DE102010060784A1 (de) | 2010-11-24 | 2012-05-24 | Tim Frey | Hyperadapter |
US9401599B2 (en) | 2010-12-09 | 2016-07-26 | Solaredge Technologies Ltd. | Disconnection of a string carrying direct current power |
US9935458B2 (en) | 2010-12-09 | 2018-04-03 | Solaredge Technologies Ltd. | Disconnection of a string carrying direct current power |
US11271394B2 (en) | 2010-12-09 | 2022-03-08 | Solaredge Technologies Ltd. | Disconnection of a string carrying direct current power |
US9866098B2 (en) | 2011-01-12 | 2018-01-09 | Solaredge Technologies Ltd. | Serially connected inverters |
US11205946B2 (en) | 2011-01-12 | 2021-12-21 | Solaredge Technologies Ltd. | Serially connected inverters |
US10666125B2 (en) | 2011-01-12 | 2020-05-26 | Solaredge Technologies Ltd. | Serially connected inverters |
US10396662B2 (en) | 2011-09-12 | 2019-08-27 | Solaredge Technologies Ltd | Direct current link circuit |
US10931119B2 (en) | 2012-01-11 | 2021-02-23 | Solaredge Technologies Ltd. | Photovoltaic module |
US10381977B2 (en) | 2012-01-30 | 2019-08-13 | Solaredge Technologies Ltd | Photovoltaic panel circuitry |
US11620885B2 (en) | 2012-01-30 | 2023-04-04 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US11929620B2 (en) | 2012-01-30 | 2024-03-12 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US9812984B2 (en) | 2012-01-30 | 2017-11-07 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US9853565B2 (en) | 2012-01-30 | 2017-12-26 | Solaredge Technologies Ltd. | Maximized power in a photovoltaic distributed power system |
US9923516B2 (en) | 2012-01-30 | 2018-03-20 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US10608553B2 (en) | 2012-01-30 | 2020-03-31 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US10992238B2 (en) | 2012-01-30 | 2021-04-27 | Solaredge Technologies Ltd. | Maximizing power in a photovoltaic distributed power system |
US11183968B2 (en) | 2012-01-30 | 2021-11-23 | Solaredge Technologies Ltd. | Photovoltaic panel circuitry |
US9639106B2 (en) | 2012-03-05 | 2017-05-02 | Solaredge Technologies Ltd. | Direct current link circuit |
US9235228B2 (en) | 2012-03-05 | 2016-01-12 | Solaredge Technologies Ltd. | Direct current link circuit |
US10007288B2 (en) | 2012-03-05 | 2018-06-26 | Solaredge Technologies Ltd. | Direct current link circuit |
US10115841B2 (en) | 2012-06-04 | 2018-10-30 | Solaredge Technologies Ltd. | Integrated photovoltaic panel circuitry |
US11177768B2 (en) | 2012-06-04 | 2021-11-16 | Solaredge Technologies Ltd. | Integrated photovoltaic panel circuitry |
US10778025B2 (en) | 2013-03-14 | 2020-09-15 | Solaredge Technologies Ltd. | Method and apparatus for storing and depleting energy |
US9941813B2 (en) | 2013-03-14 | 2018-04-10 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US11545912B2 (en) | 2013-03-14 | 2023-01-03 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US9548619B2 (en) | 2013-03-14 | 2017-01-17 | Solaredge Technologies Ltd. | Method and apparatus for storing and depleting energy |
US11742777B2 (en) | 2013-03-14 | 2023-08-29 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US10651647B2 (en) | 2013-03-15 | 2020-05-12 | Solaredge Technologies Ltd. | Bypass mechanism |
US11424617B2 (en) | 2013-03-15 | 2022-08-23 | Solaredge Technologies Ltd. | Bypass mechanism |
US9819178B2 (en) | 2013-03-15 | 2017-11-14 | Solaredge Technologies Ltd. | Bypass mechanism |
DE102013104940A1 (de) | 2013-05-14 | 2014-11-20 | Norbert Danneberg | Wandlerschaltung |
US10886831B2 (en) | 2014-03-26 | 2021-01-05 | Solaredge Technologies Ltd. | Multi-level inverter |
US11296590B2 (en) | 2014-03-26 | 2022-04-05 | Solaredge Technologies Ltd. | Multi-level inverter |
US11855552B2 (en) | 2014-03-26 | 2023-12-26 | Solaredge Technologies Ltd. | Multi-level inverter |
US10886832B2 (en) | 2014-03-26 | 2021-01-05 | Solaredge Technologies Ltd. | Multi-level inverter |
US11632058B2 (en) | 2014-03-26 | 2023-04-18 | Solaredge Technologies Ltd. | Multi-level inverter |
US9318974B2 (en) | 2014-03-26 | 2016-04-19 | Solaredge Technologies Ltd. | Multi-level inverter with flying capacitor topology |
DE102015116455A1 (de) | 2015-09-29 | 2017-03-30 | Endress+Hauser Flowtec Ag | Energieversorgung von Messgeräten aus leistungsinstabilen Energiequellen |
US11201476B2 (en) | 2016-04-05 | 2021-12-14 | Solaredge Technologies Ltd. | Photovoltaic power device and wiring |
US11177663B2 (en) | 2016-04-05 | 2021-11-16 | Solaredge Technologies Ltd. | Chain of power devices |
US11018623B2 (en) | 2016-04-05 | 2021-05-25 | Solaredge Technologies Ltd. | Safety switch for photovoltaic systems |
US11870250B2 (en) | 2016-04-05 | 2024-01-09 | Solaredge Technologies Ltd. | Chain of power devices |
US10230310B2 (en) | 2016-04-05 | 2019-03-12 | Solaredge Technologies Ltd | Safety switch for photovoltaic systems |
CN106774612A (zh) * | 2017-03-01 | 2017-05-31 | 电子科技大学 | 局部阴影下基于梯度法极值搜索的光伏最大功率跟踪方法 |
CN111949065B (zh) * | 2020-08-25 | 2022-05-17 | 深圳市英威腾电气股份有限公司 | 一种光伏水泵系统及其功率调控方法、装置、设备及介质 |
CN111949065A (zh) * | 2020-08-25 | 2020-11-17 | 深圳市英威腾电气股份有限公司 | 一种光伏水泵系统及其功率调控方法、装置、设备及介质 |
Also Published As
Publication number | Publication date |
---|---|
EP1750193B1 (de) | 2019-01-16 |
DE102005032864B4 (de) | 2011-04-14 |
EP1750193A1 (de) | 2007-02-07 |
US7471073B2 (en) | 2008-12-30 |
US20070027644A1 (en) | 2007-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102005032864B4 (de) | Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators | |
EP2104200B1 (de) | Verfahren zur ansteuerung eines multi-string-wechselrichters für photovoltaikanlagen | |
EP1995656A1 (de) | Verfahren zur Leistungsanpassung | |
EP1920525A2 (de) | Steuerungsanordnung für einen spannungskonverter und verfahren | |
DE2461449A1 (de) | Zerhacker-vorschaltanordnung fuer gasentladungslampen | |
EP2360546B1 (de) | Verfahren zum Ermitteln eines Punktes maximaler Leistung von Photovoltaikgeneratoren | |
EP3414778B1 (de) | Schutzschaltung für ein photovoltaik (pv)-modul, verfahren zum betrieb der schutzschaltung und photovoltaik (pv)-anlage mit einer derartigen schutzschaltung | |
DE102014119100A1 (de) | System und verfahren für einen leistungswandler | |
EP2580843B1 (de) | Verfahren und vorrichtung zur steuerung einer elektrischen stromerzeugung eines submoduls in einer photovoltaikanlage | |
DE102011118545A1 (de) | Verfahren und Vorrichtung zum Erzeugen eines Stromsteuerwerts zum Verfolgen eines maximalen Leistungspunkts in einem Solarenergieerzeugungssystem | |
DE112012007201T5 (de) | Maximum Power Point Tracking Controller und zugeordnete Systeme und Methoden | |
DE102017222265A1 (de) | Gleichspannungswandler | |
DE1804130C3 (de) | ||
EP3086429B1 (de) | Steuerungssystem für eine windenergieanlage oder einen windpark und steuerungsverfahren | |
DE102013202600B4 (de) | Verfahren zur Ertragsoptimierung eines teilverschatteten Photovoltaik-Feldes | |
WO2006111428A1 (de) | Verfahren zum betreiben eines wechselrichters mit vorgeschaltetem hochsetzer | |
WO2023111288A1 (de) | Vorrichtung und verfahren zum umwandeln elektrischer leistung | |
EP1309063B1 (de) | Anlage zur Einspeisung von Strom aus Gleichstromerzeugern in das Wechselstromnetz | |
DE102019127198B4 (de) | Verfahren zum betrieb einer energieerzeugungsanlage und energieerzeugungsanlage mit dem verfahren | |
DE3801399A1 (de) | Netzteil zur erzeugung einer geregelten gleichspannung | |
DE102018108462B4 (de) | Verfahren zum Betrieb eines Photovoltaik-Wechselrichters, Wechselrichter und Anlage mit einem derartigen Wechselrichter | |
WO2019002528A9 (de) | Verfahren und vorrichtung zum elektrischen verbinden eines transformators mit einem elektrischen netz | |
WO2013060692A2 (de) | Nachführverfahren und -einrichtung für einen spannungswandler für eine photovoltaikanlage | |
EP2826126B1 (de) | Leistungselektronische anordnung mit symmetrierung eines spannungsknotens im zwischenkreis | |
EP2372889A2 (de) | Schaltungsanordnung und Verfahren zur Erzeugung einer Wechselspannung aus einer Mehrzahl von ungeregelten Spannungsquellen mit zeitlich variabler Ausgangsgleichspannung |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8127 | New person/name/address of the applicant |
Owner name: SMA SOLAR TECHNOLOGY AG, 34266 NIESTETAL, DE |
|
R020 | Patent grant now final | ||
R020 | Patent grant now final |
Effective date: 20110830 |
|
R082 | Change of representative | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |