DE102005032864A1 - Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators - Google Patents

Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators Download PDF

Info

Publication number
DE102005032864A1
DE102005032864A1 DE102005032864A DE102005032864A DE102005032864A1 DE 102005032864 A1 DE102005032864 A1 DE 102005032864A1 DE 102005032864 A DE102005032864 A DE 102005032864A DE 102005032864 A DE102005032864 A DE 102005032864A DE 102005032864 A1 DE102005032864 A1 DE 102005032864A1
Authority
DE
Germany
Prior art keywords
operating point
generator
maximum
power
regulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE102005032864A
Other languages
English (en)
Other versions
DE102005032864B4 (de
Inventor
Gerd Bettenwort
Christian Kühnel
Oliver Arend
Joachim Ralf Laschinski
Gerald Alexander Leonhardt
Wolfgang Kurt Reichenbächer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SMA Solar Technology AG
Original Assignee
SMA Solar Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SMA Solar Technology AG filed Critical SMA Solar Technology AG
Priority to DE102005032864A priority Critical patent/DE102005032864B4/de
Priority to EP06009916.5A priority patent/EP1750193B1/de
Priority to US11/484,407 priority patent/US7471073B2/en
Publication of DE102005032864A1 publication Critical patent/DE102005032864A1/de
Application granted granted Critical
Publication of DE102005032864B4 publication Critical patent/DE102005032864B4/de
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • G05F1/67Regulating electric power to the maximum power available from a generator, e.g. from solar cell
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S323/00Electricity: power supply or regulation systems
    • Y10S323/906Solar cell systems

Abstract

Ein Verfahren zum Auffinden eines Maximums eines Photovoltaik-Generators, bei dem eine MPP-Regelung eines Photovoltaik-Wechselrichters eingesetzt wird, mit der eine maximale Generatorleistung bei einem Arbeitspunkt der Generatorkennlinie eingestellt wird, soll bei Teilverschattung des Generators einen verbesserten Wirkungsgrad liefern. Dies wird dadurch erreicht, dass die MPP-Regelung abgeschaltet wird, um den Generator anschließend zu be- und/oder entlasten, damit sich ein neuer Arbeitspunkt der Generatorkennlinie einstellen kann, und dass die MPP-Regelung anschließend wieder eingeschaltet wird.

Description

  • Die Erfindung betrifft ein Verfahren nach dem Oberbegriff des Anspruches 1.
  • Photovoltaik-Generatoren haben charakteristische Leistungskennlinien, bei denen in der Regel ein Arbeitspunkt maximaler Leistung vorhanden ist. Diesem Arbeitspunkt ist ein bestimmter Generator-Strom und eine bestimmte Generatorspannung zugeordnet.
  • Bekannt sind Verfahren, bei denen die Generatorbelastung, z.B. der Generatorstrom, so eingestellt wird, dass der Photovoltaik-Generator mit maximaler Leistung betrieben wird.
  • Derartige Verfahren bezeichnet man als Maximum-Power-Point-Tracking (MPPT).
  • Ein Verfahren, das in der DE 199 04 561 C1 vorgestellt wird, besteht darin, dass ein zusätzlicher Sensor eingesetzt wird, der die eintreffende Strahlung misst und über eine Kennlinienmessschaltung und einen Mikrorechner ein Leistungsmaximum einstellt. Fällt auf den Sensor ein Schatten oder wird ein Teil des Generators abgeschattet, dann stellt sich ein Arbeitspunkt ein, der nicht die größte Leistung liefert, wodurch die Energieausbeute des Gesamtsystems abfällt.
  • Ein anderes Verfahren ist aus der DE 199 09 609 C1 bekannt. Hier wird kein Sensor eingesetzt, sondern die Generatorkennlinie über das Einschalten eines Kondensators direkt gemessen. Durch einen Mikrorechner wird der ermittelte optimale Arbeitspunkt eingestellt. Bei Abschattung eines Generatorteils jedoch können sich mehrere lokale Leistungsmaxima einstellen, die verschieden hoch sein können. Daher kann es bei Teil-Abschattung vorkommen, dass der Generator nicht die maximale Leistung liefert und ein Teil der Solarenergie nicht genutzt wird.
  • Ein weiteres Verfahren zur Einstellung des Punktes maximaler Leistung eines Solargenerators einer Photovoltaikanlage ist in der DE 100 60 108 A1 beschrieben. Über eine einmalige Vermessung der physikalischen Parameter des Generators wird der maximale Punkt maximaler Leistung eingestellt, solange dieser nicht teilverschattet ist.
  • Die DE 4325436 C2 beschreibt ein Verfahren, bei dem der Generator zyklisch kurzgeschlossen und entlastet wird. Nachteilig ist auch hier, dass eine Teilverschattung nicht erkannt wird.
  • Der Erfindung liegt die Aufgabe zugrunde, einen PV-Genrator so zu betreiben, dass er ein Maximum an Energie abgeben kann.
  • Diese Aufgabe wird durch einen Stromrichter mit den kennzeichnenden Merkmalen des Anspruches 1 in Verbindung mit seinen Oberbegriffsmerkmalen gelöst.
  • Durch die Erfindung ist es möglich, die Energieausbeute eines Systems bestehend aus einem Photovoltaikgenerator und einem Stromrichter zu erhöhen, wenn eine Teilverschattung des Generators eintritt und eine herkömmliche Maximumregelung MPPT aufgrund mehrerer Maximain der Generatorkennlinie versagen würde.
  • Die Erfindung beruht auf der Erkenntnis, dass sich auch mehrere lokale Leistungsmaxima unterschiedlicher Höhe bei Teilverschattungseffekten einstellen können.
  • Hierbei liegt der Gedanke zugrunde, dass ein gezieltes Herstellen einer instabilen Regelung und Wiederherstellen einer stabilen Regelung sowie eine Auswertung der so erfolgten Messergebnisse zur Lösung des Problems der Teilverschattung führt. Grundsätzlich ist jede Regelung geeignet, die sich zwischen einer stabilisierenden und einer nicht stabilisierenden Wirkung umschalten lässt. Die erfindungsgemäße Lösung kann grundsätzlich auch ohne ein Standard-MPP-Tracking realisiert werden, und sogar eine MPP-Trackingvollwertung ersetzen.
  • Durch einen gezielten Eingriff in die Regelschleifen des Stromrichters wird eine Instabilität erzeugt, so dass sich nahezu verzögerungsfrei ein neuer Arbeitspunkt einstellt, der im Nahbereich eines lokalen oder globalen Maximums liegt, falls dieses Maximum eine höhere Leistung aufweist als das zuvor erkannte Leistungsmaximum.
  • Liegt zwischen dem sich neu einstellenden stabilen Arbeitspunkt und dem Arbeitspunkt vor dem Herstellen der Instabilität eine hinreichend große Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich eines Maximums mit höherer Leistung, was jedoch erkannt wird.
  • Das Verfahren dient zum Auffinden des linksseitigen Maximums. Nach einem gezielten Eingriff in die Regelschleifen kann die zuletzt gemessene Leistung mit einem Faktor größer Eins multipliziert und als Sollwert für die Regelung vorgegeben werden. Dadurch wird die Instabilität erzeugt. Liegt weiterhin eine Stabilität vor, wird die Leistung so lange erhöht bis die Instabilität eintritt. Um ein weiteres linksseitiges Maximum zu finden, kann die zuvor durchgeführte Prozedur wiederholt werden. Die Anzahl der Wiederholungen entspricht der Anzahl der linksseitigen Maxima mit höherer Leistung und kann begrenzt werden. Liegt zwischen dem sich jeweils neu einstellenden stabilen Arbeitspunkt und dem letzten stabilen Arbeitspunkt eine hinreichend große Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich eines Maximums mit höherer Leistung, was jedoch erkannt wird.
  • Das Verfahren dient auch zum Auffinden eines rechtsseitigen Leistungsmaximums, in dem eine Instabilität hergestellt wird. Nach dem gezielten Eingriff in die Regelschleifen wird die zuletzt gemessene Leistung mit einem Faktor nahe Null multipliziert und als Sollwert für eine Zeitdauer von z.B. kleiner einer Sekunde vorgegeben. So kann das System entlastet werden. Anschließend wird eine Leistung als Sollwert vorgegeben, die in einem Wertebereich vor dem Eingriff in die Regelschleifen liegt. Liegt zwischen dem sich neu einstellenden stabilen Arbeitspunkt und dem Arbeitspunkt vor dem Herstellen der Instabilität eine hinreichend große Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich eines Maximums mit höherer Leistung, was erkannt wird. Liegt zwischen dem sich neu einstellenden stabilen Arbeitspunkt und dem Arbeitspunkt vor dem Herstellen der Instabilität eine hinreichend kleine Spannungsdifferenz, so liegt dieser Arbeitspunkt im Nahbereich des ursprünglichen Leistungsmaximums, und es ist rechtsseitig kein weiteres Maximum vorhanden, was jedoch erkannt wird.
  • Wird ein neuer Arbeitspunkt mit höherer Leistung erkannt, wird der neue Arbeitspunkt als Startwert an die Regelung übergeben, und die ursprünglichen Regelschleifen werden hergestellt, wodurch das System nahezu schwingungsfrei den neuen Arbeitspunkt mit höherer Leistung stabil einstellen kann.
  • Durch Einstellung der Anzahl der zu suchenden linksseitigen Maxima kann die Suche an die Verschattungsempfindlichkeit des Generators angepasst werden.
  • Ein weitere vorteilhafte Ausgestaltung des erfindungsgemäßen Verfahrens zeichnet sich dadurch aus, dass nach dem Eingriff in die Regelschleifen die Leistung des Stromrichters erhöht wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe des Nullpunktes der Kennlinie liegt. Dieses Verfahren ist bei einem linksseitigen lokalen Maximum günstig.
  • Vorteilhaft ist auch, dass nach dem Eingriff in die Regelschleifen die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt. Hierdurch kann eine Einstellung auf ein rechtsseitiges lokales Leistungsmaximum erfolgen.
  • In einer vorteilhaften Weiterbildung der Erfindung ist vorgesehen, dass nach dem Eingriff in die Regelschleifen die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem lokalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt, wobei sich ein dritter Arbeitspunkt nach Erhöhen der Leistung einstellt, der in der Höhe des ersten Arbeitspunktes liegt und in der Nähe eines vierten Arbeitspunktes liegt, der ein Leistungsmaximum ist. Dieses Verfahren berücksichtigt ein rechtsseitiges Maximum höherer Leistung.
  • Weitere vorteilhafte Ausgestaltungen der Erfindung sind in den Unteransprüchen gekennzeichnet.
  • Ein Ausführungsbeispiel für den Betrieb eines Wechselrichters wird anhand der Zeichnungen näher erläutert, wobei weitere vorteilhafte Weiterbildungen der Erfindung und Vorteile derselben beschrieben sind.
  • Es zeigen:
  • 1 eine Generator-Leistungskennlinie bei einem linksseitigen globalen Maximum,
  • 2 eine Generator-Leistungskennlinie bei einem linksseitigen lokalen Maximum,
  • 3 eine Generator-Leistungskennlinie bei einem rechtsseitigen lokalen Maximum,
  • 4 eine Generator-Leistungskennlinie bei einem rechtsseitigen globalen Maximum,
  • 5 ein Ablaufdiagramm bei einer Detektion eines linksseitigen Maximums,
  • 6 ein Ablaufdiagramm bei einer Detektion eines rechtsseitigen Maximums,
  • 7 eine Darstellung eines an einem Netz betriebenen PV-Generators, und
  • 8 ein Ablaufdiagramm für eine kombinierte „rechts links" MPP-Suche.
  • 1 zeigt eine Kennlinie eines teilverschatteten Photovoltaik-Generators bzw. einer Generatoranlage. Hierbei fällt auf einen Flächenanteil des Generators eine geringere Sonneneinstrahlung infolge eines Schattens oder einer anderen Ursache.
  • Die Kennlinie weist zwei Maxima (1) und (3) auf. Das rechte Maximum (1) wird als lokales Maximum bezeichnet, während das linke Maximum (3) als globales Maximum bezeichnet wird. Das linke (globale) Maximum (3) ist größer als das rechte (lokale) Maximum.
  • Bei Anwendung eines herkömmlichen MPP-Trackings kann es vorkommen, dass sich ein lokales Leistungsmaximum (1) einstellt, da nicht zwischen verschiedenen Leistungsmaxima unterschieden werden kann. Dadurch wird ein Teil der Sonnenenergie nicht genutzt, und die Energieausbeute der Anlage sinkt erheblich.
  • Herkömmliche MPPT arbeiten vorzugsweise in ständiger Suchbewegung und bewegen sich um ein lokales Leistungsmaximum herum.
  • Linksseitiges globales Maximum
  • Dieser eben erläuterte Fall und die Wirkungsweise der Erfindung werden nun näher erläutert.
  • Die Erfindung nutzt ein Verfahren zum Auffinden eines Leistungsmaximums des Photovoltaik-Generators, bei dem ein MPP-Tracking eingesetzt wird, mit dem eine maximale Generatorleistung bei einem Arbeitspunkt der Generatorkennlinie eingestellt wird.
  • Durch das MPP-Tracking befindet sich der Arbeitspunkt bei (1) und kann sich ohne eine Änderung der Sonneneinstrahlung, Zellentemperatur und dergleichen nicht verschieben.
  • Erfindungsgemäß wird das eigentliche MPP-Tracking abgeschaltet. Das MPP-Tracking und eine Spannungsregelung werden praktisch deaktiviert. Dadurch ist es überhaupt möglich, den Arbeitspunkt zu verschieben. Anschließend wird der Generator belastet, damit sich ein neuer Arbeitspunkt der Generatorkennlinie einstellen kann. Der AC-Stromsollwert wird beispielsweise um den Faktor 1,05 erhöht. Dadurch entsteht eine Instabilität. Der Arbeitspunkt wandert sehr schnell in Richtung des globalen Maximums eines Arbeitspunktes (2) und ist dann wieder stabil. Wenn das MPP-Tracking wieder eingeschaltet wird, führt es das System zum optimalen Arbeitspunkt bzw. dem globalen Maximum (3).
  • Dadurch wird das höchste Maximum erreicht.
  • Linksseitiges lokales Maximum
  • 2 zeigt einen Fall, bei dem sich der aktuelle Arbeitspunkt bereits im globalen Maximum (1) befindet, aber links davon ein weiteres (kleineres) Maximum existiert.
  • Das MPP-Tracking wird auch hier zunächst abgeschaltet. Durch eine Belastung bewegt sich jedoch der Arbeitspunkt sehr schnell auf der Kennlinie in Richtung des Arbeitspunktes (2), bei dem zwar der Strom höher ist, die Spannung jedoch zusammenbricht, so dass praktisch der Generator keine Leistung mehr liefert.
  • Da die hohe vorgegebene Sollleistung nicht eingestellt werden kann, ergibt sich kein stabiler Arbeitspunkt.
  • Vorzugsweise ist vorgesehen, dass eine Spannungsgrenze festgelegt wird, bei deren Unterschreitung der Sprung rückgängig gemacht wird bzw. der Generator sofort wieder entlastet wird.
  • Dadurch wird das höchste Maximum erreicht.
  • Rechtsseitiges lokales Maximum
  • 3 zeigt den Fall, bei dem das MPP-Tracking sich bereits auf das globale Maximum (1) eingestellt hat. Der aktuelle Arbeitspunkt befindet sich bereits bei (1). Durch Deaktivieren des MPP-Trackings und anschließender Entlastung des Generators bewegt sich der Arbeitspunkt sehr schnell auf der Kennlinie zum Arbeitspunkt (2), der nahezu Leerlaufspannung aufweist. Bei einer erneuten Belastung mit einem Strom, der der Leistung im Arbeitspunkt (1) entspricht, kehrt der Arbeitspunkt wieder in seine Ausgangsposition (1) zurück.
  • Dadurch wird das höchste Maximum beibehalten.
  • Rechtsseitiges globales Maximum
  • 4 veranschaulicht einen Fall, bei dem ein lokales Maximum (1) links vorhanden ist, wobei das MPP-Tracking diesen Arbeitspunkt fixiert. Durch Deaktivieren des MPP-Trackings und anschließende Entlastung stellt sich der neue Arbeitspunkt (2) ein, der in der Nähe der Leerlaufspannung ist. Bei einer erneuten Belastung mit einem Strom, der der Leistung im Arbeitspunkt (1) entspricht, bewegt sich der Arbeitspunkt zum Punkt (3). Ein Wiedereinschalten des MPP-Trackers bewirkt, dass sich das globale Maximum (4) einstellt.
  • Dadurch wird das größte Leistungsmaximum erreicht.
  • 5 veranschaulicht ein Ablaufdiagramm zur Detektion eines linksseitigen Maximums. Ausgangspunkt ist der Arbeitspunkt (1) gemäß (1) bzw. gemäß 3. Im Schritt 10 wird das MPP-Tracking deaktiviert. Es wird also auf Netzstromregelung „Ikonst-Betrieb" umgestellt. Zuvor werden die Wertepaare für die PV-Spannung UDC und den Netzstrom IAC gespeichert (Schritt 9). Im Schritt 20 wird der Netzstrom bzw. der AC-Strom (des Wechselrichters) erhöht, so dass sich beispielsweise gemäß 1 der Arbeitspunkt von (1) nach (2) bewegen kann. Nach einer Pause (Schritt 30) wird geprüft, ob der sich einstellende neue Arbeitspunkt im Nahbereich des alten Arbeitspunktes liegt (Abfrage 50). Stellt sich ein stabiler Arbeitspunkt ein, dann gilt z.B. eine Kennlinie nach 1 (Schritt 60). Wird aber kein stabiler Arbeitspunkt erreicht, dann bricht die Spannung zusammen und ein Fall gemäß 3 ist gegeben. Dieser wird erkannt, indem die Spannung UDCmin erreicht wird (Abfrage 60). Wenn kein neuer stabiler Arbeitspunkt gemäß 1 sich einstellt, dann besteht eine Instabilität und die Spannung erreicht die DC-Unterspannungsgrenze. Dieser Vorgang läuft sehr schnell ab, da der Arbeitspunkt den instabilen Bereich überschreitet.
  • Liegt der neue Arbeitspunkt oberhalb der DC-Unterspannungsgrenze so wurde ein neues Maximum detektiert und der Spannungswert wird gespeichert (Schritt 71) und ein Zähler inkrementiert. Mit Hilfe einer Abfrage im Schritt 130 kann die Anzahl der zu suchenden Maxima begrenzt werden.
  • Liegt der neue Arbeitspunkt weit rechts des Maximums (3), so führt die nächste Stromerhöhung (Schritt 20) nicht zu einer weiteren Instabilität, was durch die Abfrage (Schritt 50) erkannt wird. Der Zyklus (Schritt 20, 30, 40, 50) setzt sich so lange fort bis das Maximum (3) überschritten wird.
  • Mit dem erfindungsgemäßen Verfahren wird der Arbeitspunkt (1) gemäß 3 beibehalten. Nach der erfindungsgemäßen Stromerhöhung (Schritt 20) wird kein weiterer stabiler Arbeitspunkt gefunden. Die Spannung sinkt rasch bis auf die unterste Spannungsgrenze ab, was durch die Abfrage im Schritt 60 erkannt wird. Ist dies der Fall, dann muss das System durch Sperren des Wechselrichters (Schritt 90) entlastet werden. Dadurch steigt die DC-Spannung nun rasch wieder an. Erreicht die PV-Spannung den zuletzt gespeicherten Spannungswert, wird die Spannungsregelung wieder zugeschaltet und das MPP-Tracking aktiviert.
  • Wird die linksseitige Suche durch den Zähler (130) abgebrochen, dann wird der letzte gespeicherte stabile PV-Spannungswert (40) als Sollwert für die Spannungsregelung (110) vorgegeben, die zusammen mit dem MPP-Tracking aktiviert wird. Das System spielt sich auf das globale Maximum (1) der Generatorkennlinie (Schritt 120) ein.
  • Weiterhin kann auch eine linkseitige Suche wie folgt beschrieben werden.
  • Zunächst werden aktuelle Messwerte für die DC-Spannung und den AC- Strom (IAC) gemäß 7 mittels Abtastglieder bzw. einer ersten S&H-Stufe (Sample & Hold) für IAC und einer zweiten S&H-Stufe für UDC gespeichert. Dies entspricht Schritt 09. Anschließend wird der Regelkreis auf einen Konstantbetrieb beispielsweise mittels eines Schalters umgeschaltet (Schritt 10). Der Sollwert für die Leistung wird erhöht. Hierzu wird in der ersten S&H-Stufe (IAC) mit einem Faktor größer Eins multipliziert und an den Stromregler übergeben (Schritt 20). Nach einer Pause wird überprüft, ob die DC-Spannung am Generator unter die minimal zugelassene Grenze abgefallen ist. Dieser Vorgang läuft sehr schnell ab, da die DC-Spannungsregelung und der MPP-Tracker nicht mehr aktiv sind und so die DC-Spannung nicht mehr stabil gehalten werden kann. Mit Hilfe der S&H-Stufen, einem Proportionalglied (0,9 < K < 1), einer Summationsstelle und einem Komparator (nicht gezeigt) wird festgestellt, ob sich der neue Arbeitspunkt in der Nähe des alten Arbeitspunktes befindet (Schritt 50). Ist dies nicht der Fall, liegt der neue Arbeitspunkt im Nahbereich eines lokalen oder globalen Maximums, das größer ist als das lokale Maximum, auf dem sich der Arbeitspunkt zuvor befand und der Komparatorausgang inkrementiert einen nicht dargestellten Zähler (MPP links). Falls die Anzahl der suchenden linksseitigen Maxima begrenzt wird, d.h. der maximale Zählerstand des Zählers „MPP links" ist erreicht, wird der in der zweiten S&H-Stufe (UDC) gespeicherter Wert durch Umschalten des Schalters an die Spannungsregelung und an den MPP-Tracker übergeben. Durch einen weiteren Umschaltvorgang des Schalters wird dann der Regelkreis wieder hergestellt. In dieser Schaltung kann jeder Arbeitspunkt auf der Generatorkennlinie stabil eingestellt werden.
  • In den Schritten gemäß 5 wird also Folgendes durchgeführt:
    • Schritt 9: Erste und zweite S&H-Stufe (IAC, UDC) werden aktiviert.
    • Schritt 10: Schalter befindet sich in einer Schalterstellung „B".
    • Schritt 40: Zweite S&H-Stufe (UDC) wird aktiviert.
    • Schritt 20: Netzstrom IAC wird erhöht bzw. der Wert der ersten S&H-
    • Stufe (IAC) wird mit z.B. K = 1,05 multipliziert.
    • Schritt 50: Der Wert, der in der zweiten S&H-Stufe (UDC) gespeichert ist, wird durch den Komparator verglichen.
    • Schritt 71: Die zweite S&H-Stufe wird aktiviert.
    • Schritt 100: Der Schalter wird umgeschaltet (z.B. Schalterstellung „A").
    • Schritt 110: Der Schalter wird zu einer dritten Stellung umgeschaltet (z.B. Schalterstellung „F")
  • 6 veranschaulicht die Detektion eines rechtsseitigen Maximums gemäß 2 und 4. Auch hier wird das MPP-Tracking und die Spannungsregelung zunächst deaktiviert, damit der stabile Arbeitspunkt (1) verlassen werden kann. Es wird auch hier auf Netzstromregelung „Ikonst" umgestellt, jedoch ist der Strom geringer, insbesondere 0–0,4 IAC. Zuvor werden die Wertepaare für die PV-Spannung UDC und den Netzstrom IAC gespeichert. Wie 2 veranschaulicht, erreicht der Generator den Leerlaufpunkt (2), wenn ein kleiner Strom nahe Null vorgegeben wird. Im Schritt 50 wird der Generator wieder belastet, so dass sich im Fall der 2 der Arbeitspunkt (1) wieder einstellt.
  • Damit ist kein weiteres Maximum vorhanden und die rechtsseitige Suche wird abgebrochen.
  • Andernfalls wird im stromgeregelten Betrieb das System mit nahezu dem im Arbeitspunkt (1) gemessenen Strom belastet (Schritt 50). Wird ein Maximum gefunden, welches größer als das alte lokale Maximum ist, wird der Zähler gesetzt (Schritt 110) und die Spannungsregelung bzw. das MPPT wird aktiviert (Schritt 100). Wenn sich ein neuer Arbeitspunkt nahe dem alten Arbeitspunkt (1) einstellt, dann ist rechtsseitig kein weiteres Maximum vorhanden, und der Zähler wird zurückgesetzt.
  • Weiterhin kann auch eine rechtsseitige Suche bezugnehmend auf 6 wie folgt beschrieben werden.
  • Der MPP-Tracker befindet sich zunächst in einem lokalen oder globalen Maximum. Anschließend wird eine Instabilität erzeugt. Aktuelle Messwerte für die DC-Spannung (UDC) und den AC-Strom (IAC) werden ebenfalls in den Abtasthaltegliedern bzw. S&H-Stufen für IAC und IDC gespeichert (Schritt 10, MPPSuche „rechts"). Nun wird der Regelkreis auf Konstantstrombetrieb mittels eines Schalters umgeschaltet. Der Sollwert für die Leistung wird nun deutlich gesenkt. Hierzu wird der in der S&H-Stufe für IAC gespeicherte Wert mit einem Faktor nahe Null multipliziert und an einen Stromregler übergeben (Schritt 20). Falls der Faktor K2 = 0 gewählt wird, kann im folgenden die Leerlaufspannung gespeichert werden.
  • Der Sollwert für die Leistung wird nun in etwa auf den alten Wert gebracht. Hierzu wird der in der S&H-Stufe gespeicherte Wert mit einem Faktor nahe Eins multipliziert und an den Stromregler übergeben (Schritt 50).
  • Nach einer weiteren Pause wird überprüft, ob die sich einstellende neue DCSpannung am Generator sich weit vom alten Arbeitspunkt entfernt hat. Befindet sich der neue Spannungswert im Nahbereich des alten Spannungswertes, so gibt es kein weiteres rechtsseitiges Maximum, das größer ist als das zuvor gefundene alte Maximum. Dies wird mit Hilfe einer Schaltungskombination aus der S&H Stufe für UDC, einem nicht dargestellten Proportionalglied mit einem Proportionalbeiwert 0,9 < K < 1,1, einer Summationsstelle und einem Komparator erkannt (Schritt 70) im Flussdiagramm gemäß 6 MPP-Suche "rechts").
  • Andernfalls, d.h. der neue Arbeitspunkt befindet sich nicht im Nahbereich des alten Arbeitspunktes, ergibt sich ein neuer Arbeitspunkt im Nahbereich eines neuen Leistungsmaximums, das größer ist als das zuvor. Dies wird mit Hilfe der Kombination aus der S&H Stufe, dem Proportionalglied mit dem Proportionalbeiwert 0,9 < K5 < 1,1, der Summationsstelle und dem Komparator erkannt (vgl. Schritt 70 im Flussdiagramm MPP-Suche „rechts", 6). Der Komparatorausgang inkrementiert einen Zähler „MPP-rechts" (vgl. Schritt 110). Abschließend wird der Schalter umgeschaltet und der neue Spannungswert an die Spannungsregelung und den MPP-Tracker übergeben. Der ursprüngliche Regelkreis wird durch Umschalten in eine andere Schalterstellung wieder hergestellt. In dieser Schalterstellung kann jeder Arbeitspunkt der Generatorkennlinie stabil eingestellt werden.
  • 8 zeigt eine Variante, bei der eine MPP-Suche „rechts" und eine MPP-Suche „links" mit einer einzigen Regelungsstruktur realisiert ist.

Claims (7)

  1. Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators, bei dem eine MPP-Regelung eines Stromrichters eingesetzt wird, mit der eine maximale Generatorleistung bei einem Arbeitspunkt der Generatorkennlinie eingestellt wird, dadurch gekennzeichnet, dass die MPP-Regelung abgeschaltet wird, um den Generator anschließend zu be- und/oder entlasten und dass die MPP-Regelung anschließend wieder eingeschaltet wird, um den Arbeitspunkt der Generatorkennlinie von einem stabilen Zustand in einen instabilen Zustand oder umgekehrt zu überführen.
  2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters erhöht wird, so dass ein erster zu einem lokalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der zwischen dem ersten Arbeitspunkt und einem dritten Arbeitspunkt liegt sowie in Nähe des dritten Arbeitspunktes liegt, wobei der dritte Arbeitspunkt ein globales Maximum ist.
  3. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters erhöht wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe des Nullpunktes der Kennlinie liegt.
  4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, dass bei Unterschreiten einer Spannungsgrenze der Generator wieder entlastet wird.
  5. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem globalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt.
  6. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nach der Abschaltung der MPP-Regelung die Leistung des Stromrichters reduziert wird, so dass ein erster zu einem lokalen Maximum korrespondierender Arbeitspunkt einer Leistungskennlinie sich zu einem zweiten Arbeitspunkt bewegt, der in der Nähe der Generatorleerlaufspannung liegt, wobei sich ein dritter Arbeitspunkt nach Erhöhen des Stromes einstellt, der in der Höhe des ersten Arbeitspunktes liegt und in Nähe eines vierten Arbeitspunktes liegt, der ein globales Maximum ist.
  7. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Generatorspannung gespeichert wird.
DE102005032864A 2005-07-14 2005-07-14 Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators Expired - Fee Related DE102005032864B4 (de)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE102005032864A DE102005032864B4 (de) 2005-07-14 2005-07-14 Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators
EP06009916.5A EP1750193B1 (de) 2005-07-14 2006-05-13 Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators
US11/484,407 US7471073B2 (en) 2005-07-14 2006-07-11 Method of finding a maximum power of a photovoltaic generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102005032864A DE102005032864B4 (de) 2005-07-14 2005-07-14 Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators

Publications (2)

Publication Number Publication Date
DE102005032864A1 true DE102005032864A1 (de) 2007-01-25
DE102005032864B4 DE102005032864B4 (de) 2011-04-14

Family

ID=36942414

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102005032864A Expired - Fee Related DE102005032864B4 (de) 2005-07-14 2005-07-14 Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators

Country Status (3)

Country Link
US (1) US7471073B2 (de)
EP (1) EP1750193B1 (de)
DE (1) DE102005032864B4 (de)

Cited By (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008022582A1 (de) 2008-05-07 2009-11-12 Bayerische Motoren Werke Aktiengesellschaft Elektrisches Energiebordnetz für ein Kraftfahrzeug
DE102010060784A1 (de) 2010-11-24 2012-05-24 Tim Frey Hyperadapter
DE102013104940A1 (de) 2013-05-14 2014-11-20 Norbert Danneberg Wandlerschaltung
US9088178B2 (en) 2006-12-06 2015-07-21 Solaredge Technologies Ltd Distributed power harvesting systems using DC power sources
US9112379B2 (en) 2006-12-06 2015-08-18 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US9130401B2 (en) 2006-12-06 2015-09-08 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9235228B2 (en) 2012-03-05 2016-01-12 Solaredge Technologies Ltd. Direct current link circuit
US9291696B2 (en) 2007-12-05 2016-03-22 Solaredge Technologies Ltd. Photovoltaic system power tracking method
US9318974B2 (en) 2014-03-26 2016-04-19 Solaredge Technologies Ltd. Multi-level inverter with flying capacitor topology
US9362743B2 (en) 2008-05-05 2016-06-07 Solaredge Technologies Ltd. Direct current power combiner
US9368964B2 (en) 2006-12-06 2016-06-14 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US9401599B2 (en) 2010-12-09 2016-07-26 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9407161B2 (en) 2007-12-05 2016-08-02 Solaredge Technologies Ltd. Parallel connected inverters
US9537445B2 (en) 2008-12-04 2017-01-03 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9543889B2 (en) 2006-12-06 2017-01-10 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9548619B2 (en) 2013-03-14 2017-01-17 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US9590526B2 (en) 2006-12-06 2017-03-07 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
DE102015116455A1 (de) 2015-09-29 2017-03-30 Endress+Hauser Flowtec Ag Energieversorgung von Messgeräten aus leistungsinstabilen Energiequellen
US9647442B2 (en) 2010-11-09 2017-05-09 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US9644993B2 (en) 2006-12-06 2017-05-09 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
CN106774612A (zh) * 2017-03-01 2017-05-31 电子科技大学 局部阴影下基于梯度法极值搜索的光伏最大功率跟踪方法
US9673711B2 (en) 2007-08-06 2017-06-06 Solaredge Technologies Ltd. Digital average input current control in power converter
US9680304B2 (en) 2006-12-06 2017-06-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US9812984B2 (en) 2012-01-30 2017-11-07 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9819178B2 (en) 2013-03-15 2017-11-14 Solaredge Technologies Ltd. Bypass mechanism
US9831824B2 (en) 2007-12-05 2017-11-28 SolareEdge Technologies Ltd. Current sensing on a MOSFET
US9853538B2 (en) 2007-12-04 2017-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9853565B2 (en) 2012-01-30 2017-12-26 Solaredge Technologies Ltd. Maximized power in a photovoltaic distributed power system
US9866098B2 (en) 2011-01-12 2018-01-09 Solaredge Technologies Ltd. Serially connected inverters
US9869701B2 (en) 2009-05-26 2018-01-16 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US9876430B2 (en) 2008-03-24 2018-01-23 Solaredge Technologies Ltd. Zero voltage switching
US9923516B2 (en) 2012-01-30 2018-03-20 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US9941813B2 (en) 2013-03-14 2018-04-10 Solaredge Technologies Ltd. High frequency multi-level inverter
US9960667B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US9966766B2 (en) 2006-12-06 2018-05-08 Solaredge Technologies Ltd. Battery power delivery module
US10115841B2 (en) 2012-06-04 2018-10-30 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US10230310B2 (en) 2016-04-05 2019-03-12 Solaredge Technologies Ltd Safety switch for photovoltaic systems
US10396662B2 (en) 2011-09-12 2019-08-27 Solaredge Technologies Ltd Direct current link circuit
US10673222B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673229B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
CN111949065A (zh) * 2020-08-25 2020-11-17 深圳市英威腾电气股份有限公司 一种光伏水泵系统及其功率调控方法、装置、设备及介质
US10931119B2 (en) 2012-01-11 2021-02-23 Solaredge Technologies Ltd. Photovoltaic module
US11018623B2 (en) 2016-04-05 2021-05-25 Solaredge Technologies Ltd. Safety switch for photovoltaic systems
US11177663B2 (en) 2016-04-05 2021-11-16 Solaredge Technologies Ltd. Chain of power devices
US11264947B2 (en) 2007-12-05 2022-03-01 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11296650B2 (en) 2006-12-06 2022-04-05 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US11309832B2 (en) 2006-12-06 2022-04-19 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11569659B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11687112B2 (en) 2006-12-06 2023-06-27 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11728768B2 (en) 2006-12-06 2023-08-15 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US11735910B2 (en) 2006-12-06 2023-08-22 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11855231B2 (en) 2006-12-06 2023-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11881814B2 (en) 2005-12-05 2024-01-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11888387B2 (en) 2006-12-06 2024-01-30 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7288921B2 (en) * 2004-06-25 2007-10-30 Emerson Process Management Power & Water Solutions, Inc. Method and apparatus for providing economic analysis of power generation and distribution
EP2212983B1 (de) 2007-10-15 2021-04-07 Ampt, Llc Systeme für hocheffiziente solarenergie
WO2009055474A1 (en) 2007-10-23 2009-04-30 And, Llc High reliability power systems and solar power converters
US10512769B2 (en) * 2009-03-20 2019-12-24 Electrocore, Inc. Non-invasive magnetic or electrical nerve stimulation to treat or prevent autism spectrum disorders and other disorders of psychological development
US9442504B2 (en) 2009-04-17 2016-09-13 Ampt, Llc Methods and apparatus for adaptive operation of solar power systems
WO2011049985A1 (en) 2009-10-19 2011-04-28 Ampt, Llc Novel solar panel string converter topology
US7990743B2 (en) * 2009-10-20 2011-08-02 General Electric Company System and method for decreasing solar collector system losses
US7855906B2 (en) * 2009-10-26 2010-12-21 General Electric Company DC bus voltage control for two stage solar converter
US20110184583A1 (en) * 2010-01-22 2011-07-28 General Electric Company Model-based power estimation of photovoltaic power generation system
DE102010000350B4 (de) 2010-02-10 2023-10-05 Adkor Gmbh Energieversorgungssystem mit regenerativer Stromquelle und Verfahren zum Betrieb eines Energieversorgungssystems
US8050062B2 (en) * 2010-02-24 2011-11-01 General Electric Company Method and system to allow for high DC source voltage with lower DC link voltage in a two stage power converter
US8922061B2 (en) * 2010-03-22 2014-12-30 Tigo Energy, Inc. Systems and methods for detecting and correcting a suboptimal operation of one or more inverters in a multi-inverter system
US9502904B2 (en) 2010-03-23 2016-11-22 Eaton Corporation Power conversion system and method providing maximum efficiency of power conversion for a photovoltaic system, and photovoltaic system employing a photovoltaic array and an energy storage device
US9312399B2 (en) 2010-04-02 2016-04-12 Tigo Energy, Inc. Systems and methods for mapping the connectivity topology of local management units in photovoltaic arrays
EP2390751B1 (de) * 2010-05-28 2013-09-04 Nxp B.V. Verfahren zur Verfolgung des maximalen Leistungspunkts, Fotovoltaiksystemsteuerung und Fotovoltaiksystem
CN102315794B (zh) * 2010-07-02 2013-12-11 扬光绿能股份有限公司 控制太阳能发电系统的方法
JP5928736B2 (ja) * 2010-08-31 2016-06-01 エスエムエー ソーラー テクノロジー アーゲー Acモジュール接続用acインターフェースを備えたインバータ
DE102011110677A1 (de) 2011-08-19 2012-10-11 Tobias Gädeke Vorrichtung und Verfahren zur energieoptimierten Ankopplung von Solarzellen an einen Energiespeicher
CN102566646A (zh) * 2012-01-13 2012-07-11 冶金自动化研究设计院 一种光伏系统局部遮荫条件下的最大功率点跟踪方法
CN102624285B (zh) * 2012-03-23 2014-12-03 浙江工业大学 光伏阵列最大功率点跟踪控制方法
US9397497B2 (en) 2013-03-15 2016-07-19 Ampt, Llc High efficiency interleaved solar power supply system
CN106771561B (zh) * 2016-12-13 2019-08-13 国家电网公司 高压避雷线取电最大功率点检测系统
EP3852145A1 (de) 2020-01-15 2021-07-21 Siemens Aktiengesellschaft Abkoppelung einer perowskit-solarzelle bei dunkelheit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4325436C2 (de) * 1993-07-29 2000-06-29 Inst Luft & Kaeltetechnik Ggmbh Schaltungsanordnung zur MPP-Regelung photovoltaischer Solaranlagen und Schaltungsanordnung zur Durchführung des Verfahrens
DE19904561C1 (de) * 1999-02-04 2000-08-24 Rossendorf Forschzent Verfahren und Schaltungsanordnung zur Maximum-Power-Point-Steuerung von Solargeneratoren
DE19909609C1 (de) * 1999-03-05 2000-09-21 Thomas Wunram Verfahren und Vorrichtung zur Ermittlung der Kennlinie und des Punktes maximaler Energieausbeute von Gleichstromquellen
DE10060108A1 (de) * 2000-11-27 2002-06-27 Univ Dresden Tech Verfahren zur Einstellung des Punktes maximaler Leistung eines Solargenerators einer photovoltaischen Solaranlage

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4794272A (en) * 1987-01-20 1988-12-27 The Aerospace Corporation Power regulator utilizing only battery current monitoring
JPH07225624A (ja) * 1994-02-15 1995-08-22 Kansai Electric Power Co Inc:The 太陽光発電システムの最大電力出力制御方法
US6316925B1 (en) * 1994-12-16 2001-11-13 Space Systems/Loral, Inc. Solar array peak power tracker
JP3554116B2 (ja) * 1996-09-06 2004-08-18 キヤノン株式会社 電力制御装置及びそれを用いた太陽光発電システム
JP3732944B2 (ja) * 1998-03-30 2006-01-11 三洋電機株式会社 太陽光発電装置
CN1161678C (zh) * 1998-03-30 2004-08-11 三洋电机株式会社 太阳能发电装置
JP3394996B2 (ja) * 2001-03-09 2003-04-07 独立行政法人産業技術総合研究所 最大電力動作点追尾方法及びその装置
US7091707B2 (en) * 2003-09-29 2006-08-15 Xantrex Technology, Inc. Method and apparatus for controlling power drawn from an energy converter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4325436C2 (de) * 1993-07-29 2000-06-29 Inst Luft & Kaeltetechnik Ggmbh Schaltungsanordnung zur MPP-Regelung photovoltaischer Solaranlagen und Schaltungsanordnung zur Durchführung des Verfahrens
DE19904561C1 (de) * 1999-02-04 2000-08-24 Rossendorf Forschzent Verfahren und Schaltungsanordnung zur Maximum-Power-Point-Steuerung von Solargeneratoren
DE19909609C1 (de) * 1999-03-05 2000-09-21 Thomas Wunram Verfahren und Vorrichtung zur Ermittlung der Kennlinie und des Punktes maximaler Energieausbeute von Gleichstromquellen
DE10060108A1 (de) * 2000-11-27 2002-06-27 Univ Dresden Tech Verfahren zur Einstellung des Punktes maximaler Leistung eines Solargenerators einer photovoltaischen Solaranlage

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
K.Kobayashi u.a.: A Study on a Two Stage Maximum Power Point-Tracking Control of a Photovoltaic System under Partially Shaded Insolation Conditi- ons. In: IEEE Power Engineering Society General Meeting, Vol.4, S.2613-2617, Juli 2003 *
M.Miyatake u.a.: Response of Fibonaccisearch-based Maximum Power Point Tracker when a Photovoltaic Array is Parially Shaded. In: Proceeding Power and Energy Systems, EuroPES 2003, ISBN: 0-88986-366-5, September 2003
M.Miyatake u.a.: Response of Fibonaccisearch-basedMaximum Power Point Tracker when a Photovoltaic Array is Parially Shaded. In: Proceeding Power andEnergy Systems, EuroPES 2003, ISBN: 0-88986-366-5,September 2003 *

Cited By (126)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11881814B2 (en) 2005-12-05 2024-01-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11594881B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9543889B2 (en) 2006-12-06 2017-01-10 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9088178B2 (en) 2006-12-06 2015-07-21 Solaredge Technologies Ltd Distributed power harvesting systems using DC power sources
US9112379B2 (en) 2006-12-06 2015-08-18 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US9130401B2 (en) 2006-12-06 2015-09-08 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11031861B2 (en) 2006-12-06 2021-06-08 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US11043820B2 (en) 2006-12-06 2021-06-22 Solaredge Technologies Ltd. Battery power delivery module
US11888387B2 (en) 2006-12-06 2024-01-30 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11063440B2 (en) 2006-12-06 2021-07-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US9368964B2 (en) 2006-12-06 2016-06-14 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11962243B2 (en) 2006-12-06 2024-04-16 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11073543B2 (en) 2006-12-06 2021-07-27 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11183922B2 (en) 2006-12-06 2021-11-23 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11002774B2 (en) 2006-12-06 2021-05-11 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11855231B2 (en) 2006-12-06 2023-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9590526B2 (en) 2006-12-06 2017-03-07 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11735910B2 (en) 2006-12-06 2023-08-22 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11728768B2 (en) 2006-12-06 2023-08-15 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US10673253B2 (en) 2006-12-06 2020-06-02 Solaredge Technologies Ltd. Battery power delivery module
US9644993B2 (en) 2006-12-06 2017-05-09 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11687112B2 (en) 2006-12-06 2023-06-27 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11296650B2 (en) 2006-12-06 2022-04-05 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US9680304B2 (en) 2006-12-06 2017-06-13 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11682918B2 (en) 2006-12-06 2023-06-20 Solaredge Technologies Ltd. Battery power delivery module
US11309832B2 (en) 2006-12-06 2022-04-19 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US10637393B2 (en) 2006-12-06 2020-04-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9853490B2 (en) 2006-12-06 2017-12-26 Solaredge Technologies Ltd. Distributed power system using direct current power sources
US11476799B2 (en) 2006-12-06 2022-10-18 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11598652B2 (en) 2006-12-06 2023-03-07 Solaredge Technologies Ltd. Monitoring of distributed power harvesting systems using DC power sources
US11594882B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US10447150B2 (en) 2006-12-06 2019-10-15 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11569659B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11579235B2 (en) 2006-12-06 2023-02-14 Solaredge Technologies Ltd. Safety mechanisms, wake up and shutdown methods in distributed power installations
US11961922B2 (en) 2006-12-06 2024-04-16 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11658482B2 (en) 2006-12-06 2023-05-23 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9948233B2 (en) 2006-12-06 2018-04-17 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9960731B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. Pairing of components in a direct current distributed power generation system
US9960667B2 (en) 2006-12-06 2018-05-01 Solaredge Technologies Ltd. System and method for protection during inverter shutdown in distributed power installations
US9966766B2 (en) 2006-12-06 2018-05-08 Solaredge Technologies Ltd. Battery power delivery module
US11569660B2 (en) 2006-12-06 2023-01-31 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11594880B2 (en) 2006-12-06 2023-02-28 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US10097007B2 (en) 2006-12-06 2018-10-09 Solaredge Technologies Ltd. Method for distributed power harvesting using DC power sources
US11575261B2 (en) 2006-12-06 2023-02-07 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US11575260B2 (en) 2006-12-06 2023-02-07 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US10230245B2 (en) 2006-12-06 2019-03-12 Solaredge Technologies Ltd Battery power delivery module
US10116217B2 (en) 2007-08-06 2018-10-30 Solaredge Technologies Ltd. Digital average input current control in power converter
US11594968B2 (en) 2007-08-06 2023-02-28 Solaredge Technologies Ltd. Digital average input current control in power converter
US9673711B2 (en) 2007-08-06 2017-06-06 Solaredge Technologies Ltd. Digital average input current control in power converter
US10516336B2 (en) 2007-08-06 2019-12-24 Solaredge Technologies Ltd. Digital average input current control in power converter
US9853538B2 (en) 2007-12-04 2017-12-26 Solaredge Technologies Ltd. Distributed power harvesting systems using DC power sources
US9291696B2 (en) 2007-12-05 2016-03-22 Solaredge Technologies Ltd. Photovoltaic system power tracking method
US11183969B2 (en) 2007-12-05 2021-11-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US10644589B2 (en) 2007-12-05 2020-05-05 Solaredge Technologies Ltd. Parallel connected inverters
US9831824B2 (en) 2007-12-05 2017-11-28 SolareEdge Technologies Ltd. Current sensing on a MOSFET
US11894806B2 (en) 2007-12-05 2024-02-06 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9407161B2 (en) 2007-12-05 2016-08-02 Solaredge Technologies Ltd. Parallel connected inverters
US11693080B2 (en) 2007-12-05 2023-07-04 Solaredge Technologies Ltd. Parallel connected inverters
US9979280B2 (en) 2007-12-05 2018-05-22 Solaredge Technologies Ltd. Parallel connected inverters
US11264947B2 (en) 2007-12-05 2022-03-01 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US10693415B2 (en) 2007-12-05 2020-06-23 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US11183923B2 (en) 2007-12-05 2021-11-23 Solaredge Technologies Ltd. Parallel connected inverters
US9876430B2 (en) 2008-03-24 2018-01-23 Solaredge Technologies Ltd. Zero voltage switching
US10468878B2 (en) 2008-05-05 2019-11-05 Solaredge Technologies Ltd. Direct current power combiner
US9362743B2 (en) 2008-05-05 2016-06-07 Solaredge Technologies Ltd. Direct current power combiner
US11424616B2 (en) 2008-05-05 2022-08-23 Solaredge Technologies Ltd. Direct current power combiner
DE102008022582A1 (de) 2008-05-07 2009-11-12 Bayerische Motoren Werke Aktiengesellschaft Elektrisches Energiebordnetz für ein Kraftfahrzeug
US9537445B2 (en) 2008-12-04 2017-01-03 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US10461687B2 (en) 2008-12-04 2019-10-29 Solaredge Technologies Ltd. Testing of a photovoltaic panel
US9869701B2 (en) 2009-05-26 2018-01-16 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US10969412B2 (en) 2009-05-26 2021-04-06 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US11867729B2 (en) 2009-05-26 2024-01-09 Solaredge Technologies Ltd. Theft detection and prevention in a power generation system
US9647442B2 (en) 2010-11-09 2017-05-09 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US11489330B2 (en) 2010-11-09 2022-11-01 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10931228B2 (en) 2010-11-09 2021-02-23 Solaredge Technologies Ftd. Arc detection and prevention in a power generation system
US11070051B2 (en) 2010-11-09 2021-07-20 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673229B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US10673222B2 (en) 2010-11-09 2020-06-02 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
US11349432B2 (en) 2010-11-09 2022-05-31 Solaredge Technologies Ltd. Arc detection and prevention in a power generation system
DE102010060784A1 (de) 2010-11-24 2012-05-24 Tim Frey Hyperadapter
US9401599B2 (en) 2010-12-09 2016-07-26 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9935458B2 (en) 2010-12-09 2018-04-03 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US11271394B2 (en) 2010-12-09 2022-03-08 Solaredge Technologies Ltd. Disconnection of a string carrying direct current power
US9866098B2 (en) 2011-01-12 2018-01-09 Solaredge Technologies Ltd. Serially connected inverters
US11205946B2 (en) 2011-01-12 2021-12-21 Solaredge Technologies Ltd. Serially connected inverters
US10666125B2 (en) 2011-01-12 2020-05-26 Solaredge Technologies Ltd. Serially connected inverters
US10396662B2 (en) 2011-09-12 2019-08-27 Solaredge Technologies Ltd Direct current link circuit
US10931119B2 (en) 2012-01-11 2021-02-23 Solaredge Technologies Ltd. Photovoltaic module
US10381977B2 (en) 2012-01-30 2019-08-13 Solaredge Technologies Ltd Photovoltaic panel circuitry
US11620885B2 (en) 2012-01-30 2023-04-04 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US11929620B2 (en) 2012-01-30 2024-03-12 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9812984B2 (en) 2012-01-30 2017-11-07 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US9853565B2 (en) 2012-01-30 2017-12-26 Solaredge Technologies Ltd. Maximized power in a photovoltaic distributed power system
US9923516B2 (en) 2012-01-30 2018-03-20 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US10608553B2 (en) 2012-01-30 2020-03-31 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US10992238B2 (en) 2012-01-30 2021-04-27 Solaredge Technologies Ltd. Maximizing power in a photovoltaic distributed power system
US11183968B2 (en) 2012-01-30 2021-11-23 Solaredge Technologies Ltd. Photovoltaic panel circuitry
US9639106B2 (en) 2012-03-05 2017-05-02 Solaredge Technologies Ltd. Direct current link circuit
US9235228B2 (en) 2012-03-05 2016-01-12 Solaredge Technologies Ltd. Direct current link circuit
US10007288B2 (en) 2012-03-05 2018-06-26 Solaredge Technologies Ltd. Direct current link circuit
US10115841B2 (en) 2012-06-04 2018-10-30 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US11177768B2 (en) 2012-06-04 2021-11-16 Solaredge Technologies Ltd. Integrated photovoltaic panel circuitry
US10778025B2 (en) 2013-03-14 2020-09-15 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US9941813B2 (en) 2013-03-14 2018-04-10 Solaredge Technologies Ltd. High frequency multi-level inverter
US11545912B2 (en) 2013-03-14 2023-01-03 Solaredge Technologies Ltd. High frequency multi-level inverter
US9548619B2 (en) 2013-03-14 2017-01-17 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy
US11742777B2 (en) 2013-03-14 2023-08-29 Solaredge Technologies Ltd. High frequency multi-level inverter
US10651647B2 (en) 2013-03-15 2020-05-12 Solaredge Technologies Ltd. Bypass mechanism
US11424617B2 (en) 2013-03-15 2022-08-23 Solaredge Technologies Ltd. Bypass mechanism
US9819178B2 (en) 2013-03-15 2017-11-14 Solaredge Technologies Ltd. Bypass mechanism
DE102013104940A1 (de) 2013-05-14 2014-11-20 Norbert Danneberg Wandlerschaltung
US10886831B2 (en) 2014-03-26 2021-01-05 Solaredge Technologies Ltd. Multi-level inverter
US11296590B2 (en) 2014-03-26 2022-04-05 Solaredge Technologies Ltd. Multi-level inverter
US11855552B2 (en) 2014-03-26 2023-12-26 Solaredge Technologies Ltd. Multi-level inverter
US10886832B2 (en) 2014-03-26 2021-01-05 Solaredge Technologies Ltd. Multi-level inverter
US11632058B2 (en) 2014-03-26 2023-04-18 Solaredge Technologies Ltd. Multi-level inverter
US9318974B2 (en) 2014-03-26 2016-04-19 Solaredge Technologies Ltd. Multi-level inverter with flying capacitor topology
DE102015116455A1 (de) 2015-09-29 2017-03-30 Endress+Hauser Flowtec Ag Energieversorgung von Messgeräten aus leistungsinstabilen Energiequellen
US11201476B2 (en) 2016-04-05 2021-12-14 Solaredge Technologies Ltd. Photovoltaic power device and wiring
US11177663B2 (en) 2016-04-05 2021-11-16 Solaredge Technologies Ltd. Chain of power devices
US11018623B2 (en) 2016-04-05 2021-05-25 Solaredge Technologies Ltd. Safety switch for photovoltaic systems
US11870250B2 (en) 2016-04-05 2024-01-09 Solaredge Technologies Ltd. Chain of power devices
US10230310B2 (en) 2016-04-05 2019-03-12 Solaredge Technologies Ltd Safety switch for photovoltaic systems
CN106774612A (zh) * 2017-03-01 2017-05-31 电子科技大学 局部阴影下基于梯度法极值搜索的光伏最大功率跟踪方法
CN111949065B (zh) * 2020-08-25 2022-05-17 深圳市英威腾电气股份有限公司 一种光伏水泵系统及其功率调控方法、装置、设备及介质
CN111949065A (zh) * 2020-08-25 2020-11-17 深圳市英威腾电气股份有限公司 一种光伏水泵系统及其功率调控方法、装置、设备及介质

Also Published As

Publication number Publication date
EP1750193B1 (de) 2019-01-16
DE102005032864B4 (de) 2011-04-14
EP1750193A1 (de) 2007-02-07
US7471073B2 (en) 2008-12-30
US20070027644A1 (en) 2007-02-01

Similar Documents

Publication Publication Date Title
DE102005032864B4 (de) Verfahren zum Auffinden eines Leistungsmaximums eines Photovoltaik-Generators
EP2104200B1 (de) Verfahren zur ansteuerung eines multi-string-wechselrichters für photovoltaikanlagen
EP1995656A1 (de) Verfahren zur Leistungsanpassung
EP1920525A2 (de) Steuerungsanordnung für einen spannungskonverter und verfahren
DE2461449A1 (de) Zerhacker-vorschaltanordnung fuer gasentladungslampen
EP2360546B1 (de) Verfahren zum Ermitteln eines Punktes maximaler Leistung von Photovoltaikgeneratoren
EP3414778B1 (de) Schutzschaltung für ein photovoltaik (pv)-modul, verfahren zum betrieb der schutzschaltung und photovoltaik (pv)-anlage mit einer derartigen schutzschaltung
DE102014119100A1 (de) System und verfahren für einen leistungswandler
EP2580843B1 (de) Verfahren und vorrichtung zur steuerung einer elektrischen stromerzeugung eines submoduls in einer photovoltaikanlage
DE102011118545A1 (de) Verfahren und Vorrichtung zum Erzeugen eines Stromsteuerwerts zum Verfolgen eines maximalen Leistungspunkts in einem Solarenergieerzeugungssystem
DE112012007201T5 (de) Maximum Power Point Tracking Controller und zugeordnete Systeme und Methoden
DE102017222265A1 (de) Gleichspannungswandler
DE1804130C3 (de)
EP3086429B1 (de) Steuerungssystem für eine windenergieanlage oder einen windpark und steuerungsverfahren
DE102013202600B4 (de) Verfahren zur Ertragsoptimierung eines teilverschatteten Photovoltaik-Feldes
WO2006111428A1 (de) Verfahren zum betreiben eines wechselrichters mit vorgeschaltetem hochsetzer
WO2023111288A1 (de) Vorrichtung und verfahren zum umwandeln elektrischer leistung
EP1309063B1 (de) Anlage zur Einspeisung von Strom aus Gleichstromerzeugern in das Wechselstromnetz
DE102019127198B4 (de) Verfahren zum betrieb einer energieerzeugungsanlage und energieerzeugungsanlage mit dem verfahren
DE3801399A1 (de) Netzteil zur erzeugung einer geregelten gleichspannung
DE102018108462B4 (de) Verfahren zum Betrieb eines Photovoltaik-Wechselrichters, Wechselrichter und Anlage mit einem derartigen Wechselrichter
WO2019002528A9 (de) Verfahren und vorrichtung zum elektrischen verbinden eines transformators mit einem elektrischen netz
WO2013060692A2 (de) Nachführverfahren und -einrichtung für einen spannungswandler für eine photovoltaikanlage
EP2826126B1 (de) Leistungselektronische anordnung mit symmetrierung eines spannungsknotens im zwischenkreis
EP2372889A2 (de) Schaltungsanordnung und Verfahren zur Erzeugung einer Wechselspannung aus einer Mehrzahl von ungeregelten Spannungsquellen mit zeitlich variabler Ausgangsgleichspannung

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: SMA SOLAR TECHNOLOGY AG, 34266 NIESTETAL, DE

R020 Patent grant now final
R020 Patent grant now final

Effective date: 20110830

R082 Change of representative
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee