DE102004053448A1 - Component structure used in high building structures comprises a first component formed as a corner handle of a braced mast or tower and a second component formed as a pot of a pod - Google Patents
Component structure used in high building structures comprises a first component formed as a corner handle of a braced mast or tower and a second component formed as a pot of a pod Download PDFInfo
- Publication number
- DE102004053448A1 DE102004053448A1 DE200410053448 DE102004053448A DE102004053448A1 DE 102004053448 A1 DE102004053448 A1 DE 102004053448A1 DE 200410053448 DE200410053448 DE 200410053448 DE 102004053448 A DE102004053448 A DE 102004053448A DE 102004053448 A1 DE102004053448 A1 DE 102004053448A1
- Authority
- DE
- Germany
- Prior art keywords
- pot
- component
- corner
- preamble
- invention according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Wind Motors (AREA)
Abstract
Description
Die vorliegende Erfindung betrifft eine Verbindungsanordnung und eine Gestaltung von zumindest zwei miteinander zu verbindenden Teilen.The The present invention relates to a connection arrangement and a Design of at least two parts to be joined together.
Verbindungsanordnungen der vorgenannten Art werden häufig im Stahlbau, insbesondere im Hochbau, verwendet, um einzelne Tragwerkselemente zusammengesetzter Tragstrukturen zu verbinden.connecting arrangements Of the aforementioned type are common used in steel construction, especially in building construction, to individual structural elements composite supporting structures.
Dazu werden zur Verbindung der Tragwerkselemente vorzugsweise Schraubbolzen eingesetzt, die ein Verspannen der Tragwerkselemente ermöglichen. Bei der Montage der Tragwerkselemente werden vorhandene Durchgangslöcher in eine Überdeckungsposition gebracht. Anschließend wird ein Gewindebolzen in eine Gewindemutter eingeschraubt und mit einem gegebenen Moment angezogen, so dass eine Vorspannkraft erzeugt wird, die die zu verbindenden Elemente der Tragstruktur aufeinander presst.To are for connecting the structural elements preferably bolt used, which allow a distortion of the structural elements. When mounting the structural elements existing through holes in a covering position brought. Subsequently a threaded bolt is screwed into a threaded nut and with tightened at a given moment, so that generates a biasing force is pressed against each other, the elements to be connected to the support structure.
Hierbei wird die Vorspannkraft so bemessen, dass die durch das Eigengewicht oder z.B. durch Windlasten oder den Betrieb auftretende Belastungen nicht zu einer schädlichen Querkraftbelastung der Bolzenverbindung führen.in this connection the preload force is calculated so that the by its own weight or e.g. wind loads or operation occurring loads not a harmful one Guide the lateral force load on the bolt connection.
Vielmehr werden die auftretenden Kräfte durch die kraftschlüssige Verbindung der Tragwerkselemente übertragen. Verbindungen dieser Art sind vor allem im Bereich des Stahlhochbaus zu finden. Eine besondere Bedeutung kommt den angeführten Verbindungen z.B. bei Windkraftanlagen und bei Krantürmen zu.Much more the forces are transmitted the non-positive Transfer connection of the structural elements. Compounds of this Art are mainly found in the field of structural steelwork. A Of particular importance is the cited compounds, e.g. at Wind turbines and tower cranes to.
Hier
existieren bereits Ansätze
den Kraftfluss innerhalb z.B. einer Mastkonstruktion zu vergleichmäßigen. In
der
Insbesondere bei der Gestaltung der Verbindung von Windenergieanlagen, welche einen Turm und eine Gondel aufweisen, gewinnt das Problem des durch Kraftspitzen gekennzeichneten Überganges von Kräften innerhalb der Tumkonstruktion an Bedeutung. In der Gondel befindet sich ein Generator, der einen Rotor mit mindestens einem Rotorblatt aufweist.Especially in the design of the connection of wind turbines, which a tower and a gondola wins the problem of Force peaks marked transition of forces within the Tumkonstruktion in importance. Located in the gondola a generator having a rotor with at least one rotor blade.
Der
Rotor wirkt dabei als Hebel u.a. für die am Rotor auftretenden
Windkräfte.
Deshalb werden an der Verbindungsstelle von der Gondel zu den Eckstielen
(
Weiterhin folgt die Gondel in Ihrer Ausrichtung der Windrichtung, woraus eine weitere Änderung der Belastungsrichtung für die Verbindung resultiert.Farther follows the nacelle in your orientation of the wind direction, from which one further change the loading direction for the connection results.
Bei
dem Übergang
von den Eckstielen (
Daraus resultieren im Zusammenwirken mit den oben genannten Kräfteverhältnissen Spitzen im Kraftverlauf innerhalb der Tragwerkselemente, welche zu schädlichen Belastungen der Tragwerkselemente oder/und der Elemente der Bolzenverbindung führen können.from that result in interaction with the above-mentioned balance of power Tips in the course of force within the structural elements, which too harmful May cause stress on the structural elements and / or the elements of the bolt connection.
Die während des Betriebes der Windkraftanlage auftretenden Kräfte, führen zudem zu Turmschwingungen und verursachen unter bestimmten Bedingungen auch eine elastische Verformung und damit eine wiederkehrende Veränderung der Planebenheit des Lagerflansches des Azimutwälzlagers von Windkraftanlagen. Diese Lagerflansche der Azimutwälzlager erfüllen dann nicht mehr die von der Herstellern der Wälzlager geforderten engen Toleranzen in Bezug auf die Planebenheit, welche für den sicheren Betrieb und die rechnerische Lebensdauer erforderlich sind. Die genannten Betriebszustände und die daraus resultiernden elastischen Verformungen können die Lebensdauer des Wälzlagers erheblich vermindern und im schlimmsten Fall auch zu dessen Zerstörung führen.The while the operation of the wind turbine forces occur, also lead to tower vibrations and cause under certain conditions also an elastic deformation and thus a recurring change the flatness of the bearing flange of the Azimutwälzlagers of wind turbines. These bearing flanges of the azimuth bearings fulfill then no longer required by the manufacturers of bearings tight tolerances in terms of plausibility, which for safe operation and the computational life is required. The mentioned operating conditions and the resulting elastic deformations can be the Life of the rolling bearing significantly reduce and in the worst case lead to its destruction.
Die Aufgabe der Erfindung ist es deshalb, eine Konstruktion zur Verfgügung zu stellen, welche auch bei wechselnden Lastfällen einen möglichst gleichmäßigen Kraftübergang zwischen den Bauteilen der Konstruktion gewährleistet und eine Verformung im Bereich des Überganges von den Eckstielen zu der Befestigung von Baugruppen am oberen Ende des Turmes vermindert.The The object of the invention is therefore to provide a construction available provide, even with changing load cases as even force transfer between the components of the construction and ensures a deformation in the area of the transition from the corner stems to the mounting of assemblies at the top of the tower diminished.
Diese
Aufgabe wird durch eine Erfindungsanordnung entsprechend des Oberbegriffs
des Anspruchs 1 gelöst.
Grundgedanke ist dabei, eine schädliche
Belastung der Bolzenverbindungen und/oder des Azimutlagers zu vermeiden,
indem der Übergang
der Kräfte
vom Topf (
Die
besondere Form des Anschlusses der Eckstiele (
Zur Illustration der Ausführungen zeigt:to Illustration of the achievements shows:
Eine
besonders vorteilhafte Ausführung
der Erfindung bildet die Einbringung von Nuten (
Um
die Konzentration der Kräfte
an den Enden der Schlitze zu vermeiden, ist es vorteilhaft den Übergang
von den Schlitzen zu dem Topf (
Eine
weitere besonders vorteilhafte Ausgestaltung der Erfindung bildet
die Verwendung eines zum eigentlichen Profil des Eckstieles (
Eine
weitere besonders vorteilhafte Ausführungsform der Erfindung ergibt
sich dadurch, dass die Eckstiele (
Weiterhin
ist es erfindungsgemäß vorgesehen,
dass das Medium zwischen dem Topf (
In
besonders vorteilhafter Ausgestaltung der Erfindung befindet sich
zwischen diesen formschlüssigen
Elementen zusätzlich
ein elastischer Werkstoff. Hier kann es sinnvoll sein, den elastischen
Werkstoff mittels z.B. eines Spannringes, der vorzugsweise aus Segmenten
besteht, vorzuspannen, um so einen besonders vorteilhaften Kraftübergang
zwischen dem Topf (
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200410053448 DE102004053448A1 (en) | 2004-11-05 | 2004-11-05 | Component structure used in high building structures comprises a first component formed as a corner handle of a braced mast or tower and a second component formed as a pot of a pod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200410053448 DE102004053448A1 (en) | 2004-11-05 | 2004-11-05 | Component structure used in high building structures comprises a first component formed as a corner handle of a braced mast or tower and a second component formed as a pot of a pod |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102004053448A1 true DE102004053448A1 (en) | 2006-05-11 |
Family
ID=36217149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200410053448 Withdrawn DE102004053448A1 (en) | 2004-11-05 | 2004-11-05 | Component structure used in high building structures comprises a first component formed as a corner handle of a braced mast or tower and a second component formed as a pot of a pod |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102004053448A1 (en) |
-
2004
- 2004-11-05 DE DE200410053448 patent/DE102004053448A1/en not_active Withdrawn
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1398499B1 (en) | Attachment of rotor blades to the hub of a wind turbine | |
EP2831414B1 (en) | Wind turbine comprising gearbox supporting means and method for maintaining said gearbox supporting means | |
EP2831413B1 (en) | Wind turbine comprising gearbox supporting means and method for maintaining said gearbox supporting means | |
EP1636490B1 (en) | Rotor blade connection | |
EP3550140B1 (en) | Machine support for wind turbine | |
EP1024081A2 (en) | Blade root for propellers and rotor blades | |
EP3208457A1 (en) | Pelton wheel | |
EP1878917A2 (en) | Wind turbine | |
DE102010044297B4 (en) | torque arm | |
CH666728A5 (en) | ROTOR OF A WIND TURBINE. | |
AT521885B1 (en) | Gondola for a wind turbine | |
DE10310639A1 (en) | Output configuration for wind turbines | |
EP3921494A1 (en) | Device and method for releasing a stressing strand | |
DE20114647U1 (en) | Wind turbine | |
EP0056171B1 (en) | Fixing device for a tubine casing | |
EP2059673A2 (en) | Wind energy installation | |
DE102005017162A1 (en) | Flange link between upright frame and tub superstructure is fabricated from cast metal | |
DE202004017080U1 (en) | Linked components for uncoupling elements in a supporting framework adjust different levels of rigidity through structural measures or force transmission or use of material | |
DE102004053448A1 (en) | Component structure used in high building structures comprises a first component formed as a corner handle of a braced mast or tower and a second component formed as a pot of a pod | |
AT524318B1 (en) | Plain bearing, and a gondola equipped with the plain bearing for a wind turbine | |
EP2036816A2 (en) | Detachable force-fit and form-fit connection of a grounding body with a rotatable component | |
EP3775532B1 (en) | Wind turbine rotor blade and wind turbine | |
EP4155530A1 (en) | Wind turbine rotor blade and a method of assembling a wind turbine rotor blade | |
EP3159536A1 (en) | Rotor arrangement for a turbine | |
WO2024103098A1 (en) | Plain bearing, a gondola equipped with the plain bearing for a wind turbine, a method for exchanging plain bearing pads in the plain bearing, and a device for exchanging the plain bearing pads |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ON | Later submitted papers | ||
8101 | Request for examination as to novelty | ||
8127 | New person/name/address of the applicant |
Owner name: RUUKKI DORTMUND GMBH, 44143 DORTMUND, DE |
|
8181 | Inventor (new situation) |
Inventor name: HUESEMANN-LAMMERT, KLAUS, 32351 STEMWEDE, DE |
|
R163 | Identified publications notified |
Effective date: 20110624 |
|
R012 | Request for examination validly filed |
Effective date: 20111103 |
|
R082 | Change of representative |
Representative=s name: GRAMM, LINS & PARTNER GBR, DE |
|
R081 | Change of applicant/patentee |
Owner name: RAUTARUUKKI OYJ, FI Free format text: FORMER OWNER: RUUKKI DORTMUND GMBH, 44143 DORTMUND, DE Effective date: 20130205 |
|
R082 | Change of representative |
Representative=s name: GRAMM, LINS & PARTNER PATENT- UND RECHTSANWAEL, DE Effective date: 20130205 Representative=s name: GRAMM, LINS & PARTNER GBR, DE Effective date: 20130205 |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |