DE1017564B - Delay in the construction of the mine and its method of manufacture - Google Patents

Delay in the construction of the mine and its method of manufacture

Info

Publication number
DE1017564B
DE1017564B DEST8929A DEST008929A DE1017564B DE 1017564 B DE1017564 B DE 1017564B DE ST8929 A DEST8929 A DE ST8929A DE ST008929 A DEST008929 A DE ST008929A DE 1017564 B DE1017564 B DE 1017564B
Authority
DE
Germany
Prior art keywords
concrete
iron
anchoring
attached
delay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEST8929A
Other languages
German (de)
Inventor
Rudolf Stoecker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB779052A external-priority patent/GB708098A/en
Application filed by Individual filed Critical Individual
Priority to DEST8929A priority Critical patent/DE1017564B/en
Publication of DE1017564B publication Critical patent/DE1017564B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

DEUTSCHESGERMAN

Im Tunnel- oder Streckenausbau werden aus armiertem Beton, vorzugsweise aus Bimsbeton, hergestellte Verzugsplatten oder -balken verwendet. Verzugselemente aus doppelt bewehrtem Bimsbeton, bei dem in der Druck- und in der Zugzone eine Armierung in Bimsbeton eingebettet ist, haben sich besonders bewährt, weil man mit ihnen eine neue Belastungsart mit großer Durchbiegungsmöglichkeit der Platten oder Balken zur Aufnahme von Gebirgskräften erreicht. Diese Verzugselemente werden zur Erreichung einer großen Tragfähigkeit auf die tragenden Ausbauteile, z. B. Stahlbögen, überlappt aufgelegt. Infolge der durch die Griffigkeit des Bimsbetons erhöhten Reibung zwischen Gebirge, Verzug und Ausbau werden die Verzugselemente unterein·- ander und mit dem tragenden Ausbau durch den Gebirgsdruck beidseitig fest so eingespannt, daß sie nicht nur auf Biegung, sondern im wesentlichen auf Zug beansprucht werden, wobei die Nachgiebigkeit des Bimsbetons und die Dehnung der Armierungseisen voll ausgenutzt und dadurch überraschende Tragfähigkeiten erreicht werden.Reinforced concrete, preferably pumice concrete, is used to build tunnels or routes Warping plates or beams are used. Warping elements made of double-reinforced pumice concrete, included with reinforcement embedded in pumice concrete in the compression and tension zones, have turned out to be particularly good proven because they create a new type of load with a large amount of deflection Reached plates or beams to absorb mountain forces. These delay elements are used to achieve a large load-bearing capacity on the supporting components, e.g. B. steel arches, placed overlapped. As a result of the increased friction between the mountains due to the grip of the pumice concrete, warpage and expansion, the distortion elements become one with the other and with the load-bearing expansion through the rock pressure firmly clamped on both sides so that they not only bend, but essentially on Tensile stress, whereby the resilience of the pumice concrete and the elongation of the reinforcing iron fully utilized and thereby surprising load capacities can be achieved.

Die Erfindung hat sich die Aufgabe gestellt, die Eigenschaften von flächen- oder balkenartigen Verzugselementen, vor allem für den Schachtausbau zu verbessern, indem durch eine ermöglichte überlappte Anordnung eine Verbesserung der Plattentragfähigkeit erreicht wird.The invention has the task of improving the properties of sheet-like or bar-like distortion elements, especially for the expansion of the shaft to be improved by an overlapped one made possible Arrangement an improvement in the plate load-bearing capacity is achieved.

Die Erfindung betrifft einen Verzug für Grubenausbau aus armierten Bimsbetonplatten oder -balken nach dem Hauptpatent 944 002 und besteht darin, an den Armierungseisen Eisen zu befestigen, die aus den Platten oder Balken im Abstand von ihren Enden herausragen und hakenartig abgebogen sind. Die Armierung der Platten oder Balken nach der Erfindung kann aus mit Ouerstegen versehenen Stahldrähten mit an den Querstegen befestigten Anhängehaken bestehen, die an der Plattenunterseite herausragen und am Schacht oder Streckenausbau anhakbar sind.The invention relates to a delay for pit lining made of reinforced pumice concrete slabs or beams according to the main patent 944 002 and consists in attaching irons to the reinforcing bars, which consist of the Plates or beams protrude at a distance from their ends and are bent like a hook. The reinforcement the plates or beams according to the invention can be made of steel wires provided with crossbars There are hanging hooks attached to the crossbars that protrude from the underside of the plate and can be hooked onto the shaft or route extension.

Die durch die Erfindung erreichten Vorteile sind darin zu sehen, daß die Verzugselemente in ihrer ganzen Breite an den Ausbauteilen, z. B. Schachtausbauringen, Stahlbögen u. dgl. anliegen und an letzteren so angehakt werden können, daß die angrenzenden Platten überlappt anzuordnen sind. Unter dem Einfluß von Gebirgskräften drücken die überlappt angeordneten Ausbauelemente an den Überlappungsstellen gegeneinander und gegen die Ausbaurahmen, wodurch eine Verbundswirkung erreicht wird, bei der die Ausbauelemente wie ein doppelseitig eingespannter Balken auf Biegung und Zerreißung beansprucht und die Zugfestigkeit durch die Armierung in Verbindung mit den Stahlankern nach der Erfindung erhöht wird.The advantages achieved by the invention can be seen in the fact that the delay elements in their entirety Width of the expansion parts, e.g. B. shaft expansion rings, steel arches and the like. And on the latter can be ticked so that the adjacent panels are to be arranged overlapping. Under the influence Rock forces press the overlapping extension elements at the overlapping points against each other and against the extension frames, whereby a composite effect is achieved in which the extension elements like a double-sided clamped Beams are subjected to bending and tearing and the tensile strength is related to the reinforcement is increased with the steel anchors according to the invention.

Verzug für Grubenausbau und Verfahren zu seiner HerstellungDelay in mine construction and method of its manufacture

Zusatz zum Patent 944 002Addendum to patent 944 002

Anmelder:Applicant:

Rudolf Stöcker,Rudolf Stocker,

Essen-Stadtwald, Am Waldsaum 55 Essen-Stadtwald, Am Waldsaum 55

Rudolf Stöcker, Essen-Stadtwald,
ist als Erfinder genannt worden
Rudolf Stöcker, Essen City Forest,
has been named as the inventor

Die Verankerungseisen können sowohl an den Querstegen als auch an den Längsstegen der Balkenarmierung befestigt werden. Zweckmäßig bestehen sie aus Laschen, die z. B. durch Längsschlitze am Befestigungsende in mehrere Schenkel aufgegabelt und durch Abbiegung mit der Armierung, z. B. mit den Ouerstegen, verbunden oder mit diesen verschweißt werden.The anchoring irons can be used both on the transverse webs and on the longitudinal webs of the beam reinforcement be attached. Appropriately, they consist of tabs that z. B. through longitudinal slots at the attachment end forked up into several legs and by bending with the reinforcement, z. B. with the Ouerstegen, connected or welded to these.

Da die Verankerungseisen ein flaches Anliegen der Bimsbetonplatten oder -balken am Ausbau ermöglichen, kann deren Stahlarmierung im auf Scherung beanspruchten Überlappungsbereich mit Abbiegungen und dadurch mit Verstärkungen versehen werden.Since the anchoring irons allow the pumice concrete slabs or beams to rest flat on the extension, can their steel reinforcement in the shear stressed overlap area with bends and are thereby provided with reinforcements.

Die Erfindung betrifft auch ein Verfahren, um Verzugselemente nach der Erfindung herzustellen. Es besteht darin, mit Hilfe eines an sich bekannten Rütteltisches zur Herstellung von Betonformteilen in eine Form Armierungseisen einzulegen, an denen die Verankerungseisen ohne Abbiegung ihrer freien Enden so befestigt sind, daß sie an der Unterseite der herzustellenden Verzugselemente im Formkasten ruhen; wenn nach dem Einfüllen von Beton und nach dem Schütteln der Betonkörper in bekannter Weise hergestellt und der Beton abgebunden ist, wird durch Anlegen eines Widerlagers an das Verankerungseisen an dessen freiem Ende ein Haken gebildet. Auf diese Weise ist es möglich, in allen Rüttelmaschinen auch Verzugselemente mit Ankern herzustellen, die im Betonkörper oberflächengleich eingebettet liegen und ein flächiges Anliegen der Betonkörper an den Ausbaueisen ermöglicht. Umbauten an den Maschinen oder die Verwendung besonderer Formkästen sind somit nicht erforderlich, und es hat sich ergeben, daß durch den ErfindungsVorschlag die Fertigung derThe invention also relates to a method for producing drafting elements according to the invention. It exists therein, with the help of a known vibrating table for the production of concrete moldings in a Form reinforcement bars to which the anchoring bars can be attached without bending their free ends are attached so that they are on the underside of the delay elements to be produced in the molding box rest; if after pouring concrete and after shaking the concrete body in a known manner produced and the concrete is set, is done by placing an abutment on the anchoring iron a hook is formed at its free end. In this way it is possible in all jogging machines too Manufacture warping elements with anchors that are embedded in the concrete body with the same surface and allows the concrete body to lie flat against the reinforcement bars. Modifications to the machines or the use of special molding boxes are thus not required, and it has been found that by the invention proposal the manufacture of

709 756/135709 756/135

Verzugselemente nicht beeinträchtigt wird. Wenn man einen Teil der Verankerungseisen beispielsweise aus dem Formboden herausführen würde, würde ein ungleichmäßig dichtes Betongefüge entstehen, das sich auf die Festigkeitswerte des Verzuges nachteilig auswirkt. Warpage elements is not affected. If you have a part of the anchoring iron for example would lead out of the bottom of the mold, an unevenly dense concrete structure would arise that would has a detrimental effect on the strength values of the warpage.

Im folgenden wird die Erfindung an Hand einer lediglich ein Ausführungsbeispiel darstellenden Zeichnung erläutert; es zeigtIn the following, the invention is illustrated by means of a drawing that shows only one exemplary embodiment explained; it shows

Fig. 1 in schematischer Darstellung ein Verzugselement undFig. 1 in a schematic representation of a delay element and

Fig. 2 die Anordnung von Verzugselementen am Schachtausbau.2 shows the arrangement of delay elements on the shaft extension.

Die Fig. 1 zeigt in schematischer Darstellung die Stirnansicht eines Verzugselementes 1. Das Verzugselement 1 besitzt in seiner Zugzone eine Anzahl von Armierungseisen 2, die zum Teil beidseitig in den auf Scherung beanspruchten Bereichen und darüber hinaus so abgebogen sind, daß durch die Abbiegung Bewehrungszonen mit von der Längsrichtung abweichender Armierung entstehen, welche Scherkräfte, vor allem an den Auflagerstellen der Verzugselemente 1 auf den Schachtausbaurahmen aufnehmen. Wie die Fig. 1 zeigt, sind die Armierungseisen 2 durch Querstege 3 miteinander verbunden, an denen Verankerungseisen 4 befestigt oder angeschweißt sind. Die Verankerungseisen 4 liegen mit ihren freien Schenkeln 5 in einem ihrer Form entsprechenden Bett oberflächeneben im Verzugselement und sind an seinem Ende zu einem Haken 6 abgebogen.Fig. 1 shows a schematic representation of the front view of a warping element 1. The warping element 1 has in its tensile zone a number of reinforcing bars 2, some of which are bent on both sides in the areas subject to shear stress and beyond so that reinforcement zones with the bending Reinforcement deviating from the longitudinal direction occurs, which absorb shear forces, especially at the points of support of the warping elements 1 on the manhole support frame. As FIG. 1 shows, the reinforcing irons 2 are connected to one another by transverse webs 3, to which anchoring irons 4 are attached or welded. The anchoring irons 4 lie with their free legs 5 in a bed corresponding to their shape surface level in the delay element and are bent at its end to form a hook 6.

Fig. 2 zeigt im Querschnitt einen Blindschacht, an dessen Ausbaurahmen 7 durch Anhängen mittels Haken 6 die Verzugselemente 1 flächig anliegen und überlappt angeordnet sind, so daß die Verzugselemente durch den Gebirgsdruck an den Überlappungsstellen fest gegeneinander und gegen den Ausbau angedrückt werden und dabei wie zweiseitig fest eingespannte Balken wirken können.Fig. 2 shows in cross section a blind shaft, on the extension frame 7 by means of hanging Hook 6 the delay elements 1 lie flat and are arranged overlapping so that the delay elements by the rock pressure at the overlap points firmly pressed against each other and against the expansion and can act like beams that are firmly clamped on both sides.

Claims (5)

Patentansprüche:Patent claims: 1. Verzug aus armierten Bimsbetonplatten oder -balken für den Ausbau von Untertageräumen nach dem Hauptpatent 944 002, dadurch gekennzeichnet, daß an den Armierungseisen (2) der Platten oder Balken (1) mit Abstand von deren Ende aus dem Betonkörper herausgeführte, aber oberflächeneben eingebettete Verankerungseisen (4) befestigt sind.1. Warping from reinforced pumice concrete slabs or beams for the expansion of underground rooms according to the main patent 944 002, characterized in that the reinforcing iron (2) Slabs or beams (1) led out of the concrete body at a distance from their end, but Anchoring irons (4) embedded at the same surface are attached. 2. Verzug nach Anspruch 1, dadurch gekennzeichnet, daß die Betonkörperarmierungseisen (2) durch Querstege (3) miteinander verbunden und an den Querstegen (3) aus dem Betonkörper herausgeführte sowie am freien Ende zu einem Haken abgebogene Verankerungseisen befestigt sind.2. delay according to claim 1, characterized in that the concrete body reinforcement iron (2) connected to one another by transverse webs (3) and led out of the concrete body at the transverse webs (3) and anchoring irons bent to form a hook are attached at the free end. 3. Verzug nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß die Verankerungseisen (4) an den Längseisen und den Querstegen der Armierungseisen (2) befestigt sind.3. delay according to claims 1 and 2, characterized in that the anchoring iron (4) are attached to the longitudinal bars and the crossbars of the reinforcing bars (2). 4. Verzug nach den Ansprüchen 1 bis 3, dadurch gekennzeichnet, daß die als Verankerungseisen (4) angebrachten Laschen durch Aufgabelung in mehrere Schenkel an den Betonarmierungseisen (2) befestigt sind.4. delay according to claims 1 to 3, characterized in that the brackets attached as anchoring iron (4) by fork are attached in several legs to the concrete reinforcement iron (2). 5. Verfahren zur Herstellung von Verzugselementen nach den Ansprüchen 1 bis 4, dadurch gekennzeichnet, daß auf den Boden einer Betonform mit Armierungeisen verbundene Verankerungseisen (4) ohne hakenförmige Abbiegung von Enden (5) gelegt und nach dem Formen des Betonkörpers sowie dem Erhärten des Betons die freien Enden (5) der Verankerungseisen zu Haken (6) gebogen werden.5. A process for the production of delay elements according to claims 1 to 4, characterized characterized in that anchoring iron (4) connected to the bottom of a concrete form with reinforcing iron without a hook-shaped bend of Ends (5) placed and after the molding of the concrete body and the hardening of the concrete the free The ends (5) of the anchoring iron are bent into hooks (6). In Betracht gezogene Druckschriften:
Deutsche Patentschriften Nr. 7081, 508122;
USA.-Patentschriften Nr. 1 399 023, 1 468 285;
Zeitschrift »Concrete«, Februar 1952, S. 5 bis 8.
Considered publications:
German Patent Nos. 7081, 508122;
U.S. Patent Nos. 1,399,023, 1,468,285;
"Concrete" magazine, February 1952, pp. 5 to 8.
Hierzu 1 Blatt Zeichnungen1 sheet of drawings ©709756/135 10.57© 709756/135 10.57
DEST8929A 1952-03-26 1954-10-25 Delay in the construction of the mine and its method of manufacture Pending DE1017564B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEST8929A DE1017564B (en) 1952-03-26 1954-10-25 Delay in the construction of the mine and its method of manufacture

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB779052A GB708098A (en) 1952-03-26 1952-03-26 Improvements relating to walling for mines and the like and beams therefor
DEST8929A DE1017564B (en) 1952-03-26 1954-10-25 Delay in the construction of the mine and its method of manufacture

Publications (1)

Publication Number Publication Date
DE1017564B true DE1017564B (en) 1957-10-17

Family

ID=25993838

Family Applications (1)

Application Number Title Priority Date Filing Date
DEST8929A Pending DE1017564B (en) 1952-03-26 1954-10-25 Delay in the construction of the mine and its method of manufacture

Country Status (1)

Country Link
DE (1) DE1017564B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7081C (en) * H. U. MC. KlE in Carlisle (England) Innovations in machines for the production of sanded fabric surfaces on clay pipes
US1399023A (en) * 1920-03-10 1921-12-06 Murray Richard Building block or slab
US1468285A (en) * 1921-09-28 1923-09-18 Dampney Gerald Francis Concrete-slab building construction
DE508122C (en) * 1929-03-12 1930-09-24 Bernhard Schneider Building board

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7081C (en) * H. U. MC. KlE in Carlisle (England) Innovations in machines for the production of sanded fabric surfaces on clay pipes
US1399023A (en) * 1920-03-10 1921-12-06 Murray Richard Building block or slab
US1468285A (en) * 1921-09-28 1923-09-18 Dampney Gerald Francis Concrete-slab building construction
DE508122C (en) * 1929-03-12 1930-09-24 Bernhard Schneider Building board

Similar Documents

Publication Publication Date Title
DE877057C (en) Building panels, in particular made of rolled metal
DE1017564B (en) Delay in the construction of the mine and its method of manufacture
DE2840169A1 (en) EQUIPMENT FOR CREATING WALL SURFACES
DE943905C (en) Reinforced concrete slab ceiling
DE2153495A1 (en) PREFABRICATED CEILING PANEL FOR ASSEMBLY CONSTRUCTION
DE862496C (en) Arched formwork element for the production of concrete ceilings using prefabricated beams
DE961433C (en) Warping board for pit lining
DE734490C (en) Casting mold for the production of concrete or reinforced concrete ceilings
DE959632C (en) Warped plank
DE545372C (en) Load-bearing component for cross-reinforced ceilings
DE896860C (en) Pre-stressed reinforcement element made of shaped stones
DE936204C (en) Anchor for the pit lining
AT203691B (en) Ceiling molded stone for the production of brick beams
DE807015C (en) Reinforced concrete ceiling
DE809705C (en) Plaster support made of wooden rod fabric
DE334431C (en) Ceiling made of upright wooden planks or wooden boards and a concrete top layer
DE805071C (en) Reinforced concrete rib ceiling
DE957291C (en) Delay for pit construction
DE944002C (en) Delay for larger pit construction
DE517763C (en) Form rail for shuttering concrete roads or the like.
AT241772B (en) Process for the production of a tension belt
AT365267B (en) PROFILE SHEET FORM FOR CONCRETE COMPOSITE CEILINGS
AT21321B (en) Method for tensioning iron inlays encompassing the girder flanges from below in solid ceilings.
DE1027611B (en) Impact delay for the shaft and route expansion
DE822437C (en) Mounting brackets, in particular for the production of reinforced concrete ceilings