DE1002386C2 - Circuit arrangement for signal boxes in railway security - Google Patents

Circuit arrangement for signal boxes in railway security

Info

Publication number
DE1002386C2
DE1002386C2 DE1955L0022766 DEL0022766A DE1002386C2 DE 1002386 C2 DE1002386 C2 DE 1002386C2 DE 1955L0022766 DE1955L0022766 DE 1955L0022766 DE L0022766 A DEL0022766 A DE L0022766A DE 1002386 C2 DE1002386 C2 DE 1002386C2
Authority
DE
Germany
Prior art keywords
relay
switched
circuit arrangement
arrangement according
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1955L0022766
Other languages
German (de)
Other versions
DE1002386B (en
Inventor
Robert Helmert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alcatel Lucent Deutschland AG
Original Assignee
Standard Elektrik Lorenz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Standard Elektrik Lorenz AG filed Critical Standard Elektrik Lorenz AG
Priority to DE1955L0022766 priority Critical patent/DE1002386C2/en
Publication of DE1002386B publication Critical patent/DE1002386B/en
Application granted granted Critical
Publication of DE1002386C2 publication Critical patent/DE1002386C2/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L7/00Remote control of local operating means for points, signals, or track-mounted scotch-blocks
    • B61L7/06Remote control of local operating means for points, signals, or track-mounted scotch-blocks using electrical transmission
    • B61L7/08Circuitry
    • B61L7/10Circuitry for light signals, e.g. for supervision, back-signalling
    • B61L7/103Electric control of the setting of signals

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Description

BUNDESREPUBLIK DEUTSCHLANDFEDERAL REPUBLIC OF GERMANY

DEUTSCHESGERMAN

PATENTAMTPATENT OFFICE

PATENTSCHRIFT 1 002PATENT 1 002 ANMELDETAG:REGISTRATION DAY:

BEKANNTMACHUNG DER ANMELDUNG UND AUSGABE DER AUSLEGESCHRIFT:NOTICE THE REGISTRATION AND ISSUE OF EDITORIAL:

AUSGABE DER PATENTSCHRIFT:ISSUE OF PATENT LETTERING:

kl. 2Oi 13kl. 2Oi 13

INTERNAT. KL. B 61 IINTERNAT. KL. B 61 I.

23. AUGUST 1955AUGUST 23, 1955

14. FEBRUAR 1957 18. JULI 1957FEBRUARY 14, 1957 JULY 18, 1957

STIMMT OBEREIN MIT AUSLEGESCHRIFTAGREES ABOVE WITH EDITORIAL

1002 386 (L 22766 II/2Oi)1002 386 (L 22766 II / 2Oi)

In Stellwerken, in denen die Weichen über zu ihnen führende Leitungen ferngestellt und überwacht werden, ist es üblich, gemeinsame Einrichtungen vorzusehen, z. B. Wecker oder Lampen, die eingeschaltet werden, wenn eine Weiche gestört ist, beispielsweise wenn sie aufgefahren wird oder bei der Umstellung die Endlage nicht erreicht. Um zu vermeiden, daß die Störungsmeldung auch bei Umstellung der Weiche erscheint, schaltet man sie zweckmäßig mit einer gewissen Verzögerung· ein. Diese Verzögerung muß so erheblich sein, daß die Störungsmeldung auch dann nicht kommt, wenn mehrere Weichen nacheinander umgestellt werden. Das hat zur Folge, daß die Störungsmeldung auch bei Auftreten eines Fehlers, z. B. bei Bruch einer Überwachungsleitung oder beim Auffahren einer Weiche, erst nach längerer Zeit erscheint. In signal boxes in which the points are remotely controlled and monitored via lines leading to them it is common practice to provide common facilities, e.g. B. alarm clocks or lamps that are switched on when a switch is disturbed, for example when it is opened or when changing over the end position is not reached. In order to avoid that the error message also when changing the turnout appears, it is expediently switched on with a certain delay. This delay must be like this It can be significant that the malfunction message does not come even if several points are set one after the other be changed. The consequence of this is that the fault message will be issued even if an error occurs, z. B. in the event of a break in a monitoring line or when opening a switch, only appears after a long time.

Um diese Nachteile zu vermeiden, werden gemäß der Erfindung den Störungsmeldern ein oder mehrere Verzögerungsrelais zugeordnet, die bei jeder Einleitung der Umstellung einer Weiche vorübergehend in Arbeitsstellung gebracht werden und während ihrer Rückstellzeit das Störungssiignal abschalten. Diese ■Verzögerungsrelais können erfindungsgemäß auch dazu verwendet werden, die Stellspannung an die Weichen anzuschalten, so daß diese abgeschaltet wird, wenn eine bestimmte Zeit nach Anschaltung der letzten Weiche diese die Endlage nicht erreicht hat. Die Abschaltung der Stellspannung erfolgt dabei zweckmäßig dadurch, daß der Stromkreis der Stell-Spannungsanschalter der Weichen unterbrochen wird. Die Verzögerungsrelais können erfindungsgemäß entweder bei Einzelstellung -der Weichen durch Betätigung einer Weichengruppentaste oder bei fahrstraßenweiser Einstellung der Weichen diurch Betätigung einer Fahrstraßentaste eingeschaltet werdien. Werden die Weichen bei fahrstraßenweiser Einstellung zwecks Verminderung der Anlaufströmspitze nacheinander angeschaltet, so können, die Verzögerungsrelais auch bei jeder Einleitung eines Umstell-Vorganges durch. die Weiche vorübergehend ein-; geschaltet werden. ;In order to avoid these disadvantages, according to the invention, the fault alarms are one or more Delay relays are assigned, which are temporarily switched into Working position and switch off the malfunction signal during their reset time. This ■ Delay relays can also be used according to the invention to the control voltage to the Switch on turnouts so that it is switched off when a certain time after switching on the last switch this has not reached the end position. The control voltage is switched off expediently in that the circuit of the control voltage switch of the switches is interrupted. According to the invention, the delay relays can either be activated individually by activating the switches a turnout group key or a route indicator Setting of the turnouts can be switched on by pressing a route key. If the turnouts are set according to the route to reduce the inrush current switched on one after the other, the delay relays can also be used each time a changeover process is initiated through. the switch temporarily on; be switched. ;

Erfindungsgemäß ist es. zweckmäßig, zwei Verzöge^ rungsrelais zu verwenden, von denen das eine durch Drücken einer Taste oder durch Schließen eines der Weiche zugeordneten Kontaktes eingeschaltet und das andteire gleichzeitig abgeschaltet wird. Dabei erfolgt die Abschaltung des Störungsmelders und die Anschaltung der Stellspannung nur, solange beide Verzögerungsrelais in Arbeitsstellung sind. Dadurch wird erreicht, daß der Alarm auch, eingeschaltet und die Stellspannung auch abgeschaltet wird, wenn eine Taste steckenbleibt oder der der Weiche zugeordnete Kontakt sich nicht wieder öffnet. Zur Umschaltung S chaltungs anordnung für Stellwerke
im Eisenbahnsicherungswesen
It is according to the invention. It is advisable to use two delay relays, one of which is switched on by pressing a button or by closing a contact assigned to the switch and the other is switched off at the same time. The fault indicator is switched off and the control voltage is only switched on as long as both delay relays are in their working position. This ensures that the alarm is also switched on and the control voltage is also switched off if a key gets stuck or the contact assigned to the switch does not open again. For switching the circuit arrangement for interlockings
in railway safety

Patentiert für:Patented for:

C. Lorenz Aktiengesellschaft,
Stuttgart-Z uff enhaus en
C. Lorenz Aktiengesellschaft,
Stuttgart-Z uff enhaus en

Robert Helmert, Stuttgart,
ist als Erfinder genannt worden
Robert Helmert, Stuttgart,
has been named as the inventor

der Verzögerungsrelais wird' zweckmäßig ein Hilfs- ' relais verwendet.the delay relay is 'expediently an auxiliary' relay used.

An Stelle der beiden. Verzögerungsrelais kann man auch ein einziges Verzögerungsrelais verwenden, das abwechselnd an zwei Kondensatoren' angeschaltet wird, von denen der eine beispielsweise bei gedrückter Taste aufgeladen und bei losgelassener Taste über die Relaiswicklung entladen wird und dadurch die Abfallverzögerung des Relais bewirkt, während der zweite Kondensator umgekehrt geschaltet ist.Instead of the two. Delay relay you can also use a single delay relay, the is switched on alternately to two capacitors', one of which, for example, when pressed Button charged and when the button is released via the Relay winding is discharged and thereby the dropout delay of the relay while the second capacitor is reversed.

Die Einschaltung der Störungsmelder kann durch ein gemeinsames Prüfrelais gesteuert werden, das in bekannter Weise in Arbeitsstellung gebracht wird, wenn eine Weiche gestört ist. Man kann dann erfindungsgemäß die Anschaltung der Stellspannung auch davon abhängig machen, daß das Prüf relais sich in Arbeitsstellung befindet. Außerdem kann man im Stromkreis des Störungsmelders Kontakte des Prüfrelais oder der Verzögerungsrelais erfindungsgemäß derart anordnen, daß die Störungsmelder nur abgeschaltet werden, wenn sich alle Relais in Arbeitsstellung oder alle Relais in Ruhestellung befinden. Nach einem weiteren. Erfindungsmerkmal ist es vorteilhaft, den Störungsmelder durch die Kontakte der Relais kurzzuschließen, so daß er auch dann anspricht, wenn ein Kontakt nicht schließt. Wird als Störungsmelder ein Wecker verwendet, so kann man an Stelle des Weckers auch nar seinen Unterbrechungskontakt kurzschließen. Durch alle diese Maßnahmen wird erreicht, daß Störungen wie Hängenbleiben eines Relais u. dgl. sich betriebs'hindernd bemerkbar machen oder mindestens den Störungsmelder einschalten. DieThe activation of the fault indicator can be done by a common test relay can be controlled, which is brought into working position in a known manner, when a switch is disturbed. According to the invention, it is then also possible to connect the control voltage make it dependent on the test relay being in the working position. You can also use the Circuit of the fault indicator. Contacts of the test relay or arrange the delay relay according to the invention in such a way that the fault alarm is only switched off when all relays are in the working position or all relays are in the rest position. After another. Feature of the invention, it is advantageous to the malfunction indicator through the contacts of the To short-circuit the relay so that it responds even if a contact does not close. Used as a malfunction indicator If an alarm clock is used, you can also use an interrupt contact instead of the alarm clock short circuit. Through all of these measures it is achieved that disturbances such as getting stuck a Relays and the like make themselves noticeable to the operation or at least switch on the malfunction indicator. the

709 593/154709 593/154

1 UUZ 3ÖÖ1 UUZ 3ÖÖ

3 43 4

erfmdungsgemäße Schaltungsanordnung kann auch im Weichenantrieb geöffnet würde), so wird durch noch durch Meldelampen ergänzt werden, die in be- den sich schließenden Kontakt Ü2 das Prüfrelais P kannter Weise die verschiedenen Betriebszustände über die Kontakte F23 und F13 der beiden Verzögeanzeigen. In den Zeichnungen sind zwei mögliche rungsrelais eingeschaltet. Mit dem Kontakt P2 wird Ausführungsbeispiele der Erfindung dargestellt. 5 der durch die Kontakte P2, WU2, FIl und F22Circuit arrangement according to the invention can also be opened in the point machine), so is supplemented by signal lamps which, in the closing contact Ü2, the test relay P knows the various operating states via the contacts F23 and F13 of the two delay displays. Two possible relay relays are switched on in the drawings. Exemplary embodiments of the invention are illustrated with the contact P2. 5 of the contacts P2, WU 2, FIl and F22

Fig. 1 zeigt eine Schaltung unter Verwendung gebildete Kurzschluß des Weckerkontakts WX auf-Fig. 1 shows a circuit using formed short circuit of the alarm clock contact WX on-

zweier Verzögerungsrelais Vl und V2, während in gehoben, so daß der Wecker ertönt. Bedient man nuntwo delay relays Vl and V2, while in lifted, so that the alarm clock sounds. One serves now

der Schaltung nach Fig. 2 nur ein einziges Verzöge- die Unterbrechungstaste UT, so wird über die Wecker-the circuit according to FIG. 2 only a single delay the interrupt key UT, then the alarm clock

rungsrelais Vl verwendet ist. spule W und die Kontakte P 2, F21 und UT einrelay Vl is used. coil W and contacts P 2, F21 and UT

In beiden Figuren sind unterhalb der strichpunk- io Stromkreis für das Relais WU hergestellt, welches tierten Linie diejenigen Schaltmittel aus der Schaltung seinen Kontakt WU1 schließt und damit den Tasteneiner Weiche dargestellt, die zum Verständnis der kontakt UT überbrückt. Die Weckerspule bleibt in Erfindung erforderlich sind. Rechts ist in vereinfachter diesem Stromkreis dauernd erregt, so daß der Wecker Form der Überwachungsstromkreis der Weiche mit nicht mehr ertönt.In both figures, the dashed and dotted circuit for the relay WU is made, which tied line those switching means from the circuit closes its contact WU1 and thus the keys of a switch shown, which bridges the contact UT to understand. The alarm clock coil remains necessary in the invention. On the right this circuit is constantly excited in a simplified way, so that the alarm clock form the monitoring circuit of the switch no longer sounds.

dem Überwachungsrelais Ü und zwei vom Weichen- 15 Soll jetzt die gestörte (oder auch eine andere) antrieb gesteuerten Kontakten A + und A—gezeigt; Weiche umgestellt werden, so werden die beiden in der Pluslage der Weiche ist der Kontakt^ + Tasten WT und GT bedient; dadurch werden die geschlossen und der Kontakte— geöffnet. Links beiden gleichbezeichneten Kontakte geschlossen und daneben ist ein Relais R dargestellt, welches zur Ein- das Relais R eingeschaltet, welches . in der- ersten leitung der Weichenumstellung verwendet wird; es 20 Phase seines Arbeitens die Kontakte RaI und RaZ besitzt zwei Ruhelagen, und zwar jede entsprechend schließt und Ra2 öffnet, während gleichzeitig die einer Lage der Weiche. Das Relais R kann als zwei- Kontakte Rl und R2 umgelegt werden. Das öffnen lagiges Kipprelais ausgebildet sein, das beim ersten des Kontaktes Ra2 bleibt im dargestellten Fall ohne Einschalten in die eine, beim zweiten Einschalten in Wirkung, da der Überwachungsstromkreis schon durch die andere Rühelage kippt; es kann auch als Stütz- 25 den Kontakt A + geöffnet ist; andernfalls würde mit relais ausgebildet sein, welches jeweils beim Einleiten dem Kontakt Ra2 der Überwacher Ü !abgeschaltet der Weichenumstellung von der einen in die andere und dadurch das Prüf relais P eingeschaltet werden-,
Ruhelage umgestellt wird; im letzteren Fall wirkt die Mit dem Schließen des Kontaktes Ra3 ist das gegezeichnete Wicklung mit einer zweiten nicht gezeich- meinsame Hilfsrelais H eingeschaltet, worden. Vorher neten Wicklung derart zusammen, daß die Anker 30 wurden jedoch beim Ansprechen des Relais P dessen beider Wicklungen mechanisch gekuppelt sind und Kontakte Pl, PZ und PA geschlossen; mit dem jeweils der abgefallene Anker den angezogenen anderen Kontakt Pl wird ein Haltestromkreis für das Relais P Anker in der angezogenen Lage abstützt. Die Kon- hergestellt, der nur vom Kontaikt Ü2 abhängig ist;-takte RaI bis RaZ werden jedesmal beim Einschalten mit dem Kontakt PZ ist über den Kontakt H1 das des Relais R umgestellt und gehen beim Ausschalten 35 Relais Vl eingeschaltet und mit dem Kontakt P 4 das. in die gezeichnete Lage zurück; die Kontakte Rl Einschalten des Relais V2 vorbereitet worden. Wird und R2 dagegen bleiben nach dem ersten Einschalten jetzt der Kontakt H1 umgelegt, so wird das Relais Vl in der neuen Lage und kehren, erst beim zweiten Ein- aus- und das Relais V2 eingeschaltet. Da das Relais Vl schalten in die gezeichnete Lage zurück. Ferner ist über Kondensator Ko 1 und Widerstand FFiI mit' im unteren Teil der Figuren ein Relais 6* gezeigt, 40 einer erheblichen Abfallverzögerung versehen ist,, welches als Stellspannungsanschalter wirkt und mit bleiben zunächst beide Relais Vl und V2 angezogen., nicht gezeichneten Kontakten die Stellspannung für Die Kontakte F14 und F24 schließen, und über den den Motor des Weichenantriebs einschaltet. Kontakt Pl und die geschlossenen Kontakte RaI
the monitoring relay Ü and two from the turnout 15 Soll now the disturbed (or another) drive-controlled contacts A + and A - shown; Switches are changed over, the two are operated in the plus position of the switch, the contact ^ + keys WT and GT ; this closes the contacts and opens the contacts. Left two identically designated contacts closed and next to them a relay R is shown, which is switched on the relay R , which. the switch is used in the first line; it 20 phase of its work the contacts RaI and RaZ has two rest positions, each closes accordingly and Ra2 opens, while at the same time one position of the switch. The relay R can be switched as two contacts R1 and R2 . The open-layer toggle relay can be designed, which remains in the illustrated case without switching on in the one at the first of the contact Ra2 , in the second switching on, because the monitoring circuit already tilts through the other rest position; it can also be used as a support 25 the contact A + is open; otherwise, would be formed with relays, each of which Ra2 the monitor Ü! off changeover of the switch from the one werden- switched on in the other, and thereby the test relays P when initiating the contact,
Rest position is changed; In the latter case, the winding action with the closing of the contact Ra 3 is switched on with a second auxiliary relay H , not shown. Before the winding together in such a way that the armature 30 were, however, when the relay P responded, its two windings are mechanically coupled and contacts P1, PZ and PA are closed; with each of the fallen armature the attracted other contact Pl , a holding circuit for the relay P armature is supported in the tightened position. The connection, which is only dependent on the contact Ü2 ; -cycles RaI to RaZ are switched over each time when switching on with contact PZ , that of relay R is switched via contact H1, and when switched off 35 relay Vl is switched on and with contact P 4 that. back to the position shown; the contacts Rl switching on the relay V2 have been prepared. Is and R2 on the other hand, the contact H 1 remain after initial power now turned over, so the relay Vl in the new location and return, just off the second input and switched the relay V2. Since the relay Vl switch back to the position shown. Furthermore, is shown on capacitor Co 1 and resistance ffii with 'the bottom of the figures, a relay 6 * 40 a considerable release delay is provided ,, which acts as Stellspannungsanschalter and initially remain both relays Vl and tightened V2. Not subscribed contacts the Control voltage for contacts F14 and F24 close and switch on the motor of the point machine. Contact Pl and the closed contacts RaI

Die oberhalb der strichpunktiertex-; Linie dargestell- und Ül erhält der Stellspannungsanschalter 5" Strom, ten Zeichnungsteile geben die Schaltung derjenigen 45 der mit seinem Kontakt Sl den Kontakt RaI überRelais und Kontakte wieder, die mehreren oder allen brückt und . mit weiteren Kontakten in bekannter Weichen gemeinsam zugeordnet sind. Sie enthalten Weise über nicht dargestellte Stromkreise den Motor ein Prüfrelais P, ein Hilfsrelais H, einen Wecker W des Weichenantriebes einschaltet, so daß die Weiche mit Kondensator C und Weckerkontakt Wl sowie umläuft.The above the dash-dotted ex-; Line illustrated and Ül receives the control voltage switch 5 "current, the drawing parts show the circuit of those 45 with its contact S1 the contact RaI via relays and contacts, which bridges several or all and are assigned together with other contacts in known points contain way on circuits not shown the motor a test relay P, an auxiliary relay H, an alarm clock W of the switch drive switches on, so that the switch with capacitor C and alarm clock contact Wl rotates as well.

ein Weckerunterbrechungsrelais WU, welches mit 50 Beim Loslassen der beiden Tasten GT und WT an alarm clock interruption relay WU, which with 50 When you release the two buttons GT and WT

einer Unterbrechungstaste UT zusammenwirkt. stellt das Relais R in der zweiten Phase1 seines Arbei-an interrupt key UT interacts . sets relay R in the second phase 1 of its work

In. Fig. 1 sind außerdem zwei Verzögerungsrelais tens die Kontakte Ra 1 bis RaZ wieder zurück, wäh-In. Fig. 1 are also two delay relays tens the contacts Ra 1 to RaZ back again, while

Vl und V2 mit zwei Widerständen WiI und Wi2 rend die Kontakte Rl und R2 in der umgestellten Vl and V2 with two resistors WiI and Wi 2 rend the contacts Rl and R2 in the switched

und zwei Verzögerungskondensatoren Ko 1 und Ko2 Lage verbleiben. Außerdem wird beim Anlaufen desand two delay capacitors Ko 1 and Ko2 layer remain. In addition, when the

dargestellt, während Fig. 2 zwar die beiden Wider- 55 Weichenantriebes der Antriebskontakt A + geöffnet,shown, while Fig. 2, although the two switch drives of the drive contact A + are open,

stände und die beiden Kondensatoren, jedoch nur ein sofern er nicht schon vorher durch Auffahren derstands and the two capacitors, but only if it has not already been driven by the

Verzögerungsrelais Vl enthält. . Weiche od. dgl. geöffnet wurde; sobald die WeicheContains delay relay Vl. . Soft or the like. Was opened; as soon as the switch

Die Wirkungsweise der dargestellten Ausführungs- die Minuslage erreicht hat, wird der Antriebebeispiele sei zunächst am Beispiel der Fig. 1 erklärt; kontakt A— geschlossen. Über die Kontakte Ra2, R2 anschließend werden die Abweichungen gemäß Fig. 2·, 60 (umgelegt) und A—spricht das Überwachungsrelais Ü beschrieben werden. (' wieder an und öffnet seine Kontakte Ül und Ü2. The mode of operation of the illustrated embodiment has reached the negative position, the drive examples will first be explained using the example of FIG. 1; contact A - closed. Via the contacts Ra2, R2 the deviations according to Fig. 2 ·, 60 (transferred) and A - corresponds to the monitoring relay Ü are described. ( ' again and opens its contacts Ül and Ü2.

In der Grundstellung der Schaltung nach Fig. 1 ist Dadurch werden die Relais P und S abgeschaltet;In the basic position of the circuit according to FIG. 1, the relays P and S are switched off;

der vereinfacht dargestellte Überwachungsstromkreis durch die Kontakte PZ und P 4 werden auch diethe monitoring circuit shown in simplified form through the contacts PZ and P 4 are also the

der Weiche .geschlossen; der Überwachungsstrom beiden Relais Vl und V2 von ihren Kondensatorenthe switch. closed; the monitor current two relays Vl and V2 from their capacitors

fließt über die Kontakte Ra 2, R2 und A + (sofern 65 KoI und Ko 2 getrennt und fallen ohne Verzögerung ab.flows via the contacts Ra 2, R2 and A + (if 65 KoI and Ko 2 are separated and drop out without delay.

die Weiche in der Phislage liegt) und erregt das Beim vorherigen Ansprechen des Relais V2 wurdethe switch is in the phisposition) and excites that when the relay V2 responded before

Uberwachungsrelais Ü, welches seine Kontakte Ül durch dessen Kontakt F21 das Relais WU abgesehal-Uberwachungsrelais Ü which his contacts UEL abgesehal- by its contact F21 relay WU

und Ü2 geöffnet hat. Fällt das Relais Ü infolge einer tet; der Weckerkontakt Wl blieb jedoch über dieand Ü2 is open. If the relay Ü falls as a result of a tet; the alarm clock contact Wl remained on the

Störung ab (beispielsweise beim Auffahren einer Kontakte P 2, F12 und F22 kurzgeschlossen, so daßFault from (for example, when a contacts P 2, F12 and F22 are short-circuited, so that

Weiche aus der Pipslage, wodurch der Kontakt A + 70 der Wecker nicht ertönen konnte. Beim Abfallen derMove out of the pips position, so that the contact A + 70 of the alarm clock could not sound. When the

1 UUZ 3ÖÖ1 UUZ 3ÖÖ

Relais P, Vl und V2 wird der Weckerkontakt Wl wieder über die Kontakte P 2, WU 2, FIl und F22 (alle im der gezeichneten Lage) kurzgeschlossen.Relays P, Vl and V2 , the alarm clock contact Wl is again short-circuited via the contacts P 2, WU 2, FIl and F22 (all in the position shown).

Erreicht jedoch die Weiche die Endlage nicht, so schließt der Antriebskontakt A— nicht, und der Überwacher Ü kann nicht anziehen, so daß das Relais P eingeschaltet bleibt. Dann fällt nach Ablauf seiner Verzögerungszeit.das Relais V2 ab, wenn das Relais H durch den Kontakt;i?a-3 abgeschaltet ist und. seinen Kontakt Hl,in die gezeichnete Lage zurückgestellt .hat. Bleibt das Relais H jedoch erregt, so fällt nach Ablauf der- Verzögerungszeit das Relais Vl ab. In beiden Fällen wird durch öffnen der Kontakte F14 bzw. F24 der Stellspannungsansehalter S abgeschaltet und mittels der Kontakte F22 oder F12 der Kurz-Schluß des Weckerkontaktes Wl aufgehoben, so daß der· Wecker ertönt und die Störung anzeigt.However, if the switch does not reach the end position, the drive contact A - does not close, and the monitor Ü cannot pick up, so that the relay P remains switched on. Then, after its delay time has elapsed, relay V2 drops out if relay H is switched off by contact; i? A-3 and. his contact St. has returned to the position shown. However, if the relay H remains energized, the relay V1 drops out after the delay time has elapsed. In both cases, by opening the contacts F14 or F24, the control voltage keeper S is switched off and the short circuit of the alarm clock contact W1 is canceled by means of the contacts F22 or F12, so that the alarm clock sounds and indicates the fault.

Im Schaltungsbeispiel der Fig. 2 sind die Stromkreise, .die zu der einzelnen Weiche gehören, die gleichen wie in Fig. i. Auch die Stromkreise der gemeinsamen Einrichtung entsprechen denen in, Fig. 1, mit Ausnahme dessen, daß die Kontakte des Relais V2 wegfallen bzw. der Kontakt F21 (Fig. 1) durch einen Kontakt Kl5 des Relais Vl (Fig. 2) ersetzt ist.In the circuit example of FIG. 2, the circuits that belong to the individual switch are the same as in FIG. Also, the circuits of the joint device corresponding to those in FIG. 1, except that the contacts of the relay V2 omitted or is replaced, the contact F21 (Fig. 1) by a contact Cl5 the relay Vl (Fig. 2).

Der Ablauf der Schaltfunktionen ist zunächst der gleiche wie vorher beschrieben, beispielsweise wird durch Bedienen der Tasten WT und GT das Relais R eingeschaltet und durch den Kontakt Ra2 das Relais Ü ausgeschaltet, welches durch Schließen des Kontaktes Ü 2 das Relais P einschaltet. Mit dem Kontakt Ra 3 wird das Relais H eingeschaltet.. Das Schließen des Kontaktes P3 in Fig. 2 hat zunächst keine Wirkung; spricht jedoch das Relais H an, so wird der aufgeladene Kondensator Ko 1 über die Kontakte H1 und P3 an das Relais Vl geschaltet, so daß dieses anspricht. Gleichzeitig wird durch den Kontakt H 2 der Kondensator Ko2 an Spannung■ gelegt und aufgeladen. -The sequence of the switching functions is initially the same as previously described, for example the relay R is switched on by pressing the WT and GT buttons and the relay Ü is switched off by the contact Ra2 , which switches on the relay P by closing the contact Ü 2. The relay H is switched on with the contact Ra 3. Closing the contact P 3 in FIG. 2 initially has no effect; however, if the relay H responds, the charged capacitor Ko 1 is connected to the relay Vl via the contacts H1 and P3 , so that it responds. At the same time, the capacitor Ko2 is connected to voltage through the contact H 2 and is charged. -

Über den Kontakt VlA wird der Stellspannungsansehalter vS" eingeschaltet, wodurch die Weichen-Umstellung eingeleitet wird. Beim Loslassen der Tasten GT und WT werden durch das Relais R wieder die Kontakte RaI bis Ra3 zurückgestellt, wodurch mit dem Kontakt Ra3 das Relais H wieder abgeschaltet wird. Bleibt das Relais H störungsweise erregt, so fällt das Relais Vl nach Ablauf der durch den Kondensator Ko 1 bestimmten Verzögerungszeit ab, und durch den sich öffnenden Kontakt ΡΊ2 wird der Kurzschlußstromkreis für den Weckerkontakt Wl unterbrochen. Arbeitet das Relais H ordnungsgemäß, erreicht aber die Weiche die Endlage nicht (wobei das Relais P hängenbleibt), so bleibt das Relais Vl zu nächst noch durch das Einschalten des Kondensators Ko2 (über den KontaktH2) erregt und hält seinen Kontakt F15 geöffnet; fällt dann das Relais Vl nach dem Ablauf der zweiten Verzögerungszeit ab, so öffnet der Kontakt F12 und hebt den Kurzschluß für den Weckerkontakt Wl auf. Der Stellspannungsansehalter 5* wird beim Abfall des Relais Vl durch den Kontakt F14 abgeschaltet.Via the contact VlA the control voltage keeper vS "is switched on, whereby the switch changeover is initiated. When the buttons GT and WT are released, the contacts RaI to Ra3 are reset by the relay R , whereby the relay H is switched off again with the contact Ra3 If the relay H remains energized, the relay Vl drops out after the delay time determined by the capacitor Ko 1 has elapsed, and the short-circuit circuit for the alarm clock contact Wl is interrupted by the opening contact ΡΊ2. If the relay H works properly, but reaches the If the end position does not change (whereby the relay P gets stuck), the relay Vl initially remains energized by switching on the capacitor Ko2 (via the contact H2) and keeps its contact F15 open; the relay Vl then drops after the second has expired Delay time, the contact F12 opens and removes the short circuit for the alarm clock contact Wl . is switched off by contact F14 when relay Vl drops out.

D©r Kontakt R1 dient zum Umstellen der Weiche, wenn diese in eine Fahrstraße einbezogen wird und dabei nicht durch die Tasten GT und WT umgestellt wird. In der gezeichneten Lage des Kontaktes ist nur eine Umstellung in d'ie Minuslage über die Leitung F — möglich; ist..die Weiche dagegen in die Minuslage umgestellt mod der Kontakt R1 entsprechend umgelegt, so kann die Weiche nur über die Leitung F + in die Pluslage umgestellt werden. Die weitere Wirkungsweise der Schaltung in diesem Falle ist die gleiche wie bei Umstellung der Weiche mittels der Tasten GT und WT. .The contact R1 is used to change the turnout when it is included in a route and is not changed with the GT and WT buttons. In the position shown for the contact, it is only possible to switch to the minus position via line F -; If, however, the switch is switched to the minus position mod the contact R 1 is switched accordingly, the switch can only be switched to the plus position via the F + line. The further operation of the circuit in this case is the same as when changing the switch using the GT and WT buttons. .

Claims (18)

PATENTANSPRÜCHE:PATENT CLAIMS: 1. Schaltungsanordnung für Stellwerke im Eisenbahnsicherungswesen, in denen für mehrere oder alle Weichen gemeinsame Störungsmelder (Wecker, Lampe) vorgesehen sind, die eingeschaltet werden, wenn ein einer Weiche zugeordnetes- Relais (Überwacher, Auffahrmelder) die Ruhestellung verläßt, dadurch gekennzeichnet, daß den Störungsmeldern ein oder mehrere Verzögerungsrelais zugeordnet sind, die bei jeder Einleitung der Umstellung einer Weiche vorübergehend in Arbeitsstellung gebracht werden und während ihrer Rückstellzeit das Störungssignal abschalten.1. Circuit arrangement for signal boxes in railway safety, in which for several or all points common fault indicators (alarm clock, lamp) are provided that are switched on if a relay (monitor, collision detector) is assigned to a turnout Leaves rest position, characterized in that the malfunction indicators one or more delay relays are assigned, which are temporarily brought into working position each time the switch is initiated and switch off the fault signal during their reset time. 2. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß die Stellspannung an die Weichen nur angeschaltet wird, solange sich das bzw. die Verzögerungsrelais in Arbeitsstellung befinden.2. Circuit arrangement according to claim 1, characterized in that the control voltage is on the turnouts are only switched on as long as the delay relay (s) is in the working position condition. 3. Schaltungsanordnung nach Anspruch 1 und 2, dadurch gekennzeichnet, daß Kontakte {VIZ, V23, F14, F24) des bzw. der Verzögerungsrelais in den Stromkreisen der Stellspannungsansehalter der einzelnen -^Weichen angeordnet sind.3. Circuit arrangement according to claim 1 and 2, characterized in that contacts {VIZ, V23, F14, F24) of the delay relay or relays are arranged in the circuits of the control voltage sender of the individual - ^ switches. 4. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß das ,bzw. die Verzögerungsrelais ■;nach Betätigung einer gemeinsamen Weichenstelltasite vorübergehend in Arbeitsstellung gebracht werden.4. Circuit arrangement according to claim 1, characterized in that the or. the delay relays ■; after actuating a common Switch-setting tasks are temporarily brought into working position. 5. Schaltungsanordnung nach Anspruch 1 in Stellwerken mit fahrstraßenweiser Einstellung der Weichen, dadurch gekennzeichnet, daß das bzw. die Verzögerungsrelais nach Betätigung einer Fahrstraßentaste vorübergehend in Arbeitsstellung gebracht werden.5. Circuit arrangement according to claim 1 in signal boxes with setting of the route by route Points, characterized in that the delay relay or relays after actuation of a Route button can be temporarily brought into the working position. 6. Schaltungsanordnung nach Anspruch 1 in Stellwerken, in denen die Weichen bei fahrstraßenweiser Einstellung nacheinander an die Stellspannung angelegt werden, dadurch gekennzeichnet, daß das bzw. die Verzögerungsrelais bei jeder Anschaltung einer Weiche vorübergehend in Arbeitsstellung gebracht werden.6. Circuit arrangement according to claim 1 in interlockings, in which the switches in route wise Setting can be applied to the control voltage one after the other, characterized in that that the delay relay (s) are temporarily switched to each time a turnout is switched on Be brought to work. 7. Schaltungsanordnung nach Anspruch 1, 4, 5 und 6, dadurch gekennzeichnet, daß zwei Verzögerungsrelais {VI, V2) vorgesehen sind, die bei Einleitung der Umstellung einer Welche derart umgeschaltet werden, daß immer eines von beiden ein- und das andere ausgeschaltet ist (Fig. 1).7. Circuit arrangement according to claim 1, 4, 5 and 6, characterized in that two delay relays {VI, V2) are provided, which are switched when initiating the changeover of which one of the two is always on and the other is off (Fig. 1). 8. Schaltungsanoirdnung nach Anspruch 1, 4, 5 oder 6, dadurch gekennzeichnet, daß einem Verzögerungsrelais {VI) zwei Kondensatoren zugeordnet sind, die bei Betätigen und Loslassen der Weichenstelltaste {WT) bzw. Weichengruppentaste (GT), einer Fabrstraßentaste oder bei Einleitung einer Weichenumstellung abwechselnd an das Verzögerungsrelais angeschaltet werden (Fig. 2).8. Schaltungsanoirdnung according to claim 1, 4, 5 or 6, characterized in that a delay relay {VI) are assigned two capacitors, which when pressing and releasing the switch button {WT) or switch group key (GT), a Fabrstrasse key or when initiating a Switch switches can be switched on alternately to the delay relay (Fig. 2). 9. Schaltungsanordnung nach Anspruch 1, 4 bis 6 und 8, dadurch gekennzeichnet, daß der jeweils abgeschaltete Kondensator aufgeladen und der angeschaltete über das Relais entladen wird.9. Circuit arrangement according to claim 1, 4 to 6 and 8, characterized in that the each The switched-off capacitor is charged and the switched-on capacitor is discharged via the relay. 10. .Schaltungsanordnung nach Anspruch 1 bis 9, dadurch gekennzeichnet, daß ein Hilfsrelais· (H) vorgesehen ist, welches das bzw. die Verzögerungsrelais ein- bzw. umschaltet.10. Circuit arrangement according to claim 1 to 9, characterized in that an auxiliary relay · (H) is provided which switches the delay relay or relays on or over. 11. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß ein Prüfrelais (P) vor-11. Circuit arrangement according to claim 1, characterized in that a test relay (P) is present 1 KJU4 DOO 1 KJU4 DOO gesehen ist, das in an sidh bekannter Weise bei Störung einer Weiche in Arbeitsstellung gebracht wird und den oder die Störungsmelder (W) einschaltet. is seen, which is brought into the working position in a manner known at sidh in the event of a fault in a switch and switches on the fault indicator (s) (W). 12. Schaltungsanordnung nach Anspruch 1 und 11, dadurch gekennzeichnet, daß die Stellspannung an die Weichen nur angeschaltet werden kann, solange sich das Prüfrelais (P) in Arbeitsstellung befindet.12. Circuit arrangement according to claim 1 and 11, characterized in that the control voltage can only be switched on to the points as long as the test relay (P) is in the working position. 13. Schaltungsanordnung nach Anspruch 1 und 11, dadurch gekennzeichnet, daß der Störungsmelder nur abgeschaltet wird, wenn sich das Prüfrelais und1 das oder die Verzögerungsrelais in Arbeitsstellung befinden oder wenn sich alle diese Relais in Ruhestellung befinden.13. The circuit of claim 1 and 11, characterized in that the fault detector is only switched off when the test relay 1 and the relay or the delay are in the working position or when all of these relays are in the rest position. 14. Schaltungsanordnung nach Anspruch 1, 11 und 13, dadurch gekennzeichnet, daß die Abschaltung eines Störungsweckers durch Kurzschließen seines Kontaktes, seiner Wicklung oder beider erfolgt.14. Circuit arrangement according to claim 1, 11 and 13, characterized in that the shutdown a fault alarm clock by short-circuiting its contact, its winding, or both he follows. ■ 15. Schaltungsanordnung nach Anspruch 1 und 11, dadurch gekennzeichnet, daß ein die Abschaltung eines Störungsmelders aufrechterhaltendes Relais (WU) bei Einleitung der Umstellung einer Weiche zurückgestellt wird.15. Circuit arrangement according to claim 1 and 11, characterized in that a disconnection of a fault indicator maintaining relay (WU) is reset when a switch is initiated. 16. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß zur Abschaltung der Stellspannung von den Weichen die Betätigung einer Abschalttaste (z. B. der .Weckerunterbrechungstaste UT) vorgesehen ist. ■ ■16. Circuit arrangement according to claim 1, characterized in that the actuation of a switch-off button (z. B. the. Alarm interrupt button UT) is provided for switching off the control voltage from the switches. ■ ■ 17. Schaltungsanordnung nach Ansprudh 1 und 6, dadurch gekennzeichnet, daß die Abschaltung der Stellspannung nur erfolgen kann, wenn die Störungsmelder eingeschaltet sind. .17. Circuit arrangement according to Ansprudh 1 and 6, characterized in that the shutdown of the Control voltage can only be applied if the fault indicators are switched on. . 18. Schaltungsanordnung nach. Anspruch 1, 11 und 15, dadurch gekennzeichnet, daß der Störungsmelder eingeschaltet wird·, wenn sich das' zu seiner Abschaltung dienendie Relais (WU) bei Ordnungsstellung der Weichen in Arbeitsstellung befindet.18. Circuit arrangement according to. Claims 1, 11 and 15, characterized in that the malfunction indicator is switched on when the relay (WU) which is used to switch it off is in the working position when the switches are in the correct position. Hierzu 1 Blatt Zeichnungen1 sheet of drawings © 609 770/26 2. 57 (709 593/154 7. 57)© 609 770/26 2. 57 (709 593/154 7. 57)
DE1955L0022766 1955-08-23 1955-08-23 Circuit arrangement for signal boxes in railway security Expired DE1002386C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1955L0022766 DE1002386C2 (en) 1955-08-23 1955-08-23 Circuit arrangement for signal boxes in railway security

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1955L0022766 DE1002386C2 (en) 1955-08-23 1955-08-23 Circuit arrangement for signal boxes in railway security

Publications (2)

Publication Number Publication Date
DE1002386B DE1002386B (en) 1957-02-14
DE1002386C2 true DE1002386C2 (en) 1957-07-18

Family

ID=7262512

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1955L0022766 Expired DE1002386C2 (en) 1955-08-23 1955-08-23 Circuit arrangement for signal boxes in railway security

Country Status (1)

Country Link
DE (1) DE1002386C2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1100676B (en) * 1959-11-05 1961-03-02 Siemens Ag Circuit arrangement in electrical railway signal boxes with an acoustic fault alarm

Also Published As

Publication number Publication date
DE1002386B (en) 1957-02-14

Similar Documents

Publication Publication Date Title
DE1002386C2 (en) Circuit arrangement for signal boxes in railway security
DE825698C (en) Equipment for signal boxes with electrical locks, in particular table lever mechanisms
DE919172C (en) Circuit arrangement for supporting relay in signal boxes with electrical locks
DE820902C (en) Switch circuit for electrical signal boxes with electrical locks
DE651680C (en) Line block circuit for two or more aspect signals
DE917678C (en) Circuit arrangement for locking, controlling and monitoring switches, track barriers and the like. Like., In particular in interlockings with electrical locking registers
DE544970C (en) Electrical signaling system to indicate a change in the operating status of several system parts with an acoustic signaling device and individual signal relays assigned to each fault point, which can be manually switched off and returned to the initial position after the fault has been eliminated
DE664878C (en) Switching arrangement for switching electrical switchgear from automatic to manual operation
DE659394C (en) Arrangement for securing a switch
DE590290C (en) Device and circuit arrangement for signaling systems, in particular guard control systems
DE945250C (en) Circuit arrangement of two rail devices operated simultaneously by vehicle axles
DE902625C (en) Circuit arrangement for monitoring signal lamps operated with alternating current, in particular in railway safety systems
DE895772C (en) Automatic warning system for track crossings
DE944962C (en) Equipment for interlockings with individual conversion and route-by-route conversion of points and electrical locks, in particular table lever mechanisms
DE572968C (en) Remote control and monitoring of traffic regulating devices in railways
DE765977C (en) Circuit for electrical point, signal and bolt drives
DE620765C (en) Device for remote control of railway switches and signals
AT129927B (en) Control device for traffic signal systems.
DE608789C (en) Device for the automatic starting of synchronous machines, especially synchronous motors
EP2551874B1 (en) Electric relay control circuit
DE1264584B (en) Arrangement for indicating the position of a switch with a changeover contact as signal contact
DE951010C (en) Equipment for signal boxes with electrical locks, in particular table lever mechanisms
DE816562C (en) Arrangement for the operational review of electrical locks in electrical power stations
DE1100676B (en) Circuit arrangement in electrical railway signal boxes with an acoustic fault alarm
DE682461C (en) Safety circuit for electrical point machines