DD153186A1 - DEVICE FOR THE PNEUMATIC LOADING OF SPRENG AND BOHRLOECHERS WITH SLOPE SPHERES - Google Patents

DEVICE FOR THE PNEUMATIC LOADING OF SPRENG AND BOHRLOECHERS WITH SLOPE SPHERES Download PDF

Info

Publication number
DD153186A1
DD153186A1 DD22419480A DD22419480A DD153186A1 DD 153186 A1 DD153186 A1 DD 153186A1 DD 22419480 A DD22419480 A DD 22419480A DD 22419480 A DD22419480 A DD 22419480A DD 153186 A1 DD153186 A1 DD 153186A1
Authority
DD
German Democratic Republic
Prior art keywords
pressure chamber
explosive
gas
charge
pipe
Prior art date
Application number
DD22419480A
Other languages
German (de)
Inventor
Vladimir M Skorobogatov
Anatoly I Mitsuk
Original Assignee
Vni Gorno Metall I Tsvet Met
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vni Gorno Metall I Tsvet Met filed Critical Vni Gorno Metall I Tsvet Met
Priority to DD22419480A priority Critical patent/DD153186A1/en
Publication of DD153186A1 publication Critical patent/DD153186A1/en

Links

Abstract

Die Erfindung bezieht sich auf die Sprengtechnik und betrifft eine Einrichtung zur pneumatischen Ladung von Spreng- und Bohrloechern mit schuettigen Sprengstoffen. Ziel und Aufgabe der Erfindung ist es, eine Einrichtung zur pneumatischen Ladung von Spreng- und Bohrloechern mit schuettigen Sprengstoffen zu schaffen, die es ermoeglicht, den Verbrauch von Sprengstoffen zu regeln, ihre Verluste zu verringern und die Wirtschaftlichkeit der Schiessarbeiten zu erhoehen. Bei der Einrichtung, die eine mit einer Gasquelle verbundene Druckkammer zur Bildung einer pseudoverfluessigten Schicht eines Sprengstoffes enthaelt, der durch ein Rohr ausgebracht wird, das mit einer Laderohrleitung in Verbindung steht, ist erfindungsgemaess ein Verbrauchsregler fuer Gas vorgesehen, das je nach Groesse der Druckdifferenz in der pseudoverfluessigten Schicht und am Eingang der Laderohrleitung in die Druckkammer zugefuehrt wird. Es ist fernerein Gasverbrauchsregler in der Laderohrleitung vorgesehen, der einen stufenweisen Anstieg des Gasverbrauchs in der Laderohrleitung im Schliessmoment des Steuerschiebers gewaehrleistet.The invention relates to the blasting technique and relates to a device for the pneumatic loading of explosive and boreholes with schuettigen explosives. The aim and object of the invention is to provide a device for the pneumatic loading of blasting and drilling fluids with spillages, which makes it possible to control the consumption of explosives, to reduce their losses and to increase the efficiency of the shooting. In the device which includes a pressure chamber connected to a gas source for forming a pseudo-volatile layer of explosive which is discharged through a pipe communicating with a charge pipe, a gas consumption regulator is provided according to the invention, depending on the size of the pressure difference in the pseudo-fluidized layer and at the entrance of the charge tube is fed into the pressure chamber. There is also a gas consumption regulator in the charge piping, which ensures a gradual increase in gas consumption in the charge piping in the closing moment of the spool valve.

Description

Berlin, den 29»1»1981 58 169/16Berlin, the 29 »1» 1981 58 169/16

Einrichtung zur pneumatischen Ladung von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen ' .Device for the pneumatic loading of explosive and boreholes with loose explosives'.

Anwendungsgebist .der ErfindungAnwendungsgebist .der invention

Die vorliegende Erfindung besieht sich auf die Sprengtechnik, und. betrifft eine Einrichtung -zur pneumatischen Ladung von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen* Am erfolgreichsten läßt sich die vorliegende Erfindung im Bergbau und in der Rohst of fgev/innungsindustrie anwenden«,The present invention is directed to the blasting technique, and. concerns a device for the pneumatic loading of explosive and wellbore explosive devices * The most successful application of the present invention is in the mining and raw materials industries «,

Eine weitgehende Verwendung haben gegenwärtig-billige Schüttsprengstoffe, z«. Be AH-PO (Anunoniuranitrat-Dieselöl) gefunden, die in die Spreng- und Bohrlöcher mit Hilfe einer entsprechenden pneumatischen Ladeeinrichtung eingebracht werden t.An extensive use currently have cheap bulk explosives, z. B e AH-PO (Anunoniuranitrat diesel oil) found, which are introduced into the blasting and boreholes by means of a corresponding pneumatic charging device t .

Die Entwicklung vollkommener Einrichtungen z\u- pneumatischen Ladung wurde im Zusammenhang damit besonders-wichtig und aktuell,. weil bedeutende Mengen von Gesteinen mit Hilfe von Bohrlöchern großer Durchmesser (111-165 mm) abgebaut wurden» Pur diesen Zweck wurden hochproduktive DruckluftSchlagmaschinen geschaffenj die ein effektives Bohren von Löchern kleiner und großer Durchmesser ermöglichen. Der Abbau der Gesteine durch Bohrlöcher großer Durchmesser ist beim Ausgewinnerj! mächtiger vertikaler und steilstehender Erzkörper * und Bergfesten besonders -effektiv©The development of perfect facilities for pneumatic cargo became particularly important and topical in the context of this. because significant quantities of rocks were mined using large diameter (111-165 mm) wells. Purely for this purpose, highly productive pneumatic impact machines have been created which enable effective drilling of small and large diameter holes. The mining of rocks through holes of large diameter is at Ausgewinnerj! powerful vertical and steep ore body * and mountain festivals especially -effective ©

Beim Abbau derartiger Erzkörper durch aufsteigende Bohr»-. löcher erreicht man eine Umfangskürzung der Ausrichtimgs— und Einschnittsarbeiten um 15 - 20 %* Jedoch stellt dieWhen mining such ore bodies by ascending drilling ». Holes can be reduced by 15 - 20 % in the scope of alignment and sizing *

2 2Al y *» . -2- · 29.1.19812 2Al y * ». -2- · 29.1.1981

58 169/1658 169/16

Ladung von Spreng·» mid Bohrlöchern großer Durchmesser mit schüttigen Sprengstoffen eine komplizierte technische Aufgabe darβ Zum Laden der Spreng- und Bohrlöcher wurde eine große Anzahl verschiedenartiger Ladeeinrichtungen geschaffen» die jedoch zur .Gewährleistung einer qualitativen Ladung von Löchern großer Durchmesser nicht geeignet sind© Im'Grunde genommen stehen gegenwärtig keine Universaleinrichtungen zum Laden weder der Sprenglöcher noch der Bohrlöcher großer Durchmesser zur Verfügung* Beim Laden der Bohrlöcher großer Durchmesser, beispielsweise von 111-165 mm erreichen die SprengstoffVerluste infolge deren Verstreuung an vielen Bergwerken 20 - 30 % und sogar 50 %P In den Bohrlöchern entstehen dabei LuftZwischenräume, 'und es kann weder eine hinreichende Ladungsz'uverlässigkeit noch eine genügende LacLungsdichte 'gewährleistet werderuCharging explosives with large-diameter boreholes is a complex technical problem with blasting explosives. A large number of different charging facilities have been created to load the blast and boreholes, but these are not suitable for ensuring the quality of large-diameter holes. Basically, there are currently no universal facilities available for loading neither the blast holes nor the large diameter boreholes. * When loading the large diameter bores, for example from 111-165 mm, the explosive losses due to their scattering at many mines reach 20-30 % and even 50% P Air spaces are created in the boreholes, and neither a sufficient charge reliability nor a sufficient coating density can be guaranteed

Am verkommensten gilt eine Einrichtung 9 in der die Zufuhr des Sprengstoffs in die Laderohrleitung aus einer pseudoverflüssigten Schicht verwendet wird·The most degenerate is a device 9 in which the feed of the explosive into the charge piping from a pseudo-liquefied layer is used.

Eine derartige Einrichtung enthält eine Druckkammers in welcher die pseudoverflüssigte Schicht erzeugt wird«. Diese Kammer ist mit der Druckgasquelle verbunden, und koaxial mit ihr ist ein Rohr mit einer Scheibe am unteren Ende angeordnet, dessen oberes Ende durch einen Steuerschieber mit der Laderohrleitungf d* h« mit derjenigen Rohrleitung verbunden istf durch welche der Sprengstoff in das Bohrloch eingeführt wird© . 'Such a device contains a pressure chamber s in which the pseudo-liquefied layer is produced. This chamber is connected to the source of pressurized gas, and coaxially with it there is arranged a tube with a disc at the lower end, the upper end is connected through a control valve with the charging pipe f d * h "to that pipe f by which the explosives in the well bore is introduced ©. '

Diese Einrichtung ist mit einem Ejektor für die Druckluftzufuhr in die Laderohrleitung und einem Druckregler für 'Preßluft in der Druckkammer 'versehen© ' ·This device is provided with an ejector for the compressed air supply in the charge pipe and a pressure regulator for 'compressed air in the pressure chamber' ©

Sobald der Druck.in der Druckkammer einen vorgegebenenOnce the pressure in the pressure chamber a predetermined

2 4194 _3~ ' · 29*1 „19812 4194 _3 ~ '· 29 * 1 "1981

. 58 169/16, 58 169/16

Wert erreicht hat, dessen Höhe je nach derjenigen Ladungsdichte zuvor eingestellt wird, die die Einrichtung erzeugen sollj gelangt aus der Druckkammer'ein Kommando zum Stellwerk des Steuerschiebers, der den im pseudoverflüssigten Zustand in der Druckkammer befindlichen Sprengstoff in die Laderohrleitung abläßt * ' .Has reached value, the height of which is set beforehand according to the charge density which the device is intended to produce, from the pressure chamber a command is sent to the interlocking valve of the spool valve, which discharges the explosive in the pressure chamber into the charge pipe line in the pseudo-liquefied state.

Um eine hohe Ladungsdichte zu erhalten? wird gleichzeitig mit dem Öffnen des Steuerschiebers ein Ejektor eingeschaltet f der Druckluft in die Laderohrleitung einleiteteTo get a high charge density? At the same time as opening the spool, an ejector is activated, f the compressed air is introduced into the charge piping

iiach dem Abschalten des Stellwerks des Steuerschiebers, setzt der Ejektor die Druckluft zufuhr in die Lader ohr le it uiig fort und wird durch den Operator erst dann abgeschaltet f wenn der Sprengstoff die gesamte Laderohrleitung passiert hat und sich bereits im Ladehohlraum befindet»iiach switching off of the interlocking of the control slide, the ejector sets the compressed air supply into the charger ear le it uiig continued and by the operator only switched off for when the explosive has passed the entire loading pipeline and is already in charge cavity "

Mit Hilfe dieser Einrichtung kann man jedoch die vorge-.gebene Ladungsdichte und Dosierung des Sprengstoffs mit der erforderlichen Genauigkeit des Ladungsgewichts nur bei gerin·» gen Änderungen der bezogenen Länge der Laderohrleitung während des Ladezyklus erreichen© Bekanntlich entspricht jede Drehung der Pneumotransportrohrleitung um 90° einer Vergrößerung ihrer Länge um 5 - 7 Meter«, Bei der praktischen Durchführung der Sprengarbeiten unter den beengten Arbeitsbedingungen.der unterirdischen Gruben dreht sich die Laderohrleitung bei deren Herausziehen aus dem Bohrloch zu einer Bucht zusammene Infolgedesse erreichen die Schwankungen der Druckverluste in der Laderohrleitung so hohe WerteP daß die Möglichkeit einer Erreichung der vorgegebenen Bewegungsgeschwindigkeit der Spreng«· stoffe in der Laderohrleitung- und folglich auch der erforderlichen Ladungsdielite mit Hilfe der obenbeschriebenen Ladeeinrichtung ausgeschlossen iste However, with the aid of this device, it is possible to achieve the prescribed charge density and dosage of the explosive with the required charge weight accuracy only with minor changes in the length of the charge piping during the charging cycle. It is known that every rotation of the pneumotransport pipeline is 90 ° increasing their length by 5-7 meters "in the practice of the blasting under the confined Arbeitsbedingungen.der underground mines, the charging pipe rotates on its withdrawal from the well bore to a bay together e Consequently Chandesse achieve the variations of the pressure losses in the loading pipe so high Values P that the possibility of achieving the predetermined speed of movement of the explosive materials in the Laderohrleitung- and consequently also the required charge dielite is excluded by means of the above-described charging device e

2 2 4 1 i 4 -4- " 29.ί.19812 2 4 1 i 4 -4- "29.ί.1981

· - . 58 169/16· -. 58 169/16

In der letzten Zeit werden neue Sprengstoffarten, darunter sogenannte Sprengstoffe mit getrennter Ladung verwendet, die im trockenen Zustand in die Laderohrleitung eingebracht werdens Es sind auch Sprengstoffe bekannt, bei denen eine dosierte Flüssigkeitsmenge während des Transportes durch die Laderohrleitung eingeführt wird, wodurch sich ihre Dichte entsorechend vergrößerteIn recent years new types of explosives, including so-called explosives thereby increasing their density are used with a separate charge to be introduced in the dry state in the charging pipe s are also known explosives, in which a metered amount of liquid is introduced during transport through the loading pipe, entsorechend enlarged

Für diesen Zweck ist in den Ladeinrichtungen eine spezielle Druckkammer für die Zuführung der Flüssigkeit zur Laderohrleitung vorgesehene Da aber die genannte Ladeeinrichtung keine Möglichkeit bietet, die Rege3..ung der Geschwindigkeit und der Dichte des Sprengstoffstromes in der Rohrleitung zu gewährleisten, ist es auch nicht möglich f die Flüssigkeitszugaben genau zu dosieren* 'For this purpose, a special pressure chamber is provided in the charging devices for the supply of the liquid to the charge piping. However, the said charging device offers no possibility of ensuring the speed and density of the explosive stream in the pipeline, it is also not possible f to dose the liquid additions exactly * '

Das Ziel der Erfindung besteht darin, die durch.Verschütten entstehende SprengstoffVerluste zu reduzieren, eine Erhöhung der Effektivität der Bohr- und. Sprengarbeiten und günstigere Einsatzbedingungen der Sprengstoffe mit getrennter Ladung, zu erreichen«The aim of the invention is to reduce the explosive losses caused by spillage, an increase in the effectiveness of the drilling and. Blasting operations and more favorable conditions of use of explosives with separate charges

Darlegung;--ndes Westens der Erfinduiig,presentation; --n of the West of the Invention,

Der vorliegenden Erfindung liegt die Aufgabe zugrunde, die Baueinheiten der Druckluftzufuhr in die Laderohrleitung der Einrichtung für eine pneumatische Ladung der Spreng™ und Bohrlöcher mit schüttigen Sprengstoffen so auszuführen, daß · es möglich .ist, den Verbrauch der Sprengstoffe und der Luft und folglich auch die Dichte des Sprengstoffs im Spreng- bzw» Bohrloch zu regelue ·It is the object of the present invention to design the assemblies of compressed air supply into the charge piping of the Spreng ™ pneumatic charge device and drilled explosive wells so that it is possible to control the consumption of the explosives and the air and, consequently, the density of the explosive in the explosive or "hole to regelu e ·

2 4 13 4 · -5- . 29.1.1981 . " . . 58 169/162 4 13 4 · -5-. 29.1.1981. ". 58 169/16

Die gestellte Aufgabe wird dadurch gelöst, daß in der Einrichtung zur pneumatischen Ladung -von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen, die eine mit einer Gasquelle verbundene· Druckkammer zur Bildung einer pseudoverflüssigten Sprengstoffschicht enthält, in der koaxial ein Rohr zum Ausbringen des im pseudoverflüssigten Zustand befindlichen Sprengstoffs angeordnet ist, das mit einem Ende durch einen Steuerschieber mit dem Hohlraum der Druckkammer"und mit dem anderen Ende mit der Laderohrleitung für die Sprengstoffzufuhr in den Ladehohlraum verbunden ist', welche auch mit einem Ejektor der Luftzufuhr in die Laderohrleitung verbunden ist, erfindungsgemäß ein Verbrauchsregler für Gas vorgesehen -ist, das in die Druckkammer zum Aufrechterhalten der vorgegebenen Durchsatzmasse des Sprengstoffs je nach Druckdifferenz in der pseudoverflüssigten Schicht und am Eingang der Laderohrleitung zugeführt wird, sowie ein Verbrauchsregler für Gas vorgesehen ist, das durch den Ejektor in die Laderohr leitung zugeführt wird, der auch einen stufenweisen Anstieg des Luftverbrauchs in der Laderohrleitung im" Schließmoment des Steuerschiebers gewährleisteteThis object is achieved by providing in the device for the pneumatic charging of blasting explosives and boreholes with bulk explosives containing a pressure chamber connected to a gas source to form a pseudo-liquid explosive layer, coaxially a pipe for discharging the pseudo-liquefied state located explosive, which is connected at one end by a spool with the cavity of the pressure chamber "and at the other end to the charge piping for the explosive supply in the loading cavity, which is also connected to an ejector of the air supply in the charge tube, according to the invention a consumption regulator for gas is provided which is supplied into the pressure chamber for maintaining the predetermined throughput of the explosive depending on the pressure difference in the pseudo-liquefied layer and at the inlet of the charge tube, and a consumption regulator for gas is provided by the de n ejector is fed into the charge tube, which also ensured a gradual increase in air consumption in the charge tube in the "closing moment of the spool

Die Vorzüge einer derartigen Einrichtung bestehen darin§, daß Dank der Verwendung des genannten Luftverbrauchsreglers in der Druckkammer der vorgegebene Sprengstoffverbrauch eingeschalten wird, die in die Laderohrleitung eingebracht v/erden« Gleichzeitig damit sichert die Gegenwart eines Luftzufuhrreglers in der Laderohrleitung ein Stabilisieren der vorgegebenen Bewegungsgeschwindigkeit des Sprengstoffstromes am Ausgang derselben im Verlauf des gesamten LadezyklusoThe merits of such a device are that thanks to the use of said air consumption regulator in the pressure chamber, the predetermined explosive consumption is introduced, which is introduced into the charge piping. At the same time, the presence of an air supply regulator in the charge piping stabilizes the predetermined speed of movement of the charge tube Explosive current at the output thereof in the course of the entire Ladezykluso

Besondere Vorzüge bietet diese Einrichtung beim Lösen der · Aufgabe einer Formierung der Ladungen aus schüttigen Sprengstoffen in aufsteigenden Bohrlöchern großer.Durchmesser, daThis device offers particular advantages in solving the task of forming the charges from bulk explosives in ascending boreholes of large diameter

2 2 4 1 9 ** -6- · . 29.1·1981.2 2 4 1 9 ** -6- ·. 29.1 · 1,981th

58 169/1658 169/16

bei Abweichungen von den optimalen Zufuhrbedingungen der Sprengstoffe durch die Laderohrleitung in das Bohrloch die SprengstoffVerluste infolge ihrer. Verschüttung aus den Bohrlöchern stark ansteigen»in the event of deviations from the optimum supply conditions of the explosives through the charge piping into the borehole, the explosive losses due to them. Burial from the boreholes increase sharply »

In' einer Ausführungsvarinate der vorliegenden Erfindung enthält der Verbrauchsregler für Gas, das in die Druckkammer zugeführt wird, einen Geber für den Druck in der Druckkammer und einen Geber für den Druck in der Laderohrleitung $ die gemeinsam an eine Differentialschaltung zum Erhalten ihres Differenssignals angeschlossen sind^ die mit einem Solldruckabfallgeber verbunden und mit ihrem Ausgang an das Stellwerk der Zu- und Abfuhr des Gases der genannten Kammer angeschlossen ist, zur Abfuhr des von der Gasquelle zugeführten Gases j. sobald das vorgegebene Druckgefälle überstiegen wird*In 'a Ausführungsvarinate of the present invention, the consumption regulator for gas, which is supplied into the pressure chamber, includes a sensor for the pressure in the pressure chamber and a sensor for the pressure in the charging pipe $ which are commonly connected to a differential circuit for obtaining their Differenssignals ^ which is connected to a Solldruckabfallgeber and connected with its output to the interlocking of the supply and discharge of the gas of said chamber, for removing the gas supplied from the gas source j. as soon as the given pressure gradient is exceeded *

Es ist zweckmäßig, wenn der Luftverbrauchsregler in der Laderohrleitung ein Kommandogerät enthält $ das mit dem Stellwerk des Steuerschiebers verbunden ist, und das beim Schließen dieses Steuerschiebers ein Signal zur st*»ufenweisen Steigerung des Gasverbrauchs in der Laderohrleitung erzeugt»It is expedient if the air consumption controller includes in the charging pipe a predictor $ connected with the interlocking of the control slide, and the closing of this valve spool a signal to st * »ufenweisen increase in gas consumption in the charging pipe produces"

Bei der Verwendung der erfindungsgemäßen Einrichtung für die Zufuhr der Sprengstoffe mit getrennter Ladung enthält diese Einrichtung eine Kammer für die Flüssigkeitszufuhr in den Sprengstoffstrom» Der obere Teil dieser Flüssigkeitskammer ist mit dem oberen Teil der Druckkammer und deren unterer Teil über eine Drosselt die sich nach aen Signalen des Kommandogeräts beim Öffnen des Steuerschiebers'öffnet, mit der Laderohrleitung verbunden, · .When using the device according to the invention for the supply of explosives with separate charge this device contains a chamber for the supply of liquid into the explosive stream »The upper part of this liquid chamber is connected to the upper part of the pressure chamber and the lower part via a throttle t after aen Signals of the command device when opening the spool'opened, connected to the charging pipe, ·.

241.94241.94

-7- 29.1»1981-7- 29.1 »1981

58 169/1658 169/16

Ausführungsbeispielembodiment

Im folgenden soli die# Erfindung an einem vorzugsweisen Aus*· führungsbeispiel der Einrichtung zur pneumatischen Ladung von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen für getrennte Ladung näher erläutert werden» Die dazugehörige Zeichnung zeigt ein Blockschaltbild der erfindungsge- mäßen Einrichtung zur pneumatischen Ladung von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen, wobei einige Teile im-Schnitt dargestellt sind« Auf der Figur ist die vorliegende Einrichtung zur pneumatischen Ladung von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen für getrennte Ladung, weiterhin einfach- die pneumatische La-deeaVxirichtting genannt, außerhalb des Bohrlochs dargestellt»'.Me Zeichnung enthält nicht die zusätzlichen Elemente, durch welche der Sprengstoff in den Ladehohlraum eingeführt wird; es fehlt ζ« Ββ der spezielle Rohransatz, der am Ende der Laderohrleitung ange~ ordnet wird* ' In the following, the invention will be explained in more detail on a preferred exemplary embodiment of the apparatus for the pneumatic loading of explosive and boreholes with bulk explosives for separate loading. The attached drawing shows a block diagram of the device for the pneumatic loading of explosive devices. and Drill holes with bulk explosives, with some parts in-section. "In the figure, the present device is for pneumatic loading of explosive and wellbore drones with separate disperse charge explosives, further simply called the pneumatic displacement device, outside the wellbore "Me drawing does not contain the additional elements through which the explosive is introduced into the loading cavity; is lacking ζ β of special pipe approach, which is at the end of the loading pipe ~ * assigns'

Me pneumatische Ladeeinrichtung enthält eine Druckkammer 1, in der eine pseudoverflüssigte Schicht des schüttigen Sprengstoffs 2 erzeugt wird, einen Luftverbrauchsregler 3 in der Druckkammer (durch punktierte Linien dargestellt), einen Luftverbrauchsregler 4 (durch strichpunktierte Linien . dargestellt) in der Laderohrleitung 5 sowie eine Druckkammer 6. für die Flüssigkeit und schließlich ein Kommandogerät 7, das ein Signal an den Regler 4 und an die Drossel 8 am Ausgang der Kammer 6 erzeugt, welche über die Drossel 8 mit der Laderohrleitung 5 verbunden ist» Wie bereits'erwähnt ,wurde, dient die Druckkammer 1 zum Erzeugen einer verflüssigten Schicht . des Sprengstoffs und kann eine beliebige Form haben, soweit die Erzeugung einer derartigen Schicht gewährleistet ist« Die in der Zeichnung dargestellten Kammer ist in der sowjetischen Patentschrift Ur0 280 285 genau beschrieben, weshalb sie inThe pneumatic loading device comprises a pressure chamber 1 in which a pseudo-liquid layer of the bulk explosive 2 is produced, an air consumption regulator 3 in the pressure chamber (shown by dotted lines), an air consumption regulator 4 (shown by dash-dotted lines) in the charge pipe 5 and a pressure chamber 6. for the liquid and finally a command device 7, which generates a signal to the controller 4 and the throttle 8 at the output of the chamber 6, which is connected via the throttle 8 with the charging pipe 5 »as already mentioned, was used the pressure chamber 1 for producing a liquefied layer. of the explosive and may have any shape, as far as the production of such a layer is ensured. "The chamber shown in the drawing is described in detail in the Soviet patent Ur 0 280 285, which is why in

2 4 10 4 .-8- . 29.1·1981. . 58 169/16.2 4 10 4.-8-. 29.1 · 1,981th , 58 169/16.

der vorliegenden Beschreibung nur kurz gestreift wird» Sie hat'ein kegelförmiges Gehäuse 9, durch welches ein Rohr 10 mit einer am" Ende angeordneten Scheibe 11 hindurchgeführt' ist» 'The present description is only briefly touched »It has'a conical housing 9 through which a tube 10 is passed with a arranged at the end of the disc 11 '' '

Im unteren Teil der Druckkammer 1 befindet sich ein Steuerschieber 12, der mit seiner Stange 13 bei deren Aufwärtsbewegung das untere Ende des Rohrs 10 schließt und damit den Ausfluß des pseudoverflüssigten Sprengstoffstromes aus diesem Rohr.in die Rohrleitung 5 unterbrachte Bei der Abwärtsbewegung der Stange'13 wird das untere Ende des Rohrs 10 geöffnet, und der Sprengstoff wird durch dieses Rohrende aus der Druckkammer 1 hinausgeführteIn the lower part of the pressure chamber 1 is a spool 12 which closes with its rod 13 in its upward movement, the lower end of the tube 10 and thus the outflow of the pseudo-liquefied explosive stream from this Rohr.in the pipe 5 housed in the downward movement of the rod'13 the lower end of the tube 10 is opened and the explosive is led out of the pressure chamber 1 through this tube end

Tür die Druckluftzufuhr von der Druckluft quelle (in der Zeichnung nicht dargestellt) in die Druckkammer 1 ist ein Ventil 14 und zum Ablassen der Druckluft ein Ventil 15 vorgesehen« " .Door, the compressed air supply from the compressed air source (not shown in the drawing) in the pressure chamber 1 is a valve 14 and for discharging the compressed air, a valve 15 is provided "".

Der Verbrauchsregler 3 für die Luft, die der Druckkammer 1 zugeführt wird, enthält einen Druckgeber 1 β in der Druckkammer 1 und einen Druckgeber 17 in der Rohrleitung 5? welche gemeinsam an eine Differentialschaltung 18 zur Erzeugung ihres Differenzsignals angeschlossen sind, die mit einer Vergleichsschaltung 19 verbunden ist, die ihrerseits einen Sollwertgeber 20 für das Druckgefälle enthält und mit den Ventilen 14 und 15 verbunden ist, die als Stellwerke für die Zufuhr und den Ablaß der Druckluft in bzw, aus der Druckkammer 1 dienen©The consumption regulator 3 for the air, which is supplied to the pressure chamber 1, contains a pressure transducer 1 β in the pressure chamber 1 and a pressure transducer 17 in the pipe 5? which are connected together to a differential circuit 18 for generating their differential signal, which is connected to a comparison circuit 19, which in turn contains a setpoint generator 20 for the pressure gradient and is connected to the valves 14 and 15, which serve as interlocking for the supply and the discharge of Compressed air in or, from the pressure chamber 1 serve ©

Das Arbeitsprinzip des Reglers 3 beruht auf 'der Abhängigkeit der Durchsatzmasse der Sprengstoffe vom Druckgefälle zwischen dem Eingang der Druckkammer und dem Eingang in die Laderohrleitung« ' 'The operating principle of regulator 3 is based on 'the dependence of the throughput of the explosives from the pressure gradient between the inlet of the pressure chamber and the inlet into the charge pipe' ''

2 4 19 4» -9- " 29*1.19812 4 19 4 »-9-" 29 * 1.1981

58 169/1658 169/16

Bei Abweichungen vom vorgegebenen Druckgefälle auf dem Formierungsabschnitt eines pseudoverflüssigten Stroms der Sprengstoffe wird nach einem Signal der Vergleichsschaltung 19 mit Hilfe der Ventile 14 und 15 der Verbrauch von Druckluft und Sprengstoff aus der Druckkammer 1 geregelt» .In deviations from the predetermined pressure gradient on the forming section of a pseudo-liquid stream of explosives is controlled by a signal of the comparison circuit 19 by means of the valves 14 and 15, the consumption of compressed air and explosive from the pressure chamber 1 ».

Der Luftverbrauchsregler 4 enthält einen Ejektor 21 (sinnbildlich dargestellt) mit einer Stelleinrichtung 22 der Luftzufuhr in die Rohrleitung 5 sowie ein Kommandogerät 7 mit einem Luftverbrauchssollwertgeber 23 des Ejektors 21· Das Kommandogerät 7 gewährleistet die Einschaltung des Itfachblasens des Ejektors 21 in die Rohrleitung 5» um die"gesamte Rohrleitung bis zum Öffnen des Steuerschiebers 12 und nach dessen Öffnung mit Druckluft auszufüllen^ Die Menge der zugeführten Druckluft wird dabei durch den Pegel eines Signals bestimmt, das der Stelleinrichtung 22 über ..das Kommandogerät 7 entsprechend der durch den Luftverbrauchssollwertgeber 23 eingestellten Vorgabe zugeführt wird» Sobald die Stange 13 des Steuerschiebers 12 das Rohr 10 geschlossen hat, gewährleistet das Kommandogerät 7 eine derartige stufenweise Steigerung der Druckluftzufuhr durch die Stelleinrichtung 22 in die Rohrleitung 5? daß die Bewegungsgeschwindigkeit des Sprengstoffs am Rohrleitungsausgang gleich das im Moment der Luft- und Sprengstoffzufuhr aus der Druckkammer in die Rohrleitung 5 bestehenden Geschwindigkeit bleibte Das Kommandogerät 7 kann.ein beliebiger sachkundiger Fachmann aus jeweiligen pneumatischen und sonstigen Mitteln zusammenbauen, weshalb das in dieser Beschreibung nicht ausführlich erläutert wird* . The air consumption regulator 4 includes an ejector 21 (symbolically shown) with an adjusting device 22 of the air supply into the pipe 5 and a command device 7 with an air consumption setpoint 23 of the ejector 21 · The command device 7 ensures the activation of Itfachblasens the ejector 21 in the pipe 5 » the amount of compressed air supplied is determined by the level of a signal that the actuator 22 via .. the command device 7 according to the set by the air consumption setpoint generator 23 default As soon as the rod 13 of the spool 12 has closed the tube 10, the command device 7 ensures such a stepwise increase in the supply of compressed air by the adjusting device 22 into the pipeline 5 that the speed of movement of the explosive gle at the pipe outlet If, at the moment of the air and explosives supply, the speed from the pressure chamber remains in the pipeline 5. The control unit 7 can be assembled by any expert skilled in the art from respective pneumatic and other means, which is why this is not explained in detail in this description.

Pur die Zufuhr der flüssigen-Zugaben in den Sprengstoff unmittelbar während dessen Bewegung durch die Rohrleitung 5 ist der obere Teil der Flüssigkeitsdruckkammer 6 über einen Kanal mit dem oberen Teil der Druckkammer 1-verbunden»' DerPur the supply of liquid additions to the explosive immediately during its movement through the pipe 5, the upper part of the fluid pressure chamber 6 via a channel with the upper part of the pressure chamber 1-connected »'The

· 2 2 4 19 4 -10- : " _ 29.1.1981  · 2 2 4 19 4 -10-: "_ 29.1.1981

58 169/1658 169/16

untere Teil der Flüssigkeitsdruokkaiamer 6 ist über die Drossel 8 mit der Rohrleitung 5 verbunden« Für die Zufuhr und Ableitung der Flüssigkeit ist an. der Flüssigkeitsdruckkammer ein Zufuhrventil 24 und ein Ablaßventil 25 vorgesehen« Wie bereits erwähnt wurde, ist die Drossel 8 mit dem Kommandogerät 7 verbunden^ das mit einem Sollwertgeber 26 für die Messung des Flüssigkeitsverbrauches ausgerüstet ist» Gleichzeitig mit dem Kommando zum Öffnen des Rohrs 10 mittels der Stange 13 des Steuerschiebers 12 gibt das Kommandogerät 7 entsprechend dem durch den Flüssigkeitsverbrauchssollwert eingestellten Niveau ein Kommando zum entsprechenden Öffnen der Drossel 8? durch welche die Flüssigkeit aus der Flüssigkeitsdruckkammer 6 in die Rohrleitung 5 gelangt«,The lower part of the fluid pressure chamber 6 is connected via the throttle 8 to the pipe 5 "for the supply and discharge of the liquid is on. As already mentioned, the throttle 8 is connected to the control unit 7 which is equipped with a setpoint generator 26 for the measurement of the liquid consumption "Simultaneously with the command to open the tube 10 by means of the Rod 13 of the spool 12 is the command device 7 according to the set by the liquid consumption setpoint level command for opening the corresponding throttle 8? through which the fluid from the fluid pressure chamber 6 enters the pipeline 5,

Die pneumatische Ladeeinrichtung arbeitet wie folgtt The pneumatic charging device operates as follows t

In die Druckkammer 1 wird der Sprengstoff 2 eingebracht, während die Flüssigkeitsdruckkammer·6 durch das Ventil 24 mit der Flüssigkeit gefüllt wird» . .In the pressure chamber 1, the explosive 2 is introduced while the liquid pressure chamber · 6 is filled by the valve 24 with the liquid ». ,

Je nach dem Durchmesser und der bezogenen Länge der Laderohrleitung 5j dem Durchmesser und dem Neigungswinkel der zu ladenden Spreng~ bzw«, Bohrlöcher stellt der Operator mit Hilfe des Sollwertgebers 20 das. erforderliche Druckgefälle zwischen dem Eingang der Druckkammer 1 und dem Eingang der Laderohrleitung 5 ein9 Mit dem Sollwertgeber 23 stellt er das erforderliche Anfangsniveau des Luftdurchflusses durch den Ejektor 21 in die Laderohrleitung 5 ein, und mit dem Sollwertgeber 26 gibt er den notwendigen Flüssigkeitsverbrauch für die Flüssigkeitszufuhr aus der Di1UCkkammer 6- in die Laderohrleitung 5 vor β Danach schaltet er-das Kommandogerät 7 ein«, das ein Kommandosignal zum Schließen und Offneu "des Steuerschiebers 12 und des Luftzufuhrventils 22 (der Stellein- ' richtung) in die Rohrleitung 5· formierte Gleichzeitig damitDepending on the diameter and the related length of the charge pipe 5j the diameter and the angle of inclination of the blasting or to be loaded, the operator uses the setpoint generator 20 to set the required pressure gradient between the inlet of the pressure chamber 1 and the inlet of the charge pipe 5 9 With the setpoint generator 23, he sets the required initial level of air flow through the ejector 21 in the charge pipe 5, and with the setpoint generator 26, he gives the necessary liquid consumption for the liquid supply from the Di 1 UCkkammer 6- in the Laderohrleitung 5 before β Then switches he-the command device 7 ", a command signal for closing and Off" of the spool 12 and the air supply valve 22 (the Stellein- 'direction) in the pipe 5 · formed simultaneously with it

24194 -H- 29.1.198124194 -H- 29.1.1981

.. 58 169/16.. 58 169/16

'gelangt die Druckluft durch das Ventil 14 (der Stelleinrichtung) in die Druckkammer 1· Uach Ablauf der Zeit, die zum Füllen der gesamten Rohrleitung 5 mit Druckluft erforderlich ist, wird ein Kommando zum Öffnen des Steuerschiebers gegeben, wonach sich die Stange 13 absenkt und das Rohr 1.0 geöffnet wird» Unter der Wirkung der durch die Druckkammer strömenden Druckluft wird der Sprengstoff pseudoverflüssigt und durch das Rohr 10 der Laderohrleitung 5 zugeführt«, Hier wird der pseudoverflüssigte Strom durch die aus dem Ejektor 21 gelangende Luft verflüssigt und bewegt sich in der Rohrleitung 5 fort«After the time required to fill the entire pipe 5 with compressed air, a command is given to open the control spool, after which the rod 13 is lowered and the pipe 1.0 is opened »Under the action of the compressed air flowing through the pressure chamber, the explosive is pseudo-liquefied and supplied through the pipe 10 to the charging pipe 5. Here, the pseudo-liquefied stream is liquefied by the air coming from the ejector 21 and moves in the pipe 5 away «

Gleichzeitig mit dem Öffnen des Steuerschiebers 12 wird von dem Kommandogerät 7 ein Kommando zum Öffnen der Drossel 8 abgegeben, wodurch die Flüssigkeit der Rohrleitung 5 zuge~ führt wird. Aus den von Geber 16 und 17 an die Differentialschaltung 18 abgegebenen Signalen berechnet diese Druckdifferenz© Das erhaltene Signal wird an die Vergleichsschaltung 19 übertragen, in der das Signal mit der Vorgabe verglichen wird, die am Sollwertgeber 20 eingestellt wurde· Je nach Größe des Signals wird in der Schaltung ein Signal zum Öffnen bzw·· Schließen des Zufuhrventils 14 und des Ablaßventils 15 der Druckluftspeisung der Druckkammer 1 formiert«,Simultaneously with the opening of the spool 12, a command to open the throttle 8 is issued by the command device 7, whereby the liquid of the pipe 5 is supplied ~ leads. From the signals supplied by encoders 16 and 17 to the differential circuit 18 calculates this pressure difference © The signal obtained is transmitted to the comparison circuit 19, in which the signal is compared with the default, which was set at the setpoint generator 20 · Depending on the size of the signal is forming in the circuit a signal for opening or closing the supply valve 14 and the discharge valve 15 for supplying compressed air to the pressure chamber 1,

Nach dem Austragen des vorgegebenen Gewichts der Sprengstoffladung aus der Druckkammer 1 gibt das Kommandogerät 7 ein Kommando an den Steuerschieber 12 zum Schließen des Rohres und zum Schließen der Drossel 8© Gleichzeitig damit wird von dem Kommandogerät 7 ein"Kommando an das Ventil 22 zur stufenteisen Steigerung des Luftverbrauchs in" der Laderohrleitung 5 abgegeben, Nachdem die gesamte Sprengstoffmenge aus der Laderohrleitung in den Ladehohlraum gelangt ist» schaltet der Operator das Kommandogerät 7 aus, wodurch die LuftzufuhrAfter discharging the predetermined weight of the explosive charge from the pressure chamber 1, the command device 7 gives a command to the spool 12 to close the pipe and to close the throttle 8 At the same time is from the command device 7 a "command to the valve 22 for step iron increase of the air consumption in "the charge pipe 5, after the entire amount of explosive from the charge pipe has entered the charging cavity" the operator switches off the command device 7, whereby the air supply

£ d. t* 1 J *». -12- 29.1.1981 £ d. t * 1 J * ». -12- 29.1.1981

. , 53 169/16, , 53 169/16

durch das Ventil 22 und den Ejektor 21 unterbrochen wird«, Damit ist der Ladungszyklus beendet„.is interrupted by the valve 22 and the ejector 21, "Thus, the charge cycle is completed".

In diesem !Beispiel wurde eine vorzugsweise Ausführungsvariante der erfindungsgemäßen Einrichtung zur pneumatischen Ladung von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen beschrieben» in der der Sprengstofftransport mit Hilfe von Druckluft erfolgt«, Selbstverständlich kann auch für die Druckluft ein inertes Gas, beispielsweise Argon oder ein anderes Gas verwendet werden« Die Auswahl des entsprechenden Gases muß dabei nach den Kriterien der gegebenen Betri.ebssich.er— heitsbedingungen und der verwendeten Technologie erfolgen«In this example, a preferred embodiment of the device according to the invention for the pneumatic loading of explosive and boreholes with bulk explosives was described "in which the explosive transport using compressed air takes place." Of course, for the compressed air, an inert gas, such as argon or another Gas must be selected "according to the criteria of the given operating conditions and the technology used."

Weiterhin können die Reglereinheiten ebenfalls aus pneumatischen, hydraulischen, elektronischen, mechanischen Bauelementen und/oder aus entsprechenden Kombinationen dieser Hilfsenergiearten bestehen*Furthermore, the regulator units may also consist of pneumatic, hydraulic, electronic, mechanical components and / or corresponding combinations of these auxiliary energy types *

Der Einsatz der vorliegenden Erfindung' ermöglicht eine wesentliche Verringerung der SprengstoffVerluste beim Laden der Bohrlöcher sowie eine erhöhte Ladungsqualität»The use of the present invention 'allows a substantial reduction of explosive losses when loading the wells and increased charge quality »

Claims (1)

2 2 4 19 4 -13- "29·1.19812 2 4 19 4 -13- "29 · 1.1981 58 Ί69/1658 Ί69 / 16 'Erfindungsanspruch 'Invention claim 1β Einrichtung zur pneumatischen Ladung von Spreng- und Bohrlöchern mit schüttigen Sprengstoffen, die eine mit einer Gasquelle verbundene Druckkammer, zur Bildung einer pseudoverflüssigten Sprengstoffschicht enthält, in der koaxial ein Rohr zum Ausbringen des im pseudoverflüssigten "Zustand befindlichen Sprengstoffs angeordnet ist, das mit einem Ende durch einen Steuerschieber mit dem Hohlraum der Druckkammer und mit dem anderen Ende mit einer Laderohrleitung für die Sprengstoffzufuhr in den Ladehohlraum verbunden ist, die ferner einen Ejektor für die Luftzufuhr und eine Laderohrleitung aufweist, gekennzeichnet dadurch^ daß ein Verbrauchsregler (3) für Gas vorgesehen ist, das in die Druckkammer zum Aufrechterhalten "der vorgegebenen Durchsatzmasse des Sprengstoffs .je nach der Druckdifferenz in der pseudoverflüssigten Schicht und am Eingang der Laderohrleitung (5) zugeführt wird, sowie ein Verbrauchsregler (4) für das Gas in der Laderohrleitung, der einen stufenweisen Anstieg des Gasverbrauchs in der Laderohrleitung im Schließmoment des Steuerschiebers (12) gewähr-1 eistet ο1 β device for pneumatic charging of explosive and boreholes with bulk explosives containing a pressure chamber connected to a gas source to form a pseudo-liquid explosive layer in which a coaxial tube for discharging the pseudo-liquefied state explosive is arranged End is connected by a spool with the cavity of the pressure chamber and at the other end with a charge piping for the explosive supply in the loading cavity, which further comprises an ejector for the air supply and a Laderohrleitung, characterized in that ^ provided a consumption regulator (3) for gas which is supplied into the pressure chamber for maintaining the predetermined throughput of the explosive, depending on the pressure difference in the pseudo-liquid layer and at the inlet of the charging conduit 5, and a gas flow regulator 4 in the charge conduit, one stepwise ans Gas consumption in the charge pipe at the closing moment of the spool valve (12) is guaranteed 2* Einrichtung nach Punkt 1, gekennzeichnet dadurch, daß der Verbrauchsregler (3) des in die Druckkammer (1) zugeführten Gases einen Geber (16) für den Druck in der Druckkammer (1) und einen Geber (17) für den' Druck in der Laderohrleitung (5) enthält, die gemeinsam an eine Differentialschaltung (18) zur Gewinnung ihres Differehzsignals angeschlossen sind, die mit einem Sollwertgeber (20) für das Druckgefälle verbunden und mit ihrem Ausgang an die Stell- einrichtung für die Zufuhr (14) und Abfuhr (15) des Gases der Druckkammer (1), zur Abfuhr des von der Gasquelle zu-2 * Device according to item 1, characterized in that the consumption regulator (3) of the gas fed into the pressure chamber (1) comprises a pressure chamber (1) pressure transducer (16) and a pressure transducer (17) the charge pipe (5), which are connected together to a differential circuit (18) for obtaining their Differehzsignals connected to a setpoint generator (20) for the pressure gradient and with its output to the adjusting device for the supply (14) and discharge (15) of the gas of the pressure chamber (1), for the removal of gas from the source 2 2 4 1 9 4 -H- 29.1.19812 2 4 1 9 4 -H- 29.1.1981 58 169/1658 169/16 geführten Gases, sobald das vorgegebene Druckgefälle überstiegen wird, angeschlossen ist«gas as soon as the specified pressure gradient is exceeded " 3* Einrichtung nach Punkt 1 bzw«,· 29 gekennzeichnet dadurch t daß der Verbrauchsregler (4) für Gas in der Laderohrleitung ein Kommandogerät (7)-enthält, das mit der Stelleinrichtung des Steuerschiebers (12) verbunden ist und dasbeim Schließen dieses Steuerschiebers ein Signal an das Ventil (22) zur stufenweisen Steigerung des Gasverbrauchs in der Laderohrleitung (5) erzeugte .3 * device according to item 1 or "x 2 9 characterized in t that the consumption regulator (4) for gas in the loading pipe a predictor (7) -contains, which is connected to the actuating device of the control slide (12) and dasbeim closing of this control slide a signal to the valve (22) for gradually increasing the gas consumption in the charge pipe (5) generated. 4* Einrichtung nach Punkt 1 bis 3» gekennzeichnet dadurch* daß der obere Teil der Flüssigkeitsdruckkammer (6) mit dem oberen Teil der Druckkammer (1) und ihr unterer Teil über die Drossel (8), die sich nach den Signalen-des Kommandogeräts (7) beim Öffnen des Steuerschiebers (12) öffnet♦ mit der Laderohrleitung (5) verbunden ist«4 * device according to items 1 to 3 »characterized in that the upper part of the fluid pressure chamber (6) communicates with the upper part of the pressure chamber (1) and its lower part via the throttle (8) which follows the signals of the command device ( 7) when opening the spool (12) opens ♦ is connected to the charge pipe (5) « Hierzu 1 Seite ZeichnungenFor this 1 page drawings
DD22419480A 1980-09-29 1980-09-29 DEVICE FOR THE PNEUMATIC LOADING OF SPRENG AND BOHRLOECHERS WITH SLOPE SPHERES DD153186A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DD22419480A DD153186A1 (en) 1980-09-29 1980-09-29 DEVICE FOR THE PNEUMATIC LOADING OF SPRENG AND BOHRLOECHERS WITH SLOPE SPHERES

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DD22419480A DD153186A1 (en) 1980-09-29 1980-09-29 DEVICE FOR THE PNEUMATIC LOADING OF SPRENG AND BOHRLOECHERS WITH SLOPE SPHERES

Publications (1)

Publication Number Publication Date
DD153186A1 true DD153186A1 (en) 1981-12-23

Family

ID=5526497

Family Applications (1)

Application Number Title Priority Date Filing Date
DD22419480A DD153186A1 (en) 1980-09-29 1980-09-29 DEVICE FOR THE PNEUMATIC LOADING OF SPRENG AND BOHRLOECHERS WITH SLOPE SPHERES

Country Status (1)

Country Link
DD (1) DD153186A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19637024A1 (en) * 1996-09-12 1998-03-26 Appenzeller Albert Method and device for producing explosives and filling explosive and boreholes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19637024A1 (en) * 1996-09-12 1998-03-26 Appenzeller Albert Method and device for producing explosives and filling explosive and boreholes
DE19637024C2 (en) * 1996-09-12 1999-04-08 Appenzeller Albert Method and device for producing explosives and for filling explosive and boreholes

Similar Documents

Publication Publication Date Title
EP0215857B1 (en) Process for the evacuation of particles of residue from a pressure gasification reactor
DE3418808C2 (en)
DE3210657A1 (en) METHOD AND DEVICE FOR INCREASING THE SOLID-FLUID RATIO OF A SLUDGE
DE2728853A1 (en) METHOD AND DEVICE FOR MINING MINERALS IN CAVES OF AN UNDERGROUND WAREHOUSE
DE3515967A1 (en) VIBRATION METHOD FOR CLEARING A CLOGGED SUSPENSION PIPELINE
DE202022101554U1 (en) Flow regulation, water control and acidification complete device for oil and gas wells
DE3145856A1 (en) TRANSMISSION DEVICE
DE102012004762A1 (en) Device for expanding bore hole up to large diameter, has delivery line extending from region of cutting wheel inside machine pipe, and outlet located in rear portion of machine pipe, where support plate is connected with machine pipe
DD153186A1 (en) DEVICE FOR THE PNEUMATIC LOADING OF SPRENG AND BOHRLOECHERS WITH SLOPE SPHERES
EP1583887B1 (en) Method and device for intensifying the permeability of ground layers close to bore holes and filter bodies and filter layers in wells and other production wells
DE2911148C3 (en) Device for the pneumatic loading of blasting holes and boreholes with free-flowing explosives
DE3515970A1 (en) FLUID COUPLED VIBRATOR DEVICE
DE3713577A1 (en) METHOD FOR PRODUCING A FOUNTAIN
DE4000687C2 (en) Device for the hydraulic conveying of bulk goods
DE2534279A1 (en) VALVE
DE3344480A1 (en) Safety shut-off valve
DE3416583C1 (en) Device for the pneumatic loading of shot holes and drilled holes with free-flowing explosives
DE102017005798B3 (en) A mixing plant and method for producing a drilling fluid for a wellbore and use in producing a drilling fluid for a wellbore
DE1945891C3 (en) Oil flow control rotary valve for a hydraulic elevator
CH649360A5 (en) HYDRAULICALLY UNLOCKABLE VALVE ARRANGEMENT.
EP2580422B1 (en) Device and method for producing high-pressure pulses
DE10360515B3 (en) Air pressure control valve for operating air pressure brake for railway vehicle has reservoir pressure supplied to brake application valve and control pressure supplied to application and release valves
DE19925502C1 (en) Process for extracting oil from drilling mud and / or oil-containing drilling mud fractions
DE19850183A1 (en) Hammer drill head has a moving piston in a chamber to compress the drilling fluid for delivery through at least one outlet jet for horizontal drilling in rock with a drilling fluid
EP0333859A1 (en) Device for cleaning pipelines

Legal Events

Date Code Title Description
ENJ Ceased due to non-payment of renewal fee