CZ6414U1 - Training machine - Google Patents

Training machine Download PDF

Info

Publication number
CZ6414U1
CZ6414U1 CZ19976910U CZ691097U CZ6414U1 CZ 6414 U1 CZ6414 U1 CZ 6414U1 CZ 19976910 U CZ19976910 U CZ 19976910U CZ 691097 U CZ691097 U CZ 691097U CZ 6414 U1 CZ6414 U1 CZ 6414U1
Authority
CZ
Czechia
Prior art keywords
training
walls
wall
horizontal
fixed
Prior art date
Application number
CZ19976910U
Other languages
Czech (cs)
Inventor
Vladimír Mgr. Jaroš
Ladislav Doc. Phdr. Csc. Kubálek
Original Assignee
Vladimír Mgr. Jaroš
Ladislav Doc. Phdr. Csc. Kubálek
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vladimír Mgr. Jaroš, Ladislav Doc. Phdr. Csc. Kubálek filed Critical Vladimír Mgr. Jaroš
Priority to CZ19976910U priority Critical patent/CZ6414U1/en
Publication of CZ6414U1 publication Critical patent/CZ6414U1/en

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

Oblast technikyTechnical field

Technické řešení se týká výcvikového trenažéru pro nácvik a trénink profesních činností, spojených s vlastním pohybem při překonávání svislých překážek a výkony ve výškách.The technical solution relates to a training simulator for training and training of professional activities associated with self-movement in overcoming vertical obstacles and performance at heights.

Dosavadní stav technikyBackground Art

Není známo komplexní výcvikové zařízení pro nácvik a trénink profesních činností, prováděných ve výškách a při vertikálním pohybu, které by koncentrovalo různorodé možnosti náročného výcviku do malého prostoru.There is no comprehensive training facility for training and training of professional activities carried out at heights and vertical movements, which would concentrate the diverse possibilities of demanding training in a small space.

Podstata technického řešeníThe essence of the technical solution

Tento nedostatek do značné míry odstraňuje výcvikový trenažér podle tohoto technického řešení, jehož podstata spočívá v tom, že sestává z prostorové trubkové nosné konstrukce čtvercového nebo obdélníkového tvaru. Tato nosná konstrukce, která je provedena lešenářský na bázi trubkového lešení, obsahuje pevné vodorovné lávky a šikmé žebříky a na jejich stěnách jsou připevněny výcvikové moduly, které vytvářejí plášť nosné konstrukce. Na první stěně je připevněna horolezecká stěna a vybavení pro slaňování bez opory a na druhé, protilehlé, stěně jsou vytvořeny okna, římsy, svodová roura, hromosvod a balkony. Na třetí stěně jsou upevněny svislé tyče, vodorovné tyče a pevné žebříky a na čtvrté sténě jsou umístěny lanové žebříky, lanová síť a svislá lana. Dále jsou mezi stěnami v různých výškách upevněna šikmá lana a vodorovná lana. Část horního prostoru mezi stěnami může být opatřena vodorovnou střechou. Ve stěnách mohou být vytvořeny prolézací tunely, šachty a imitace zbořeniště.This drawback is largely eliminated by the training trainer of the present invention, which consists in the fact that it consists of a square or rectangular tubular support structure. The scaffolding scaffolding supporting structure includes fixed horizontal platforms and inclined ladders, and training modules are attached to their walls to form a support structure. On the first wall there is a climbing wall and equipment for abseiling without support and on the other side, opposite, there are windows, ledges, down pipe, lightning conductor and balconies. On the third wall are mounted vertical bars, horizontal bars and fixed ladders, and on the fourth wall there are rope ladders, rope net and vertical ropes. Furthermore, inclined ropes and horizontal ropes are fixed between the walls at different heights. Part of the upper space between the walls can be provided with a horizontal roof. Crawling tunnels, shafts, and imitation ruins can be created in the walls.

Výhodami výcvikového trenažéru podle tohoto technického řešení jsou zvýšení efektivnosti, intenzívnosti a atraktivnosti výcviku speciálních odborností, využití malého prostoru pro umístění trenažéru a tudíž jeho umístění prakticky kdekoliv, čímž se šetří čas a eliminují se náklady na dopravu při výjezdech cvičenců. Trenažér umožňuje hromadný výcvik až 30 cvičenců, přičemž je zajištěna jejich bezpečnost při výcviku a požadovaná úroveň metodiky nácviku a tréninku. Kromě profesního výcviku poskytuje trenažér i další alternativy jeho využití, například v oblasti prevence sociálně patologických jevů, v oblasti školních i mimoškolních aktivit mládeže, v oblasti zábavy i oblasti sportovního soutěžení .The advantages of the training simulator are to increase the efficiency, intensity and attractiveness of the training of specialty skills, the use of a small space for the placement of the trainer and hence its location virtually anywhere, thus saving time and eliminating the cost of transportation during trainers' exits. The trainer allows mass training of up to 30 practitioners, while ensuring their training safety and the required level of training and training methodology. In addition to professional training, the trainer provides other alternatives to its use, such as prevention of socially pathological phenomena, school and extracurricular youth activities, entertainment and sports competitions.

Přehled obrázků na výkresechBRIEF DESCRIPTION OF THE DRAWINGS

Technické řešení bude blíže osvětleno pomocí výkresů, na kterých obr. 1 znázorňuje axonometrický pohled na trenažér, obr. 2 půdorys trenažéru, na obr. 3 je znázorněna boční stěna v pohledu a na obr. 4 bokorys této boční stěny. Na obr. 5 je další boční stěna v pohledu a na obr. 6 a obr. 7 jsou znázorněny v pohledu zadní a přední stěna trenažéru.1 is a perspective view of the treadmill, FIG. 2 is a plan view of the treadmill, and FIG. 3 is a plan view of the side wall and FIG. FIG. 5 is a further side view of the trainer, and FIGS. 6 and 7 show the rear and front walls of the trainer.

-1CZ 6414 Ul-1CZ 6414 Ul

Příklady provedení technického řešeníExamples of technical solutions

Výcvikový trenažér, podle obr. 1, sestává z nosné konstrukce obdélníkového tvaru, která je provedena z trubek, vytvářejících prostorovou konstrukci. Nosná konstrukce je tvořena stěnami 1, 2,The training simulator of FIG. 1 consists of a rectangular support structure made of tubes forming a spatial structure. The supporting structure consists of walls 1, 2,

3. a 4, v nichž jsou umístěny pevné vodorovné lávky 20 a šikmé žebříky 21. Na stěnách 1, 2, 2 a 4 jsou připevněny dále uváděné výcvikové moduly, které jsou základními funkčními prvky trenažéru, na nichž je prováděn vlastní výcvik. Na první stěně 1 je podle obr. 1, obr. 2, obr. 3 a obr. 4 umístěna horolezecká stěna 7 a vybavení 8 pro sladování bez opory. Na druhé stěně 2 jsou podle obr. 5 vytvořeny okna 9., římsy 10, svodová roura 11, hromosvod 12 a balkony 12. Na třetí stěně 2 jsou podle obr. 6 upevněny svislé tyče 14, vodorovné tyče 15 a pevné žebříky 16. Na čtvrté stěně 4 jsou podle obr. 7 umístěny lanové žebříky 17., lanová siř 18 a svislá lana 19. Mezi stěnami 1, 2, 2 a 4 jsou podle obr. 2 v různých výškách upevněna šikmá lana 5 a vodorovná lana3 and 4, in which the fixed horizontal trays 20 and the inclined ladders 21 are located. A climbing wall 7 and a malting device 8 are provided on the first wall 1 according to FIG. 1, FIG. 2, FIG. 3 and FIG. On the second wall 2, according to FIG. 5, the windows 9, ledges 10, the downcomer pipe 11, the lightning conductor 12 and the balconies 12 are formed. in Fig. 7, cable ladders 17, rope wire 18 and vertical ropes 19 are located. Figs. 2, 2 and 4, respectively, show inclined ropes 5 and horizontal ropes at different heights in accordance with FIG.

6.6.

Konstrukce trenažéru je samonosná a nevyžaduje žádné kotvení. Podmínkou pro její instalaci je vodorovný a pevný podklad, například betonová nebo asfaltová plocha, popřípadě pevný zemní podklad.The simulator is self-supporting and requires no anchorage. A prerequisite for its installation is a horizontal and solid base, such as a concrete or asphalt surface, or a solid ground support.

Průmyslová využitelnostIndustrial usability

Technické řešení je možno využívat k výcviku speciálních odborností v oblasti vojenské, policejní, požární, v oblasti záchranné služby a pro práci, související s opravou a údržbou výškových obj ektů.The technical solution can be used to train special expertise in the field of military, police, fire, rescue services and work related to the repair and maintenance of high-rise buildings.

Claims (4)

NÁROKY NA OCHRANUPROTECTION REQUIREMENTS 1. Výcvikový trenažér, pro nácvik a trénink profesních činností, vyznačující se tím, že sestává z prostorové trubkové nosné konstrukce čtvercového nebo obdélníkového tvaru, obsahující pevné vodorovné lávky (20) a šikmé žebříky (21), přičemž na stěnách (1, 2, 3,4) prostorové trubkové nosné konstrukce jsou připevněny výcvikové moduly.A training simulator for practicing and training professional activities, characterized in that it consists of a spatial tubular support structure of square or rectangular shape, comprising fixed horizontal footbridges (20) and sloping ladders (21), wherein on the walls (1, 2), 3.4) Spatial tubular supporting structures are attached by training modules. 2. Výcvikový trenažér podle nároku 1, vyznačující se tím, že na první stěně (1) je připevněna horolezecká stěna (7) a vybavení (8) pro slaňování bez opory, na druhé stěně (2) jsou vytvořeny okna (9), římsy (10), svodová roura (11), hromosvod (12) a balkony (13), a dále na třetí stěně (3) jsou upevněny svislé tyče (14), vodorovné tyče (15) a pevné žebříky (16) a na čtvrté stěně (4) jsou umístěny lanové žebříky (17), lanová sít (18) a svislá lana (19) a mezi stěnami (1, 2, 3, 4) jsou v různých výškách upevněna šikmá lana (5) a vodorovná lana (6).Training trainer according to claim 1, characterized in that a climbing wall (7) and an abseiling abseiling device (8) are fixed to the first wall (1), and windows (9), cornices (9) are formed on the second wall (2). (10), drain pipe (11), lightning conductor (12) and balconies (13), and on the third wall (3) are mounted vertical bars (14), horizontal bars (15) and fixed ladders (16) and on the fourth the rope ladders (17), the rope net (18) and the vertical ropes (19) are located in the wall (4) and the ropes (5) and the horizontal ropes (6) are fixed at different heights between the walls (1, 2, 3, 4) ). 3. Výcvikový trenažér podle nároků la2, vyznačující se tím, že část horního prostoru mezi stěnami (1, 2, 3, 4) je opatřena vodorovnou střechou.Training simulator according to claims 1 and 2, characterized in that a part of the upper space between the walls (1, 2, 3, 4) is provided with a horizontal roof. -2CZ 6414 Ul-2GB 6414 Ul 4. Výcvikový trenažér podle nároků 1 se t í m, že ve stěnách (1, 2, žací tunely a šachty.The training simulator according to claim 1, characterized in that in the walls (1, 2) the mowing tunnels and shafts. a 2, vyznačující 3, 4) jsou vytvořeny prolé5. Výcvikový trenažér podle nároků la2, vyznačující se tím, že ve stěnách (1, 2, 3, 4) je vytvořena imitace zbořeniště.and 2, characterized 3, 4) are formed. Training simulator according to claims 1 and 2, characterized in that an imitation of a demolition site is formed in the walls (1, 2, 3, 4).
CZ19976910U 1997-07-03 1997-07-03 Training machine CZ6414U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CZ19976910U CZ6414U1 (en) 1997-07-03 1997-07-03 Training machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CZ19976910U CZ6414U1 (en) 1997-07-03 1997-07-03 Training machine

Publications (1)

Publication Number Publication Date
CZ6414U1 true CZ6414U1 (en) 1997-07-30

Family

ID=38827733

Family Applications (1)

Application Number Title Priority Date Filing Date
CZ19976910U CZ6414U1 (en) 1997-07-03 1997-07-03 Training machine

Country Status (1)

Country Link
CZ (1) CZ6414U1 (en)

Similar Documents

Publication Publication Date Title
US7572207B2 (en) Climbing wall structure and method of construction
US8435039B2 (en) Adjustable pitch simulated roof for training firefighters in roof ventilation procedures
CN108786053A (en) Fire-fighting life-saving, rock-climbing integrated training platform
CN111816047A (en) Comprehensive emergency rescue training facility
CZ6414U1 (en) Training machine
CN212342149U (en) Comprehensive emergency rescue training facility
CN213269122U (en) Sports palace building device
US20150379883A1 (en) Firefighter Training Fixture
CN216849010U (en) High-altitude wiring experience equipment
CN111803862A (en) Multifunctional expanding and teaching training combined device
CN211705747U (en) Combined type wooden child expansion training device with horizontal bar
US20210113874A1 (en) Firefighter Training Devices
CN2899857Y (en) Multifunction physical agility and psychological behavour training equipment
RU2786464C1 (en) "work at height" training complex
CN212235777U (en) Multifunctional comprehensive psychological behavior training frame
CN212406071U (en) Building engineering construction scaffold protective structure
WO2008059092A1 (en) Climbing-wall simulator
CN214123210U (en) Escape training platform
CN217085942U (en) Wind turbine generator system ascends a height and high altitude rescue teaching aid of fleing
AU2019101625A4 (en) MG Supergola - a steel pergola with an opaque roof, that allows to quickly and safely attach a variety of different implements for play, fitness training and leisure
CN2650798Y (en) Multifunctional exerciser
JP3140143U (en) Artificial climbing wall
CN217054525U (en) Tour assembled road bridge construction safety of construction experience shop
CN218685976U (en) Steep slope forest of climbing technical and tactics trainer of putting out a fire
CN218351024U (en) City rope rescue training frame

Legal Events

Date Code Title Description
ND1K First or second extension of term of utility model

Effective date: 20040614

MK1K Utility model expired

Effective date: 20070703