CZ295219B6 - Method for periodic rinsing a wastewater gravity piping and wastewater gravity piping for making the same - Google Patents

Method for periodic rinsing a wastewater gravity piping and wastewater gravity piping for making the same Download PDF

Info

Publication number
CZ295219B6
CZ295219B6 CZ20021493A CZ20021493A CZ295219B6 CZ 295219 B6 CZ295219 B6 CZ 295219B6 CZ 20021493 A CZ20021493 A CZ 20021493A CZ 20021493 A CZ20021493 A CZ 20021493A CZ 295219 B6 CZ295219 B6 CZ 295219B6
Authority
CZ
Czechia
Prior art keywords
storage tank
water
pressure
valve
pipe
Prior art date
Application number
CZ20021493A
Other languages
Czech (cs)
Other versions
CZ20021493A3 (en
Inventor
Josef Ringhofer
Original Assignee
Josef Ringhofer
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Josef Ringhofer filed Critical Josef Ringhofer
Publication of CZ20021493A3 publication Critical patent/CZ20021493A3/en
Publication of CZ295219B6 publication Critical patent/CZ295219B6/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • B08B9/0326Using pulsations
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • E03F9/007Devices providing a flushing surge

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)
  • Cleaning In General (AREA)
  • Sink And Installation For Waste Water (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

The present invention relates to a method for periodically rinsing a wastewater gravity piping (1) that follows up a terrain (2) course and has at least one lowest point (3) with compressed air. Amount of water is collected in a reservoir (8) which is connected in a manner similar to that of a communicating vessel to an inlet end of the piping (1) and which is periodically impinged upon by compressed air from a pressure vessel (9) in order to expel the amount of water prepared, optionally to expel at least a portion of the prepared amount of water in the form of a surge originating from the reservoir (8) in the piping (1). For the wastewater gravity piping used for carrying out the method according to the present invention, the reservoir is pressure resistant and is made as a siphon and is connected as a communicating vessel with the piping (1). Said pressure vessel (9) is connected to the piping (1) via said reservoir (8), whereby a valve (11) is disposed between the pressure vessel (9) and the reservoir (8). In the water supply pipe (5) of the reservoir (8), there is arranged a closing fitting (13), particularly a slide valve.

Description

Vynález se týká způsobu proplachování potrubí odpadních vod, při němž je odpadní voda, nashromážděná v zásobní nádrži, prostřednictvím tlakového vzduchu protlačována na způsob vodního rázu potrubím odpadních vod. Vynález se dále týká spádového potrubí odpadních vod k provádění způsobu podle vynálezu, které v instalované poloze sleduje průběh terénu a má alespoň jedno nejnižší místo, se zařízením k proplachování potrubí pomocí vody, přiveditelné do potrubí, na kterou působí tlakový vzduchu, s kompresorem a s k němu připojenou tlakovou nádobou, která je prostřednictvím ventilu spojena s potrubím, a se zásobní nádrží pro shromažďování množství vody, jakož i s přívodním potrubím vody pro přívod vody do zásobní nádrže.The invention relates to a method for flushing sewage pipes, in which the waste water accumulated in the storage tank is forced through the sewage pipes by means of compressed air. The invention further relates to a wastewater downflow pipe for carrying out the method according to the invention which, in the installed position, follows the course of the terrain and has at least one lowest point, with a device for flushing the pipe with water. a connected pressure vessel which is connected to the pipe via a valve and to a storage tank for collecting a quantity of water, as well as a water supply pipe for supplying water to the storage tank.

Dosavadní stav technikyBACKGROUND OF THE INVENTION

Rádný odvod a čištění odpadních vod z provozů a z domácností nabývá stále více na důležitosti. Tento problém je přitom zejména v oblastech venkova řešen nedostatečně, neboť v porovnání s městskými strukturami jsou náklady na vybudování kanalizace podstatně vyšší, a to v důsledku velké délky kanálů. Rovněž se často vyskytují nepříznivé stavebně technické podmínky, například v kopcovitém terénu, kdy se kanály nacházejí ve velkých hloubkách a jsou proto nezbytná pomocná čerpací zařízení. Při napojení většího počtu obcí z důvodu hospodárnosti, jakož i s ohledem na ochranu vody (zmenšením zbytkového znečištění odpadních vod) bývají čistírny odpadních vod zřizovány zpravidla v blízkosti stok. I v tomto případě však bývají často zapotřebí velmi dlouhá spojovací potrubí mezi poslední domácí přípojkou a čističkou odpadních vod.Proper drainage and treatment of wastewater from operations and households is becoming increasingly important. This problem is inadequately addressed, especially in rural areas, as the cost of constructing a sewer system is considerably higher compared to urban structures due to the length of the canals. Also, unfavorable constructional conditions often occur, for example in hilly terrain where the canals are at great depths and therefore auxiliary pumping equipment is necessary. When connecting a larger number of municipalities for reasons of economy as well as with regard to water protection (by reducing residual waste water pollution), waste water treatment plants are usually established near sewers. However, even in this case, very long connecting pipes are often required between the last domestic connection and the sewage treatment plant.

Potrubí odpadních vod musí být vybudováno tak, aby mohla být umožněna jeho kontrola a údržba, například vizuálně, proplachováním, apod. Obvykle je pokládáno přímé potrubí, přičemž v místech zalomení, při horizontální nebo vertikální změně směru potrubí, musí být vybudovány kontrolní šachty. Tyto kontrolní šachty se budují zpravidla v závislosti na příslušném terénu ve vzdálenostech od 10 do 150 m. Kontrolní šachty však zvyšují náklady na vybudování kanálů na odvod odpadních vod, a jednak tvoří překážky na zemědělsky využívaných plochách. V důsledku přímých potrubí odpadních vod mezi jednotlivými kontrolními šachtami se také dosahuje často velkých hloubek pokládky, přičemž nejmenší hloubka, nezbytná pro ochranu proti zamrznutí, musí být větší než 1,3 m. Kontrolní šachty a přípojky k nim rovněž představují potencionálně slabá místa s ohledem na nebezpečí vzniku netěsností, rozdílné sesedání, a pod.Waste water piping must be constructed in such a way that it can be inspected and maintained, for example visually, by flushing, etc. Typically, a straight pipeline is laid, and check shafts must be installed at bend points when horizontal or vertical direction changes. These inspection shafts are usually built, depending on the terrain, at distances of 10 to 150 m. However, the inspection shafts increase the costs of building sewage channels and, on the other hand, create obstacles to agriculturally used areas. Due to the direct sewage piping between the inspection shafts, often also great installation depths are often achieved, with the minimum depth necessary for frost protection to be greater than 1.3 m. Inspection shafts and connections to them also represent potentially weak points with respect to the risk of leakage, misalignment, etc.

Za účelem pravidelného proplachování z důvodu zabránění nárůstu usazenin bylo namísto cenově nákladných klasických kanálů pro odpadní vody s kontrolními šachtami vytvořeno okolnímu terénu přizpůsobené potrubí odpadních vod, které vnejnižších místech terénu tvoří nejnižší místa, ve kterých se odpadní voda soustřeďuje jako v sifonu. V těchto místech nashromážděné určité množství odpadní vody je prostřednictvím rázů tlakového vzduchu periodicky protlačováno potrubím odpadních vod, čímž jsou spláchnuty případné usazeniny v potrubí. Potrubí odpadních vod je přitom vytvořeno jako svařované tlakové potrubí, které je z důvodu ochrany proti mrazu položeno vnezámrzné hloubce a nevyžaduje žádné kontrolní šachty. Při normálním provozu, má-li potrubí z nejvyššího bodu dostatečný spád, odpadní voda jím proudí bez působení tlaku.For regular flushing to prevent the build-up of deposits, instead of the costly conventional sewage channels with control shafts, a tailor-made wastewater pipeline has been created for the surrounding terrain, forming the lowest point of the terrain at which the wastewater is concentrated like a siphon. At this point, a certain amount of wastewater collected is periodically forced through the wastewater pipeline by compressed air surges, thereby flushing out any deposits in the pipeline. The waste water piping is in the form of a welded pressure pipeline which, for reasons of frost protection, is laid at a frost-free depth and does not require any inspection shafts. In normal operation, if the pipeline has a sufficient gradient from the highest point, the wastewater flows through it without pressure.

Tímto provedením mohou být náklady na vybudování potrubí odpadních vod oproti obvyklým kanálům s přímými úseky a kontrolními šachtami sníženy na polovinu. S přihlédnutím k délkám potrubí, nezbytným ve venkovských oblastech, odpadnou rovněž dodatečné náklady na zbudování stanic tlakového vzduchu.With this embodiment, the cost of constructing the waste water pipeline can be halved compared to conventional straight-section channels and inspection shafts. Taking into account the piping lengths necessary in rural areas, the additional costs of installing compressed air stations are also eliminated.

-1 CZ 295219 B6-1 CZ 295219 B6

Jak se však ukazuje, i u takto vybudovaných potrubí odpadních vod určité množství odpadní vody, nashromážděné na nejnižších místech, často nestačí pro vytvoření požadovaného proplachovacího efektu, neboť problémy tvoří především usazeniny v potrubí, vzniklé mimo těchto nejnižších míst. Dochází však i k tomu, že není možné provádět proplachování potrubí odpadních vod prostřednictvím vodního rázu, neboť se v něm nenacházejí žádná nejnižší místa s nashromážděnou odpadní vodou. To nastává obvykle tehdy, je-li potrubí položeno ve svahovitém a/nebo rovinném terénu, a také v nejvýše položeném úseku potrubí.However, even with the sewage pipelines so constructed, a certain amount of waste water accumulated at the lowest points is often not sufficient to produce the desired flushing effect, since the problems are mainly deposits in the pipelines outside these lowest points. However, it is also not possible to purge the waste water pipeline by means of a water hammer, since there are no lowest places with accumulated waste water. This usually occurs when the pipeline is laid on sloping and / or planar terrain, and also in the uppermost section of the pipeline.

Z patentového spisu US 4 391 288 A je známo prostřednictvím mamutového čerpadla protlačovat odpadní vodu vyšší rychlostí skrz shybku odpadního potrubí. Mamutím čerpadlem je současně přiváděn tlakový vzduch. Vytváří se tak směs vody a vzduchu, čímž vzniká vyšší tlakový spád, jehož důsledkem je, že v nádrži nashromážděná odpadní voda proudí shybkou poněkud vyšší rychlostí než normálně. Přitom je však dosažen jen malý tlakový rozdíl a tím jen nepatrně vyšší rychlost proudění. Z tohoto důvodu nelze docílit spolehlivý čisticí účinek. Zejména se nedaří odstranit pevnější usazeniny, nacházející se ve shybce a vzniká tak nebezpečí jejího ucpání, resp. zanesení. Použití mamutího čerpadla rovněž představuje relativně vysoké náklady.It is known from U.S. Pat. No. 4,391,288 A to drive the wastewater through a mammoth pump at a higher speed through the drain pipe. At the same time, a compressed air is supplied by the mammoth pump. This creates a mixture of water and air, resulting in a higher pressure drop, which results in the accumulated wastewater flowing at a slightly higher rate than normal in the tank. In this case, however, only a small pressure difference and thus a slightly higher flow rate is achieved. Therefore, a reliable cleaning effect cannot be achieved. In particular, it is not possible to remove the stronger deposits present in the chamfer and there is a risk of blockage or clogging. clogging. The use of a mammoth pump also entails relatively high costs.

Podstata vynálezuSUMMARY OF THE INVENTION

Úkolem vynálezu je vytvořit spolehlivé proplachování spádového potrubí odpadních vod libovolného průběhu za účelem zabránění usazování usazenin a jejich narůstání v potrubí prostřednictvím vodních rázů za použití tlakového vzduchu.SUMMARY OF THE INVENTION It is an object of the present invention to provide a reliable flushing of wastewater downpipes of arbitrary flow in order to prevent sediment build-up and their build-up in the pipeline by water hammering using compressed air.

Uvedený úkol splňuje způsob proplachování spádového potrubí odpadních vod, které sleduje průběh terénu a má alespoň jedno nejnižší místo, prostřednictvím tlakového vzduchu, přičemž do potrubí se přivede množství vody, které se nashromáždí v zásobní nádrži spojené s potrubím, podle vynálezu, jehož podstatou je, že na množství vody, nashromážděné v zásobní nádrži, která je provedena tlakově odolná, je vytvořena jako sifon a jako spojená nádobka je spojena s potrubím, se periodicky, zatímco přívodní potrubí vody do zásobní nádrže se uzavře, působí tlakovým vzduchem pro vytlačení připraveného množství vody, popřípadě alespoň částečného objemu připraveného množství vody, pomocí tlakového vzduchu na způsob rázu ze zásobní nádrže do potrubí.The object of the present invention is to provide a method for flushing downstream wastewater piping which follows the course of the terrain and has at least one lowest point by means of compressed air, supplying to the pipeline a quantity of water accumulated in a storage tank connected to the piping according to the invention. that the amount of water accumulated in the storage tank, which is made pressure-resistant, is designed as a siphon and is connected as a connected vessel to the pipeline, periodically, while the water supply line to the storage tank is closed, pressurized air to displace the prepared amount of water or at least a partial volume of the prepared quantity of water by means of compressed air in the manner of a surge from the storage tank to the pipeline.

Podle výhodného provedení se tlakový vzduch do zásobní nádrže přivádí pod tlakem v podstatě 0,2 MPa. Do zásobní nádrže se pro vytvoření více za sebou následujících proplachovacích rázů přivede tlakový vzduch s výhodou vícekrát za sebou.According to a preferred embodiment, the pressurized air is supplied to the storage tank at a pressure of substantially 0.2 MPa. Compressed air, preferably several times in succession, is fed to the storage tank to produce a plurality of successive flushing surges.

Množství vody ze zásobní nádrže se s výhodou protlačuje potrubím rychlostí v podstatě 6 m/s. Množství vody se do potrubí ze zásobní nádrže vytlačí s výhodou v podstatě jedenkrát týdně.The amount of water from the storage tank is preferably forced through the conduit at a rate of substantially 6 m / s. Preferably, the amount of water is discharged into the conduit from the storage tank substantially once a week.

Uvedený úkol dále splňuje spádové potrubí odpadních vod k provádění způsobu podle vynálezu, které v instalované poloze sleduje průběh terénu a má alespoň jedno nejnižší místo, se zařízením k proplachování potrubí pomocí vody, přiveditelné do potrubí, na kterou působí tlakový vzduch, s kompresorem a s k němu připojenou tlakovou nádobou, která je prostřednictvím ventilu spojena s potrubím, a se zásobní nádrží pro shromažďování množství vody, jakož i s přívodním potrubím vody pro přívod vody do zásobní nádrže, přičemž podstatou vynálezu je, že zásobní nádrž je provedena tlakově odolná, je vytvořena jako sifon a jako spojená nádoba je spojena s potrubím, přičemž tlaková nádoba je spojena s potrubím přes zásobní nádrž při vložení ventilu mezi tlakovou nádobu a zásobní nádrž, a přičemž v přívodním potrubí vody do zásobní nádrže je uspořádána uzavírací armatura, zejména šoupátko.The object furthermore fulfills the waste water drainage pipe for carrying out the method according to the invention which, in the installed position, follows the course of the terrain and has at least one lowest point, with a device for flushing the pipe with water a connected pressure vessel which is connected to a pipe via a valve and to a storage tank for collecting a quantity of water, as well as a water supply pipe for supplying water to the storage tank, the essence of the invention is that the storage tank is pressure-resistant, siphon and as a connected vessel it is connected to a conduit, the pressure vessel being connected to the conduit via a reservoir when a valve is inserted between the pressure reservoir and the reservoir, and wherein a shut-off valve is provided in the water supply conduit to the reservoir tko.

Zásobní nádrž je s výhodou vytvořena pro tlak nejméně 0,2 MPa.The storage tank is preferably designed for a pressure of at least 0.2 MPa.

-2CZ 295219 B6-2GB 295219 B6

Zásobní nádrž je s výhodou provedena jako tlaková nádrž z betonu, jako tlaková nádrž z plastu, vyztuženého vlákny, nebo jako tlaková nádrž z kovu.The storage tank is preferably a concrete pressure tank, a fiber reinforced plastic pressure tank, or a metal pressure tank.

Potrubí je s výhodou v provozní poloze připojeno k zásobní nádrži prostřednictvím vývodu, připojeného k zásobní nádrži v oblasti jejího dna vycházejícího z ní šikmo vzhůru do úrovně pod vrchní stranou zásobní nádrže.Preferably, the pipe is in the operating position connected to the storage tank by means of an outlet connected to the storage tank in the region of its bottom extending obliquely upwards to a level below the top side of the storage tank.

Zásobní nádrž má s výhodou objem v podstatě 2 m3.The storage tank preferably has a volume of substantially 2 m 3 .

Uzavírací armatuře v přívodním potrubí do zásobní nádrže a ventilu mezi tlakovou nádobou a zásobní nádrží je s výhodou přiřazena elektronická ovládací jednotka, opatřená hodinami pro automatické ovládání.The shut-off valve in the supply line to the storage tank and the valve between the pressure vessel and the storage tank is preferably assigned an electronic control unit provided with a clock for automatic control.

Ovládací jednotka je s výhodou spojena s kompresorem pro automatické vytvoření tlaku v tlakové nádobě před ovládáním uzavírací armatury a ventilu.The control unit is preferably connected to a compressor for automatically generating pressure in the pressure vessel prior to actuating the shut-off valve and valve.

Provedením podle vynálezu je výhodným způsobem vyřešen stanovený cíl. Zásobní nádrž má pro požadovaný účel proplachování dostatečný objem, např. 2 m3 (2000 1) v závislosti na průřezu potrubí odpadních vod, takže při vtoku tlakového vzduchu do zásobní nádrže prochází potrubím odpadních vod dostatečné množství vody na způsob vodního rázu, s náležitou rychlostí. Tlak vzduchuje přitom dán v závislosti na délce potrubí, přičemž zpravidla je postačující tlak od 0,1 do 0,2 MPa. Tomuto tlaku musí být samozřejmě přizpůsobena i zásobní nádrž, která může být zhotovena různými způsoby. Zásobní nádrž může být zhotovena například z betonu, z kovu nebo z umělé hmoty, zejména z umělé hmoty, vyztužené vlákny. V normálním provozu protéká odpadní voda volně potrubím odpadních vod. Za účelem proplachování potrubí odpadních vod, například jednou za týden, je zásobní nádrž natlakována tlakovým vzduchem z tlakové nádoby, při současném uzavření přívodu odpadní vody do zásobní nádrže. Působením tlakového vzduchu v zásobní nádrži je sloupec odpadní vody vytlačen ze zásobní nádrže do potrubí odpadních vod. Za účelem natlakování zásobní nádrže tlakovým vzduchem je otevřen ventil mezi tlakovou nádobou a zásobní nádrží.In an embodiment of the invention, the objective set is advantageously solved. The storage tank has a sufficient volume of flushing, for example 2 m 3 (2000 l), depending on the waste water pipe cross-section, so that when the compressed air enters the storage tank, sufficient water is passed through the waste water pipe . The air pressure is given in dependence on the length of the duct, a pressure of from 0.1 to 0.2 MPa being generally sufficient. Of course, the storage tank must also be adapted to this pressure, which can be produced in various ways. The storage tank may be made, for example, of concrete, metal or plastic, in particular fiber-reinforced plastic. In normal operation, the waste water flows freely through the waste water pipe. In order to flush the waste water piping, for example once a week, the storage tank is pressurized with compressed air from the pressure tank, while shutting off the waste water supply to the storage tank. By the action of compressed air in the storage tank, the waste water column is forced out of the storage tank into the waste water line. In order to pressurize the reservoir with compressed air, a valve is opened between the pressure vessel and the reservoir.

Zásobní nádrž může být vytvořena jako oddělená nádrž, která se nachází mimo potrubí odpadních vod, a v případě potřeby (při proplachování) je na potrubí odpadních vod napojena. V tomto případě však musí být napojení zásobní nádrže na potrubí odpadních vod uzavřeno. Výhodné je zásobní nádrž integrovat přímo do systému odpadních vod, kdy odpadní voda je přívodním potrubím přiváděna do zásobní nádrže, kterou při normálním provozu protéká, nebo je v ní shromažďována, a z ní je pak odváděna přímo do potrubí odpadních vod. V tomto případě je výhodné, jeli zásobní nádrž vytvořena na způsob sifonu. Možné je však i takové provedení, podle kterého není při normálním provozu v zásobní nádrži shromažďována žádná odpadní voda, pouze jí protéká, přičemž v tomto případě musí být výtok ze zásobní nádrže pro účel proplachování potrubí odpadních vod opatřen uzavíracím ventilem, po jehož uzavření se v zásobní nádrži nashromáždí dostatečné množství odpadní vody. Po dosažení potřebného množství odpadní vody v zásobní nádrži, které může být například stanoveno prostřednictvím hladinového senzoru, je uzavírací ventil na výtoku ze zásobní nádrže otevřen při současném uzavření přítoku odpadní vody do zásobní nádrže. Otevření uzavíracího ventilu na výtoku ze zásobní nádrže je synchronizováno s otevřením ventilu tlakového vzduchu, upraveného ve spojení zásobní nádrže s tlakovou nádobou.The storage tank can be formed as a separate tank, which is located outside the wastewater piping and, if necessary (during flushing), is connected to the wastewater piping. In this case, however, the connection of the storage tank to the waste water piping must be closed. It is advantageous to integrate the storage tank directly into the waste water system, where the waste water is fed through the supply line into a storage tank which flows or is collected in normal operation and is then discharged directly into the waste water line. In this case, it is advantageous if the storage tank is designed in the manner of a siphon. However, it is also possible that no waste water is collected in the storage tank during normal operation, but only flows through it, in which case the outlet of the storage tank for the purpose of flushing the waste water piping must be provided with a shut-off valve. the storage tank accumulates sufficient waste water. Upon reaching the required amount of waste water in the storage tank, which can be determined, for example, by a level sensor, the shut-off valve at the outlet of the storage tank is opened while the wastewater inlet to the storage tank is closed. The opening of the shut-off valve at the outlet of the storage tank is synchronized with the opening of the compressed air valve provided in connection of the storage tank to the pressure vessel.

V případě, že v zásobní nádrži je shromažďováno určité množství odpadní vody, je z hlediska jednoduchého napojení potrubí odpadních vod výhodné, jestliže potrubí odpadních vod je k zásobní nádrži připojeno prostřednictvím vývodu, vycházejícího šikmo ze dna zásobní nádrže k jejímu vrchnímu konci.In the case where a certain amount of waste water is collected in the storage tank, it is advantageous for the simple connection of the waste water line if the waste water line is connected to the storage tank via an outlet extending obliquely from the bottom of the storage tank to its upper end.

-3CZ 295219 B6-3GB 295219 B6

Objem zásobní nádrže může být stanoven tak, aby při proplachování potrubí odpadních vod byl dosažen větší počet za sebou následujících proplachovacích rázů s dostatečným množstvím vody. V tomto případě je do zásobní nádrže rovněž několikrát po sobě přiváděn tlakový vzduch.The volume of the storage tank can be determined such that when flushing the waste water pipeline, a plurality of successive flushing surges with sufficient water is achieved. In this case, compressed air is also supplied to the storage tank several times in succession.

Tento průběh proplachování může být uskutečněn prostřednictvím elektronické ovládací jednotky, opatřené zařízením pro měření času, například hodinami, která automaticky řídí činnost alespoň uzavírací armatury v přívodním potrubí do zásobní nádrže a ventilu mezi tlakovou nádobou a zásobní nádrží. Kromě toho může ovládací jednotka ovládat i kompresor za účelem vytvoření tlaku teprve bezprostředně před procesem proplachování, tj. dřív než dojde k ovládání uzavírací armatury a ventilu.This flushing process may be accomplished by means of an electronic control unit provided with a time measuring device, for example a clock, which automatically controls the operation of at least the shut-off valve in the supply line to the storage tank and the valve between the pressure vessel and the storage tank. In addition, the control unit can also operate the compressor to generate pressure only immediately before the flushing process, i.e. before the shut-off valve and valve are actuated.

Při proplachování je voda, nashromážděná v zásobní nádrži, prostřednictvím tlakového vzduchu vytlačena z tlakové nádoby do potrubí odpadních vod, kterým proudí rychlostí například 6 nebo 7 m/s.During flushing, the water accumulated in the storage tank is forced out of the pressure vessel into the waste water pipeline by means of compressed air, through which it flows, for example, at 6 or 7 m / s.

Přehled obrázků na výkresechBRIEF DESCRIPTION OF THE DRAWINGS

Vynález je dále blíže objasněn na příkladných provedeních, znázorněných na výkresech. Zde značí:The invention is further elucidated with reference to the exemplary embodiments shown in the drawings. Here means:

obr. 1 schematicky znázorněný podélný řez potrubím odpadních vod, položeným v terénu, s proplachovací stanicí, nacházející se na jeho horním konci;FIG. 1 is a schematic longitudinal cross-sectional view of a waste water line laid in the field with a flushing station at its upper end;

obr. 2 proplachovací stanici podle obr. 1, znázorněnou ve zvětšeném měřítku;FIG. 2 is an enlarged view of the flushing station of FIG. 1;

obr. 3 schematicky znázorněnou proplachovací stanici v normálního provozu;FIG. 3 shows a schematically illustrated flushing station in normal operation;

obr. 4 schematicky znázorněnou proplachovací stanici v procesu proplachování;FIG. 4 shows a schematically illustrated flushing station in the flushing process;

obr. 5 schematicky znázorněnou proplachovací stanici na konci procesu proplachování.FIG. 5 shows a schematically illustrated flushing station at the end of the flushing process.

Příklady provedení vynálezuDETAILED DESCRIPTION OF THE INVENTION

Na obr. 1 je znázorněno spádové potrubí 1 odpadních vod, položené ve schematicky znázorněném terénu 2, přičemž v tomto potrubí 1 odpadních vod je příkladně znázorněno nejnižší místo 3, vytvořené v podstatě ve tvaru sifonu, v němž je nashromážděna odpadní voda pro vytvoření vodního rázu. Jak je zřejmé, takto vytvořený vodní ráz zpravidla nepostačuje k proplachování potrubí 1 odpadních vod za účelem zabránění usazenin pevných látek a zanášení potrubí. Mimo to se mohou usazeniny pevných látek tvořit v tlakovém potrubí 1 i nad tímto nejnižším místem 3, takže i zde je nezbytné provádět proplachování. To stejné platí i pro shybku potrubí 1 odpadních vod, procházejícím například pod řečištěm.Figure 1 shows a sewage downpipe 1 laid in a schematically illustrated terrain 2, the sewage line 1 showing, for example, the lowest point 3, formed essentially in the shape of a siphon, in which the sewage is collected to create a water impact . As can be seen, the water hammer formed in this way is generally not sufficient to flush the waste water line 1 in order to prevent solids deposits and fouling of the line. In addition, solids deposits can also form in the pressure line 1 above this lowest point 3, so that it is necessary here to perform a flushing. The same applies to the sewerage of the sewage pipe 1 passing, for example, below the bed.

Na vrchním konci potrubí 1 odpadních vod se proto nachází proplachovací stanice 4, do které je přívodním potrubím 5 přiváděna odpadní voda ze sběrného kanálu nebo jímky, přiváděná dále do potrubí 1 odpadních vod.At the upper end of the waste water line 1 there is therefore a flushing station 4, to which the waste water from the collecting duct or sump is fed through the inlet line 5, and fed further into the waste water line 1.

Na spodním konci tlakového potrubí 1 se nachází například výtoková šachta 6 v kanálu 7 s volnou hladinou.At the lower end of the pressure line 1 there is, for example, an outlet shaft 6 in a free-flow channel 7.

Provádění pravidelného proplachování, například jednou za týden, prostřednictvím proplachovací stanice 4 za působení tlaku mohou být odstraněny usazeniny, které se tvoří v potrubí 1 odpadních vod, přičemž usazeniny nezůstávají ani v nejnižších místech 3 potrubí 1 odpadních vod.By performing a regular flushing, for example once a week, by means of a pressure flushing station 4, deposits that are formed in the waste water line 1 can be removed, where the deposits do not remain at the lowest points 3 of the waste water line 1.

-4CZ 295219 B6-4GB 295219 B6

Na obr. 2 je schematicky znázorněna proplachovací stanice 4 se zásobní nádrží 8, do které je prostřednictvím tlakového potrubí 10, opatřeného ventilem 11, přiváděn z tlakové nádoby 9 tlakový vzduch. K natlakování vzduchu do tlakové nádoby 9 slouží k ní připojený kompresor 12.FIG. 2 schematically shows a flushing station 4 with a storage tank 8 to which compressed air is supplied from the pressure vessel 9 via a pressure line 10 provided with a valve 11. A compressor 12 is connected to the pressure vessel 9 to pressurize the air.

Zásobní nádrž 8 je napojena na přívodní potrubí 5 prostřednictvím uzavírací armatury 13, například šoupátka. S potrubím 1 odpadních vod, jehož vrchní konec se nachází téměř pod úrovní vrchní strany zásobní nádrže 8, je zásobní nádrž 8 spojena prostřednictvím vývodu 14, vycházejícího šikmo vzhůru ze dna zásobní nádrže 8. Tímto způsobem připojení zásobní nádrže 8 na potrubí 1 odpadních vod je vytvořen sifon, s na obr. 2 vyznačenou vodní hladinou 15.The storage tank 8 is connected to the supply line 5 via a shut-off fitting 13, for example a slide. With the waste water line 1, the top end of which is almost below the upper side of the storage tank 8, the storage tank 8 is connected via an outlet 14 extending obliquely upwards from the bottom of the storage tank 8. In this way the connection of the storage tank 8 to the waste water line 1 is a siphon is provided with the water level 15 in FIG.

Při normálním provozu přitéká odpadní voda přívodním potrubím 5 při otevřené uzavírací armatuře 13 do zásobní nádrže 8, kde se shromažďuje určité množství odpadní vody v množství přibližně 2000 1. Odpadní voda dále protéká vývodem 14 ze zásobní nádrže 8 do potrubí 1 odpadních vod, které je zhotoveno jako tlakové potrubí. Ventil 11 v tlakovém potrubí 10, spojujícím zásobní nádrž 8 s tlakovou nádobou 9, je během tohoto normálního provozu uzavřen. Při proplachování potrubí 1 odpadních vod je uzavírací armatura 13 uzavřena a ventil 11 otevřen. Do zásobní nádrže 8 tak může z tlakové nádoby 9 proudit tlakový vzduch, jehož tlak může být podle potřeby od 0,1 nebo 0,2 MPa. Tím je na obr. 2, 3 a 4 znázorněný sloupec 16 odpadní vody, nacházející se v zásobní nádrži 8, na způsob rázu protlačen potrubím 1 odpadních vod s rychlostí 6 až 7 m/s. Tento sloupec 16 odpadní vody odplaví sedimenty, nacházející se v potrubí 1 odpadních vod, čímž je zabráněno jeho postupnému zanášení. Podle okolností může být toto proplachování prováděno například jednou za týden, avšak při silně znečištěné odpadní vodě může být prováděno častěji.In normal operation, the waste water flows through the supply line 5 with the shut-off valve 13 open to a storage tank 8, where a certain amount of wastewater is collected in an amount of approximately 2000. The wastewater further flows through an outlet 14 from the storage tank 8 into a wastewater line 1. made as pressure piping. The valve 11 in the pressure line 10 connecting the storage tank 8 to the pressure vessel 9 is closed during this normal operation. When flushing the waste water line 1, the shut-off valve 13 is closed and the valve 11 is opened. Thus, compressed air can be supplied from the pressure vessel 9 to the storage tank 8, the pressure of which may be from 0.1 to 0.2 MPa, if necessary. 2, 3 and 4, the waste water column 16 present in the storage tank 8 is thereby pushed through the waste water line 1 at a speed of 6 to 7 m / s in the form of an impact. This wastewater column 16 washes away the sediments present in the wastewater pipe 1, thereby preventing its gradual fouling. Depending on the circumstances, this flushing can be carried out, for example, once a week, but more frequently if the waste water is heavily contaminated.

Za účelem automatického proplachování je proplachovací stanice 4, znázorněná na obr. 2, opatřena ovládací jednotkou 17, vybavenou jednotkou pro měření času, například hodinami 18, nastavenými na stanovený časový interval. V tomto časovém intervalu, například jednou za týden, je uzavřena uzavírací armatura 13, otevřen ventil 11 a spuštěn kompresor 12, vytvářející tlak vzduchu v tlakové nádobě 9. Na obr. 2 je rovněž znázorněno ovládací vedení 19 uzavírací armatury 11, ovládací vedení 20 ventilu 11 a ovládací vedení 21 kompresoru 12.For automatic flushing, the flushing station 4 shown in FIG. 2 is provided with a control unit 17 equipped with a time measuring unit, for example a clock 18 set to a predetermined time interval. At this time, for example once a week, the shut-off valve 13 is closed, the valve 11 is opened and the compressor 12 generating air pressure in the pressure vessel 9 is started. FIG. 2 also shows the shut-off valve control line 19, the valve control line 20 11 and the compressor control line 21.

Ovládací jednotka 17 přitom může být také vytvořena tak, že do zásobní nádrže 8 je při častějším otevření a uzavření ventilu 11 přiváděn tlakový vzduch v kratších intervalech než jednou týdně, což má za následek častější proplachování potrubí 1 odpadních vod prostřednictvím odpadní vody, nashromážděné v zásobní nádrži 8. Za tímto účelem musí mít zásobní nádrž 8 větší objem, přičemž potrubím 1 odpadních vod je protlačována jen pouze část odpadní vody, nacházející se v zásobní nádrži 8. Mezi jednotlivými vodními rázy tedy musí být v zásobní nádrži 8 nashromážděno dostatečné množství odpadní vody, což je podmíněno dostatečným přítokem odpadní vody. Shromažďování odpovídajícího množství odpadní vody v zásobní nádrži 8 může být rovněž sledováno prostřednictvím na obr. 2 blíže neznázoměným ukazatelem vodní hladiny, jehož signál je předáván do ovládací jednotky 17.The control unit 17 can also be designed in such a way that, when the valve 11 is opened and closed more frequently, the air tank 8 is supplied with compressed air at shorter intervals than once a week, resulting in a more frequent flushing of the waste water line 1 via the waste water accumulated in the storage tank. For this purpose, the storage tank 8 must have a larger volume, and only a portion of the waste water contained in the storage tank 8 is forced through the wastewater pipe 1. Thus, a sufficient amount of waste water must be accumulated in the storage tank 8 between water shocks. , which is conditioned by a sufficient inflow of wastewater. The collection of the corresponding amount of waste water in the storage tank 8 can also be monitored by means of a water level indicator (not shown in FIG. 2) whose signal is transmitted to the control unit 17.

Na obr. je schematicky znázorněna proplachovací stanice 4 při normálním provozu. Při tomto provozu je ventil 11 uzavřen, uzavírací armatura 13 otevřena. Odpadní voda přitéká přívodním potrubím 5 a volně vytéká vývodem 14 ze zásobní nádrže 8 do potrubí 1 odpadních vod.In the figure, the flushing station 4 is shown schematically in normal operation. In this operation, the valve 11 is closed, the shut-off valve 13 is opened. The waste water flows through the supply line 5 and flows freely through the outlet 14 from the storage tank 8 into the waste water line 1.

Na obr. 4 je znázorněn stav při proplachování. V tomto stavuje uzavírací armatura 13 uzavřena a ventil 11 otevřen. Vzduch v tlakové nádobě 9, natlakovaný kompresorem 12, je vpuštěn do zásobní nádrže 8, ze které na způsob rázu vytlačí nashromážděné množství odpadní vody do potrubí 1 odpadních vod. Mezitím se může odpadní voda shromažďovat v přívodním potrubí 5 nad uzavřenou uzavírací armaturou 13, čímž je zajištěn dostatečný objem 22 odpadní vody.Fig. 4 shows the flushing condition. In this state, the shut-off valve 13 is closed and the valve 11 is opened. The air in the pressure vessel 9, pressurized by the compressor 12, is admitted to the storage tank 8, from which it collects, in the manner of impact, the accumulated amount of waste water into the waste water line 1. Meanwhile, the waste water can collect in the supply line 5 above the closed shut-off valve 13, thereby ensuring a sufficient volume of waste water 22.

Na obr. 5 je znázorněn konec procesu proplachování, při němž je sloupec 16 nashromážděné odpadní vody ze zásobní nádrže 8, znázorněný na obr. 3 a 4, vytlačen do potrubí 1 odpadních vod. Tento stav také může být v případě potřeby zjišťován prostřednictvím senzoru 23, umístěFIG. 5 shows the end of the flushing process in which the column 16 of the accumulated waste water from the storage tank 8 shown in FIGS. 3 and 4 is pushed into the waste water line 1. This condition can also be detected by a sensor 23, if necessary

-5CZ 295219 B6 ného na dně zásobní nádrže 8, který prostřednictvím vedení 24 vyšle signál ovládací jednotce 17 o vyprázdnění zásobní nádrže 8. Na základě tohoto signálu ovládací jednotka 17 opět zavře ventil 11 a otevře uzavírací armaturu 13, takže odpadní voda, nashromážděná v přívodním potrubí 5, může opět proudit do zásobní nádrže 8. Dosáhne se tak opět stav normálního provozu, znázorněný na obr. 3, při němž se nejprve vytvoří sloupec 16 odpadní vody v zásobní nádrži 8 a ve vývodu 14, přičemž odpadní voda pak volně protéká zásobní nádrží 8 do potrubí 1 odpadních vod.295219 B6 at the bottom of the storage tank 8, which via a line 24 sends a signal to the control unit 17 to empty the storage tank 8. On the basis of this signal, the control unit 17 closes the valve 11 again and opens the shut-off valve 13 so that the waste water accumulated in the supply 3, in which the wastewater column 16 is first formed in the storage tank 8 and in the outlet 14, whereby the wastewater then flows freely through the storage tank. tanks 8 into the waste water line 1.

PATENTOVÉ NÁROKYPATENT CLAIMS

Claims (14)

1. Způsob proplachování spádového potrubí (1) odpadních vod, které sleduje průběh terénu (2) a má alespoň jedno nejnižší místo (3), prostřednictvím tlakového vzduchu, přičemž do potrubí (1) se přivede množství vody, které se nashromáždí v zásobní nádrži (8), spojené s potrubím (1), vyznačující se tím, že na množství vody, nashromážděné v zásobní nádrži (8), která je provedena jako tlakově odolná, je vytvořena jako sifon a jako spojená nádoba je spojena s potrubím (1), se periodicky, zatímco přívodní potrubí (5) vody do zásobní nádrže (8) se uzavře, působí tlakovým vzduchem pro vytlačení připraveného množství vody, popřípadě pro vytlačení alespoň částečného objemu připraveného množství vody, na způsob rázu ze zásobní nádrže (8) do potrubí (1)·A method for flushing a wastewater downpipe (1) which follows the course of a terrain (2) and has at least one lowest point (3) by means of compressed air, wherein the amount of water accumulated in the storage tank is introduced into the line (1) (8) connected to a pipe (1), characterized in that it is designed as a siphon for the amount of water accumulated in the storage tank (8) as a siphon and connected to the pipe (1) as a connected vessel , periodically, while the water supply line (5) to the storage tank (8) is closed, pressurized air is applied to expel the prepared amount of water, or to displace at least a partial volume of the prepared amount of water, (1) · 2. Způsob podle nároku 1, vyznačující se tím, že tlakový vzduch se do zásobní nádrže (8) přivádí pod tlakem v podstatě 0,2 MPa.Method according to claim 1, characterized in that the compressed air is supplied to the storage tank (8) at a pressure of substantially 0.2 MPa. 3. Způsob podle nároku 1 nebo 2, vyznačující se tím, že do zásobní nádrže (8) se pro vytvoření více za sebou následujících proplachovacích rázů přivede tlakový vzduch vícekrát za sebou.Method according to claim 1 or 2, characterized in that compressed air is supplied to the storage tank (8) several times in succession to produce a plurality of successive flushing surges. 4. Způsob podle jednoho z nároků laž3, vyznačující se tím, že množství vody ze zásobní nádrže (8) se protlačuje potrubím (1) rychlostí v podstatě 6 m/s.Method according to one of claims 1 to 3, characterized in that the amount of water from the storage tank (8) is forced through the line (1) at a rate of substantially 6 m / s. 5. Způsob podle jednoho z nároků laž4, vyznačující se tím, že množství vody se do potrubí (1) ze zásobní nádrže (8) vytlačí v podstatě jedenkrát týdně.Method according to one of Claims 1 to 4, characterized in that the amount of water is expelled into the pipe (1) from the storage tank (8) substantially once a week. 6. Spádové potrubí odpadních vod k provádění způsobu podle nároku 1, které v instalované poloze sleduje průběh terénu a má alespoň jedno nejnižší místo (3), se zařízením k proplachování potrubí (1) pomocí vody, přiveditelné do potrubí (1), na kterou působí tlakový vzduch, s kompresorem (12) a skněmu připojenou tlakovou nádobou (9), která je prostřednictvím ventilu (11) spojena s potrubím (1), a se zásobní nádrží (8) pro shromažďování množství vody, jakož i s přívodním potrubím (5) vody pro přívod vody do zásobní nádrže (8), vyznačující se tím, že zásobní nádrž (8) je provedena jako tlakově odolná, je vytvořena jako sifon a jako spojená nádoba je spojena s potrubím (1), přičemž tlaková nádoba (9) je spojena s potrubím (1) přes zásobní nádrž (8) při vložení ventilu (11) mezi tlakovou nádobu (9) a zásobní nádrž (8), a přičemž v přívodním potrubí (5) vody do zásobní nádrže (8) je uspořádána uzavírací armatura (13), zejména šoupátko.Sewage downpipe for carrying out the method according to claim 1, which in the installed position follows the course of the terrain and has at least one lowest point (3), with a device for flushing the pipe (1) with water, which can be brought into the pipe (1) to apply compressed air to the compressor (12) and the pressure vessel (9) connected to the housing, which is connected to the pipe (1) via a valve (11) and to the water storage tank (8) as well as the supply pipe (5) water for supplying water to the storage tank (8), characterized in that the storage tank (8) is designed as pressure-resistant, is designed as a siphon and is connected as a connected vessel to a pipe (1), the pressure vessel (9) is connected to the conduit (1) via a storage tank (8) when a valve (11) is inserted between the pressure vessel (9) and the storage tank (8) and wherein the water supply line (5) to the storage tank (8) a shut-off valve (13), in particular a slide, is provided. 7. Spádové potrubí podle nároku 6, vyznačující se tím, že zásobní nádrž (8) je vytvořena pro tlak nejméně 0,2 MPa.The downcomer according to claim 6, characterized in that the storage tank (8) is designed for a pressure of at least 0.2 MPa. 8. Spádové potrubí podle nároku 6 nebo 7, vyznačující se tím, že zásobní nádrž (8) je provedena jako tlaková nádrž z betonu.The downcomer according to claim 6 or 7, characterized in that the storage tank (8) is designed as a concrete pressure tank. -6CZ 295219 B6-6GB 295219 B6 9. Spádové potrubí podle nároku 6 nebo 7, vyznačující se tím, že zásobní nádrž (8) je provedena jako tlaková nádrž z plastu, vyztuženého vlákny.The downcomer according to claim 6 or 7, characterized in that the storage tank (8) is designed as a pressure tank made of fiber-reinforced plastic. 10. Spádové potrubí podle nároku 6 nebo 7, vyznačující se tím, že zásobní nádrž (8) je provedena jako tlaková nádrž z kovu.The downcomer according to claim 6 or 7, characterized in that the storage tank (8) is designed as a metal pressure tank. 11. Spádové potrubí podle jednoho z nároků 6 až 10, vyznačující se tím, že potrubí (1) je v provozní poloze připojeno k zásobní nádrži (8) prostřednictvím vývodu (14), připojeného k zásobní nádrži (8) v oblasti jejího dna a vycházejícího z ní šikmo vzhůru do úrovně pod vrchní stranou zásobní nádrže (8).Downcomer according to one of Claims 6 to 10, characterized in that the pipe (1) is connected to the storage tank (8) in the operating position by means of an outlet (14) connected to the storage tank (8) in the region of its bottom and extending from it obliquely upwards to a level below the top of the storage tank (8). 12. Spádové potrubí podle jednoho z nároků 6 až 11, vyznačující se tím, že zásobní nádrž (8) má objem v podstatě 2 m3.Downcomer according to one of Claims 6 to 11, characterized in that the storage tank (8) has a volume of substantially 2 m 3 . 13. Spádové potrubí podle jednoho z nároků 6 až 12, vyznačující se tím, že uzavírací armatuře (13) v přívodním potrubí (5) do zásobní nádrže (8) a ventilu (11) mezi tlakovou nádobou (9) a zásobní nádrží (8) je přiřazena elektronická ovládací jednotka (17), opatřená hodinami (18) pro automatické ovládání.Downcomer according to one of Claims 6 to 12, characterized in that the shut-off valve (13) in the supply line (5) to the storage tank (8) and the valve (11) between the pressure vessel (9) and the storage tank (8) ) is assigned an electronic control unit (17) provided with a clock (18) for automatic control. 14. Spádové potrubí podle nároku 13, vyznačující se tím, že ovládací jednotka (17) je spojena s kompresorem (12) pro automatické vytvoření tlaku v tlakové nádobě (9) před ovládáním uzavírací armatury (13) a ventilu (11).The downcomer according to claim 13, characterized in that the control unit (17) is connected to a compressor (12) for automatically generating pressure in the pressure vessel (9) before actuating the shut-off valve (13) and the valve (11).
CZ20021493A 1999-11-04 2000-10-19 Method for periodic rinsing a wastewater gravity piping and wastewater gravity piping for making the same CZ295219B6 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0076399U AT3656U3 (en) 1999-11-04 1999-11-04 METHOD AND DEVICE FOR PERIODICALLY FLUSHING A WASTEWATER PIPELINE

Publications (2)

Publication Number Publication Date
CZ20021493A3 CZ20021493A3 (en) 2003-06-18
CZ295219B6 true CZ295219B6 (en) 2005-06-15

Family

ID=3499135

Family Applications (1)

Application Number Title Priority Date Filing Date
CZ20021493A CZ295219B6 (en) 1999-11-04 2000-10-19 Method for periodic rinsing a wastewater gravity piping and wastewater gravity piping for making the same

Country Status (12)

Country Link
EP (1) EP1226316B1 (en)
AT (2) AT3656U3 (en)
AU (1) AU1114301A (en)
CZ (1) CZ295219B6 (en)
DE (1) DE50013867D1 (en)
HR (1) HRPK20020293B3 (en)
HU (1) HU226389B1 (en)
PL (1) PL195015B1 (en)
RS (1) RS49972B (en)
SI (1) SI1226316T1 (en)
SK (1) SK6072002A3 (en)
WO (1) WO2001032997A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2861762B1 (en) * 2003-11-04 2006-12-15 Ksb Sas METHOD OF CURING A PIPE AND MOTOR PUMP PARTICULARLY ADAPTED THEREFOR
FR2968022B1 (en) * 2010-11-25 2014-03-14 Saint Dizier Environnement Sdenv DEVICE FOR AUTOMATIC CLEANING OF A LIQUID ACCUMULATION CHAMBER
PL228968B1 (en) * 2016-05-12 2018-05-30 Szuster Miroslaw Szuster Consulting Method for washing and aeration of a delivery pipeline and the sewage pumping device
DE102017005994A1 (en) 2017-06-15 2018-12-20 Berliner Wasserbetriebe Anstalt des öffentlichen Rechts Device for the automated flushing of sewer network sections
CN107597749A (en) * 2017-10-02 2018-01-19 王尉 A kind of intelligent permanent magnet floor heating cleaning machine

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1609181B1 (en) * 1965-12-10 1969-10-23 Zander Ges Fuer Rein Und Abwas Disposal facility with pressurized wastewater
SE416981B (en) * 1979-06-11 1981-02-16 Nils Gosta Ragnar Nilsson SET AND DEVICE FOR CLEANING OF DIVERS
NL1003187C2 (en) * 1996-05-23 1997-11-25 Joh Ranzijn Engineering B V Emptying method of drain-system

Also Published As

Publication number Publication date
SK6072002A3 (en) 2003-09-11
RS49972B (en) 2008-09-29
SI1226316T1 (en) 2007-06-30
AT3656U3 (en) 2001-02-26
HU226389B1 (en) 2008-10-28
HRPK20020293B3 (en) 2006-02-28
HRP20020293A2 (en) 2004-02-29
PL195015B1 (en) 2007-07-31
ATE348224T1 (en) 2007-01-15
WO2001032997A1 (en) 2001-05-10
PL355295A1 (en) 2004-04-05
AU1114301A (en) 2001-05-14
HUP0203742A2 (en) 2003-01-28
YU28202A (en) 2003-07-07
EP1226316B1 (en) 2006-12-13
AT3656U2 (en) 2000-06-26
CZ20021493A3 (en) 2003-06-18
EP1226316A1 (en) 2002-07-31
DE50013867D1 (en) 2007-01-25

Similar Documents

Publication Publication Date Title
CA2929096C (en) Closed flow sewer system
US8122902B2 (en) Apparatus and method for unclogging a pipe
CN209509161U (en) A kind of rinsing unit and system using piping lane internal drainage facility flushing drain pipe
KR100855016B1 (en) cleaning system of pressing drainage pipe and processing method by using same
CZ295219B6 (en) Method for periodic rinsing a wastewater gravity piping and wastewater gravity piping for making the same
RU2393336C1 (en) Connections of wellhead and surface equipment of coal-methanol well (versions)
Pisano et al. Automated sewer and drainage flushing systems in Cambridge, Massachusetts
CN110029721A (en) A kind of combine with the pipe culvert of blowdown and first rain Regulation Function cuts dirty structure
WO2010142950A1 (en) Rainwater harvesting system
NO20131476A1 (en) drainage
KR101833926B1 (en) Apparatus for washing sewage pipe
CN108301487A (en) Rain water collecting system
US20230120401A1 (en) Modular
JP2005048509A (en) Storage infiltration facility for rainwater
KR101208947B1 (en) cleaning system for gravity flow type wastewater pipeline
KR101756708B1 (en) Inlet pipe apparatus of syphon type having functions of anti-odor and removal of impurities, fat and oils
JP2005083184A (en) Rainwater storage tank
US417100A (en) shone
SK284238B6 (en) Device for sewage water elimination
Kreissl Status of Pressure Sewer Technology
KR100749915B1 (en) Sewage pipe flushing system
CZ9301U1 (en) Equipment for draining excess sludge, especially from biological wastewater treatment plants
Hansen Access terminal design for horizontal landfill conduits
CZ287666B6 (en) Apparatus for pumping off excessive sludge, particularly from bio-aeration plants
US20060191577A1 (en) Hydro-controller

Legal Events

Date Code Title Description
MM4A Patent lapsed due to non-payment of fee

Effective date: 20091019