CZ15451U1 - System for carrying out automated multi-modular control of manufacture preparation phase including diagnostics - Google Patents

System for carrying out automated multi-modular control of manufacture preparation phase including diagnostics Download PDF

Info

Publication number
CZ15451U1
CZ15451U1 CZ200416109U CZ200416109U CZ15451U1 CZ 15451 U1 CZ15451 U1 CZ 15451U1 CZ 200416109 U CZ200416109 U CZ 200416109U CZ 200416109 U CZ200416109 U CZ 200416109U CZ 15451 U1 CZ15451 U1 CZ 15451U1
Authority
CZ
Czechia
Prior art keywords
capacity
production
block
tpv
modular
Prior art date
Application number
CZ200416109U
Other languages
Czech (cs)
Inventor
Pavel Ing. Votruba
Original Assignee
Pavel Ing. Votruba
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pavel Ing. Votruba filed Critical Pavel Ing. Votruba
Publication of CZ15451U1 publication Critical patent/CZ15451U1/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

Systém k provádění automatizované vícemodulární regulace přípravné fáze výroby včetně diagnostikySystem for automated multi-module regulation of the preparatory phase of production including diagnostics

Oblast technikyTechnical field

Technické řešení se týká systému k provádění automatizované vícemodulární regulace přípravné 5 fáze výroby včetně diagnostiky (dále AVDRS).The technical solution relates to a system for the implementation of automated multi-module regulation of the preparatory phase of production including diagnostics (hereinafter AVDRS).

Dosavadní stav technikyBACKGROUND OF THE INVENTION

Stav technické přípravy výroby (TPV) a jejího řízení je vymezen obvykle dvanácti základními etapami a přibližně dvěma sty základními činnostmi evidovanými, ze kterých hlavni činnosti jsou kontrolované a regulované. Tato charakteristika TPV se vztahuje na středně velký podnik s ku10 sovou a malosériovou výrobou. Z uvedených dvanácti základních etap je tři až pět etap kritických a tvoří kritickou cestu TPV.The state of technical preparation of production (TPV) and its management is usually defined by twelve basic stages and approximately two hundred basic activities registered, of which the main activities are controlled and regulated. This TPV characteristic refers to a medium-sized enterprise with small and batch production. Of the twelve basic stages, three to five are critical and form the critical path of TPV.

Kvalitu inovací i technologických plnění termínů a výši výrobních nákladů nejvíce ovlivňují tři kritické etapy na konci cyklu TPV ve fázi transferu technologií, které jsou uvedené v chronologickém pořadí: zpracování technologických postupů včetně technicko hospodářských norem (THN), konstrukce speciálního nářadí a jednoúčelových strojů (JÚS) a výroba speciálního nářadí a JÚS.The quality of innovations and technological fulfillment of deadlines and the level of production costs are most influenced by three critical stages at the end of the TPV cycle in the phase of technology transfer, which are listed in chronological order: elaboration of technological procedures including technical economic standards (THN), special tools and single-purpose machines ) and production of special tools and JÚS.

Do specifikovaných kritických etap na konci cyklu TPV se kumulují časové, kapacitní a hodnotové skluzy a tím se zkracuje průběžná doba a limituje možnost plnění termínů zejména v etapě výroba speciálního nářadí a JÚS a tím se podstatně snižuje možnost kompletovat a vybavit výro20 bu již v prvním roce po zavedení inovovaného výrobku úplnou sadou speciálního nářadí a JÚS tak, jak to bylo specifikováno v technologických postupech pro zavedenou a opakovanou výrobu inovovaného výrobku.The specified critical stages at the end of the TPV cycle accumulate time, capacity and value slips, thus shortening the running time and limiting the possibility of meeting deadlines, especially in the stage of special tool production and JÚS, thus significantly reducing the possibility to complete and equip production20 after the introduction of the innovated product with a complete set of special tools and JÚS as specified in the technological procedures for the established and repeated production of the innovated product.

Po privatizaci průmyslových podniků odešla řada kvalifikovaných pracovníků na lépe placená místa do zahraničních firem a následkem toho mnohdy až rapidně poklesla úroveň normativní základny pro kritické etapy TPV a lhůtové plánování etap TPV se často provádělo bez kapacitní bilance plánů TPV. Za těchto okolností splnitelnost takto postavených plánů TPV a ročních programů inovací byla a je stále nepřesná a nejistá. Zejména přesné zjištění limitujících faktorů časových a kapacitních, které určují realizovatelnost inovace výrobku ještě ve stanoveném termínu a kvalitě buď s nasazením přesčasů nebo dokonce kooperací v jiném podniku, je v malých a středních podnicích do 250 zaměstnanců jen obtížně zjistitelné v důsledku nízké úrovně normativní základny TPV a nepřesné nebo chybějící kapacitní bilance kritických etap TPV.After the privatization of industrial enterprises, many qualified workers left for better-paid jobs to foreign companies, and as a result, the level of normative basis for critical stages of TPVs often dropped and the TPV stages scheduling was often carried out without a capacity balance of TPVs. In these circumstances, the feasibility of TPVs and annual innovation programs constructed in this way has been and is still inaccurate and uncertain. In particular, the accurate identification of time and capacity constraints that determine the feasibility of product innovation within a set deadline and quality, either with overtime or even collaboration in another enterprise, is difficult to detect in small and medium-sized enterprises with up to 250 employees. and inaccurate or missing capacity balances of critical stages of TPV.

U větších podniků nad 250 zaměstnanců, kde byly zavedené komplexní systémy řízení výroby, se průchodnost předvýrobními kritickými etapami TPV nezjišťuje buď vůbec nebo jen nepřesně, takže rizika neplnění termínů i kvality inovovaných výrobků se zamlžují a to následně vede ke značným ztrátám na zisku, neplnění smluvních podmínek nebo dokonce k bankrotům průmyslových podniků. Pokud se vůbec kapacitní bilance provádí pak obvykle lokálně za celkovou kapacitu TPV, což nezajišťuje průchodnost kritickými etapami na konci cyklu TPV.For larger enterprises with more than 250 employees, where comprehensive production management systems have been implemented, the throughput of pre-production critical stages of TPV is not determined at all or only inaccurately, so the risks of non-fulfillment of deadlines and quality of innovated products become blurred. or even bankruptcy of industrial enterprises. If the capacity balance is performed at all then it is usually locally for the total capacity of the TPV, which does not ensure throughput through the critical stages at the end of the TPV cycle.

Základním cílem inovace řízení TPV včetně fáze transferu technologií je podstatně zvýšit přesnost kvantifikace skutečných zdrojů reálné kapacity R určené a vyčleněné pro inovace výrobků a technologií a to především ve třech kritických etapách na konci cyklu TPV, kde dochází nejčastěji k přetížení, disproporcím a napětí mezi reálnou podnikovou kapacitou R a požadovanými kapacitními zdroji P pro plnění termínu a kvality zakázek.The basic goal of TPV management innovation, including the technology transfer phase, is to significantly increase the accuracy of quantification of real R capacity resources designed and earmarked for product and technology innovation, especially in the three critical stages at the end of the TPV cycle, where congestion, disproportions and tensions between company capacity R and required capacity resources P to meet the deadline and quality of orders.

Jako příklad z konkrétní podnikové praxe lze uvést statisticky zjištěné následující hodnoty reálných kapacit tří kritických etap RL R2, R3, které jsou ekvidistantami ročního průběhu teoretických kapacit Th T2, T3 vypočtených z měsíčních fondů pracovní doby kalendářního roku a celkového počtu pracovníků uvedené kritické etapy:As an example of a particular business practice we can mention statistically determined values of real capacities of three critical stages R L R 2 , R 3 , which are equidistant of annual capacity of theoretical capacities T h T 2 , T 3 calculated from monthly funds of working time workers of the mentioned critical stage:

1. zpracování technologických postupů vč. THN: R| - 0,4 Tj1. processing of technological processes incl. THN: R | - 0.4 Ie

- 1 CZ 15451 Ul- 1 CZ 15451 Ul

2. konstrukce spec. nářadí a JUS: R2 = 0,8 T2 2. construction spec. tools and JUS: R 2 = 0.8 T 2

3. výroba spec. nářadí a JUS: R3 = 0,6 T3.3. production spec. tools and JUS: R 3 = 0.6 T 3 .

Reálná kapacita R obecně je díl teoretické kapacity T, který je určen pro kapacitní pokrytí výrobkových a technologických inovací a tudíž zbývající část kapacity T - R pokrývá tzv. údržbu série, což je kapacitní pokrytí potřeb již zavedené a opakované výroby např. opotřebených dílů a součástí i opotřebeného spec. nářadí a JUS.Real capacity R is generally a part of theoretical capacity T, which is intended for capacity coverage of product and technological innovations and therefore the remaining part of capacity T - R covers so-called series maintenance, which is capacity coverage of already established and repeated production of worn parts and components. and worn spec. tools and JUS.

Výše uvedeným způsobem se podstatně zvýšila přesnost určení skutečných limitujících faktorů a zejména technických dimenzí určujících průchodnost kritických etap na konci cyklu TPV, kde se kumulují skluzy a disproporce z předchozích etap, což se týká zejména fáze transferu technolo10 gií.In the above way, the accuracy of the determination of the actual limiting factors and in particular the technical dimensions determining the throughput of critical stages at the end of the TPV cycle, where slips and disproportions from previous stages accumulate, is particularly increased.

Rovněž zakázkami a výrobkovými i technologickými inovacemi požadované kapacitní zdroje P, jakožto regulovaná veličina, prošly náročnou zpřesňující metodikou a specifikací na bázi klasifikace a třídění nově konstruovaných a nově vyráběných součástí a speciálních nástrojů i JÚS do tříd a skupin dle konstrukčně technologické složitosti a podobnosti. Byly vytvořeny soubory kvalitativně i kvantitativně nejčastěji používaných technických hodnot, představující soustavy hodnotových kalibrů, sestavených do matice hodnotové NORMATIVNÍ a k ní odpovídající matice množstevní VÝROBKOVÁ, která vytváří maticovou soustavu četnosti hodnotových impulsů. Až po pronásobení obou matic se dostáváme k číselným hodnotám týdenním, měsíčním i ročním, které specifikují podmínky průchodnosti uvedenými etapami na konci cyklu TPV.The required capacity sources P as a regulated quantity have also been subject to demanding methodology and specifications based on the classification and sorting of newly designed and newly manufactured components and special tools as well as JÚS into classes and groups according to construction-technological complexity and similarity. We created sets of qualitatively and quantitatively most frequently used technical values, representing systems of value gauges, assembled into a value matrix NORMATIVE and corresponding quantity quantity matrix, which creates a matrix system of frequency of value pulses. Only after multiplication of both matrices we reach the numerical values weekly, monthly and yearly, which specify the conditions of throughput by the mentioned stages at the end of the TPV cycle.

Pracný výběr odpovídajících a správných hodnot normativních a množstevních i pronásobení obou matic automatizovaně minipočítačem umožňuje rychle a přesně identifikovat neviditelné a nehmotné časové a kapacitní disproporce. Dále sestavit a vyhodnotit jejich průběh v ročním cyklu TPV rovněž pomocí minipočítače a vytisknout technickou dokumentaci formou protokolů o způsobilosti PZ a průchodnosti kritickými etapami pro plánování a řízení průběhu TPV.Working selection of corresponding and correct values of normative and quantity and multiplication of both matrices by automated minicomputer enables to quickly and accurately identify invisible and intangible time and capacity disproportions. Further to compile and evaluate their course in the annual TPV cycle also using a minicomputer and to print the technical documentation in the form of protocols on the eligibility of CA and throughput through the critical stages for planning and managing the TPV course.

Navíc takto již přesně identifikované a změřené disproporce technických veličin je možné opět s využitím minipočítače automatizovaně regulovat a korigovat interaktivními změnami a to obvykle bez nároků na kapacitní nebo finanční zdroje.Moreover, already precisely identified and measured disproportions of technical variables can again be automatically controlled and corrected by interactive changes using a minicomputer, usually without the need for capacity or financial resources.

Výhodou výše uvedeného automatizovaného způsobu zůstává, že číselné a grafické výstupy z minipočítače jsou poměrně jednoduše a rychle kontrolovatelné pomocí kalkulačky ruční meto30 dou, na kterou se rovněž vztahuje ochrana.The advantage of the above-mentioned automated method remains that the numerical and graphical outputs of the minicomputer are relatively easy and quick to control by means of a hand-held calculator which is also protected.

Podstata technického řešeníThe essence of the technical solution

V počáteční výchozí fázi zavádění řízení systému TPV funguje první stupeň inovace analogicky jako automatizovaný mikrometr, který pomocí programovatelných funkcí minipočítače automatizuje cyklus vyhledávání, třídění a řazení hodnotových impulsů a po zjištění četnosti jejich vý35 skytu provádí změření a sumarizaci naměřených hodnot a následnou kvantifikaci a zobrazení průběhu disproporcí v ročním cyklu. Automatizovaně prováděné interaktivní změny regulují disproporce a zachovávají stav rovnováhy a adaptivity v přípravné i realizační fázi hmotných, tj. technických systémů.In the initial initial phase of TPV control implementation, the first stage of innovation works analogously to an automated micrometer, which uses programmable minicomputer functions to automate the cycle of value pulses, sorting, and sorting. disproportions in the annual cycle. Automatically implemented interactive changes regulate disproportions and maintain the state of equilibrium and adaptivity in the preparatory and implementation phases of tangible, ie technical systems.

Uvedený systém automatizované regulace interaktivními změnami umožňuje korigovat přetížení a disproporce preventivně ještě před tím, než včas zjištěné a změřené disproporce způsobí ztráty anebo vznik skrytých vad ve hmotném výrobním procesu, tj. obrábění, tváření, montáž apod., zejména nedostatečnou vybaveností výroby speciálními nástroji, JÚS a mechanizačními prostředky pro operační a mezioperační manipulaci, jako jsou upínače, nakladače, zásobníky, válečkové tratě apod. A právě uvedené zpřesnění výpočtu a zviditelnění i změření hodnot požadova45 ných, reálných a teoretických P, R, T a následně i průběhu napětí P/R umožňuje korigování disproporcí preventivně v tzv. inkubační době, což je jednou ze základních výhod ve srovnání s dosavadním stavem regulace a řízení TPV zejména ve fázi transferu technologie.The system of automated control by interactive changes enables overload and disproportionation correction to be prevented before timely detected and measured disproportions cause losses or hidden defects in the material production process, ie machining, forming, assembly, etc., especially due to insufficient production of special tools, JÚS and mechanization means for operational and interoperational manipulation, such as clamps, loaders, magazines, roller tracks, etc. And just the above-mentioned more precise calculation and visibility and measurement of required, real and theoretical P, R, T and consequently R enables correction of disproportions preventively in the so-called incubation period, which is one of the basic advantages compared to the current state of TPV regulation and control, especially in the phase of technology transfer.

-2CZ 15451 Ul-2EN 15451 Ul

Hlavním přínosem řešení je možnost včas a přesně identifikovat, změřit a diagnostikovat výskyt časových, kapacitních a hodnotových disproporcí v technické přípravě výroby TPV se zaměřením na fázi transferu technologií. Zároveň zjištěnou, lokalizovanou, kvantifikovanou a zobrazenou disproporcí, která je v TPV obvykle nehmotná, neviditelná a těžko zjistitelná, automatizova5 ně, rychle, přesně a efektivně regulovat.The main benefit of the solution is the possibility to identify, measure and diagnose the occurrence of time, capacity and value disproportions in the technical preparation of TPV production with a focus on the technology transfer phase. At the same time, the detected, localized, quantified and displayed disproportion, which is usually intangible, invisible and difficult to detect, automated, fast, accurate and effective in TPV.

Uvedené systémové řešení umožňuje kombinaci interaktivní regulace s automatickým adaptivním seřízením optimálního stavu rovnováhy na kritické cestě TPV zejména u nejčastěji přetěžovaných kritických etap na konci cyklu TPV a volbu optimální metody regulace s ohledem na typ a stupeň disproporce.This system solution enables the combination of interactive control with automatic adaptive adjustment of the optimal equilibrium state on the critical TPV path, especially for the most overloaded critical stages at the end of the TPV cycle and selection of the optimal control method with respect to the type and degree of disproportion.

Právě včasná a preventivní identifikace typu disproporce a přesná kvantifikace stupně disproporce umožňuje správné řazení regulačních opatření a časově, kapacitně a hodnotově chránit podnik před neplněním termínu zakázky, sníženou kvalitou zakázky a skrytými vadami inovovaných výrobků a z toho plynoucími důsledky jako ztráty adaptibility podniku v důsledku přetížení předvýrobní fáze, ztráty úvěru u banky, ztráty dobrých partnerů a odběratelů nebo i bankrotem.It is precisely the timely and preventive identification of the type of disproportion and the precise quantification of the degree of disproportion that enables the correct ordering of regulatory measures and time, capacity and value protection to protect the company against default, reduced quality and hidden defects of innovated products. phase, loss of credit at the bank, loss of good partners and customers or even bankruptcy.

Systémová integrace a řízení předvýrobní fáze zejména v oblasti transferu technologií předchází riziku inverzního efektu ztrát v důsledku neprůchodnosti na kritické cestě TPV způsobené nehmotnými nebo jen obtížně zjistitelnými disproporcemi ve srovnání s disproporcemi v hmotné výrobní sféře.System integration and pre-production phase management, especially in the field of technology transfer, avoids the risk of the inverse effect of losses due to obstruction on the critical path of TPV caused by intangible or difficult to detect disproportions compared to disproportions in the material manufacturing sector.

Proto je zde větší riziko zneužití nekalou konkurencí a právě z těchto důvodů navrhovaný systém integrace řízení TPV podstatně zvyšuje finanční a ekonomickou bezpečnost. AVDRS umožňuje kvalifikovaný výběr i spolehlivé partnerství zejména exportujících podniků se zahraničními podniky především v EU a v případě potřeby zahraničního partnera umožňuje zkrátit průběžnou dobu i termíny zakázky v předvýrobní fázi až na jednu polovinu.Therefore, there is a greater risk of abuse by unfair competition and it is for these reasons that the proposed TPV management integration system significantly increases financial and economic security. AVDRS enables qualified selection as well as reliable partnership of mainly exporting companies with foreign companies mainly in the EU and in case of need of foreign partner it is possible to shorten the lead time and order dates in the pre-production phase up to one half.

V období vstupu nových států do EU, zejména u exportujících podniků a v bankovní úvěrové sféře, je AVDRS přesným a rychlým zdrojem číselných hodnot a informací o schopnosti vývozce dostát svým závazkům ze smlouvy o vývozu. AVDRS především z pohledu eliminace rizik v předvýrobní a předexportní fázi zabezpečuje průběh celé zakázky kritickými místy a zejména u malých středních podniků pomáhá zvýšit finanční a ekonomickou bezpečnost v nej rizikovějších článcích řetězce na sebe navazujících etap realizace vývozního případu zakončeného vývozem zboží.At the time of the accession of new states to the EU, especially in exporting companies and in the banking credit sector, AVDRS is an accurate and fast source of numerical values and information on the exporter's ability to meet its obligations under the export contract. AVDRS, especially from the point of view of risk elimination in the pre-production and pre-export phases, ensures the entire order process through critical points and helps especially for small and medium-sized enterprises to increase financial and economic security in the most risky chain links.

Elementární vertikální integrace umožňuje lokalizaci, identifikaci, zobrazení, kvantifikaci a regulaci neviditelných, nehmotných a neelektrických odchylek a disproporcí i určení stupně přetížení a realizaci odpovídajících technických a organizačních opatření k uvedení systému do rovnováhy nebo alespoň do adaptivního stavu systému a průchodnosti kritickými etapami na kritické cestě TPV.Elemental vertical integration enables the localization, identification, display, quantification and control of invisible, intangible and non-electrical deviations and disproportions, as well as determining the degree of congestion and implementing appropriate technical and organizational measures to balance the system or at least adaptive state of the system and TPV.

Horizontální integrace funguje jako pružné propojení přípravné a realizační fáze technologické přípravy výroby TgPV, konstrukční přípravy výroby KPV, materiálně technického zabezpečení MTZ a náběhu nových výrob NNV pouhým rozšířením a odladěním vstupních dat horizontálně propojených modulů - fází etap TPV, TgPV (Ml), KPV (M2), MTZ (M3) a NNV (M4).Horizontal integration works as a flexible interconnection of the preparatory and implementation phases of technological preparation of TgPV production, construction preparation of KPV production, material technical support of MTZ and start of new LV production by simply extending and debugging the input data of horizontally connected modules - stages TPV, TgPV (Ml), KPV ( M2), MTZ (M3) and NNV (M4).

Kombinací elementární vertikální integrace a zvoleného rozsahu horizontální integrace TgPV, KPV, MTZ a NNV se zaměřuje na korigování disproporcí v předvýrobní fázi a ztrát ve výrobní fázi především hodnotových a to ještě před jejich zhmotněním a vznikem jak v předvýrobní tak i výrobní fázi, čímž se korigují preventivně značné ztráty ještě před vznikem přetížení výrobní fáze a to především interaktivními změnami bez zvýšení nároků na technické a finanční zdroje optimalizací využití stávajících zdrojů a kapacit.Combining elementary vertical integration and a selected range of horizontal integration TgPV, KPV, MTZ and NNV focuses on correcting disproportions in the pre-production phase and losses in the production phase, especially value, before their materialization and formation in both pre-production and production phase, thereby correcting preventively significant losses before the overload of the production phase, mainly through interactive changes without increasing the demand for technical and financial resources by optimizing the use of existing resources and capacities.

Uvedené technické řešení umožňuje preventivně a ještě v předstihu realizovat technická i organizační regulační opatření s ohledem na zjištěný stupeň odchylky. Výše úspor v prvním roce zavedení se odhaduje na 5 % roční výroby zboží v Kč.The above-mentioned technical solution enables preventive and even in advance implementation of technical and organizational regulatory measures with regard to the detected degree of deviation. The amount of savings in the first year of introduction is estimated at 5% of the annual production of goods in CZK.

-3CZ 15451 Ul-3EN 15451 Ul

V bankovní i podnikové praxi v návaznosti na mezinárodní normy jakosti uvedený systém umožňuje ještě před navázáním smluvních vztahů prokázat způsobilost ke splnění hlavních smluvních podmínek, kteiými jsou termín zakázky i kvalita včetně dohodnutých technických parametrů. Přehled obrázků na výkresechIn banking and business practice, in relation to international quality standards, the system allows to prove the ability to fulfill the main contractual conditions, which are the contract term and quality, including agreed technical parameters, before establishing contractual relations. BRIEF DESCRIPTION OF THE DRAWINGS

Technické řešení bude podrobněji popsáno na příkladech konkrétního provedení s pomocí přiložených výkresů, kde je na obr. 1 je znázorněno schéma realizačního modelu, na obr. 2 je znázorněno schéma funkčního a informačního propojení a na obr. 3 a 4 jsou znázorněna schémata propojení vertikální integrace AVDRS.The technical solution will be described in more detail with reference to the accompanying drawings, in which Fig. 1 shows a diagram of an implementation model, Fig. 2 shows a diagram of functional and information interconnection, and Figs. AVDRS.

Příklady provedení technického řešení ío Na obr. 1 je znázorněn realizační model, kde:DETAILED DESCRIPTION OF THE INVENTION FIG. 1 shows an implementation model where:

Mi + M4 jsou moduly v předvýrobní a výrobní fázi;Mi + M 4 are pre-production and production modules;

M| je výchozí modul v technologické přípravě (TgPV) zaměřený na průchodnost kritickými etapami v oblasti transferu technologiíM | is an initial module in technology preparation (TgPV) focused on throughput through critical stages in the field of technology transfer

- technologické postupy vč. THN- technological processes incl. THN

- konstrukce spec. nářadí vč. JUS- design spec. tools incl. JUS

- výroba spec. nářadí vč. JÚS;- production spec. tools incl. JÚS;

M2 je následný modul v konstrukční přípravě výroby (KPV)M 2 is a follow-up module in design production preparation (KPV)

- kusovník a techn. podmínky- BOM and techn. conditions

- konstrukční výkresy prototypu- prototype design drawings

- výroba prototypu- prototype production

- technologičnost konstrukce;- technological design;

M3 je modul orientovaný na materiálně technické zabezpečení (MTZ)M 3 is material-technical security module (MTZ)

1. výchozí materiály1. starting materials

2. polotovary2. semi-finished products

3. nakupované hotové díly3. Finished parts purchased

4. stroje a technické zařízení4. machinery and technical equipment

5. nářadí5. tools

6. realiz. fáze technolog, projektu;6. realiz. stage of technologist, project;

M4 je modul náběhu nových výrob (NNV) výrobní fázeM 4 is a new production start-up module (NNV) of the production phase

7. technické a technologické výrobní zařízení podniku:7. technical and technological production equipment of the enterprise:

tváření obrábění povrchové úpravy montáže.forming machining surface finishing assembly.

Na obr. 2 je znázorněno funkční a informační propojení, kde:Fig. 2 shows functional and information interconnection, where:

Fáze řízení průchodnosti kritickými etapami minipočítačem:Stage management through critical stages of the minicomputer:

A) Roční inovační programA) Annual Innovation Program

B) Datová základna výrobkůB) Data base of products

C) Diagnostické zobrazení skutečného stavu - původní verzeC) Diagnostic display of actual state - original version

D) Regulace odchylek, monitorování regulovaného stavu, provádění interaktivních změn IZ, vytištění protokolů o způsobilosti PZ a plán dokumentace.D) Regulation of deviations, monitoring of the regulated state, implementation of interactive changes to IT, printing of protocols on CA eligibility and documentation plan.

Fáze realizace průchodnosti kritickými etapami:Phase of realization through critical phases:

Mi je výchozí modul v technologické přípravě výroby (TgPV) s vyznačením kritických etap TgPVMi is the initial module in the technological preparation of production (TgPV), indicating the critical stages of TgPV

1 technologické postupy vč. THN1 technological procedures incl. THN

-4CZ 15451 Ul konstrukce speciálního nářadí vč. JÚS výroba spec, nářadí vč. JÚS-4GB 15451 Ul Special tool construction incl. JÚS production spec, tools incl. JÚS

M2 je následný modul konstrukční přípravy výroby (KPV) s vyznačením kritických etap KPV konstrukce prototypuM 2 is a subsequent module of structural preparation of production (KPV) with indication of critical stages of KPV prototype construction

5 výroba prototypu.5 prototype production.

Na obr. 1 a 2 je znázorněna horizontální integrace předvýrobních mechanizmů (modulů) M] až M4 (TgPV, KPV, MTZ a NNV). Vertikální integrace vytváří vnitřní struktury uvedených horizontálních modelů Mi až M4 a probíhá ve třech základních fázích:Fig. 1 and 2 show a horizontal integration preproduction mechanisms (modules) m] to M 4 (TgPV, KPV, MTZ and NNV). Vertical integration creates the internal structures of these horizontal models Mi to M 4 and proceeds in three basic phases:

- zjištění a změření odchylky (disproporce časové nebo kapacitní); ío - regulace odchylek;- detection and measurement of deviation (temporal or capacitive disproportion); io - regulation of deviations;

- řízení a plánování průběhu činností v kritických etapách a průchodnosti na kritické cestě TPV.- management and planning of activities in critical phases and throughput on the critical TPV path.

Tyto tři základní fáze jsou číselně specifikované a sumarizované v Protokolech o způsobilosti, které mají tři základní části:These three basic phases are numerically specified and summarized in the Eligibility Protocols, which have three basic parts:

- lhůtový diagram ročního programu inovací;- timetable for the annual innovation program;

- kapacitní bilance a určení hodnot P, R, T;- capacity balance and determination of P, R, T values;

- histogram kapacit v ročním průběhu programu inovací a zakázek.- a histogram of capacities in the annual course of the innovation and procurement program.

V následujících obr. 3 a 4 jsou znázorněny dvě varianty funkčního propojení uvedené vertikální integrace.The following Figures 3 and 4 show two variants of the functional interconnection of said vertical integration.

Na obr. 3 je znázorněn automatizovaný regulační modul, který sestává z normativní matice NM a výrobkové matice VM, které jsou propojené s modulární formací histogramem kapacit HK. Vstup normativní matice NM je propojen s tiskárnou termínovaného lhůtového diagramu TLD ročního programu inovací. Výrobková matice VM je propojena s průběhem zakázek inovačního programu PZIP. Výstup z modulární formace histogramu kapacit HK je propojen s porovnávacím modulárním členem, který změří a vyčíslí disproporci v případě, že požadovaná kapacita P je větší než reálná kapacita R.Fig. 3 shows an automated control module consisting of a normative matrix NM and a product matrix VM, which are connected to a modular formation by a histogram of the capacitance HK. The input of the NM normative matrix is linked to the TLD printer of the Annual Innovation Agenda. The VM product matrix is interconnected with the progress of orders of the PZIP innovation program. The output of the modular formation of the HG capacitance histogram is coupled to a comparator modular member that measures and quantifies the disproportion when the required capacity P is greater than the real capacity R.

Na obr. 4 je znázorněno provedení se zakomponovaným vyšším stupněm automatizace regulace, plánování a řízení předvýrobní fáze podniku. Zde je modulární formace histogramu kapacit přímo propojena s automatizovaně prováděnou kapacitní bilancí KB. K výstupu porovnávacího modulárního členu PMČ je připojen optimalizační člen automatizované změny lhůt ZL, který prostřednictvím minipočítače vytváří adaptivní regulační a řídicí mechanizmus, který se na předem určený stupeň rovnováhy systému předvýrobní fáze (například max. disproporce do 10% R) sám automaticky seřídí minipočítačem.Fig. 4 shows an embodiment with a higher degree of automation of control, planning and management of the pre-production phase of the company incorporated. Here, the modular formation of the capacity histogram is directly linked to the automated KB capacity balance. The PML comparator modular output is connected to the ZL automated timing optimizer, which, via a minicomputer, creates an adaptive control and control mechanism that automatically adjusts itself to a predetermined degree of pre-production phase equilibrium (for example max. Disproportion up to 10% R).

Roční inovační program s vyznačením priorit výrobků a přijaté zakázky jsou předány plánovači PL, který navrhuje a provádí interaktivní změny. Výstupem z minipočítače pro plánovače PL je pak termínovaný lhůtový plán podložený kapacitní bilancí včetně priorit výrobků a zakázek, ze kterého jsou následně odvozené konkrétní úkoly pracovníkům TPV viz UPTPV.The annual innovation program, indicating the product priorities and the orders received, is handed over to the PL planner, who designs and makes interactive changes. The output from the minicomputer for PL planners is then a deadline plan based on capacity balance including product and order priorities, from which specific tasks of TPV employees are derived, see UPTPV.

Automatizovaný modul zjišťuje a měří disproporce, diagnostikuje, reguluje a řídí průběh inovací výrobků a technologií na kritické cestě TPV. Celé uvedené řešení zapracovává a koriguje neplánované úkoly, skluzy termínů a kapacitní disproporce pomocí interaktivních změn přijatých ve40 děním podniku a provedených plánovačem PL nebo jiným pověřeným pracovníkem.The automated module detects and measures disproportions, diagnoses, regulates and controls the product and technology innovation process along the critical TPV path. The whole solution incorporates and corrects unscheduled tasks, delays, and capacity disproportions through the interactive changes adopted by the enterprise 40 and made by the PL scheduler or other authorized personnel.

Příklad 1Example 1

Postupná realizace přímo ve výrobním podniku, přičemž průběžná doba realizace je 6 měsíců až 3 roky, dle rozsahu řešení.Gradual realization directly in the manufacturing company, with a continuous realization period of 6 months to 3 years, depending on the scope of the solution.

Řešení bude popsáno na příkladném podniku střední velikosti bez pobočných závodů s vlastní výzkumně - vývojovou základnou, který je výrobcem textilních strojů. Maloprůměrové textilní stroje se dělí do řady typů, které se dále člení na jednotlivé typorozměry dle velikosti a dle jemnosti úpletu. Tím je určen i typ výroby, kterou lze charakterizovat jako malosériovou nepravidel-5 CZ 15451 Ul ně opakovanou, přičemž velikost výrobních sérií se pohybuje od 10 do 160 ks. Z hlediska inovačního tempa lze hovořit o průměrně čtyřech ověřovacích sériích nových typů textilních strojů ročně. Hmotnost kompletního stroje, který je sestaven asi ze tří tisíc vyráběných a nakupovaných dílců, se pohybuje v rozmezí od 200 do 400 kg.The solution will be described in an exemplary medium-sized enterprise without branch plants with its own R&D base, which is a manufacturer of textile machines. Small diameter textile machines are divided into a number of types, which are further subdivided into individual types according to the size and fineness of the fabric. This also determines the type of production, which can be characterized as small-series irregular-repeated, the size of production series ranges from 10 to 160 pieces. In terms of innovation pace, we can speak of an average of four verification series of new types of textile machines per year. The weight of the complete machine, which consists of about three thousand manufactured and purchased parts, ranges from 200 to 400 kg.

Útvar technické přípravy výroby je součástí technického úseku a zabezpečuje technologickou přípravu výroby, včetně výroby a hospodaření nářadím, podle konstrukční dokumentace převzaté z úseku pro rozvoj techniky. Plánování TPV je prováděno na základě inovačního programu a plánu výroby. Vzhledem k nestabilitě požadavků na sortiment textilních strojů je detailně zpracováván pouze roční plán TPV. Kapacitní bilancování je prováděno jen u kritických etap, které ío rozhodujícím způsobem ovlivňují průběžnou dobu technologické přípravy výroby. V podmínkách konkrétního podniku jsou to tyto kritické etapy: technologické postupy součástí včetněThe Technical Production Preparation Unit is a part of the Technical Department and provides technological preparation of production, including production and tool management, according to the design documentation taken from the Technical Development Department. TPV planning is carried out on the basis of an innovative program and a production plan. Due to the instability of requirements for the assortment of textile machines, only the annual TPV plan is elaborated in detail. Capacitive balancing is only performed at critical stages, which have a decisive impact on the ongoing time of technological preparation of production. In the conditions of a particular company these are the following critical stages: technological procedures of components included

THN, konstrukce speciálního nářadí a výroba speciálního nářadí.THN, construction of special tools and production of special tools.

Základním předpokladem pro sestavení plánu a bilancování kapacit jsou normativy pracnosti výše uvedených kritických etap TPV, které byly stanoveny rozborem a vhodným tříděním údajů obsažených v dosavadní evidenci. Normativy pracnosti technologických postupů udávají průměrnou pracnost zpracování technologického postupu, včetně stanovení THN-Materiálové a THN-Výkonové v hodinách pro tři skupiny součástí a tři třídy jejich složitosti. Normativy pracnosti konstrukce speciálního nářadí udávají průměrnou pracnost zpracování konstrukční dokumentace v hodinách na druh speciálního nářadí v členění na 5 skupin a 3 třídy složitosti. Obdob20 ně jsou stanoveny normativy pracnosti výroby speciálního nářadí s tím, že normativní hodnoty jsou uváděny v normohodinách na kus speciálního nářadí.The basic prerequisite for drawing up the plan and balancing capacities are the labor intensive norms of the above-mentioned critical stages of TPV, which were determined by analysis and appropriate sorting of data contained in the existing records. Technological workmanship standards indicate the average workmanship workmanship, including the determination of THN-Material and THN-Power in hours for three component groups and three complexity classes. Standards of labor intensive construction of special tools indicate the average labor intensive of design documentation in hours per kind of special tool divided into 5 groups and 3 complexity classes. Similarly, norms of labor intensive production of special tools are set, with normative values given in norm-hours per piece of special tools.

Neméně důležité je stanovení disponibilních zdrojů, které jsou pro bilancování etapy TPV k dispozici. Základem je teoretická disponibilní kapacita, která je dána plánovaným počtem pracovníků zabezpečujících danou etapu s efektivním fondem pracovníka, přičemž rozdělení kapa25 city do jednotlivých měsíců je prováděno dle plánovacího kalendáře.Equally important is the determination of the available resources available for balancing the TPV stage. The basis is the theoretical available capacity, which is given by the planned number of workers ensuring the given stage with an effective employee fund, while the allocation of capacity to individual months is carried out according to the planning calendar.

Vlastní provádění ročního lhůtového plánu TPV s kapacitní bilancí je prováděno minipočítačem.The actual implementation of the annual schedule of TPV with a capacity balance is carried out by a mini-computer.

Příprava vstupních dat, která zahrnují informace o věcných úkolech kritických etap TPV a jejich termínovém zajištění jsou získávána následovně. Věcné úkoly TPV jsou převzaty z plánu TPV a upřesňovány při konstrukčně technologických prověrkách. Úkoly technologické obsluhy výroby jsou kvalifikovány na základě statistických údajů. Pro jednotlivé plánované etapy TPV jsou použity následující plánovací jednice. Technologické postupy součástí - počet součástí - počet součástí vyráběných, konstrukce speciálního nářadí - počet druhů speciálního nářadí, výroba speciálního nářadí. Požadované termíny realizace úkolů TPV jsou převzaty z lhůtového plánu výroby a na základě zkušeností je proveden návrh na zahájení a ukončení jednotlivých etap. Uvedená data jsou zaznamenávána do univerzálního formuláře dle jednotlivých úkolů, čímž je vytvořena stavebnicová organizace vstupních dat umožňující jejich rychlou přípravu při změně plánu.The preparation of input data, which includes information on the material tasks of the critical stages of TPV and their timing, is obtained as follows. Substantive tasks of TPV are taken over from the TPV plan and specified during construction-technological checks. The tasks of the technological service of production are qualified on the basis of statistical data. The following planning units are used for individual planned stages of TPV. Technological procedures of parts - number of parts - number of parts produced, construction of special tools - number of types of special tools, production of special tools. The required deadlines for the implementation of TPV tasks are taken from the production schedule and based on experience, a proposal is made to start and end individual stages. These data are recorded in a universal form according to individual tasks, which creates a modular organization of input data allowing their rapid preparation when changing plans.

Po zadání vstupních dat a jejich případné úpravě se provede vlastní kapacitní propočet s tím, že na displeji se zobrazí rozpory mezi požadovanou a reálnou kapacitou v jednotlivých měsících, vyjádřené v procentech. Zde má uživatel možnost rozhodnout, zda navržený plán vyhovuje nebo ne. Pokud je plán nevyhovující, tj. kapacitní rozpory jsou příliš vysoké, může uživatel provést korekce přesouváním začátků i konců časových úseček jednotlivých úkolů. Potom se znovu provede kapacitní propočet a výstup nových hodnot na displeji. Jakmile je vytvořen vyhovující plán, vytiskne se na tiskárně tisková sestava plánu TPV.After entering the input data and eventually adjusting it, the actual capacity calculation is performed with the display showing the discrepancies between the required and real capacity in individual months, expressed as a percentage. Here, the user has the option to decide whether the proposed plan fits or not. If the plan is unsatisfactory, ie the capacity discrepancies are too high, the user can make corrections by shifting the start and end times of individual tasks. Then the capacitive calculation and the new values are displayed again. Once a satisfactory layout has been created, a TPV layout report is printed to the printer.

Tisk plánu TPV je prováděn pro každou kritickou etapu TPV odděleně na třech listech. Obsahuje tisk vstupních dat a dále výstupní údaje v následujícím uspořádání: úsečkový plán dané etapy TPV, grafické znázornění porovnání požadované, reálné a teoretické kapacity v jednotlivých měsících a za rok, s výpisem použitých normativů přednosti.The printing of the TPV plan is performed separately for each critical stage of the TPV on three sheets. It includes printing of input data and output data in the following arrangement: a line plan of the given TPV stage, a graphical representation of the comparison of required, real and theoretical capacity in individual months and per year, with a listing of used normatives of priority.

Takto zpracované tiskové sestavy obdrží vedoucí zabezpečující příslušné etapy, dále plánovač TPV a vedoucí útvaru TPV.The press reports processed in this way will be received by the head of the respective stages, the TPV planner and the head of the TPV department.

-6CZ 15451 Ul-6EN 15451 Ul

Běžná kontrola plnění plánu je prováděna na pravidelných dispečincích TPV jednou týdně ve fyzických jednotkách - plánovacích jednicích - dle jednotlivých úkolů. Jednou měsíčně je dispečink spojen s vykazováním skutečně dosažených výsledků v plánovacích jednicích, odpracovaných hodinách celkem a na plánovaných úkolech v členění dle skupin a tříd složitosti bez ohledu na jednotlivé úkoly. Vykazování je prováděno na univerzálním formuláři, který je rovněž používán pro zápis vstupních dat.Routine control of plan fulfillment is performed at regular TPV dispatching centers once a week in physical units - planning units - according to individual tasks. Once a month, the dispatching center is associated with reporting the actual results in planning units, hours worked in total and planned tasks broken down by groups and complexity classes regardless of individual tasks. Reporting is performed on a universal form that is also used to write input data.

Při kontrole plnění plánu přistupuje aktualizace plánu na základě skutečně dosahovaných výsledků. Aktualizace plánu TPV je rovněž prováděna při každé významné změně plánu TPV a plánu výroby. Aktualizace normativů a disponibilních kapacit je prováděna lx ročně na základě souboru měsíčních výkazů a plánu práce.When reviewing plan fulfillment, the plan update is based on actual results. The TPV plan update is also performed whenever a significant change to the TPV plan and production plan is made. Norms and available capacities are updated once a year on the basis of a set of monthly statements and a work plan.

I když popsaná metoda je spojena se zjednodušením celé problematiky, přináší podstatné zpřesnění plánu TPV a v nejdůležitějších kritických etapách se odhalují se značnou přesností úzká místa jak z hlediska věcného tak časového v předstihu až jednoho roku.Although the described method is connected with simplification of the whole issue, it brings a substantial refinement of the TPV plan and in the most important critical stages, bottlenecks are discovered with considerable accuracy both in terms of time and matter in advance of up to one year.

Dalším přínosem je rychlost zpracování plánu TPV při změnách programu inovací a plánu výro15 by, ke kterým při výrobě textilních strojů často dochází. Nový roční plán TPV dle popsané metody lze zpracovat prakticky v jedné směně, kdy změnu vstupních dat díky jejich stavebnicovému uspořádání lze zpracovat asi za 8 hodin a vlastní sestavení plánu na počítači včetně úpravy úseček interaktivním způsobem a tisku v průběhu jedné hodiny.Another benefit is the speed with which the TPV is processed in the case of changes to the innovation program and production plan15 that often occur in the manufacture of textile machinery. The new annual TPV plan according to the described method can be processed in practically one shift, when the change of input data due to their modular arrangement can be processed in about 8 hours and the actual compilation of the plan on the computer, including editing lines in an interactive way and printing in one hour.

Zpřesnění plánu TPV a možnost jeho rychlé aktualizace umožňují účinnější regulaci průběhu 20 technické přípravy výroby. Celý systém plánování a aktualizace normativní základny včetně ověřování reálných kapacit na základě vykazování skutečných výsledků vede k trvalému zpřesňování výchozí základny a tím i plánování TPV.The refinement of the TPV plan and the possibility of its rapid updating allow more efficient regulation of the technical preparation process. The whole system of planning and updating of the normative base, including the verification of real capacities based on the reporting of actual results, leads to a permanent refinement of the starting base and hence the planning of the TPV.

Příklad 2Example 2

Realizace prvního stupně automatizovaného vícemodulámího regulačního a řídicího systému ve 25 fázi transferu technologií metodou na klíč, přičemž průběžná doba realizace je 2 až 4 týdny po dodání výchozího souboru informací.Implementation of the first stage of the automated multi-module control and regulation system in the 25-phase turn-key technology transfer phase, with a running time of 2 to 4 weeks after delivery of the initial set of information.

Řešení formou na klíč bude popsáno na příkladu strojírenského podniku do 250 zaměstnanců, který je výrobcem motocyklů vyráběných z 80% na export s inovačním cyklem 3 až 5 měsíců. Jednotlivé realizační kroky a činnosti byly provedeny v následujícím pořadí:The turnkey solution will be described on the example of an engineering company with up to 250 employees, which is the manufacturer of motorcycles produced 80% for export with an innovation cycle of 3 to 5 months. The individual implementation steps and activities were carried out in the following order:

- všeobecná konstrukčně - technologická charakteristika výroby a výrobků, úrovně jejich technické vybavenosti a výběr typových představitelů;- general constructional and technological characteristics of production and products, level of their technical equipment and selection of type representatives;

- vytvoření a doplnění souborů normativních hodnot pro kritické etapy v rámci stávající normativní základny;- the creation and completion of sets of normative values for critical stages within the existing normative base;

- sestavení výchozího souboru vstupních dat;- compiling a default input data set;

- instalace softwarového vybavení AVDRS do podnikového počítače;- installing AVDRS software on the company computer;

- seřízení softwarového vybavení AVDRS na vstupní data a limitující faktory podniku;- adjustment of AVDRS software to input data and business limiting factors;

- automatizované vytištění protokolů o způsobilosti PZ pro kritické etapy TgPV včetně transferu technologií a plánovací dokumentace plánu TgPV včetně nářaďovny v ročním průběhu programu inovací a to v následujícím členění:- automated printing of PZ capability protocols for the critical stages of TgPV, including technology transfer and planning documentation of the TgPV plan, including tools, in the annual course of the innovation program, broken down as follows:

1. technologické postupy včetně THN, protokol o způsobilosti PZ-1, technologický postup TP;1. technological procedures including THN, PZ-1 eligibility protocol, TP technological procedure;

2. konstrukce speciálního nářadí včetně JÚS, protokol o způsobilosti PZ-2, konstrukce nářadí KN;2. construction of special tools including JÚS, certificate of competence PZ-2, construction of KN tools;

3. nářaďovna, výroba speciálního nářadí včetně JÚS, protokol o způsobilosti PZ-3, výroba nářadí VN.3rd tool shop, production of special tools including JÚS, certificate of competence PZ-3, production tools HV.

-7CZ 15451 Ul-7EN 15451 Ul

Přičemž všechny obsahují lhůtový diagram ročního plánu, kapacitní bilanci hodnot P, R, T a histogram kapacit P, R, T;All of which contain a time schedule of the annual plan, a capacity balance of P, R, T values and a histogram of P, R, T capacities;

- návrh a provedení interaktivních změn IZ;- design and implementation of interactive changes to IT;

- přezkoušení a ověření přesnosti i funkčnosti automatizovaně zpracovaných dokladů, dokumen5 táce a hodnot;- checking and verifying the accuracy and functionality of automated documents, documents and values;

- předání podnikového počítače zpět do realizačního podniku a zaškolení obsluhy na instalované softwarové vybavení AVDRS;- handing over the company computer back to the implementation company and training the operators for the AVDRS software installed;

- vyhodnocení funkčnosti a přesnosti AVDRS v provozních podmínkách, včetně návrhu na opatření a závěry i reference včetně začlenění AVDRS do stávající organizace a řízení podniku.- evaluation of the functionality and accuracy of AVDRS in operational conditions, including design of measures and conclusions as well as references, including the incorporation of AVDRS into existing business organization and management.

Pracovníci realizačního podniku se podíleli na zavedení AVDRS v následující krocích a činnostech: spolupráce na sestavení výchozího souboru informací pro AVDRS, zajištění a provedení začlenění AVDRS do stávajícího systému řízení podniku, provozní zkoušení, ověřování a testování funkčnosti a přesnosti výsledků AVDRS v provozních podmínkách a průběžně 3 až 6 měsíců po zavedení AVDRS zpřesňovali a odlaďovali výchozí soubor vstupních dat a normativní základnu podniku.The implementation company staff participated in the implementation of AVDRS in the following steps and activities: collaboration on the development of the initial set of information for AVDRS, ensuring and implementing the integration of AVDRS into the existing business management system, operational testing, verification and testing Three to six months after the introduction of AVDRS, they refined and tuned the initial input data set and the company normative base.

Průmyslová využitelnostIndustrial applicability

Systém automatizované vícemodulámí regulace přípravné fáze výroby včetně diagnostiky podle tohoto technického řešení nalezne uplatnění zejména u menších a středních výrobních podniků.The system of automated multi-module regulation of the preparatory phase of production including diagnostics according to this technical solution will find application especially in small and medium-sized production companies.

V současném období po vstupu nových členských států do EU, zejména u exportních průmyslo20 vých podniků a v bankovní úvěrové sféře je AVDRS přesným a rychlým zdrojem číselných hodnot a informací o schopnosti výrobce dostát svým závazkům ze smluv o vývozu a to především z pohledu eliminace rizik v předvýrobní a předexportní fázi, kdy se zabezpečuje průběh celé dodávky kritickými místy a etapami.In the current period after the accession of new Member States to the EU, especially in export industry20 and in the banking credit sector, AVDRS is an accurate and fast source of numerical values and information about the manufacturer's ability to meet its obligations under export contracts, especially in terms of risk elimination. pre-production and pre-export stage, during which the whole supply is ensured through critical points and stages.

Claims (3)

NÁROKY NA OCHRANUPROTECTION REQUIREMENTS 25 1. Systém automatizované vícemodulámí regulace přípravné fáze výroby včetně diagnostiky, sestávající z bloku normativní matice a bloku výrobkové matice, které jsou propojeny s modulární formací histogramu změřených a zobrazených hodnot požadované kapacity P, reálné kapacity R a teoretické kapacity T, přičemž vstup bloku normativní matice je připojen k zobrazovací jednotce termínového lhůtového diagramu, vstup bloku výrobkové matice je připojen k bloku s25 1. System of automated multi-module regulation of pre-production phase including diagnostics, consisting of normative matrix block and product matrix block, which are connected with modular histogram formation of measured and displayed values of required capacity P, real capacity R and theoretical capacity T, the matrix is connected to the deadline display unit, the input of the product matrix block is connected to the block s 30 inovačním programem výrobků a/nebo průběhu zakázek a výstup z modulární formace histogramu změřených a zobrazených hodnot požadované kapacity P, reálné kapacity R a teoretické kapacity T je připojen k porovnávacímu modulárnímu členu prvku požadované kapacity P a reálné kapacity R, vyznačující se tím, žejek němu připojen blok technologické přípravy výroby a/nebo blok konstrukční přípravy výroby.30, an innovative program of product and / or order flow, and output from the modular histogram formation of the measured and displayed capacitance P, real capacitance R, and theoretical capacitance T values is coupled to a comparative modular member of the required capacitance P and real capacitance R element. a technological preparation preparation block and / or a construction preparation preparation block connected thereto. 3535 2. Systém podle nároku 1, vyznačující se tím, že jek němu připojen blok materiálně technického zabezpečení a/nebo blok náběhu nové výroby.System according to claim 1, characterized in that a material-security block and / or a new production start-up block is connected thereto. 3. Systém podle nároku 1 nebo 2, vyznačující se tím, že modulární formace histogramu změřených a zobrazených hodnot požadované kapacity P, reálné kapacity R a teoretické kapacity T obsahuje blok kapacitní bilance a k výstupu porovnávacího modulárního členuSystem according to claim 1 or 2, characterized in that the modular histogram formation of the measured and displayed values of the required capacity P, the real capacity R and the theoretical capacity T comprises a block of capacity balance and for outputting a comparative modular term. 40 je připojen optimalizační člen pro automatizovanou regulaci disproporcí, seřízení rovnováhy a celkové adaptivity předvýrobní fáze pro umožnění průchodnosti kritickými etapami technické přípravy výroby TPV na kritické cestě.40, an optimization member for automated disproportion control, balance adjustment, and overall adaptability of the pre-production stage is coupled to allow passage through critical stages of the technical preparation of TPV production on a critical path.
CZ200416109U 2004-11-29 2004-11-29 System for carrying out automated multi-modular control of manufacture preparation phase including diagnostics CZ15451U1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CZ20041154A CZ298013B6 (en) 2004-11-29 2004-11-29 Method of automated multi-modular control of manufacture preparative phase including diagnostics and system for making the same

Publications (1)

Publication Number Publication Date
CZ15451U1 true CZ15451U1 (en) 2005-05-30

Family

ID=34706121

Family Applications (2)

Application Number Title Priority Date Filing Date
CZ200416109U CZ15451U1 (en) 2004-11-29 2004-11-29 System for carrying out automated multi-modular control of manufacture preparation phase including diagnostics
CZ20041154A CZ298013B6 (en) 2004-11-29 2004-11-29 Method of automated multi-modular control of manufacture preparative phase including diagnostics and system for making the same

Family Applications After (1)

Application Number Title Priority Date Filing Date
CZ20041154A CZ298013B6 (en) 2004-11-29 2004-11-29 Method of automated multi-modular control of manufacture preparative phase including diagnostics and system for making the same

Country Status (1)

Country Link
CZ (2) CZ15451U1 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5469361A (en) * 1991-08-08 1995-11-21 The Board Of Regents Acting For And On Behalf Of The University Of Michigan Generic cell controlling method and apparatus for computer integrated manufacturing system
US5881115A (en) * 1997-11-07 1999-03-09 Cbs Corporation Method and system for automatically executing multiple procedures for a complex process facility
AU1115700A (en) * 1998-10-16 2000-05-08 Iconics, Inc. Process control

Also Published As

Publication number Publication date
CZ298013B6 (en) 2007-05-23
CZ20041154A3 (en) 2006-07-12

Similar Documents

Publication Publication Date Title
Kelley Productivity and information technology: The elusive connection
Wiendahl Load-oriented manufacturing control
Riezebos et al. Lean production and information technology: connection or contradiction?
CN102081760A (en) A method and a system for executing a scheduled production process
Kumar et al. Statistical process control at Motorola's Austin assembly plant
Liu et al. An integrated production and delay-time based preventive maintenance planning model for a multi-product production system
das Neves et al. Deployment the MES (Manufacturing Execution System) aiming to improve competitive priorities of manufacturing
KR20030006432A (en) Enterprise Resource Planning Method and System for performing original cost control using quality control and productivity control
CN101777169A (en) Technological analysis-based ERP production planning management software
Müller et al. Simulation based online production planning
CZ15451U1 (en) System for carrying out automated multi-modular control of manufacture preparation phase including diagnostics
Primrose et al. The use of a conceptual model to evaluate financially flexible manufacturing system projects
US20070255605A1 (en) Multi-period financial simulator of a manufacturing operation
Afriansyah et al. Production planning and control system with just in time and lean production: a review
Zülch et al. Approach for personnel development planning based on the technology calendar concept
Islam Crashing project time with least cost: A linear programming approach
Fidlerová et al. Application of selected methods of industrial engineering in enterprises in the context of sustainable production
Wicaksono et al. An Automated Information System for Medium to Short-Term Manpower Capacity Planning in Make-To-Order Manufacturing
CN113627873B (en) Project type enterprise financial moon knot automatic system based on SAP and use method
Chartmongkoljaroen et al. Defect Reduction By DMAIC Method: a case study of a jewelry manufacturer
Castillo-Perdomo et al. Strategic Management Plan for Maintenance in Mining Companies as a Form of Technological Innovation
Sunder et al. Offshore Output.
Garg To Improve First-Hour Sewing Production Efficiency for a Garment Manufacturing Factory Using the Lean Problem-Solving Tool, Root Cause Analysis
Leonov et al. Parameters and methods of assessing the quality of metal-cutting equipment of machine-building enterprises
Bulgaru et al. Using Six Sigma Methodology to Reduce Nonconformities

Legal Events

Date Code Title Description
FG1K Utility model registered

Effective date: 20050530

MK1K Utility model expired

Effective date: 20081129