CS260908B1 - Mounting Workers - Google Patents

Mounting Workers Download PDF

Info

Publication number
CS260908B1
CS260908B1 CS851155A CS115585A CS260908B1 CS 260908 B1 CS260908 B1 CS 260908B1 CS 851155 A CS851155 A CS 851155A CS 115585 A CS115585 A CS 115585A CS 260908 B1 CS260908 B1 CS 260908B1
Authority
CS
Czechoslovakia
Prior art keywords
frame
assembly
assembled
brackets
spatial
Prior art date
Application number
CS851155A
Other languages
Czech (cs)
Other versions
CS115585A1 (en
Inventor
Vaclav Muzik
Josef Vitek
Miroslav Rubik
Original Assignee
Vaclav Muzik
Josef Vitek
Miroslav Rubik
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vaclav Muzik, Josef Vitek, Miroslav Rubik filed Critical Vaclav Muzik
Priority to CS851155A priority Critical patent/CS260908B1/en
Publication of CS115585A1 publication Critical patent/CS115585A1/en
Publication of CS260908B1 publication Critical patent/CS260908B1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Montážní rám pro sestavování dodatečně spínaných železobetonových předpínaných dílců pomocí sestavovacího zařízení je ocelový tuhý rám pravoúhlého tvaru, opatřený přídavnými upevňovacími stojkami s osazo- . vacími konzolkami s distančníky pro zajištění spáry mezi sestavovanými dílci, otočnými vřeteny a sklopnými přídržníky, které společně zajištují zachycení sestavovaného dílce do rámu, který je potom možné za závěsná oka přenést na sestavovací zařízení prostorových dílců a pomocí výklopných přídržníků přichytit.The assembly frame for assembling additionally connected reinforced concrete prestressed elements using the assembly device is a rigid steel frame of rectangular shape, equipped with additional fastening posts with assembly brackets with spacers to secure the gap between the assembled elements, rotating spindles and folding holders, which together ensure that the assembled element is caught in the frame, which can then be transferred to the assembly device of spatial elements by the suspension eyes and attached using the folding holders.

Description

Vynález se týká montážního rámu pro výrobu spínaných střešních panelů, zejména železobetonových předpínaných střešních dílců pro stavební objekty, montované z prostorových dílců.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an assembly frame for the production of switched roof panels, in particular reinforced concrete prestressed roof panels for building objects assembled from spatial panels.

V současné době se střešní dílce z předpínaného železobetonu na objekty z prostorových prvků vyrábějí u nás i ve světě jako jednodílné naskládané. Pro technologii předpínaných střešních dílců se podle nejnovějších technologických postupů začalo používat s výhodou i spínání více dílců. Tím bylo dosaženo v technologickém toku výroby prostorových dílců sjednocení způsobu výroby prostorových a střešních dílců, což přináší význačné úspory investiční i provozní. Při praktické realizaci tohoto způsobu spínání na lince se však u spínaných střešních dílců dosahuje často větší pracnosti provedení než u daleko rozměrnějších a složitějších prostorových dílců. Důvodem jsou pomocná sestavovací zařízení, která nedovolují při sestavování střešních díjlců dosáhnout jednoduchým způsobem požadovaných rozměrových parametrů.At present, roof elements made of pre-stressed reinforced concrete are manufactured as one-piece stacked in the Czech Republic and abroad. For the technology of prestressed roof panels, switching of more panels has started to be used according to the latest technological procedures. In this way, the technological flow of the production of spatial components has been achieved by unifying the way of production of spatial and roof components, which brings significant investment and operational savings. In practical implementation of this method of switching on the line, however, switching roof tiles are often more labor intensive than in much larger and more complex spatial tiles. This is due to auxiliary assembling devices which do not allow the required dimensional parameters to be achieved in a simple manner when assembling the roof elements.

Tato zařízení jsou většinou přizpůsobena rozměrově i technologicky konkrétním technologickým podmínkám výroben. Jde většinou o velkoprostorový vyztužený nosník, opatřený koncovými rektifikovatelnými dorazy s různým stupněm nastavení prostorové přesnosti, který je svými rozměry uzpůsoben jednoúčelovému použití pro různé druhy prostorových dílců. Tam, kde není předepsána přesná rozměrová odchylka, se využívá i zařízení tvořené jednoduchým vyztuženým rámem daného rozměru s pevnými nerektifikovatelnými dorazy. Dalším používaným zařízením je vně orientovaný rektifikovatelný rám z každé strany prostorového nebo střešního dílce. Zatímco velkoprostorové nosníky a jednoduché rámy se osazují na spínané dílce jsou vně orientované rámy zabudovány do podlahy a dílce se vkládají mezi ně. U těchto rámů se používá pro rektifikaci hydraulických prvků.These devices are usually adapted to the specific technological conditions of the plants. It is usually a large-area reinforced beam, provided with rectifiable end stops with varying degrees of spatial accuracy adjustment, which is dimensioned for single use for various types of spatial components. Where a precise dimensional deviation is not prescribed, a device consisting of a simple reinforced frame of a given size with fixed non-rectifiable stops is also used. Another device used is an outwardly oriented rectifiable frame from each side of the spatial or roof panel. While the large-span beams and single frames are mounted on the switching panels, the outwardly oriented frames are built into the floor and the panels are inserted between them. These frames are used for rectification of hydraulic elements.

Montážní rám podle vynálezu se oproti uvedeným zařízením vyznačuje především snadnou manipulací, použitím řešení, které jej umožňuje osazovat na velkoprostorový nosník zařízení pro sestavování prostorových dílců a víceúčelovostí svého využití na různé druhy spínaných dílců.The mounting frame according to the invention is distinguished in particular by its ease of handling, the use of a solution which makes it possible to mount it on a large-span beam of a device for assembling spatial components and its versatility for various types of switching components.

Podstatou vynálezu je montážní rám pro sestavováni dodatečně spínaných železobetonových dílců tvořený pravoúhelníkem ze stojek opatřených otočnými přídržňíky, z horního nosníku se závěsnými oky, z dolního nosníku a osazovacími prvky a otočnými' přídržňíky, a výztuhami proti deformaci. Na tento základní rám jsou připojeny v dolní části svislé tyčové závěsy opatřené konzolkami s úložnými destičkami a distančníky, které spolu s otočnými vřeteny zabezpečují předepsané připojeni sestavovaného prvku.SUMMARY OF THE INVENTION The present invention provides a mounting frame for assembling additionally switched reinforced concrete members, consisting of a rectangle of pivoted uprights, an upper pendant with hinge eyes, a lower beam and mounting members and pivotable supports, and anti-deformation stiffeners. To this base frame are attached at the bottom of the vertical rod hinges provided with brackets with bearing plates and spacers, which together with rotating spindles ensure the prescribed connection of the assembled element.

Takto navržený montážní rám, který je přídavným zařízením sestavovacího velkoprostorového nosníku pro spínání prostorových dílců, umožňuje beze změny výrobního taktu polohovou stabilizaci sestavovaného dílce ve třech směrech, předepnutí sestavených dílců a injektáž předpínacích kanálků. Manipulace se sestavovanými dílci je snadná, dílce jsou chráněny v rámu proti deformaci a poškozeni povrchů. Rám je lehce přepravovatelný a vícenásobně použitelný. Nemá nároky na skladovací prostor jak na skládkách dílců, tak na výrobní lince. Jeho konstrukce je jednoduchá, realizovatelná s dobrými výsledky i v podmínkách běžných údržbářských dílen.The mounting frame thus designed, which is an additional device of the assembly large-area beam for switching the spatial components, enables positional stabilization of the assembled component in three directions, prestressing of the assembled components and grouting of the biasing channels without changing the production cycle. Handling of assembled parts is easy, the parts are protected in the frame against deformation and damage to surfaces. The frame is easy to transport and reusable. It does not require any storage space both in the landfills of the parts and on the production line. Its construction is simple, feasible with good results even in conditions of common maintenance workshops.

Využití začíná osazením rámu na sestavovaný dílec na skládce. Rám se s dílcem pomocí úložných destiček, upevňovacích přídržníků z čela i z boku stabilně spojí. 2a závěsná oka se jeřábem vyzvedne ze skládky a spolu s dílcem přepraví k sestavovacímu pracovišti. Zde se pomocí jeřábu, v závěsu za závěsná oka osadí na lomené nosníky sestavovacího zařízení prostorových dílců. Pomocí rektifikovateIných dorazových distančníků a otočných přídržníků se upevní k tomuto zařízení. Po kontrole přesnosti osazení se odpojí z jeřábu a zahájí se předpinání. Po dokončení celé operace předpínání a injektáže se montážní rám uvolní nejdříve ze sestavovaného dílce a později pomocí jeřábu z lomených nosníků sestavovacího zařízení.The use begins with the installation of the frame on the assembled part in the landfill. The frame is permanently connected to the panel by means of bearing plates, fastening brackets from the front and side. 2a the lifting eyes are lifted by crane from the dump and transported together with the workpiece to the assembly site. In this case, the crankshaft assemblies of the spatial components are mounted on the angled beams in the hitch behind the lifting eyes. It is fastened to this device by means of rectifiable stop spacers and pivot brackets. After checking the stocking accuracy, it is disconnected from the crane and preloading begins. After completing the entire prestressing and grouting operation, the mounting frame is first released from the assembled member and later by a crane from the kinked beams of the assembling device.

Takto uvolněný montážní rám je připraven k dalšímu použití.The loosened mounting frame is ready for further use.

Příkladné provedení montážního rámu je znázorněno na výkresech kde obr. 1 znázorňuje čelní pohled na montážní rám a obr. 2 představuje boční pohled na sestavu montážního rámu, zavěšeného spolu se sestavovaným dílcem na sestavovacím zařízení prostorových dílců.An exemplary embodiment of a mounting frame is shown in the drawings wherein Fig. 1 shows a front view of the mounting frame and Fig. 2 is a side view of a mounting frame assembly suspended along with the assembled member on the spatial assembly device.

Montážní rám sestává z horního nosníku 6, dolního nosníku 2 a dvou svislých stojek K dolnímu nosníku 2 jsou na jeho obou koncích připojeny svislé tyčové závěsy 10 s osazovacími konzolkaml 11, opatřenými úložnými destičkami 21· je vyztužen dvěma šikmými výztuhami 2 a opatřen závěsnými oky 5 pro zavěšení na jeřáb. Pro stabilizaci vloženého dílce 16 je rám opatřen dvěma otočnými přídržniky 13, dvěma přídržníky s otočnými vřeteny 12 a dvěma sklopnými přídržníky 15. S takto upevněnými vloženými dílci 16 je montážní rám osazen pomocí jeřábu na vysunuté lomené nosníky 2 sestavovacího zařízení 2 prostorových dílců. Pomocí výklopných přídržníků 2 tohoto zařízení a vlastních otočných přídržníků 13 se celá sestava montážního rámu' a sestavovaného dílce 16 dorazí na rektifikovatelnou vzdálenost od dalšího sestavovaného dílce 22· Pomocí výklopného přídržníků 2 a otočného přídržníků 13 se pevně zajistí v poloze potřebné pro další operace.The mounting frame consists of an upper beam 6, a lower beam 2 and two vertical uprights. To the lower beam 2 are attached at its both ends vertical hinges 10 with mounting brackets 11, provided with bearing plates 21, reinforced by two oblique stiffeners 2 and provided with hinge eyes 5 for hanging on a crane. In order to stabilize the intermediate member 16, the frame is provided with two pivotable holders 13, two holders with rotating spindles 12 and two hinged holders 15. With the intermediate members 16 so attached, the mounting frame is mounted by a crane on the extended beams 2 of the space unit assembly 2. With the tilting of the counter support 2 of this rotary apparatus and its own counter support 13, the whole assembly of the mounting frame "compiled by panels 16 and arrives at a further distance from rectificational compiled by components 22 · Using tilting counter support 2 and a rotary counter support 13 is rigidly secured in the position required for the next operation.

Na obr. 2 příkladného provedení montážního rámu je znázorněn boční pohled na tento rám s osazeným sestavovaným dílcem 2®/ který doplňuje další podrobnosti, které nejsou patrné z pbr. 1. Montážní rám, tvořený horním nosníkem 2 s připevněnými závěsnými oky 5, svislými stojkami 2, Ke kterým je připevněn dolní nosník 2 opatřený na koncích svislými tyčovými závěsy 10 s osazovacími konzolkami 11, dovoluje pomocí úložných destiček 14 s dorazovými distančníky 18 osazení příslušného sestavovaného dílce 16 k dalšímu sestavovanému dílci 22· Pomocí sklopných přídržníků 15 a přídržníků s otočnými vřeteny 12 se díleď 16 v rámu upevní v předepsané poloze. Pomocí horního nosníku 2 3e zavěšen na lomené nosníky 2 sestavovacího zařízení 2 prostorových dílců, které již dříve je osazeno na sestavovaný dílec 17 podle technologického předpisu pro sestavování střešních dílců. Dorazový distančník 18 montážního rámu a nárazník 2 sestavovacího zařízení 2 prostorových dílců vymezí vzájemnou polohu obou sestavovaných dílců 16, 12· Pomocí otočných přídržníků 13 montážního rámu a výklopných přídržníků 2 sestavovacího zařízení 2 prostorových dílců se montážní rám stabilizuje ve stanovené poloze.Fig. 2 of an exemplary embodiment of a mounting frame shows a side view of this frame with an assembled assembly 2 ® / which complements other details not seen in FIG. 1. The mounting frame, consisting of an upper beam 2 with hinged eyes 5 attached, vertical uprights 2, to which the lower beam 2 provided with vertical rod hinges 10 with mounting brackets 11, is attached, allows the mounting of the assembled assembly by means of bearing plates 14 with stop spacers. 16 to the next assembled part 22. By means of the tilting holders 15 and the holders with rotating spindles 12, the member 16 is fixed in the frame in the prescribed position. With 2 the upper girder 3 and hinged to two beams refracted equipment set-up space elements 2 which is previously fitted on assembling member 17 by technological regulation for the assembly of roof parts. The stop frame spacer 18 and the bumper 2 of the spatial assembler 2 define the relative position of the two assembled components 16, 12. By rotating the brackets 13 of the mounting frame and the hinged supports 2 of the spatial assembler 2, the mounting frame is stabilized.

Claims (1)

' PŘEDMÉT VYNÁLEZUSUBJECT OF THE INVENTION Montážní rám pro sestavování dodatečně spínaných stavebních železobetonových dílců, sestávající ze dvou stojek, opatřených otočnými přídržníky, z horního nosníku se závěsnými oky a z dolního nosníku se sklopnými přídržníky a vyztužený šikmými výztuhami, vyznačující se tím, že na konce dolního nosníku (7) rámu jsou připojeny svislé tyčové závěsy (10), ukončené osazovacími konzolkami (11), opatřenými úložnými destičkami (14) a dorazovými distančníky (18), spolupracujícími s otočnými vřeteny (12) při zajištování polohy sestavovaného dílce (16)A mounting frame for assembling additionally switched reinforced concrete structural members, consisting of two uprights, provided with pivotable brackets, an upper beam with hinged eyes and a lower beam with hinged brackets and reinforced with oblique stiffeners, characterized in that at the ends of the lower frame beam (7) connected vertical hinges (10), terminated with mounting brackets (11), provided with bearing plates (14) and stop spacers (18), cooperating with rotating spindles (12) in securing the position of the assembled part (16)
CS851155A 1985-02-19 1985-02-19 Mounting Workers CS260908B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS851155A CS260908B1 (en) 1985-02-19 1985-02-19 Mounting Workers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS851155A CS260908B1 (en) 1985-02-19 1985-02-19 Mounting Workers

Publications (2)

Publication Number Publication Date
CS115585A1 CS115585A1 (en) 1988-06-15
CS260908B1 true CS260908B1 (en) 1989-01-12

Family

ID=5345202

Family Applications (1)

Application Number Title Priority Date Filing Date
CS851155A CS260908B1 (en) 1985-02-19 1985-02-19 Mounting Workers

Country Status (1)

Country Link
CS (1) CS260908B1 (en)

Also Published As

Publication number Publication date
CS115585A1 (en) 1988-06-15

Similar Documents

Publication Publication Date Title
EP2893103B1 (en) A panel support bracket
CN112424105B (en) Steel structure composite assembly for lifting equipment
CN210658011U (en) Steel truss arch bridge installation system
KR20210035007A (en) Frame assembly device for building beam
CS260908B1 (en) Mounting Workers
HU198767B (en) Method for assembling the frame of framed high constructions and template framing for carrying out the method
CN109487827B (en) Modular processing and binding method for comprehensive pipe gallery steel reinforcement framework
CN112195802B (en) Variable-section solar-type hollow thin-wall pier reinforcement partition prefabricating jig and partition installation method
JP2931761B2 (en) Fixing device for outer wall material and laminating method for middle and high-rise buildings using the fixing device
CN208500281U (en) The constructing device of prefabricating clear water concrete hanging plate
CN209907886U (en) Adjustable assembled stair construction platform
JPS6243080Y2 (en)
JP2017155489A (en) Construction method of outer wall panel ground frame and outer wall material
JPH0311298Y2 (en)
JPH0874412A (en) Building scaffold and construction method thereof
JP2562398Y2 (en) Orientation fixing fixture
JP2000045297A (en) Construction method of turbine mount
CN217028180U (en) Lattice column positioning device
JPH0712541Y2 (en) Scaffolding equipment
JP3010942U (en) Girder overpass device
CN109518948B (en) Supporting and positioning template device for construction of assembled building beam column joints and application thereof
KR20250135040A (en) Pipe rack module and construction method thereof
SU1728434A1 (en) Device for erecting cast-in-place buildings using panel forms
JPS63125743A (en) Construction of building
SU958632A1 (en) Jig for positioning a structure