CS203246B1 - Lock chamber with the bottom bypass - Google Patents

Lock chamber with the bottom bypass Download PDF

Info

Publication number
CS203246B1
CS203246B1 CS758151A CS815175A CS203246B1 CS 203246 B1 CS203246 B1 CS 203246B1 CS 758151 A CS758151 A CS 758151A CS 815175 A CS815175 A CS 815175A CS 203246 B1 CS203246 B1 CS 203246B1
Authority
CS
Czechoslovakia
Prior art keywords
chamber
parts
articulated
bypasses
lock chamber
Prior art date
Application number
CS758151A
Other languages
Czech (cs)
Slovak (sk)
Inventor
Blahoslav Rusina
Original Assignee
Blahoslav Rusina
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Blahoslav Rusina filed Critical Blahoslav Rusina
Priority to CS758151A priority Critical patent/CS203246B1/en
Publication of CS203246B1 publication Critical patent/CS203246B1/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Foundations (AREA)

Description

Vynález sa týká jednoduchej, dvojitej, připadne i trojítej plavebnej komory s dnovými obtokmi, a to najma komory o velkých podorysných rozměrech, o veíkom spáde a budovanej na podloží z priepustných, nesúdržných zemin.The invention relates to a single, double or even triple lock chamber with bottom bypasses, in particular chambers of large under-ground dimensions, of large gradient and built on a bed of permeable, cohesive soils.

Doteraz sú známe plavebně komory s dnovými obtokmi iba jednoduché a len o středných spádoch. U týchto sa niekedy na priaznivé ovplyvnenie napátia v základovej škáre a v doske dna využívá osobitný stavebný postup a stlačiteínosť podložia, pričom sa vnáša predpátis do doprodá csadensj výstuže hornej časti došky budúceho dna a do spodnej časti došky, v střede komory predbežne prerušenej škárou. V závere stavebných práč sa dobuduje horná časť dna a dobetónuje oddelovacia škára, čím sa doska dna zmonolitní. Takéto plavebně komory s monolitickým dnom majú nevýhodu v tom, že ich dno· je velmi hrubé a obnáša 30 až 50 % šířky komory, pričom má zložitý tvar a zdíhavý stavebný postup, lebo dno třeba robiť v celej šírke, tj. obe strany súčasne, a to na dve etapy, až kým sa zmonolitní. Komora s hrubým monolitickým dnom zle znáša rozdiely v stlačltelnosti podložia. Takáto komora okrem toho vyžaduje hlbokú stavebnú jamu a drahé i zdíhavé zakladanie zvlášť, ak je stavebná jama umele těsněná.So far, lock chambers with bottom bypasses are known to be simple and only moderate. In these cases, sometimes a special construction method and subsoil compression are used to favorably influence the stress in the foundation joint and in the bottom plate, introducing a pre-draft into the additional reinforcement of the top of thatch and the bottom of thatch in the middle of the chamber pre-interrupted. At the end of the construction work, the upper part of the bottom is completed and the separating joint is concreted, thus rendering the bottom plate monolithic. Such monolithic bottom lock chambers have the disadvantage that their bottom is very coarse and amounts to 30 to 50% of the width of the chamber, having a complicated shape and a cumbersome construction process; both sides at the same time, for two stages until they become monolithic. The chamber with a thick monolithic bottom does not tolerate the differences in ground compressibility. Furthermore, such a chamber requires a deep construction pit and expensive and tedious foundation especially if the construction pit is artificially sealed.

Tieto nevýhody odstraňuje plavebná komora s dnovými obtokmi, a to tak jednoduchá ako aj dvojitá, připadne trojitá a budovaná najma na podloží z priepustných a nesúdržných zemin podlá vynálezu, ktorého podstata je v tom, že krajné dnové obtoky, připadne opatřené hoře výtokovými otvormi, umiestnené přibližné do strednej třetiny hrůbky dna, sú odsadené od múrov komory, že doska dna za krajnými obtokami je přerušená na šířku stredného obtoku a má celá oboch jej častí pri oboch jej povrchoch v tomto mieste spojené len vodorovnými pásmi, a to dolným pásom súvislým a horným pásom přerušovanými štrbinami, pričom tieto pásy sú k obom častiam došky trvalo kíbovito připojené a že u dvoch komor umiestnených íesne vedla seba a oddělených od seba pozdížnou dilatačnou škárou, číže u dvojitej komory s pozdížne dilatovaným středným múrom sú obe časti stredného múru najmenej v jednej úrovni spojené súvislým radom vodorovných rozpier, kíbovito připojeným k obom častiam stredného múru.These drawbacks are overcome by the bottom by-pass lock chamber, both single and double, possibly triple, and built in particular on the subsoil of permeable and cohesive soils according to the invention, which is based on the fact that the bottom bottom bypasses or approximately to the middle third of the depth of the bottom, are offset from the walls of the chamber that the bottom plate behind the outer bypasses is interrupted to the width of the middle bypass and has all its parts at both its surfaces connected only by horizontal strips at this point; the strips are intermittent slits, the strips being permanently articulated to both parts of the thatch, and that in two chambers placed at right angles to each other and separated by a longitudinal expansion joint, the two chambers with a longitudinally dilated middle wall are at least one level connected a series of horizontal spacers, articulated to both parts of the middle wall.

Plavebná komora podía vynálezu má viaceré výhody. Rozdělením došky dna na dve časti, spojené potom v mieste stredného obtoku len pásmi, k nej kíbovito připojenými sú v porovnaní s doteraz známými komorami ohybové momenty, normálně sily aleThe navigation chamber of the invention has several advantages. By dividing the bottom thatch into two parts, then joined at the middle bypass only by the bands to which it is articulated, bending moments are compared to the previously known chambers, but normally

203 hlavně priečne sily v doske zmenšené, a to jednak vplyvom prlrodzeného sústredenia napatia v základovej škáre viac k múrom komory a u komory dvojitej so· středným múrom pozdlžne dilatovaným a s oboma časíami múru spojenými radom vodorovných rozpier aj vplyvom malej hrůbky stredného múru a ďalej tiež vplyvom trvalého prerušenia přenosu priečnych sil v mieste stredného obtoku pri zachovaní přenosu normálnych sil vodorovnými pásmi natolko, že sa meze výrazné zmenšit hrúbka dna. Spojením, či rozopretím oboch častí stredného múru pozdlžne dílatovaného rozperami sa súčasne dosiáhne taký přenos sil z jednej, plnej do druhej, prázdnej časti dvojitej komory, že ohybové momenty oboch častí stredného múru budu pri dne přibližné rovnaké a o polovičně) hodnotě, ako bez tohoto spojenia. Přitom sa zmenšia aj priečne sily a súčasne sa urnožnia všetky známe výhody pozdížnej dilatácie a nezávislé sadanie jednotlivých celkov objektu, čo je zvlášť Vy ηΟϋίϊΘ U piaVSbiLGj KOiilOry ΖαΐϋΖΘΠΟ] Για nerovnako stlačiteínom podloží. Přitom sú tieto výhody výraznejšie, ak spojenie oboch častí stredného múru sa urobí až v závere výstavby objektu, po čiastočnom sadnutí objektu. To isté platí aj o spojení došky dna vodorovnými pásmi. Plavebná komora vytvořená podlá vynálezu umožňuje súčasne dobré rozvinúť stavebné práce a postupy, lebo doska dna přerušená v šírke stredného obtoku umožňuje nasadenie stavebných inechanizmov právě v tomto mieste vo vnútri komory a ich pohyb po celej dížke komory. Vodorovné pásy, připojené k čelám došky dna, rnožu sa výhodné prefabrikovat a k doske připojit’ až v závere stavebných práč. úsporný konštrukčný systém komůr pódia vynálezu zhospodárňuje nielen vlastný objekt, ale aj jeho založenie a tým aj urýchluje jeho výstavbu. Obzvlášť výrazná je táto výhoda u plavebnej komory zakladanej na nesúdržných, priepustných zeminách so stavebnou jamou umele utěsněnou tak po bokoch ako aj pod dnom, lebo sa nielen značné zmenší objem zemných a betonářských práce, ale tiež objem injektážnych práč, ktoré sú drahé a zdíhavé.203 mainly transverse forces in the slab reduced, both due to the natural concentration of the stress in the baseline more to the walls of the chamber and to the double chamber with a medium wall longitudinally dilated and connected to the wall by a series of horizontal spans. interruption of the transverse force transmission at the medium bypass point while maintaining the transmission of normal forces through the horizontal bands to such an extent that the limits significantly reduce the bottom thickness. By joining or spreading both parts of the middle wall longitudinally spaced, the transmission of forces from one, full to the other, empty chamber of the double chamber is simultaneously achieved so that the bending moments of both parts of the middle wall will be approximately equal at the bottom and half) . At the same time, the transverse forces are reduced and all known advantages of longitudinal dilatation and independent settling of individual units of the object are multiplied, which is particularly unevenly compressible by the subsoil. At the same time, these advantages are more pronounced if the joining of both parts of the middle wall is done only at the end of the construction of the building, after the building has partially settled. The same applies to joining the thatched bottom with horizontal bands. At the same time, the lock chamber constructed according to the invention allows good development of the construction work and procedures, since the bottom plate interrupted in the width of the middle bypass allows the construction inechanisms to be placed there just inside the chamber and to move them throughout the length of the chamber. The horizontal strips, attached to the ends of thatch bottom, are advantageously prefabricated and attached to the board 'at the end of the construction work. The economical construction system of the chambers according to the invention economizes not only the actual object, but also its foundation and thus accelerates its construction. This advantage is particularly pronounced in a lock chamber based on incoherent, permeable soils with a foundation pit artificially sealed both sideways and underneath, since not only does the volume of earthwork and concreting work significantly decrease, but also the volume of grouting works, which are expensive and time consuming.

Příklad plavebnej komory podlá vynálezu je uvedený na pripcjenom výkrese, kde je vyznačená v priečnom řeze dvojitá plavebná komora so středným múrom rozděleným pozdížnou dilatáciou na dve časti, založená v umele tesnenej stavebnej jame.An example of a lock chamber according to the invention is shown in the accompanying drawing, in which a double lock chamber with a middle wall divided by a lengthwise dilatation into two parts, based on an artificially sealed building pit, is shown in cross section.

Plavebná komora je vytvořená monolitickým spojením došky dna i s bočnými múrmi 2 a so středným múrom 3 rozděleným na dve časti pozdížnou dilatáciou. V doske dna 1 sú vytvořené krajné dnové obtoky 4, připadne opatřené hoře výtokovými otvorϊϊϊι 5), umiestnené přibližné do strednej tře tiny hrůbky dna a sú odsadené od múrov 2, 3 komory. Doska dna 1 je za krajnými obtokmi 4 přerušená v šírke stredného dnového obtoku 9 a má čelá oboch jej častí při oboch jej povrchoch v tomto mieste navzájom spojené len vodorovnými pásmi a to dolným pásom E súvislým a horným pásom 7 přerušovaným výtokovými štrbinami 8, pričom tieto pásy S, 7 sú k obom častiam došky dna 1 trvalo kíbovito připojené a dole i hoře ohraničujú stredný dnový obtokThe lock chamber is formed by a monolithic joining of thatch bottom i with side walls 2 and a middle wall 3 divided into two parts by longitudinal dilatation. Bottom bypasses 4 are formed in the bottom plate 1, optionally provided with upper outflow openings 5), located approximately to the middle third of the bottom depth and are spaced from the walls 2, 3 of the chamber. The bottom plate 1 is interrupted in the width of the middle bottom bypass 9 behind the outer bypasses 4 and has the faces of both its parts at both its surfaces at this point interconnected only by horizontal bands, the lower band E continuous and the upper band 7 intermittent outlet slots 8. the strips S, 7 are permanently articulated to both parts of the thatch bottom 1 and delimit the bottom bottom bypass

9. Obe časti stredného múru 3, pozdlžne dilatovaného, sú v střede jeho výšky navzájom súvislým radom vodorovných rozpier9. The two parts of the central wall 3, longitudinally dilated, are in the middle of its height a continuous row of horizontal spacers

10, 'kíbovito k ním připojených.10, articulated to it.

PREDMETSUBJECT

Claims (2)

PREDMETSUBJECT Plavebná komora s dnovými obtokmi, jednoduchá ako aj dvojitá, připadne trojitá, budovaná najma na podloží z priepustných a nesúdržných zemin, vyznačujúce sa tým, že krajné dnové obtoky (4) sú odsadené od múrov (2, 3) komory, doska dna (1) za krajnými dnovými obtokmi (4) je v střede přerušená na šířku stredného dnového obtoku (9) a má čelá oboch jej častí pri obochDouble-passage lock, single as well as double, or triple, constructed on a bed of permeable and non-cohesive soils, characterized in that the extreme bottom bypasses (4) are spaced from the walls (2, 3) of the chamber, bottom plate (1) ) behind the bottom bypasses (4) is interrupted in the middle to the width of the middle bottom bypass (9) and has faces of both parts at both VYNÁLEZU jej povrchoch spojené len vodorovnými pásmi a to dolným pásom (6) súvislým a horným pásom (7) přerušovaným štrbinami (8), pričom tieto pásy (7, 8) sú k nej připojené kíbovito, a u případného pozdlžne dilatovaného stredného múru (3), sú obe jeho časti najmenej v jednej úrovni spojené súvislým radom vodorovných rozpier (10), kíbovito k nim připojeným.OF THE INVENTION connected to its surfaces only by horizontal strips, namely a lower stripe (6) continuous and an upper stripe (7) interrupted by slits (8), said strips (7, 8) being articulated thereto, and possibly a longitudinally dilated middle wall (3) , the two parts thereof are joined at least at one level by a continuous row of horizontal spacers (10) articulated to them. 1 list výkresov1 sheet of drawings Severografia, n. p., závod 7, Mo^Severography, n. p., Plant 7, Mo ^
CS758151A 1975-12-02 1975-12-02 Lock chamber with the bottom bypass CS203246B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS758151A CS203246B1 (en) 1975-12-02 1975-12-02 Lock chamber with the bottom bypass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS758151A CS203246B1 (en) 1975-12-02 1975-12-02 Lock chamber with the bottom bypass

Publications (1)

Publication Number Publication Date
CS203246B1 true CS203246B1 (en) 1981-02-27

Family

ID=5431706

Family Applications (1)

Application Number Title Priority Date Filing Date
CS758151A CS203246B1 (en) 1975-12-02 1975-12-02 Lock chamber with the bottom bypass

Country Status (1)

Country Link
CS (1) CS203246B1 (en)

Similar Documents

Publication Publication Date Title
EP0413693B1 (en) Reinforced concrete construction for road tunnels
US4982544A (en) Module and method for constructing sealing load-bearing retaining wall
CN104204375A (en) Bracket assemblies and formwork systems for structural elements
EP0322668A1 (en) Building blocks for wall constructions, and wall built with the building blocks
FR2401277A2 (en) SYSTEM OF CONCRETE CONSTRUCTION ELEMENTS FOR ESTABLISHING WALLS THAT CAN BE COVERED WITH PLANTS
US3422626A (en) Soil drainage method
US3656268A (en) Drainage wall system and method of erecting same
CS203246B1 (en) Lock chamber with the bottom bypass
DE2616348C3 (en) Device for trench sheeting
DE197021T1 (en) METHOD OF BUILDING A TUNNEL.
JPS6245809A (en) How to build a dam
DE2030854A1 (en) retaining wall
GB1402259A (en) Building method and structure using prefabricated elements
DE699762C (en) Method and device for creating trench-like construction pits
DE2838210A1 (en) Earth fissure angled support wall construction - involves joining prefabricated sections to protruding shanks rammed into ground
AT317092B (en) Process for the production of a trough arranged in the ground below the groundwater level and for this purpose prefabricated reinforced concrete girders for their production
DE1634531A1 (en) Process for the production of retaining walls using prefabricated concrete walls
SU968151A1 (en) Dam made of locally available materials
GB2062079A (en) Precast Wall Unit for Silage Pit or Tank
DE2803860A1 (en) Horizontally loaded support or free standing wall - has vertical support joined to foot piece protruding beyond outline
DE1058535B (en) Process for the construction of extensive underground spaces, e.g. B. from tunnels or bunkers
DE957739C (en) Method for bracing construction pits
RU2081239C1 (en) Earth dam
SU1268669A1 (en) Earth-fill structure
DE206878C (en)