CN2931675Y - 电解铝用阳极生产厂房的配置结构 - Google Patents

电解铝用阳极生产厂房的配置结构 Download PDF

Info

Publication number
CN2931675Y
CN2931675Y CN 200620200624 CN200620200624U CN2931675Y CN 2931675 Y CN2931675 Y CN 2931675Y CN 200620200624 CN200620200624 CN 200620200624 CN 200620200624 U CN200620200624 U CN 200620200624U CN 2931675 Y CN2931675 Y CN 2931675Y
Authority
CN
China
Prior art keywords
workshop section
anode
work section
workshop
charcoal piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620200624
Other languages
English (en)
Inventor
王时芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN 200620200624 priority Critical patent/CN2931675Y/zh
Application granted granted Critical
Publication of CN2931675Y publication Critical patent/CN2931675Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

本实用新型公开了一种电解铝用阳极生产厂房的配置结构,它包括生阳极制造工段、焙烧工段、炭块转运工段和阳极组装工段,其中的两个工段设置在炭块转运工段的一侧,另一个工段设置在炭块转运工段的另一侧,并分别与炭块转运工段平行,生阳极制造工段、焙烧工段、阳极组装工段、炭块转运工段之间通过连廊相连接。本实用新型具有可减少工厂用地、减小道路铺砌面积和管线铺设长度,使物料可实现连续运输、减少装卸环节,提高运输效率、降低物料损耗和运输成本,大大降低了基建投资和生产运营成本等优点。

Description

电解铝用阳极生产厂房的配置结构
技术领域:
本实用新型涉及一种电解铝用阳极生产厂房的配置结构。
背景技术:
在生产电解铝用阳极中,涉及几个生产工段即:利用石油焦和沥青生产生阳极炭块的生阳极制造工段;将生阳极炭块进行焙烧为熟阳极炭块的焙烧工段;将生阳极炭块和熟阳极炭块进行贮存编组,以利于转运的炭块转运工段;将熟阳极炭块进行加工装配使其成为电解铝用阳极的阳极组装工段。
目前,在配置电解铝用阳极生产厂房时,通常是以炭块转运工段为中心,将生阳极制造工段、焙烧工段及阳极组装工段分别垂直且紧邻在炭块转运工段的两侧布置。此种布置方式由于对工厂的厂区场地大小有一定要求,造成工厂占地面积加大,道路铺砌面积及管线铺设长度加大;物料不能连续运输、装卸环节多,使工段管理复杂、运输效率低、物料损耗加大、运输成本高,最终使工厂企业基建投资增加、生产运营成本上升。
发明内容:
本实用新型的目的在于:提供一种可节约工厂用地、布置灵活、能减少道路铺砌面积和管线铺设长度、缩短物料运输距离,使工段间物料得以连续运输,并可减少装卸环节和物料损耗以降低基建投资和生产运营成本的电解铝用阳极生产厂房的配置结构,以解决现有技术存在的问题。
本实用新型是这样构成的:它包括生阳极制造工段(1)、炭块转运工段(2)、焙烧工段(3)和阳极组装工段(4),生阳极制造工段(1)、焙烧工段(3)、阳极组装工段(4)中的两个工段设置在炭块转运工段(2)的一侧,另一个工段设置在炭块转运工段(2)的另一侧,并且生阳极制造工段(1)、焙烧工段(3)、阳极组装工段(4)分别与炭块转运工段(2)平行,生阳极制造工段(1)、焙烧工段(3)、阳极组装工段(4)、炭块转运工段(2)之间通过连廊(5)相连接。
生阳极制造工段(1)和阳极组装工段(4)设置在炭块转运工段(2)的一侧,焙烧工段(3)设置在炭块转运工段(2)的另一侧。
本实用新型以炭块转运工段为中心,将生阳极制造工段、焙烧工段及阳极组装工段分别平行且紧邻在其两侧布置,这样使得厂房的整体布局较紧凑,对厂区场地要求不高,工段之间的距离减小,其区域用地面积、道路铺砌面积、管线铺设长度比各工段分开布局要节约15%以上,物料可实现连续运输、减少了装卸环节,使工段管理简单、提高了运输效率、降低了物料损耗和运输成本,其运输效率可提高至50%,每吨铝用阳极炭块的装卸费用可节省25~30元,大大降低了基建投资和生产运营成本,经济效益十分明显,而且厂房之间用连廊连接,可以有多种组合方式,车间布置比较灵活机动。
附图说明:
图1为本实用新型的结构示意图。
图2为本实用新型的另一种实施方式的结构示意图;
附图3为本实用新型的又一种实施方式的结构示意图。
具体实施方式:
本实用新型的实施例1:如图1所示,炭块转运工段2位于中央位置,焙烧工段3平行布置在炭块转运工段2一侧,生阳极制造工段1和阳极组装工段4平行布置在炭块转运工段2的另一侧,生阳极制造工段1与炭块转运工段2之间,以及生阳极制造工段1和阳极组装工段4与炭块转运工段2之间分别用连廊5相连接。工段之间的物料运输通过链式或板式输送机完成。
本实用新型的实施例2:如图2所示,当焙烧工段3根据生产需要为两个时,两个焙烧工段3平行布置在炭块转运工段2的一侧,生阳极制造工段1和阳极组装工段4平行布置在炭块转运工段2的另一侧,两个焙烧工段3之间以及生阳极制造工段1和阳极组装工段4与炭块转运工段2之间均通过连廊5相互连接。
本实用新型的实施例3:如图3所示,当生阳极制造工段1和焙烧工段3根据生产需要均为两个时,两个焙烧工段3平行布置在炭块转运工段2的一侧,两个生阳极制造工段1和阳极组装工段4平行布置在炭块转运工段2的另一侧,两个生阳极制造工段1和阳极组装工段4与炭块转运工段2之间,以及两个焙烧工段3之间均通过连廊5相互连接。
上述中平行布置的焙烧工段3之间的距离在设置时需要满足布置焙烧烟气净化处理设施、供配电设施及其它辅助设施、道路、管线布局的要求以及消防安全要求,其最佳的厂房间距为78~84m。平行布置的生阳极制造工段1及阳极组装工段4之间的距离,应满足供配电系统及辅助生产设施、道路、管线的布局要求以及消防安全的要求。

Claims (2)

1.一种电解铝用阳极生产厂房的配置结构,它包括生阳极制造工段(1)、炭块转运工段(2)、焙烧工段(3)和阳极组装工段(4),其特征在于:生阳极制造工段(1)、焙烧工段(3)、阳极组装工段(4)中的两个工段设置在炭块转运工段(2)的一侧,另一个工段设置在炭块转运工段(2)的另一侧,并且生阳极制造工段(1)、焙烧工段(3)、阳极组装工段(4)分别与炭块转运工段(2)平行,生阳极制造工段(1)、焙烧工段(3)、阳极组装工段(4)、炭块转运工段(2)之间通过连廊(5)相连接。
2.根据权利要求1所述的电解铝用阳极生产厂房的配置结构,其特征在于:生阳极制造工段(1)和阳极组装工段(4)设置在炭块转运工段(2)的一侧,焙烧工段(3)设置在炭块转运工段(2)的另一侧。
CN 200620200624 2006-07-17 2006-07-17 电解铝用阳极生产厂房的配置结构 Expired - Fee Related CN2931675Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620200624 CN2931675Y (zh) 2006-07-17 2006-07-17 电解铝用阳极生产厂房的配置结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620200624 CN2931675Y (zh) 2006-07-17 2006-07-17 电解铝用阳极生产厂房的配置结构

Publications (1)

Publication Number Publication Date
CN2931675Y true CN2931675Y (zh) 2007-08-08

Family

ID=38348175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620200624 Expired - Fee Related CN2931675Y (zh) 2006-07-17 2006-07-17 电解铝用阳极生产厂房的配置结构

Country Status (1)

Country Link
CN (1) CN2931675Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101391763B (zh) * 2007-09-20 2010-12-08 贵阳铝镁设计研究院 以链式输送机串接的炭素厂焙烧系统配置方式
CN102943577A (zh) * 2012-11-01 2013-02-27 中国瑞林工程技术有限公司 “双闪”铜冶炼厂的总平面布置
CN106315169A (zh) * 2015-06-24 2017-01-11 沈阳铝镁设计研究院有限公司 一种阳极炭块悬链输送系统

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101391763B (zh) * 2007-09-20 2010-12-08 贵阳铝镁设计研究院 以链式输送机串接的炭素厂焙烧系统配置方式
CN102943577A (zh) * 2012-11-01 2013-02-27 中国瑞林工程技术有限公司 “双闪”铜冶炼厂的总平面布置
CN102943577B (zh) * 2012-11-01 2014-07-09 中国瑞林工程技术有限公司 一种“双闪”铜冶炼厂配置方法
CN106315169A (zh) * 2015-06-24 2017-01-11 沈阳铝镁设计研究院有限公司 一种阳极炭块悬链输送系统
CN106315169B (zh) * 2015-06-24 2018-11-27 沈阳铝镁设计研究院有限公司 一种阳极炭块悬链输送系统

Similar Documents

Publication Publication Date Title
CN203111979U (zh) 一种刮板输送机中部槽
CN2931675Y (zh) 电解铝用阳极生产厂房的配置结构
CN101786539A (zh) 一种管桩生产输送链
CN2809101Y (zh) 原材料仓库与加工车间及成品堆场的配置结构
CN201144528Y (zh) 阳极焙烧车间与炭块库的配置结构
CN100362138C (zh) 电解铝用阳极炭块生产组合厂房的配置方法
CN216808564U (zh) 一种新型光伏压延玻璃生产线
CN101451401B (zh) 阳极厂炭块转运站与阳极焙烧车间的配置结构
CN101391763B (zh) 以链式输送机串接的炭素厂焙烧系统配置方式
CN103587540B (zh) 一种可转换载荷分配的大吨位移运台车
CN2782638Y (zh) 阳极碳块堆垛天车
CN1172942A (zh) 移动式隧道窑及采用该隧道窑生产粘土制品的工艺布局
CN2890242Y (zh) 电解车间与铸造车间组合厂房的配置结构
CN203359551U (zh) 一种电解铝工业阳极生产厂中石油焦原料输送装置
CN2893064Y (zh) 电解铝厂简易阳极组装车间与电解厂房的布局结构
CN212842945U (zh) 一种碳素罐式煅烧炉双向下料小车
CN206300469U (zh) 一种矿热炉系统
CN201206168Y (zh) 一种生阳极制造系统的配置结构
CN201334526Y (zh) 一种电解车间与铸造车间的布置结构
CN106315169A (zh) 一种阳极炭块悬链输送系统
CN101463664A (zh) 焙烧及炭块库配置方式
CN2908678Y (zh) 阳极厂焙烧厂房与烟气净化装置的布局结构
CN212538748U (zh) 一种节能环保型双层陶瓷气烧辊道窑
CN202175558U (zh) 系列化阳极煅烧制造系统的配置结构
CN201121424Y (zh) 铝厂加工氢氧化铝的组合式厂房结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110523

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY

TR01 Transfer of patent right

Effective date of registration: 20110523

Address after: 550081 2 Jin Zhu Road, Jinyang New District, Guiyang

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070808

Termination date: 20130717