CN102943577B - 一种“双闪”铜冶炼厂配置方法 - Google Patents

一种“双闪”铜冶炼厂配置方法 Download PDF

Info

Publication number
CN102943577B
CN102943577B CN201210427685.9A CN201210427685A CN102943577B CN 102943577 B CN102943577 B CN 102943577B CN 201210427685 A CN201210427685 A CN 201210427685A CN 102943577 B CN102943577 B CN 102943577B
Authority
CN
China
Prior art keywords
smelting
area
zone
transport
functional areas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210427685.9A
Other languages
English (en)
Other versions
CN102943577A (zh
Inventor
梁晓文
曾小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ruim engineering technology Limited by Share Ltd
Jinguan Copper Industry Branch of Tongling Nonferrous Metals Group Holding Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN201210427685.9A priority Critical patent/CN102943577B/zh
Publication of CN102943577A publication Critical patent/CN102943577A/zh
Application granted granted Critical
Publication of CN102943577B publication Critical patent/CN102943577B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

一种以采用闪速熔炼、闪速吹炼(即“双闪”)为冶炼工艺的铜冶炼厂功能区的总平面配置,它是将冶炼厂辅助区、熔炼区、电解区、制酸区、渣选区按一定规律布置,并与环绕这些功能区的外围厂内道路共同形成如“囸”字型配置。辅助区紧邻能源、动力、辅助材料需求最大的熔炼区和电解区;熔炼区与电解区、制酸区、渣选区之间的内部物料采用道路运输和管道输送方式,沿“正”字笔画流动;铜精矿、阴极铜、硫酸、选矿渣等原料和产品的外部运输沿外围厂内道路“口”字边框运动,不与内部物料运输线路交叉。此方法工厂功能分区清晰明确,能源、动力输送损耗小,内部物料运输线路短捷顺畅,外部物料运输交通安全,可以降低企业运营成本。

Description

一种“双闪”铜冶炼厂配置方法
技术领域
本发明属于工业企业平面配置技术领域,涉及一种大型铜冶炼厂的总平面配置方法。
背景技术
近年来高铜价刺激了全球铜产能的迅速上升,新建铜冶炼厂不断涌现。与之相对应的是铜加工费日益削减,利润越来越薄。许多新建铜冶炼厂采用当今世界最先进技术之一的闪速熔炼、闪速吹炼(即“双闪”)铜精矿冶炼工艺,提高自动化程度和走规模化道路,以此增加企业利润。而工厂大型化后,易造成工厂功能分区混乱,厂内供电、供氧、供气等输送距离加大,增加途中损耗,内部物料运输距离长、运输线路相互交叉,与外部物料运输冲突造成安全隐患,从而造成运营成本上升,消减企业利润。
发明内容
本发明的目的是提供一种采用“双闪”冶炼工艺的大型铜冶炼厂配置的新方法,克服大型冶炼厂常有的功能分区紊乱,供电、供氧、供气线路损耗大,内部、外部物料运输线路交叉冲突的缺点。
一种“双闪”铜冶炼厂配置方法,其特征在于:电解区和制酸区平行布置,两个功能区置于熔炼区一侧,平行熔炼区和电解区的一侧布置辅助区,平行熔炼区和制酸区的另一侧布置渣选区,外围厂内道路将以上五个功能区环绕包围,共同形成如“囸”字型配置。
本发明的“双闪”铜冶炼厂配置方法,辅助区紧邻能源、动力、辅助材料需求最大的熔炼区和电解区;熔炼区与电解区之间的内部物料主要采用道路运输;熔炼区与制酸区之间的内部物料主要采用管道运输;熔炼区与渣选区之间的内部物料主要采用道路运输。
本发明的“双闪”铜冶炼厂配置方法,内部物料运输沿“正”字笔画流动,原料和产品的外部运输沿外围厂内道路“口”字边框运动。
本发明的“双闪”铜冶炼厂配置方法具有如下优点:工厂功能分区清晰明确,便于企业生产活动中分工段管理、考核;能源、动力供应靠近主要负荷中心,输送过程中损耗小;内部物料运输有相对固定、独立的运输线路,运输线路短捷顺畅;外部物料运输线路不与内部物料运输线路交叉,降低生产事故发生几率;进而达到降低企业运营成本的目的。
附图说明
图1为本发明的“双闪”铜冶炼厂配置示意图。
具体实施方式
下面详细说明本发明的实施例:
本发明实例及附图所描述的是示例性的,仅用于解释本发明,而不能理解为对本发明的限制。本发明描述中,需要理解的是,术语“东”、“南”、“西”、“北”等指示方位和位置关系是基于上述实例及附图所示的方位和位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示功能区必须具有特定方位或位置,因此不能理解为对本发明的限制。
本发明的实施例:电解区和制酸区平行布置,其中电解区位于北面,制酸区居南侧;此两个功能区的西面布置熔炼区;熔炼区和电解区的北侧布置辅助区;熔炼区和制酸区的南侧布置渣选区;外围厂内道路将以上五个功能区环绕包围,共同形成如“囸”字型配置。
本发明的“双闪”铜冶炼厂配置方法,其辅助区含电力供应、氧气供应、压缩空气供应、辅助材料供应及其他生产设备设施。
本发明的“双闪”铜冶炼厂配置方法,其熔炼区含原料预处理、闪速熔炼、闪速吹炼、阳极精炼、烟气处理、冰铜处理及其他生产设备设施。
本发明的“双闪”铜冶炼厂配置方法,其电解区含电解、电解液净化及其他生产设备设施。
本发明的“双闪”铜冶炼厂配置方法,其制酸区含烟气净化、烟气干吸、烟气转化及其他生产设备设施。
本发明的“双闪”铜冶炼厂配置方法,其渣选区含炉渣缓冷、破碎、磨浮、压滤及其他生产设备设施。
本发明的“双闪”铜冶炼厂配置方法,辅助区紧邻能源、动力、辅助材料需求最大的熔炼区和电解区;熔炼区与电解区、制酸区、渣选区之间的内部物料采用道路运输和管道输送方式,沿“正”字笔画流动;铜精矿、阴极铜、硫酸、选矿渣等原料和产品的外部运输沿外围厂内道路“口”字边框运动,不与内部物料运输线路交叉。此方法工厂功能分区清晰明确,能源、动力输送损耗小,内部物料运输线路短捷顺畅,外部物料运输交通安全,可以降低企业运营成本,尤其适用于以铜精矿为原料的阴极铜年产量不小于30万吨的大型铜冶炼厂平面配置。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下做出若干等同替代或明显变型,而且性能或用途相同,则应当视为属于本发明所提交的权利要求书确定的保护范围。

Claims (3)

1.一种“双闪”铜冶炼厂配置方法,其特征在于:电解区和制酸区平行布置,两个功能区置于熔炼区一侧,平行熔炼区和电解区的一侧布置辅助区,平行熔炼区和制酸区的另一侧布置渣选区,外围厂内道路将以上五个功能区环绕包围,共同形成如“囸”字型配置。
2.根据权利要求1所述的“双闪”铜冶炼厂配置方法,其特征在于:辅助区紧邻能源、动力、辅助材料需求最大的熔炼区和电解区;熔炼区与电解区之间的内部物料主要采用道路运输;熔炼区与制酸区之间的内部物料主要采用管道运输;熔炼区与渣选区之间的内部物料主要采用道路运输。
3.根据权利要求1或2所述的“双闪”铜冶炼厂配置方法,其特征在于:内部物料运输沿“正”字笔画流动,原料和产品的外部运输沿外围厂内道路“口”字边框运动。
CN201210427685.9A 2012-11-01 2012-11-01 一种“双闪”铜冶炼厂配置方法 Active CN102943577B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210427685.9A CN102943577B (zh) 2012-11-01 2012-11-01 一种“双闪”铜冶炼厂配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210427685.9A CN102943577B (zh) 2012-11-01 2012-11-01 一种“双闪”铜冶炼厂配置方法

Publications (2)

Publication Number Publication Date
CN102943577A CN102943577A (zh) 2013-02-27
CN102943577B true CN102943577B (zh) 2014-07-09

Family

ID=47726556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210427685.9A Active CN102943577B (zh) 2012-11-01 2012-11-01 一种“双闪”铜冶炼厂配置方法

Country Status (1)

Country Link
CN (1) CN102943577B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2931675Y (zh) * 2006-07-17 2007-08-08 贵阳铝镁设计研究院 电解铝用阳极生产厂房的配置结构
UA80526C2 (en) * 2000-03-24 2007-10-10 Pechiney Aluminium Location mode for plants of an electrolysis industrial enterprise for aluminium producing
CN101392604A (zh) * 2007-09-20 2009-03-25 贵阳铝镁设计研究院 系列化布局的电解铝厂配置形式
US7901616B2 (en) * 2004-03-17 2011-03-08 Technological Resources Pty. Limited Method of building a direct smelting plant
CN102206834A (zh) * 2011-05-03 2011-10-05 四川省尼科国润新材料有限公司 一种用低冰镍直接生产电解镍的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
UA80526C2 (en) * 2000-03-24 2007-10-10 Pechiney Aluminium Location mode for plants of an electrolysis industrial enterprise for aluminium producing
US7901616B2 (en) * 2004-03-17 2011-03-08 Technological Resources Pty. Limited Method of building a direct smelting plant
CN2931675Y (zh) * 2006-07-17 2007-08-08 贵阳铝镁设计研究院 电解铝用阳极生产厂房的配置结构
CN101392604A (zh) * 2007-09-20 2009-03-25 贵阳铝镁设计研究院 系列化布局的电解铝厂配置形式
CN102206834A (zh) * 2011-05-03 2011-10-05 四川省尼科国润新材料有限公司 一种用低冰镍直接生产电解镍的方法

Also Published As

Publication number Publication date
CN102943577A (zh) 2013-02-27

Similar Documents

Publication Publication Date Title
Wang et al. The current status of heavy metal pollution and treatment technology development in China
CN102943577B (zh) 一种“双闪”铜冶炼厂配置方法
Bertau et al. Integrated direct carbonation process for lithium recovery from primary and secondary resources
CN104878410A (zh) 电解铝残极结壳料综合回收利用方法
CN203253505U (zh) 高效环保细碎电石制备系统
CN202766313U (zh) 一种能同时处理电石渣和废硫酸的生产装置
CN204809334U (zh) 一种生产锂离子电池用低温电解液设备
CN206127286U (zh) 一种动物细胞分离器
CN207952335U (zh) 冲裁模具的夹料装置
CN201960407U (zh) 热连轧飞剪剪切热检双重控制结构
CN204535370U (zh) 铁芯网带烘烤炉
CN110142129A (zh) 一种无线自动控制破碎输送系统
CN205188348U (zh) 正火炉用推拉料装置
CN205308548U (zh) 一种从铁矿中提取铁精粉的装置
CN204063990U (zh) 焙烧炉简易防尘器
CN202137851U (zh) 一种块出料槽
CN103133853A (zh) 一种新型钛合金复合管
CN203244904U (zh) 一种再生胶生产尾气吸收系统
CN203631266U (zh) 一种变压器铁芯芯柱硅钢片的结构
CN203635306U (zh) 立磨选粉机的新型转子
CN103482033B (zh) 一种破冰船
CN213680251U (zh) 一种稀土冶炼氨皂化工艺中氨的综合利用装置
CN205313641U (zh) 一种从黄铜中提取纯锌的设备
CN202555339U (zh) 一种薯类淀粉生产二级粉碎装置
CN203253516U (zh) 一种循环式破碎设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JINGUAN COPPER INDUSTRY BRANCH OF TONGLING NONFERR

Effective date: 20141230

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liang Xiaowen

Inventor after: Zhou Jun

Inventor after: Zeng Xiaoping

Inventor after: Chai Manlin

Inventor before: Liang Xiaowen

Inventor before: Zeng Xiaoping

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIANG XIAOWEN CENG XIAOPING TO: LIANG XIAOWEN ZHOU JUN CENG XIAOPING CHAI MANLIN

TR01 Transfer of patent right

Effective date of registration: 20141230

Address after: 330063 Jiangxi city of Nanchang province Hongjiaozhou Lake Road No. 888

Patentee after: China Nerin Engineering Co., Ltd.

Patentee after: JINGUAN COPPER INDUSTRY BRANCH OF TONGLING NONFERROUS METALS GROUP HOLDING CO., LTD.

Address before: 330063 Jiangxi city of Nanchang province Hongjiaozhou Lake Road No. 888

Patentee before: China Nerin Engineering Co., Ltd.

CP03 Change of name, title or address

Address after: 330031 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Co-patentee after: JINGUAN COPPER INDUSTRY BRANCH OF TONGLING NONFERROUS METALS GROUP HOLDING CO., LTD.

Patentee after: China ruim engineering technology Limited by Share Ltd

Address before: 330063 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Co-patentee before: JINGUAN COPPER INDUSTRY BRANCH OF TONGLING NONFERROUS METALS GROUP HOLDING CO., LTD.

Patentee before: China Nerin Engineering Co., Ltd.

CP03 Change of name, title or address