CN2930035Y - 330kVJG1型铁塔中相跳线引流装置 - Google Patents

330kVJG1型铁塔中相跳线引流装置 Download PDF

Info

Publication number
CN2930035Y
CN2930035Y CN 200620079208 CN200620079208U CN2930035Y CN 2930035 Y CN2930035 Y CN 2930035Y CN 200620079208 CN200620079208 CN 200620079208 CN 200620079208 U CN200620079208 U CN 200620079208U CN 2930035 Y CN2930035 Y CN 2930035Y
Authority
CN
China
Prior art keywords
wire
steel tower
middle phase
330kvjg1
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620079208
Other languages
English (en)
Inventor
曾桐福
雒国栋
董波
范起鹏
李栎
漆柏林
张玉刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAIYIN POWER SUPPLY Co OF GANSU ELECTRIC POWER Co
Original Assignee
BAIYIN POWER SUPPLY Co OF GANSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAIYIN POWER SUPPLY Co OF GANSU ELECTRIC POWER Co filed Critical BAIYIN POWER SUPPLY Co OF GANSU ELECTRIC POWER Co
Priority to CN 200620079208 priority Critical patent/CN2930035Y/zh
Application granted granted Critical
Publication of CN2930035Y publication Critical patent/CN2930035Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型涉及架空电力输送线路,特别是一种330kVJG1型铁塔中相跳线引流装置,它包括铁塔本体,铁塔地线横担,线路绝缘子串,跳线用绝缘子串,线路导线,中相引流导线,中相引流导线的两根导线之间装有间隔棒,其特征在于:该引流装置装有两串跳线用绝缘子串,铁塔地线横担的末端固装有跳线支架,跳线支架的两端分别安装有第一跳线用绝缘子串和第二跳线用绝缘子串,中相引流导线与两个跳线用绝缘子串串接后与线路导线相连接。本实用新型适用于电力系统220kV~330kV输电线路同类型铁塔,它实施容易,成本低廉,能够避免放电造成的线路跳闸事故,保证电网安全、可靠运行,确保安全稳定供电。

Description

330kVJG1型铁塔中相跳线引流装置
技术领域  本实用新型涉及架空电力输送线路,特别是330kVJG1型铁塔中相跳线引流装置。
背景技术  目前,国内330kV架空输电线路耐张铁塔普遍使用83系列和84系列JG型铁塔。这些铁塔在运行过程中逐渐暴露出本身存在着的许多问题和不足,不能够满足线路安全运行的需要。经调查研究发现。目前,架空输电线路上普遍投运的330kV84系列和83系列JG1型铁塔引流结构不合理,其一是横担长度过小,引流与塔身空气间隙过小;其二是中相引流装置采用单串,重量轻;两者的综合作用,导致在大风作用下引流装置容易摆动,且摆动幅度较大,使得导线引流装置对塔身的空气间隙急剧减小,很容易发生放电,造成设备故障。我公司2002年以前投运的330kV输电线路,先后多次在JG1转角塔上发生由于大风引起的中相引流跳线串对塔身放电造成线路跳闸,给输电线路安全稳定运行造成极大影响。如何保证输电线路安全运行,消除意外停电给用户造成的不必要损失,成为急需解决的重大生产难题。本公司成立了攻关小组,通过对JG1型铁塔存在的局部结构性缺陷进行彻底的技术改造,经过多次反复实验,终于解决了这一技术问题。
实用新型内容  本实用新型的目的在于提供一种330kVJG1型铁塔中相跳线引流装置,该引流装置能够避免放电造成的线路跳闸事故,保证电网安全、可靠运行,确保安全稳定供电。
为了实现所述目的,本实用新型采取的技术方案如下:一种330kVJG1型铁塔中相跳线引流装置,包括铁塔本体,铁塔地线横担,线路绝缘子串,跳线用绝缘子串,线路导线,中相引流导线,中相引流导线的两根导线之间装有间隔棒,其特征在于:跳线用绝缘子串是两串,铁塔地线横担的末端固装有跳线支架,跳线支架的两端分别安装有第一跳线用绝缘子串和第二跳线用绝缘子串,中相引流导线与两个跳线用绝缘子串串接后与线路导线相连接。
铁塔地线横担长度最好在5.6米左右。
本实用新型在保证330kVJG1型铁塔技术设计条件不变的前提下,对JG1塔内角侧地线横担进行局部改造,将中相跳线引流的跳线串由原来的单串绝缘子悬挂改为双串绝缘子悬挂,加装中相导线跳线支架,取消原跳线中间的加重铁棒,同时横担长度也得以加长,即跳线距离加长,从原来的3.8米改为5.6米左右,使引流装置对铁塔横担的放电距离增大,空气间隙大幅度的得到了增加。增大了引流与塔身的空气间隙,确保大风情况下引流与塔身的安全距离,杜绝了由于跳线水平摆动与塔身距离不够而造成对杆塔横担放电而引发事故。
以前,大风引起中相跳线引流对杆塔横担放电而造成线路跳闸后,每次组织线路运行人员进行巡线查处故障及组织检修人员消除,巡线查处和检修人员的差费、车辆台班费及材料费每次都在万元以上。故障严重时,还会引起线路长时间的停电,对一条330kV联络输电线路,线路输送容量为60万千伏安,如果由于中相跳线引流对杆塔横担放电被迫停用10小时,将损失电量600万千瓦。而改造一个基塔只需费用约2万余元,可见实施本实用新型投入产出比较高。
本实用新型在本公司进行了试验,现已进入推广,实践证明实施容易,成本低廉。它为输电线路的安全、稳定、经济运行提供了很好的保障,极大的减少了线路的跳闸次数和停电时间,为线路安全运行奠定了良好的基础。本实用新型适用于电力系统220kV~330kV输电线路同类型铁塔。
附图说明  附图是本实用新型的结构示意图。
图中:1-铁塔本体,2-铁塔地线横担,3-线路绝缘子串,4-线路导线,5-中相引流导线,6-跳线支架,7-第一跳线用绝缘子串,8-第二跳线用绝缘子串,9-间隔棒,L-铁塔地线横担的长度(跳线宽度)。
具体实施方式  如图所示:一种330kVJG1型铁塔中相跳线引流装置,由铁塔本体1,铁塔地线横担2,线路绝缘子串3,两个跳线用绝缘子串7和8,线路导线4,中相引流导线5,中相引流导线5的两根导线之间装有间隔棒9;铁塔地线横担2的末端固装有跳线支架6,跳线支架6的两端分别安装有第一跳线用绝缘子串7和第二跳线用绝缘子串8,中相引流导线5与两个跳线用绝缘子串7和8串接后与线路导线4相连接。铁塔地线横担2的长度L,即跳线宽度是5.6米,既可保证铁塔地线横担2的刚度与强度,又可保证大风情况下引流与塔身的安全距离。

Claims (2)

1、一种330kVJG1型铁塔中相跳线引流装置,包括铁塔本体,铁塔地线横担,线路绝缘子串,跳线用绝缘子串,线路导线,中相引流导线,中相引流导线的两根导线之间装有间隔棒,其特征在于:该引流装置装有两串所述跳线用绝缘子串(7、8),所述铁塔地线横担(2)的末端固装有跳线支架(6),所述跳线支架(6)的两端分别安装有所述第一跳线用绝缘子串(7)和所述第二跳线用绝缘子串(8),所述中相引流导线(5)与所述两个跳线用绝缘子串(7、8)串接后与所述线路导线(4)相连接。
2、如权利要求1所述的一种330kVJG1型铁塔中相跳线引流装置,其特征在于:所述铁塔地线横担(2)的长度(L)是5.6米。
CN 200620079208 2006-06-15 2006-06-15 330kVJG1型铁塔中相跳线引流装置 Expired - Fee Related CN2930035Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620079208 CN2930035Y (zh) 2006-06-15 2006-06-15 330kVJG1型铁塔中相跳线引流装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620079208 CN2930035Y (zh) 2006-06-15 2006-06-15 330kVJG1型铁塔中相跳线引流装置

Publications (1)

Publication Number Publication Date
CN2930035Y true CN2930035Y (zh) 2007-08-01

Family

ID=38308407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620079208 Expired - Fee Related CN2930035Y (zh) 2006-06-15 2006-06-15 330kVJG1型铁塔中相跳线引流装置

Country Status (1)

Country Link
CN (1) CN2930035Y (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882767A (zh) * 2010-04-15 2010-11-10 河南省电力公司信阳供电公司 高压架空线路的架线方法
WO2011029311A1 (zh) * 2009-09-08 2011-03-17 国网电力科学研究院 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN102185267A (zh) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 66kv地电位带电断接引流方法
CN102185266A (zh) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 66kV送电线路大截面导线带电断接引方法
CN102751687A (zh) * 2012-07-12 2012-10-24 国核电力规划设计研究院 一种高压交流线路耐张塔引流金具
CN103346517A (zh) * 2013-07-17 2013-10-09 国家电网公司 输电线路复导线引流方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011029311A1 (zh) * 2009-09-08 2011-03-17 国网电力科学研究院 一种复合材料杆塔外侧竖直接地引下方法及其杆塔
CN101882767A (zh) * 2010-04-15 2010-11-10 河南省电力公司信阳供电公司 高压架空线路的架线方法
CN101882767B (zh) * 2010-04-15 2013-01-23 河南省电力公司信阳供电公司 高压架空线路的架线方法
CN102185267A (zh) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 66kv地电位带电断接引流方法
CN102185266A (zh) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 66kV送电线路大截面导线带电断接引方法
CN102185267B (zh) * 2011-05-13 2013-03-27 辽宁省电力有限公司辽阳供电公司 66kv地电位带电断接引流方法
CN102751687A (zh) * 2012-07-12 2012-10-24 国核电力规划设计研究院 一种高压交流线路耐张塔引流金具
CN102751687B (zh) * 2012-07-12 2015-04-15 国核电力规划设计研究院 一种高压交流线路耐张塔引流金具
CN103346517A (zh) * 2013-07-17 2013-10-09 国家电网公司 输电线路复导线引流方法
CN103346517B (zh) * 2013-07-17 2016-02-03 国家电网公司 输电线路复导线引流方法

Similar Documents

Publication Publication Date Title
CN2930035Y (zh) 330kVJG1型铁塔中相跳线引流装置
CN203734209U (zh) 电缆旁路带电作业装置
CN204835226U (zh) 一个半断路器接线配成两个完整串的线路布置结构
CN101752806A (zh) 可带电更换220kV双分裂导线耐张绝缘子的联板及方法
CN206490408U (zh) 一种地线连接双保险装置
CN205646747U (zh) 一种±800千伏直流线路避雷器安装装置
CN201490354U (zh) 单芯高压电缆金属护套接地系统
CN201502207U (zh) 架空线路高压塔杆
CN203166397U (zh) 一种消除感应电压的电路结构
CN201008028Y (zh) 鼠笼式刚性跳线装置
CN203481755U (zh) 一种35kV架空输电线路跳线托架
CN102570482A (zh) 一种基于中性点直接接地的高压并联电容器装置
CN201444578U (zh) 变压器避雷保护装置
CN203012211U (zh) 一种带隔离底座的光缆交接箱
CN105762753A (zh) 一种±800千伏直流线路避雷器安装装置及方法
CN202435030U (zh) 一种特高压换流站平波电抗器间连接结构
CN201549854U (zh) 导线间绝缘支撑装置
CN201075365Y (zh) 用户分界负荷开关
CN202797849U (zh) 电缆线与架空线的连接装置
CN103474933B (zh) 一种35kV架空输电线路跳线托架
CN202455022U (zh) 网砼杆防雷保护装置
CN220367356U (zh) 一种一二次融合断路器安装相序正确性检测装置
CN102904243A (zh) 中性点分散接地式两端直流双极输电系统
CN204668945U (zh) 特高压串补系统
CN2759023Y (zh) 一种组合式接地电阻装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070801

Termination date: 20100615