CN103346517A - 输电线路复导线引流方法 - Google Patents
输电线路复导线引流方法 Download PDFInfo
- Publication number
- CN103346517A CN103346517A CN2013102994089A CN201310299408A CN103346517A CN 103346517 A CN103346517 A CN 103346517A CN 2013102994089 A CN2013102994089 A CN 2013102994089A CN 201310299408 A CN201310299408 A CN 201310299408A CN 103346517 A CN103346517 A CN 103346517A
- Authority
- CN
- China
- Prior art keywords
- drainage
- line
- connecting plate
- install
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Insulators (AREA)
Abstract
本发明涉及一种输电线路复导线引流方法,它包括以下步骤:①将#1线引流和#2线引流的两端分别压上连板;②将两根引流平行摆放并保持两侧均匀,取两根引流的中心部分安装间隔棒,安装牢固后,在两根引流两侧的连板根部位置处各安装一个间隔棒,然后在连板与引流的中心处之间再分别安装一个间隔棒;③把#1线引流通过连板与拐形连板相连;④复导线引流组装完毕后进行塔上安装;⑤将#1线引流通过拐形连板与#1线对接。本发明由于将两根引流平行摆放并保持两侧均匀,取其中心部分安装间隔棒,使两根引流通过一根粗螺丝,相当于轴心支撑得到绞力互补,相互吸收,从而达到两根引流平行在一条线上,不会造成七扭八歪的现象。
Description
技术领域
本发明涉及输电线路复导线引流方法。
背景技术
现有技术中复导线由上下两根导线组成并分别称之为#1线和#2线,每根复导线连接的引流分别称之为#1线引流和#2线引流,两根引流间的距离由引流间隔棒控制。但是这种方法存在以下问题:①复导线引流由于所安装的位置、角度及向下的弧垂不同而导致两根引流长短不齐,外观异常。②同时由于现有的复导线引流间隔棒之间的间距宽为200mm,用两个细螺丝各自控制各自的引流。由于螺丝的松紧产生的压力不同两根引流释放的扭绞力不同,导致两根引流各自按照各自的扭绞力方向拱出弧度,并不能互相补偿绞力,并产生了形象各异的效果,导致外观不规范不整齐,角度不一致不同步,施工不标准不整齐。③由于两根引流的中心点间距200mm,加上两个引流半径加上由不同绞力所向外拱出的不确定部分,占据的空气间隙不可轻视,对于线路的施工、运行、检修、都存在着严重的安全隐患,运行不安全不方便。
发明内容
本发明要解决的技术问题是提供一种输电线路复导线引流方法,该方法提高了电力线路形象和质量,线路运行安全,检修方便。
为了解决现有技术存在的问题,本发明采用的方案是:
输电线路复导线引流方法,包括以下步骤:
①取两根平直同步长度相同的导线作为#1线引流和#2线引流,将#1线引流和#2线引流的两端分别压上连板;
②将两根引流平行摆放并保持两侧均匀,取两根引流的中心部分安装间隔棒,安装牢固后,在两根引流两侧的连板根部位置处各安装一个间隔棒,然后在连板与引流的中心处之间再分别安装一个间隔棒;
③把#1线引流通过连板与拐形连板相连;
④复导线引流组装完毕后进行塔上安装:
两名作业人员带绳索同时进入到塔上两侧安装位置后,地面人员用绳将组装好的引流绑好并拉至安装位置,两侧的#2线引流直接与#2线对接;
⑤#2线引流安装结束后,将#1线引流通过拐形连板与#1线对接。
所述的方法还包括下述步骤:
安装旋转式吊串绝缘子:
将旋转式吊串绝缘子下端的金属连接件与复导线引流中心点上的间隔棒上的螺栓露出部分旋转对接,将旋转式吊串绝缘子上端的U型挂板安装在铁塔横担中间的U型螺栓中,安装后的吊串不能转动只能向线路横向摆动,通过旋转式吊串绝缘子控制向塔身倾斜的引流。
本发明所具有的优点与效果是:
本发明由于将两根引流即#1线引流和#2线引流平行摆放并保持两侧均匀,取其中心部分安装间隔棒,间隔棒间距80mm,只有一根粗螺丝可以使两根引流通过一根粗螺丝,相当于轴心支撑得到绞力互补,相互吸收,从而达到两根引流平行在一条线上,即便是稍有偏差,由于间隔棒间距小,在视觉上也很难发现,更不会造成七扭八歪的现象。采用本发明方法可以使两线引流同步一致,角度相同,整齐规范;外型美观,线路运行安全,检修方便。
当线路铁塔转角过大时,引流安装完毕后自然下垂,会向塔身倾斜移位,因此本发明还具有安装旋转式吊串绝缘子这一步骤,安装后的吊串不能转动只能向线路横向摆动,通过旋转式吊串绝缘子来控制向塔身倾斜的引流。
附图说明
图1为本发明输电线路复导线引流方法安装后示意图;
图2为间隔棒的结构示意图;
图3为拐形连板的结构示意图;
图4为旋转式吊串绝缘子的结构示意图。
图中:#1线引流1,#2线引流2,间隔棒3,U形槽31,压盖32,螺栓33,引流孔34,拐形连板4,主体41,上连板411,下连板412,连接板413,孔42,旋转式吊串绝缘子5,U型挂板51,金属连接件52。
具体实施方式
下面结合附图对本发明作进一步详述:
如图1所示,本发明输电线路复导线引流方法,包括以下步骤:
①根据设计尺寸取两根平直同步长度相同的导线作为#1线引流1和#2线引流2,将#1线引流1和#2线引流2的两端分别压上联板;
②将两根引流平行摆放并保持两侧均匀,取两根引流的中心部分安装间隔棒3,安装牢固后,在两根引流两侧的连板根部位置处各安装一个间隔棒,然后在连板与引流的中心处之间再分别安装一个间隔棒;
③把#1线引流1通过连板与拐形连板相连;
如图2所示,间隔棒3的结构如下:所述的间隔棒3包括有U形槽31、压盖32和螺栓33,所述的U形槽31与压盖32之间形成两个引流孔34,两个引流孔的中心点的间距为80mm。U型槽通过引流孔托住两根引流使两根引流之间的宽度得到控制,压盖32将两根引流固定住使其扭向得到控制,压盖32与U形槽31之间通过螺栓33连接在一起,使间隔棒上下两部分连接紧密。所述的U形槽31的底部具有螺栓槽,螺栓拧紧后与U形槽的底面保持一平。
如图3所示,拐形连板4的结构如下:所述的拐形连板4包括有主体41,所述的主体41是厚度为12mm的铝板制成的,主体41的宽度为60mm,长度为450mm,主体41包括有上连板411、下连板412和连接板413,上连板与下连板上均设置有两个孔42,两个孔之间的间距为40mm,上连板上左侧孔与下连板上左侧孔间的距离为400mm,上连板上右侧孔与下连板上右侧孔的距离也为400mm,拐型连板与导线压接管的连接部分垂直地面,上连板与连接板以及下连板与连接板之间的夹角为15度,使等长的两根引流通过本发明既与导线相接又可改变连接的角度。
④复导线引流组装完毕后进行塔上安装:两名作业人员带绳索同时进入到塔上两侧安装位置后,地面人员用绳将组装好的引流绑好并拉至安装位置,两侧的#2线引流直接与#2线对接;
⑤#2线引流安装结束后,将#1线引流通过拐形连板与#1线对接。
如果线路铁塔转角过大,引流安装完毕后自然下垂,会向塔身倾斜移位,因此还需要安装旋转式吊串绝缘子5这一步骤,通过旋转式吊串绝缘子来控制向塔身倾斜的引流。如图4所示,旋转式吊串绝缘子的顶部具有U型挂板51,底部具有金属连接件52,金属连接件52具有内螺纹,将旋转式吊串绝缘子下端的金属连接件与复导线引流中心点上的间隔棒上的螺栓露出部分旋转对接,将旋转式吊串绝缘子上端的U型挂板安装在铁塔横担中间的U型螺栓中,安装后的吊串不能转动只能向线路横向摆动,通过旋转式吊串绝缘子控制向塔身倾斜的引流。
Claims (2)
1.输电线路复导线引流方法,其特征在于包括以下步骤:
①取两根平直同步长度相同的导线作为#1线引流和#2线引流,将#1线引流和#2线引流的两端分别压上连板;
②将两根引流平行摆放并保持两侧均匀,取两根引流的中心部分安装间隔棒,安装牢固后,在两根引流两侧的连板根部位置处各安装一个间隔棒,然后在连板与引流的中心处之间再分别安装一个间隔棒;
③把#1线引流通过连板与拐形连板相连;
④复导线引流组装完毕后进行塔上安装:
两名作业人员带绳索同时进入到塔上两侧安装位置后,地面人员用绳将组装好的引流绑好并拉至安装位置,两侧的#2线引流直接与#2线对接;
⑤#2线引流安装结束后,将#1线引流通过拐形连板与#1线对接。
2.根据权利要求1所述的输电线路复导线引流方法,其特征在于包括下述步骤:
安装旋转式吊串绝缘子:将旋转式吊串绝缘子下端的金属连接件与复导线引流中心点上的间隔棒上的螺栓露出部分旋转对接,将旋转式吊串绝缘子上端的U型挂板安装在铁塔横担中间的U型螺栓中,安装后的吊串不能转动只能向线路横向摆动,通过旋转式吊串绝缘子控制向塔身倾斜的引流。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310299408.9A CN103346517B (zh) | 2013-07-17 | 2013-07-17 | 输电线路复导线引流方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310299408.9A CN103346517B (zh) | 2013-07-17 | 2013-07-17 | 输电线路复导线引流方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103346517A true CN103346517A (zh) | 2013-10-09 |
| CN103346517B CN103346517B (zh) | 2016-02-03 |
Family
ID=49281300
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310299408.9A Active CN103346517B (zh) | 2013-07-17 | 2013-07-17 | 输电线路复导线引流方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103346517B (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103928864A (zh) * | 2014-04-09 | 2014-07-16 | 国家电网公司 | 220kV-66kV输电线路带电调整复导线线缝的方法 |
| CN104538919A (zh) * | 2014-12-03 | 2015-04-22 | 国家电网公司 | 绝缘挂件及具有其的耐张杆塔 |
| CN108199324A (zh) * | 2018-02-07 | 2018-06-22 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种改变跳线引流方向的特制引流板及引流方法 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS508794B1 (zh) * | 1970-12-25 | 1975-04-07 | ||
| CN2930035Y (zh) * | 2006-06-15 | 2007-08-01 | 甘肃省电力公司白银供电公司 | 330kVJG1型铁塔中相跳线引流装置 |
| CN201252379Y (zh) * | 2008-09-09 | 2009-06-03 | 南京线路器材厂 | 特高压直流六分裂鼠笼式硬跳线装置 |
-
2013
- 2013-07-17 CN CN201310299408.9A patent/CN103346517B/zh active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS508794B1 (zh) * | 1970-12-25 | 1975-04-07 | ||
| CN2930035Y (zh) * | 2006-06-15 | 2007-08-01 | 甘肃省电力公司白银供电公司 | 330kVJG1型铁塔中相跳线引流装置 |
| CN201252379Y (zh) * | 2008-09-09 | 2009-06-03 | 南京线路器材厂 | 特高压直流六分裂鼠笼式硬跳线装置 |
Non-Patent Citations (1)
| Title |
|---|
| 国家电网公司直流建设分公司: "《特高压直流输电线路典型施工工艺标准化手册》", 31 March 2011 * |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103928864A (zh) * | 2014-04-09 | 2014-07-16 | 国家电网公司 | 220kV-66kV输电线路带电调整复导线线缝的方法 |
| CN103928864B (zh) * | 2014-04-09 | 2016-08-31 | 国家电网公司 | 220kV-66kV输电线路带电调整复导线线缝的方法 |
| CN104538919A (zh) * | 2014-12-03 | 2015-04-22 | 国家电网公司 | 绝缘挂件及具有其的耐张杆塔 |
| CN108199324A (zh) * | 2018-02-07 | 2018-06-22 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种改变跳线引流方向的特制引流板及引流方法 |
| CN108199324B (zh) * | 2018-02-07 | 2023-10-03 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种改变跳线引流方向的特制引流板及引流方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103346517B (zh) | 2016-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202474702U (zh) | 一种配电线路带点作业用平台安装支架 | |
| CN103346517B (zh) | 输电线路复导线引流方法 | |
| CN203932813U (zh) | 电力维修电缆线绝缘支撑装置 | |
| CN105097141A (zh) | 用于通讯设备供电的电力电缆制造设备 | |
| CN208423608U (zh) | 建筑工程电缆架设转弯导向装置 | |
| CN205406775U (zh) | 一种接地线装置 | |
| CN104300424B (zh) | 一种绝缘子串架设杆塔的横担卡具 | |
| CN205476792U (zh) | 一种10kv配电线路用绝缘横担 | |
| CN204012405U (zh) | 一种螺旋式接地引下线提升装置 | |
| CN203895917U (zh) | 自调节横担 | |
| CN203774690U (zh) | 用于电力线路架设的放线装置 | |
| CN103398221B (zh) | 平行集束电缆归方器 | |
| CN211173892U (zh) | 一种复合绝缘子爬梯 | |
| CN218265263U (zh) | 电力系统用t型复合材料绝缘横担 | |
| CN204696559U (zh) | 一种角度可调的新型35kV绝缘锁杆固定装置 | |
| CN102025120A (zh) | 一字型相间防舞金具 | |
| CN204205402U (zh) | 特高压直流线路更换直线塔线夹工具 | |
| CN104201611B (zh) | 特高压直流线路更换直线塔线夹工具 | |
| CN204089143U (zh) | 一种矿物电缆单芯中间连接器 | |
| CN210223642U (zh) | 一种用于高低压的矿物绝缘电缆 | |
| CN204089142U (zh) | 一种矿物电缆多芯中间连接器 | |
| CN203631196U (zh) | 一种架空输电线路复合绝缘子芯棒固定装置 | |
| CN203589662U (zh) | 分段式接地线连接结构 | |
| CN111431086A (zh) | 一种可跨越间隔棒的跟斗滑车 | |
| CN207732397U (zh) | 可调节母线槽 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |