CN102185267A - 66kv地电位带电断接引流方法 - Google Patents

66kv地电位带电断接引流方法 Download PDF

Info

Publication number
CN102185267A
CN102185267A CN2011101239054A CN201110123905A CN102185267A CN 102185267 A CN102185267 A CN 102185267A CN 2011101239054 A CN2011101239054 A CN 2011101239054A CN 201110123905 A CN201110123905 A CN 201110123905A CN 102185267 A CN102185267 A CN 102185267A
Authority
CN
China
Prior art keywords
yoke plate
bypassing
drainage
fixing
break
Prior art date
Application number
CN2011101239054A
Other languages
English (en)
Other versions
CN102185267B (zh
Inventor
张森
牛江
关文鹏
翟禹
计海森
王�忠
王吉宏
赵群
董政
贾桐
丁冠西
陶建军
赵洪凯
Original Assignee
辽宁省电力有限公司辽阳供电公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 辽宁省电力有限公司辽阳供电公司 filed Critical 辽宁省电力有限公司辽阳供电公司
Priority to CN 201110123905 priority Critical patent/CN102185267B/zh
Publication of CN102185267A publication Critical patent/CN102185267A/zh
Application granted granted Critical
Publication of CN102185267B publication Critical patent/CN102185267B/zh

Links

Abstract

本发明涉及一种66KV地电位带电断接引流方法,它包括以下步骤:①将绝缘吊线串的一端固定在塔身的横担上;②一人将引流线送入绝缘吊线钩里,另一人拧紧绝缘吊线钩上的螺丝,将引流线固定在绝缘吊线钩内;③将过流卡头的两端挂在引流联板的两侧并固定;④一人固定住联板螺栓101,另一人拆卸联板螺栓;⑤联板螺栓拆卸以后,迅速使引流联板脱离,并拆掉过流卡头,将引流线靠在塔身上并固定。本发明66KV地电位带电断接引流方法将传统66kV带电断接引工作由等电位向安全系数更高的地电位作业方法转型,最大限度确保作业人员人身安全。避免作业人员进入电场和受塔形紧凑的限制,从而大大的提高了作业的安全性和作业可操作范围。

Description

66KV地电位带电断接弓I流方法
技术领域
[0001 ] 本发明涉及一种66KV地电位带电断接引流方法。 背景技术
[0002] 传统的66kV带电断接引工作均采用等电位与地电位相结合的操作方法,每次断接引工作均需要等电位人员进入强电场操作,作业危险性、复杂性、困难性较高。
发明内容
[0003] 本发明要解决的技术问题是提供一种66KV地电位带电断接引流方法,该方法具有作业安全性高、操作简单方便的特点。
[0004] 为了解决现有技术存在的问题,本发明采用的技术方案是: 66KV地电位带电断接引流方法,包括以下步骤:
①作业人员将绝缘吊线串的一端固定在塔身的横担上;
②一人将引流线送入绝缘吊线钩里,另一人拧紧绝缘吊线钩上的螺丝,将引流线固定在绝缘吊线钩内;
③将过流卡头的两端挂在引流联板的两侧并固定;
④一人固定住联板螺栓101,另一人拆卸联板螺栓;
⑤联板螺栓拆卸以后,迅速使引流联板脱离,并拆掉过流卡头,将引流线靠在塔身上并固定。
[0005] 所述的步骤①中操作人员的身体不准低于横担。
[0006] 本发明所具有的优点与效果是:
1、本发明66KV地电位带电断接引流方法将传统66kV带电断接引工作由等电位向安全系数更高的地电位作业方法转型,最大限度确保作业人员人身安全,操作简单、方便。
[0007] 2、本发明66KV地电位带电断接引流方法全部采用地电位作业,避免作业人员进入电场和受塔形紧凑的限制,从而大大的提高了作业的安全性和作业可操作范围。
附图说明
[0008] 图1为本发明66KV地电位带电断接引流方法中卡头杆的使用状态示意图;
图2为本发明66KV地电位带电断接引流方法中短套管杆和长套管杆的使用状态示意
图;
图3为本发明66KV地电位带电断接引流方法中绝缘吊线钩的侧视图。
[0009] 图中:绝缘吊线串1 ;卡头杆2 ;短套管杆5 ;长套管杆6 ;过流卡头7 ;横担8 ;引流线9 ;绝缘吊线钩11 ;螺丝111 ;引流联板10 ;联板螺栓101。
具体实施方式
[0010] 如图1-3所示,本发明66KV地电位带电断接引流方法中所使用的工具包括有绝缘吊线串1、卡头杆2、短套管杆5、长套管杆6、过流卡头7、绝缘吊线钩11、引流联板10。所述的绝缘吊线串1的一端固定在横担8上,另一端卡在引流线9上,是用来固定吊线的工具。 所述的卡头杆2是万用绝缘杆,是地电位作业人员用来托住引流线9的工具。所述的短套管杆5是万用绝缘杆,是地电位作业人员用来安装、拆卸联板螺栓101的工具。所述的长套管杆6是万用绝缘杆,是地电位作业人员用来安装、拆卸联板螺栓101的工具。所述的过流卡头7是用来防止联板脱离时对设备造成伤害。
[0011] 本发明66KV地电位带电断接引流方法,包括以下步骤:
①首先,作业人员将绝缘吊线串1的一端固定在塔身的横担8上,操作时注意身体不准低于横担8 ;
②之后,作业人员配合,一人将卡头杆2固定在引流线9上,将引流线9送入绝缘吊线串1下端的绝缘吊线钩11里,另一人用钩头杆勾住绝缘吊线钩11上的螺丝111并拧紧,这样引流线9就被固定在了绝缘吊线钩11内。
[0012] ③然后,作业人员用钩头杆将过流卡头7的两端挂在引流联板10的两侧并固定。
[0013] ④进行完以上准备工作后,作业人员配合,一人用长套管杆6固定住联板螺栓 101,另一人用短套管杆5套住联板螺栓101并拆卸螺栓。如果引流联板10的角度不适宜用短套管杆,就用扳头杆拆卸联板螺栓101,作业时注意动作幅度不可过大。
[0014] ⑤联板螺栓101拆卸以后,两名持卡头杆2作业人员迅速使引流联板10脱离,并拆掉过流卡头7,将引流线9靠在塔身上并固定,操作卡头杆2时要注意身边人员的距离,防止引流线9对人员放电。
[0015] 在遇到大截面积的导线时难以回弯绑扎,使得不少带电断引工作受到限制,采用本发明方法后,将一串绝缘性良好的复合绝缘子的两端进行改装,将其端头两侧改装成线卡子。将其卡子的一端固定在横担上,另一端固定在受电侧引流线上然后将线卡子的两端用万能绝缘操作杆分别紧固即可。

Claims (2)

1.66KV地电位带电断接引流方法,其特征在于包括以下步骤:①作业人员将绝缘吊线串的一端固定在塔身的横担上;②一人将引流线送入绝缘吊线钩里,另一人拧紧绝缘吊线钩上的螺丝,将引流线固定在绝缘吊线钩内;③将过流卡头的两端挂在引流联板的两侧并固定;④一人固定住联板螺栓101,另一人拆卸联板螺栓;⑤联板螺栓拆卸以后,迅速使引流联板脱离,并拆掉过流卡头,将引流线靠在塔身上并固定。
2.根据权利要求1所的66KV地电位带电断接引流方法,其特征在于所述的步骤①中作业人员的身体不准低于横担。
CN 201110123905 2011-05-13 2011-05-13 66kv地电位带电断接引流方法 CN102185267B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110123905 CN102185267B (zh) 2011-05-13 2011-05-13 66kv地电位带电断接引流方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110123905 CN102185267B (zh) 2011-05-13 2011-05-13 66kv地电位带电断接引流方法

Publications (2)

Publication Number Publication Date
CN102185267A true CN102185267A (zh) 2011-09-14
CN102185267B CN102185267B (zh) 2013-03-27

Family

ID=44571361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110123905 CN102185267B (zh) 2011-05-13 2011-05-13 66kv地电位带电断接引流方法

Country Status (1)

Country Link
CN (1) CN102185267B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820621A (zh) * 2012-08-10 2012-12-12 国家电网公司 地电位处理变电设备节点发热方法
CN103247962A (zh) * 2013-04-26 2013-08-14 国家电网公司 66kV输电线路压接管连板地电位带电断、接引流方法
CN103500966A (zh) * 2013-06-20 2014-01-08 国家电网公司 66kv隔离开关至管母线带电断接引线方法
CN104538919A (zh) * 2014-12-03 2015-04-22 国家电网公司 绝缘挂件及具有其的耐张杆塔
CN105207123A (zh) * 2015-10-13 2015-12-30 国网辽宁省电力有限公司丹东供电公司 一种管状母线等电位作业的方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2930035Y (zh) * 2006-06-15 2007-08-01 甘肃省电力公司白银供电公司 330kVJG1型铁塔中相跳线引流装置
CN201408942Y (zh) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 用于10kV线路的引流连接装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2930035Y (zh) * 2006-06-15 2007-08-01 甘肃省电力公司白银供电公司 330kVJG1型铁塔中相跳线引流装置
CN201408942Y (zh) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 用于10kV线路的引流连接装置

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
《高电压技术》 19791220 胡定超 110_220千伏空载线路带电断接引线的现场试验 第33页8-10段,图1 1-2 , 第04期 *
东北电管局供电中级工培训教材编委会: "《供电中级工培训教材-带电作业》", 31 August 1986 *
国家电网公司: "《国家电网公司电力安全工作规程(电力线路部分)》", 31 March 2005 *
朱艳君: "带电断、接变电站500kV母线上的引线", 《电力建设》 *
柏克寒: "《带电作业》", 31 October 1981 *
胡定超: "110―220千伏空载线路带电断接引线的现场试验", 《高电压技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820621A (zh) * 2012-08-10 2012-12-12 国家电网公司 地电位处理变电设备节点发热方法
CN102820621B (zh) * 2012-08-10 2014-12-31 国家电网公司 地电位处理变电设备节点发热方法
CN103247962A (zh) * 2013-04-26 2013-08-14 国家电网公司 66kV输电线路压接管连板地电位带电断、接引流方法
CN103500966A (zh) * 2013-06-20 2014-01-08 国家电网公司 66kv隔离开关至管母线带电断接引线方法
CN103500966B (zh) * 2013-06-20 2016-08-17 国家电网公司 66kv隔离开关至管母线带电断接引线方法
CN104538919A (zh) * 2014-12-03 2015-04-22 国家电网公司 绝缘挂件及具有其的耐张杆塔
CN105207123A (zh) * 2015-10-13 2015-12-30 国网辽宁省电力有限公司丹东供电公司 一种管状母线等电位作业的方法

Also Published As

Publication number Publication date
CN102185267B (zh) 2013-03-27

Similar Documents

Publication Publication Date Title
CN204959786U (zh) 一种抗风防倒电线杆
CN205429581U (zh) 一种用于电子领域的锁杆结构
CN202872263U (zh) 带电更换直线杆塔双分裂导线双串绝缘子的工具
CN202034506U (zh) 一种接地线导线挂钩
CN105337233A (zh) 一种可调式通用街码
CN101582572B (zh) 一种特高压张力架线的方法
CN105322482B (zh) 一种通用街码
CN203481420U (zh) 用于输电线路检修的接地线装置
CN104201489B (zh) 一种新型电力线路防脱落接地线线夹装置
CN102290742B (zh) 张力架线施工工艺
CN202797769U (zh) 110kV线路门型杆边相带电更换绝缘子工具
CN103240727B (zh) 一种整体移除鸟窝的工具
CN208674827U (zh) 一种电力杆塔固定电缆的组件
CN102856838B (zh) 管型母线支柱绝缘子更换工具及更换方法
CN205610149U (zh) 终端街码
CN106602293A (zh) 一种带有预警和验电功能的接地线装置
CN201189645Y (zh) 变电站设备线夹螺栓紧固器
CN102040166A (zh) 柱上设备吊装工具
CN207339088U (zh) 输电线路直线杆架空地线检修支架
CN205178441U (zh) 可调式通用街码
CN104348116A (zh) 可自动卡紧的对称式翼型卡线器
CN103094722A (zh) 一种线夹式应急电源车快速接入接头
CN201785175U (zh) 用于高压线铁塔的吊篮
CN102270817A (zh) 带电更换耐张绝缘子的工具
CN203981720U (zh) 一种搭设及使用便捷的避雷器带电测试线夹

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20120926

Address after: 111000 Liaoyang City, Liaoning province Taizihe District South Street No. 81

Applicant after: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

Applicant after: State Grid Corporation of China

Address before: 111000 No. 81, south suburb street, Liaoning, Liaoyang

Applicant before: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

C41 Transfer of patent application or patent right or utility model
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120926

GR01 Patent grant
C14 Grant of patent or utility model