CN2927439Y - Connecting structure of preset cable calandria and station - Google Patents

Connecting structure of preset cable calandria and station Download PDF

Info

Publication number
CN2927439Y
CN2927439Y CN 200620044179 CN200620044179U CN2927439Y CN 2927439 Y CN2927439 Y CN 2927439Y CN 200620044179 CN200620044179 CN 200620044179 CN 200620044179 U CN200620044179 U CN 200620044179U CN 2927439 Y CN2927439 Y CN 2927439Y
Authority
CN
China
Prior art keywords
prefabricated
well
worker
comb
prefabricated cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620044179
Other languages
Chinese (zh)
Inventor
朱海钢
姚时忆
陆融
廖英
潘国美
孙斌
袁振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Dongjie Power Design Co., Ltd.
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
FOUNDATION ENGINEERING Co OF SHANGHAI CITY
SHANGHAI DONGJIE POWER DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOUNDATION ENGINEERING Co OF SHANGHAI CITY, SHANGHAI DONGJIE POWER DESIGN CO Ltd filed Critical FOUNDATION ENGINEERING Co OF SHANGHAI CITY
Priority to CN 200620044179 priority Critical patent/CN2927439Y/en
Application granted granted Critical
Publication of CN2927439Y publication Critical patent/CN2927439Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a connecting structure for prefabricated cable conduit and pit, which comprises a prefabricated cable conduit and a prefabricated pit. An opening of the terminal plate of the pit has an opening larger than the maximum shape of the prefabricated cable conduit, and a buttress is positioned at the connection part of the pit terminal plate opening and lower side of the prefabricated cable conduit; dowel bars are pre-left on three sides of the connection part of other pit terminal openings and the prefabricated cable conduit; concrete is adopted to fill between the conduit and the pit terminal plate openings. The utility model can solve the problem in connection of prefabricated cable conduits and prefabricated pits, thus connecting effectively the prefabricated cable conduits and prefabricated pits and satisfying the structural requirements of force bearing and water stopping.

Description

The joint construction of prefabricated cable comb and worker's well
Technical field
The utility model relates to the syndeton of a kind of cable duct bank and worker's well, in particular for the syndeton of prefabricated cable comb and worker's well.
Background technology
At present, at the drawback of cast-in-place cable duct bank and worker's well, adopt prefabricated cable comb and cable worker well.According to the characteristics of comb and worker's well, comb is the passage of cable from an active well towards another active well, and cable is played a protective role; And active well is the end of cable or the place that connecting portion is laid, and provides the work about electric power personnel cable to be carried out the space of Operation and Maintenance.According to the characteristics of cable laying, after finishing, cable duct bank and worker's well construction need both are linked together, for use.The measure that is connected of cast-in-place cable duct bank and worker's well, owing to, on the end plate of worker's well, reserved corresponding hole count, and reserve joint bar when making worker's well at the end plate place in advance according to the hole count of comb, treat that using concrete that both are put in order after comb inserts waters, and forms whole.
Characteristics for prefabricated cable comb and cable worker well, owing in factory, make in advance, the size at the hole of cable duct bank and worker's well end plate is fixing, therefore need take a kind of syndeton, prefabricated comb can be connected effectively with worker's well, and satisfy the requirement of the stressed and sealing of structure.
Summary of the invention
The utility model is the connectivity problem that will solve between prefabricated cable comb and the cable worker well, and the joint construction of a kind of prefabricated cable comb and worker's well is provided.It can make prefabricated comb can be connected effectively with worker's well, and satisfies the requirement of the stressed and sealing of structure.
The technical solution of the utility model is achieved in that the joint construction of a kind of prefabricated cable comb and worker's well, comprises the prefabricated cable comb, prefabricated electrical cable working well.The hole of making up maximum profile greater than the prefabricated cable comb is left in the centre of worker's well end plate, and buttress is set in the following junction of worker's well end plate hole and prefabricated cable comb, on three limits of remaining worker's well end plate hole and prefabricated cable comb junction, be reserved with joint bar, adopt concrete to fill between comb and the worker's well end plate hole.
Worker's well end plate the hole bigger 5 to 6 centimetres than prefabricated cable comb combination overall dimension.
Strength grade of concrete is than the high one-level of used concrete grade of pre-fabricated electric cables worker well.
The utility model can solve the connectivity problem of pre-fabricated electric cables comb and prefabricated worker's well, the pre-fabricated electric cables comb can be connected effectively with prefabricated worker's well, and satisfy the requirement of the stressed and sealing of structure.
Description of drawings
Fig. 1 is the connection diagram of pre-fabricated electric cables three hole combs and prefabricated worker's well;
Fig. 2 is the connection diagram of pre-fabricated electric cables four hole combs and prefabricated worker's well.
Embodiment
Below in conjunction with accompanying drawing and embodiment utility model is further described.
As Fig. 1, shown in 2, the joint construction of a kind of prefabricated cable comb and worker's well comprises prefabricated cable comb 1,7, prefabricated electrical cable working well 2.The full-size of sizes after than comb 1,7 combination is reserved at the hole 6 of worker's well 2 end plates, slightly slightly extends out 5 ~ 6 centimetres, owing to lay the construction error that produces in the comb process, and in end plate corresponding units bottom buttress 3 is set in order to eliminate, with flat fixed calandria.Reserve joint bar 4 in three on all the other limits, treat that comb is in place after, adopt concrete 5 fillings between comb 1,7 and the hole 6.Because this junction is comparatively weak from the structure stress, so concrete 5 strength grades of filling are than the high one-level of used concrete grade of pre-fabricated electric cables worker well 2.

Claims (3)

1. the joint construction of a prefabricated cable comb and worker's well, comprise prefabricated cable comb (1,7), prefabricated electrical cable working well (2), it is characterized in that, the centre of described prefabricated electrical cable working well (2) end plate is left greater than prefabricated cable comb (1,7) hole (6) of the maximum profile of combination, and at Gong Jing (2) end plate hole (6) and prefabricated cable comb (1,7) following junction is provided with buttress (3), is reserved with joint bar (4) on three limits of remaining worker's well (2) end plate hole (6) and prefabricated cable comb (1,7) junction, adopt concrete (5) to fill between comb (1,7) and worker's well (2) the end plate hole (6).
2. the joint construction of prefabricated cable comb according to claim 1 and worker's well is characterized in that, described worker's well (2) end plate hole (6) bigger 5 to 6 centimetres than prefabricated cable comb (1,7) combination overall dimension.
3. the joint construction of prefabricated cable comb according to claim 1 and worker's well is characterized in that, the strength grade of described concrete (5) is than the high one-level of used concrete grade of pre-fabricated electric cables worker well (2).
CN 200620044179 2006-07-24 2006-07-24 Connecting structure of preset cable calandria and station Expired - Lifetime CN2927439Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620044179 CN2927439Y (en) 2006-07-24 2006-07-24 Connecting structure of preset cable calandria and station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620044179 CN2927439Y (en) 2006-07-24 2006-07-24 Connecting structure of preset cable calandria and station

Publications (1)

Publication Number Publication Date
CN2927439Y true CN2927439Y (en) 2007-07-25

Family

ID=38281693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620044179 Expired - Lifetime CN2927439Y (en) 2006-07-24 2006-07-24 Connecting structure of preset cable calandria and station

Country Status (1)

Country Link
CN (1) CN2927439Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469818A (en) * 2013-10-09 2013-12-25 中国建筑第八工程局有限公司 Connecting structure for prefabricated cable well and cable duct cast-in-place structure and construction method thereof
CN103669400A (en) * 2013-12-03 2014-03-26 国家电网公司 Typical construction method for prefabricated tube bank
CN101781935B (en) * 2009-12-30 2014-05-14 中国瑞林工程技术有限公司 Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN110829342A (en) * 2019-11-29 2020-02-21 国网上海市电力公司 Groove type prefabricated assembly type cable duct bank unit and method
CN111585214A (en) * 2020-04-03 2020-08-25 国网浙江省电力有限公司湖州供电公司 Prefabricated assembled cable laying structure of cable trench facility
CN111997088A (en) * 2020-08-17 2020-11-27 国网上海市电力公司 Groove type prefabricated assembly type cable duct bank and working well installation and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781935B (en) * 2009-12-30 2014-05-14 中国瑞林工程技术有限公司 Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN103469818A (en) * 2013-10-09 2013-12-25 中国建筑第八工程局有限公司 Connecting structure for prefabricated cable well and cable duct cast-in-place structure and construction method thereof
CN103469818B (en) * 2013-10-09 2016-03-09 中国建筑第八工程局有限公司 Pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof
CN103669400A (en) * 2013-12-03 2014-03-26 国家电网公司 Typical construction method for prefabricated tube bank
CN110829342A (en) * 2019-11-29 2020-02-21 国网上海市电力公司 Groove type prefabricated assembly type cable duct bank unit and method
CN111585214A (en) * 2020-04-03 2020-08-25 国网浙江省电力有限公司湖州供电公司 Prefabricated assembled cable laying structure of cable trench facility
CN111585214B (en) * 2020-04-03 2022-04-01 国网浙江省电力有限公司湖州供电公司 Prefabricated assembled cable laying structure of cable trench facility
CN111997088A (en) * 2020-08-17 2020-11-27 国网上海市电力公司 Groove type prefabricated assembly type cable duct bank and working well installation and construction method

Similar Documents

Publication Publication Date Title
CN2927439Y (en) Connecting structure of preset cable calandria and station
CN107142960A (en) A kind of city piping lane construction method
EP1548190A3 (en) Structure and method of connecting I-Type prestressed concrete beams using steel brackets
CN203334473U (en) Tooth socket type connecting structure of upper layer interior wall plate and lower layer interior wall plate of assembling type shear wall
CN102587554A (en) Laminated concrete slab connected by bending reinforcing steel bars by 180 degrees within span and connection method
CN203684263U (en) General foundation for GIS equipment at transformer station
CN202076736U (en) Novel cable protective pipe
CN212926718U (en) Prefabricated horizontal grouting sleeve connecting wall unit and wall
CN207211186U (en) A kind of power transmission line iron tower foundation protective cap mould
CN211817392U (en) Laminated slab with reserved object transfer hole
CN2359331Y (en) Steel repported added prestressed device
CN204753342U (en) Double-layer steel cable bridge
CN211285702U (en) Prefabricated cable shaft
CN107419743A (en) A kind of new city pipe gallery mobile formwork
CN203361736U (en) Temporary reinforcement device for electric pole
CN201846017U (en) Clamping device of Dyneema guiding rope of power transmission line
CN201753492U (en) Building chase
CN207032036U (en) A kind of interchangeable anchorage prestress anchoraging device
CN211859164U (en) Factory building automatic control cabinet cable protection device
CN201118174Y (en) Outlet cable shaft and out-station tunnel connecting structure
CN216446034U (en) Prefabricated calandria basis of modularization electric power
CN219604660U (en) ALC autoclaved aerated concrete wallboard with transverse embedded pipes
CN215442342U (en) High-strength prefabricated recycled concrete balcony slab
CN216618890U (en) Municipal administration water supply and drainage pipeline connection structure
CN221080889U (en) Cable calandria structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 200120, No. 297, Shangcheng Road, 3, Shanghai, Pudong New Area

Patentee after: Shanghai Dongjie Power Design Co., Ltd.

Patentee after: Shanghai Foundation Engineering Group Co., Ltd.

Address before: 200120, No. 297, Shangcheng Road, 3, Shanghai, Pudong New Area

Patentee before: Shanghai Dongjie Power Design Co., Ltd.

Patentee before: Foundation Engineering Co. of Shanghai City

CX01 Expiry of patent term

Granted publication date: 20070725

EXPY Termination of patent right or utility model