CN103469818B - Pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof - Google Patents
Pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof Download PDFInfo
- Publication number
- CN103469818B CN103469818B CN201310398781.XA CN201310398781A CN103469818B CN 103469818 B CN103469818 B CN 103469818B CN 201310398781 A CN201310398781 A CN 201310398781A CN 103469818 B CN103469818 B CN 103469818B
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- reinforcement
- electric cables
- borehole wall
- fabricated electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The present invention relates to a kind of pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof, comprise reinforcing bar connector, comb arrangement of reinforcement, cable sleeve and cable duct bank, reinforcing bar connector one end connects the L shape reinforcing bar be embedded among the borehole wall, the other end connects comb arrangement of reinforcement, multiple cable sleeve is set in the borehole wall and is socketed cable duct bank one by one, outside the borehole wall, have a plate groove to mate with comb concrete pack.The present invention ensures the globality of pre-fabricated electric cables well and concrete pack, meets waterproof requirement by cable sleeve, solves issuable uneven subsidence by plate groove reserved on prefabricated well.
Description
Technical field
The present invention relates to a kind of pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof.
Background technology
Prefabricated assembled manhole has the advantages such as good integrity, good endurance, raising speed of application, but in electric power/communication engineering field, the weak link that what prefabricated assembled manhole and comb cast-in-situ concrete were encapsulated connect in order to quality control on construction, existence due to this type of construction gap reduces the globality of electric power and telecommunication system, may occur because differential settlement, cast-in-place concrete structure exist the factors such as retractility and cause the manhole borehole wall and concrete pack to ftracture, leak.Chinese patent CN202131613 discloses a kind of lined prefabricated reinforced concrete inspection well, comprise well body, manhole cover plate and well seat, both sides, well body bottom correspondence is provided with pipe joint, borehole wall inner liner is connected by retainingf key with between well body and well seat, pipe lining layer is connected by retainingf key with between pipe joint, described pipeline is blow-off line, not cast-in-place structural.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of pre-fabricated electric cables well and cable duct cast-in-place structure syndeton, and the construction method of this syndeton, cause the pre-fabricated electric cables well borehole wall and concrete pack to ftracture to solve because differential settlement, cast-in-place concrete structure exist the factors such as retractility, the technical problem such as to leak.
For realizing above-mentioned technique effect, the invention discloses a kind of pre-fabricated electric cables well and cable duct cast-in-place structure syndeton, comprise plural reinforcing bar connector, plural comb arrangement of reinforcement, plural cable sleeve and plural cable duct bank, described reinforcing bar connector one end connects the L shape reinforcing bar be embedded among the borehole wall, the other end connects described comb arrangement of reinforcement, multiple cable sleeve is set in the borehole wall and is socketed described cable duct bank one by one, outside the borehole wall, have a plate groove to mate with comb concrete pack.
Described syndeton is further improved and is, described reinforcing bar connector adopts with described L shape reinforcing bar and described comb arrangement of reinforcement and is threaded.
The invention also discloses the construction method of a kind of pre-fabricated electric cables well and cable duct cast-in-place structure syndeton, comprise the following steps:
Step 1, in pre-fabricated electric cables well reinforcing bar binding process, arranges a L shape reinforcing bar and adopts colligation or welding manner to be fixed on pre-fabricated electric cables well borehole wall arrangement of reinforcement, and be threaded with described reinforcing bar connector by described L shape reinforcing bar;
Step 2, at reserving hole place installing cables sleeve pipe, is fixedly connected with borehole wall arrangement of reinforcement;
Step 3, before pre-fabricated electric cables well is built, reserves plate groove at the borehole wall, the dark 30mm of plate groove;
Step 4, pre-fabricated electric cables well reaches intensity, after installation in position, carries out the construction of its periphery concrete pack, adopts die head threading machine to process comb arrangement of reinforcement, outside comb arrangement of reinforcement and embedded bar connector are connected firmly;
Step 5, installing cables comb after reinforcement construction completes, guarantees that same cable sleeve interface is tight;
Step 6, shuttering, carries out the connection that the pre-fabricated electric cables well borehole wall and cast-in-situ concrete are encapsulated, strictly need control, guarantee that the Concrete Filled in plate groove is closely knit in the concrete construction of seaming position.
The invention has the advantages that:
1) globality of pre-fabricated electric cables well and concrete pack is ensured by the bar connecting of the borehole wall and encapsulating;
2) solve waterproof requirement by cable sleeve, solve issuable uneven subsidence by the aboveground reserved plate groove of pre-fabricated electric cables;
3) reliability, good sealing performance that the pre-fabricated electric cables well borehole wall is connected with cast-in-place structural can be realized.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of pre-fabricated electric cables well of the present invention and cable duct cast-in-place structure syndeton.
Fig. 2 is the A-A sectional drawing of Fig. 1.
Fig. 3 is the B-B sectional drawing of Fig. 1.
Fig. 4 is the lateral view of plate groove in pre-fabricated electric cables well of the present invention and cable duct cast-in-place structure syndeton.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
As shown in Figure 1 to 4, pre-fabricated electric cables well 8 of the present invention and cable duct bank 7 cast-in-place structural syndeton, comprise reinforcing bar connector 2, comb arrangement of reinforcement 6, cable sleeve 4 and cable duct bank 7, reinforcing bar connector 2 one end connects the L shape reinforcing bar 1 be embedded among the borehole wall 3, the other end connects comb arrangement of reinforcement 6, multiple cable sleeve 4 is set in the borehole wall 3 and is socketed cable duct bank 7 one by one, outside the borehole wall 3, have a plate groove 5 to mate with cable duct bank 7 concrete pack.Reinforcing bar connector 2 adopts with L shape reinforcing bar 1 and comb arrangement of reinforcement 6 and is threaded.
The construction method of pre-fabricated electric cables well 8 of the present invention and cable duct bank 7 cast-in-place structural syndeton, construction sequence is as follows:
Step 1, in pre-fabricated electric cables well 8 reinforcing bar binding process, arranges a L shape reinforcing bar 1 and adopts colligation or welding manner to be fixed on pre-fabricated electric cables well 8 borehole wall 3, and be threaded with reinforcing bar connector 2 by L shape reinforcing bar 1;
Step 2, at reserving hole place installing cables sleeve pipe 4, is fixedly connected with the borehole wall 3 arrangement of reinforcement;
Step 3, before pre-fabricated electric cables well 8 is built, reserves plate groove 5 at the borehole wall 3, the dark 30mm of plate groove 5;
Step 4, pre-fabricated electric cables well 8 reaches intensity, after installation in position, carries out the construction of its periphery concrete pack, adopts die head threading machine to process comb arrangement of reinforcement 6, be connected firmly by outside comb arrangement of reinforcement 6 with embedded bar connector 2;
Step 5, installing cables comb 7 after reinforcement construction completes, guarantees that same cable sleeve 4 interface is tight;
Step 6, shuttering, carries out the connection that pre-fabricated electric cables well 8 borehole wall 3 is encapsulated with cast-in-situ concrete, strictly need control, guarantee that the Concrete Filled in plate groove 5 is closely knit in the concrete construction of seaming position.
More than show and describe general principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection domain is defined by appending claims and equivalent thereof.
Claims (3)
1. a pre-fabricated electric cables well and cable duct cast-in-place structure syndeton, it is characterized in that: described syndeton comprises plural reinforcing bar connector, plural comb arrangement of reinforcement, plural cable sleeve and plural cable duct bank, described reinforcing bar connector one end connects the L shape reinforcing bar be embedded among the borehole wall, the other end connects described comb arrangement of reinforcement, multiple cable sleeve is set in the borehole wall and is socketed described cable duct bank one by one, outside the borehole wall, have a plate groove to mate with comb concrete pack.
2. syndeton as claimed in claim 1, is characterized in that: described reinforcing bar connector adopts with described L shape reinforcing bar and described comb arrangement of reinforcement and is threaded.
3. be applicable to the pre-fabricated electric cables well of syndeton as claimed in claim 2 and a construction method for cable duct cast-in-place structure syndeton, it is characterized in that described construction method comprises the following steps:
Step 1, in pre-fabricated electric cables well reinforcing bar binding process, arranges a L shape reinforcing bar and adopts colligation or welding manner to be fixed on pre-fabricated electric cables well borehole wall arrangement of reinforcement, and be threaded with described reinforcing bar connector by described L shape reinforcing bar;
Step 2, at reserving hole place installing cables sleeve pipe, is fixedly connected with borehole wall arrangement of reinforcement;
Step 3, before pre-fabricated electric cables well is built, reserves plate groove at the borehole wall, the dark 30mm of plate groove;
Step 4, pre-fabricated electric cables well reaches intensity, after installation in position, carries out the construction of its periphery concrete pack, adopts die head threading machine to process comb arrangement of reinforcement, outside comb arrangement of reinforcement and embedded bar connector are connected firmly;
Step 5, comb arrangement of reinforcement has been constructed rear installing cables comb, guarantees that same cable sleeve interface is tight;
Step 6, shuttering, carries out the connection that the pre-fabricated electric cables well borehole wall and cast-in-situ concrete are encapsulated, strictly need control, guarantee that the Concrete Filled in plate groove is closely knit in the concrete construction of seaming position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310398781.XA CN103469818B (en) | 2013-10-09 | 2013-10-09 | Pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310398781.XA CN103469818B (en) | 2013-10-09 | 2013-10-09 | Pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103469818A CN103469818A (en) | 2013-12-25 |
CN103469818B true CN103469818B (en) | 2016-03-09 |
Family
ID=49794847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310398781.XA Active CN103469818B (en) | 2013-10-09 | 2013-10-09 | Pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103469818B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867540B (en) * | 2018-06-25 | 2020-09-11 | 广东省建筑设计研究院 | Construction method of underground overlapped double-pipeline common well structure |
CN110858710A (en) * | 2018-08-24 | 2020-03-03 | 深圳市德春水电工程有限公司 | Distribution transformer adjustment engineering construction method |
CN110344444A (en) * | 2019-06-14 | 2019-10-18 | 苏州电力设计研究院有限公司 | The cable shaft not having a power failure raises construction method |
CN111697481A (en) * | 2020-06-30 | 2020-09-22 | 上海宝冶集团有限公司 | Manufacturing and using method of cable well |
CN111997088A (en) * | 2020-08-17 | 2020-11-27 | 国网上海市电力公司 | Groove type prefabricated assembly type cable duct bank and working well installation and construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1555446A (en) * | 2002-07-16 | 2004-12-15 | 早川橡胶株式会社 | Man hole structure, flexible water joint for man hole structure and construction method for man hole structure |
CN2927439Y (en) * | 2006-07-24 | 2007-07-25 | 上海东捷电力设计有限公司 | Connecting structure of preset cable calandria and station |
CN201770996U (en) * | 2010-08-11 | 2011-03-23 | 浙江双环塑胶阀门有限公司 | Cable inspection well |
CN103326279A (en) * | 2013-07-18 | 2013-09-25 | 国家电网公司 | Cable duct bank construction device and method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10219719A (en) * | 1997-02-07 | 1998-08-18 | Nippon Telegr & Teleph Corp <Ntt> | Manhole duct |
-
2013
- 2013-10-09 CN CN201310398781.XA patent/CN103469818B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1555446A (en) * | 2002-07-16 | 2004-12-15 | 早川橡胶株式会社 | Man hole structure, flexible water joint for man hole structure and construction method for man hole structure |
CN2927439Y (en) * | 2006-07-24 | 2007-07-25 | 上海东捷电力设计有限公司 | Connecting structure of preset cable calandria and station |
CN201770996U (en) * | 2010-08-11 | 2011-03-23 | 浙江双环塑胶阀门有限公司 | Cable inspection well |
CN103326279A (en) * | 2013-07-18 | 2013-09-25 | 国家电网公司 | Cable duct bank construction device and method |
Non-Patent Citations (1)
Title |
---|
电线电缆排管敷设工程施工探讨;李卫萍;《科学之友》;20110731(第14期);36-37 * |
Also Published As
Publication number | Publication date |
---|---|
CN103469818A (en) | 2013-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103469818B (en) | Pre-fabricated electric cables well and cable duct cast-in-place structure syndeton and construction method thereof | |
CN107605507B (en) | Service channel shield-tunneling construction receives structure and construction method | |
CN207598254U (en) | A kind of shield radial direction stratum bracing means | |
CN103256052B (en) | Construction method for integral straight middle wall type double-arch tunnel | |
CN103485548B (en) | Assembling hollow concrete overlapped shear wall Vertical bar connection method | |
CN102777189A (en) | Intermediate-jacking-station-free jacking construction device of ultra-long pipe roof and method thereof | |
CN106939791A (en) | One kind can prestress steel structure concrete pipe sheet and its construction method | |
CN103114863A (en) | Tunnel secondary lining back arch grouting pipe reserving system | |
CN101532386B (en) | Method and device for underpinning antifriction separator for shallow underground space construction | |
CN103103926B (en) | Connection method of inhaul cable protecting bush | |
CN103259228A (en) | Connecting method of wall electrical pipe line of prefabricated assembly type house | |
CN206538783U (en) | Jacking prefabricated box culvert | |
CN104314105B (en) | The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method | |
CN107387092B (en) | A kind of multiple rectangular top pipes are connected in parallel on the engineering method of the formation underground space under complex environment | |
CN108487250A (en) | Uplift pile stake side post-grouting device and construction method | |
CN106368215B (en) | Pre-buried slip casting pipe assembly | |
CN106761833A (en) | A kind of antidetonation tunnel structure with rubber blanket | |
CN104089103A (en) | Circulating water pipe lined with glass steel pipe and glass steel pipe lined method thereof | |
JP3191602U (en) | Steel column structure | |
CN102691312A (en) | Precast assembled pipeline combined shaft | |
CN204151835U (en) | The vertical piece structure of connection of the basement wall and cast-in-place buttress | |
CN206636571U (en) | One kind can prestress steel structure concrete pipe sheet | |
CN110486538A (en) | A kind of service sleeve connect plugging structure and method for blocking with pipeline | |
KR20120134677A (en) | The precast concrete closed conduit that is reinforced by the shear connector and constructing method of it | |
CN106522230B (en) | Installation and grouting construction method of pre-buried grouting pipe assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |