Bidirectional oil-well pump Download PDF

Info

Publication number
CN2924070Y
CN2924070Y CN 200620118090 CN200620118090U CN2924070Y CN 2924070 Y CN2924070 Y CN 2924070Y CN 200620118090 CN200620118090 CN 200620118090 CN 200620118090 U CN200620118090 U CN 200620118090U CN 2924070 Y CN2924070 Y CN 2924070Y
Authority
CN
China
Prior art keywords
oil
well
pump barrel
way
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620118090
Other languages
Chinese (zh)
Inventor
刘扬
李华林
马先平
纪朝风
田建成
郑刚
江永全
狄鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN 200620118090 priority Critical patent/CN2924070Y/en
Application granted granted Critical
Publication of CN2924070Y publication Critical patent/CN2924070Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

A two-way oil pump that leads to of oil well production usefulness of petroleum industry viscous crude and thin oil, including inner pump cylinder (3), two-way intercommunication hole (4), upstream valve (5), long piston (6), downstream valve (7) of constant diameter, etc., the outer pump cylinder (2) is connected with inner pump cylinder (3), the long piston (6) of constant diameter is equipped with in the inner pump cylinder (3), the inferior part of the inner pump cylinder (3) is connected with the fixed valve (8), there are upstream valve (5), downstream valve (7) in the long piston (6) of constant diameter respectively, carry on the operation of steam injection, positive well flushing or positive sand flushing; the well completion pipe column does not need to be provided with any oil drain device, the crude oil in the oil well pump and the oil pipe can be smoothly drained into the well during well repair operation, and the problem of ground environment mirror pollution caused by the fact that the oil drain device cannot open the crude oil to spill to the ground is avoided.

Description

Two-way logical oil well pump
Technical field
The two-way logical oil well pump that the utility model provides a kind of petroleum industry viscous crude and thin oil oil well production to use.
Background technique
At present, heavy crude well steam injection technology mostly adopts traditional mode on the oil field: be lowered to steam injection string-steam injection-vexed well-open flow-kill-job-trip out steam injection string-be lowered to manufacturing process that flow string-Kai takes out production, complex procedures, it is long that not only investment height, and operation accounts for the well time; The thin oil oil well production string is because structural defective, can't carry out direct flushing, the sand washing of inspection pump could play oil pipe to carry out the sand washing operation after also former well casing post all can only being proposed, if it is tight to run into the oil well pipe screw thread, be difficult to shackle, cementing truck then often appears, the tank car scene problem of awaiting orders for a long time, cause sand washing to fail in one's scheme, in addition, crude oil scatters ground and causes ground ring mirror to pollute in the above oil pipe of oil well pump when preventing operation, is convenient to the well head workman and operates construction, also frequent supporting installation oil drainer on the tubing string, oil drainer can smooth opening under the normal condition, but occurs that pump rod is disconnected to take off phenomenon, and oil drainer also just can't be opened.
Summary of the invention
The purpose of this utility model is: provide a kind of petroleum industry viscous crude and thin oil oil well production with two-way logical oil well pump.
The utility model is achieved in that and comprises upper connection, outer pump barrel, interior pump barrel, two-wayly leads to through hole, upper travelling valve, equal diameter long-term job plug, lower travelling valve, standing valve, lower contact, upper connection is connected with outer pump barrel, lower contact is connected with outer pump barrel, outer pump barrel is connected with interior pump barrel, equal diameter long-term job plug is housed in the interior pump barrel, the bottom of interior pump barrel is connected with standing valve, is respectively arranged with upper travelling valve, lower travelling valve in the equal diameter long-term job plug.
Have the two-way through hole that leads on the interior pump barrel.
Two-way entire length of leading to the distance 〉=equal diameter long-term job plug between through hole and the standing valve.
The length of outer pump barrel is greater than the length of interior pump barrel.
Advantage of the present utility model is: 1. after adopting two-way logical oil well pump, need only and carry over-stroke, piston is closed the two-way through hole that leads to, and just can directly open and take out production; As long as transfer piston at the bottom of the pump, just can open the two-way through hole that leads to, carry out steam injection, positive well-flushing or positive sand washing operation; Any oil drainer need be installed on the completion tubular column, during workover eration in the above oil pipe of oil well pump crude oil can leak into smoothly in the well, avoid oil drainer can't open crude oil and scatter ground and cause ground ring mirror pollution problem; 2. two-way logical oil well pump overall structure is simply compact, and sealing is reliable, stable performance, and its length can be regulated according to on-the-spot needs, and manufacturing, installation, dismounting and replacing are convenient.
Can realize steam injection and oil pumping production integration tubing string for thick oil well, that is: be lowered to steam injection and take out the manufacturing process of production with oil pumping production integration tubing string-steam injection-vexed well-open flow-Kai; For the thin oil oil well, the one, well-flushing just, can not trip out former well casing post, only need to deepen tubing string and can realize positive sand washing, be convenient to arrange the sand washing plan, reduce investment outlay, shorten operation and account for the well time, the 2nd, can realize oil drainer is not installed on the tubing string, even the disconnected phenomenon of taking off of pump rod occurs, tubing string still can draining during operation, avoids causing ground ring mirror pollution problem.
Description of drawings
Accompanying drawing is a structural representation of the present utility model.
Embodiment
As shown in drawings, the utility model comprises upper connection 1, outer pump barrel 2, interior pump barrel 3, two-way through hole 4, upper travelling valve 5, equal diameter long-term job plug 6, lower travelling valve 7, standing valve 8, lower contact 9 compositions of leading to, upper connection 1 is connected with outer pump barrel 2, lower contact 9 is connected with outer pump barrel 2, outer pump barrel 2 is connected with interior pump barrel 3, equal diameter long-term job plug 6 is housed in the interior pump barrel 3, and the bottom of interior pump barrel 3 is connected with standing valve 8, is respectively arranged with upper travelling valve 5, lower travelling valve 7 in the equal diameter long-term job plug 6.
Have the two-way through hole 4 that leads on the interior pump barrel 3.
Two-way entire length of leading to the distance 〉=equal diameter long-term job plug 6 between through hole 4 and the standing valve 8.
The length of outer pump barrel 2 is greater than the length of interior pump barrel 3.
Upper connection 1 top is the box screw thread, so that with oil pipe pin thread scyewed joint on the pump, connect with outer pump barrel 2 outside the bottom of upper connection 1, connect with interior pump barrel 3 in the bottom of upper connection 1, interior pump barrel 3 bottoms are standing valve 8, in the interior pump barrel 3 is equal diameter long-term job plug 6, be upper travelling valve 5 on the equal diameter long-term job plug 6, equal diameter long-term job plug is for 6 times a lower travelling valve 7, the pump barrel wall of interior pump barrel 3 is provided with the two-way through hole 4 that leads to, and two-way distance of leading to through hole 4 and standing valve 8 equals or less times greater than the entire length of equal diameter long-term job plug 6, outer pump barrel 2 length are greater than interior pump barrel 3 length, outer pump barrel 2 bottoms connect with lower contact 9, and lower contact 9 can directly connect tail pipe under the pump.
Embodiment: during lower tubular column, two-way logical oil well pump top links to each other with oil pipe, and the bottom is right after tail pipe, and the connection of oil pipe, pump rod is identical with conventional pumps, carries over-stroke on behind the following intact tubing string, and equal diameter long-term job plug 6 is closed the two-way through hole 4 that leads to, and can directly open and take out production.For thick oil well if need steam injection, can transfer piston equal diameter long-term job plug 6 at the bottom of the pump, open the two-way through hole 4 that leads to, can carry out steam injection, vexed well, open flow measure, carry over-stroke on after the stop-spraying, equal diameter long-term job plug 6 is closed the two-way through hole 4 that leads to, open and take out production,, can repeat above-mentioned steps when needs again during steam injection, so move in circles, do not need to carry out kill-job, workover eration midway; When needing positive well-flushing for the thin oil oil well, transfer equal diameter long-term job plug 6 at the bottom of the pump, open the two-way through hole 4 that leads to, can carry out positive well-flushing, wash on the back and carry over-stroke, equal diameter long-term job plug 6 is closed the two-way through hole 4 that leads to, and opens and takes out production; If when pump detection and workover needs sand washing, can trip out rod string, also can not trip out former well casing post, only need transfer equal diameter long-term job plug 6 at the bottom of the pump, open the two-way through hole 4 that leads to, to deepen tubing string and can realize positive sand washing, the shortening operation accounts for the well time, reduces investment outlay.

Claims (4)

1, two-way logical oil well pump, comprise upper connection (1), outer pump barrel (2), interior pump barrel (3), the two-way through hole (4) that leads to, upper travelling valve (5), equal diameter long-term job plug (6), lower travelling valve (7), standing valve (8), lower contact (9), it is characterized in that: upper connection (1) is connected with outer pump barrel (2), lower contact (9) is connected with outer pump barrel (2), outer pump barrel (2) is connected with interior pump barrel (3), equal diameter long-term job plug (6) is housed in the interior pump barrel (3), the bottom of interior pump barrel (3) is connected with standing valve (8), is respectively arranged with upper travelling valve (5) in the equal diameter long-term job plug (6), lower travelling valve (7).
2, two-way logical oil well pump according to claim 1 is characterized in that: have the two-way through hole (4) that leads on the interior pump barrel (3).
3, two-way logical oil well pump according to claim 1 is characterized in that: two-way entire length of leading to the distance 〉=equal diameter long-term job plug (6) between through hole (4) and the standing valve (8).
4, two-way logical oil well pump according to claim 1, it is characterized in that: the length of outer pump barrel (2) is greater than the length of interior pump barrel (3).
CN 200620118090 2006-06-14 2006-06-14 Bidirectional oil-well pump Expired - Lifetime CN2924070Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620118090 CN2924070Y (en) 2006-06-14 2006-06-14 Bidirectional oil-well pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620118090 CN2924070Y (en) 2006-06-14 2006-06-14 Bidirectional oil-well pump

Publications (1)

Publication Number Publication Date
CN2924070Y true CN2924070Y (en) 2007-07-18

Family

ID=38260501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620118090 Expired - Lifetime CN2924070Y (en) 2006-06-14 2006-06-14 Bidirectional oil-well pump

Country Status (1)

Country Link
CN (1) CN2924070Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590765A (en) * 2012-08-13 2014-02-19 中国石油天然气股份有限公司 Oil gas well under-pressure operation well head shackle device
CN104819140A (en) * 2015-05-19 2015-08-05 成都北方石油勘探开发技术有限公司 Rotary rod oil well pump and rotary rod oil pumping system formed by the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590765A (en) * 2012-08-13 2014-02-19 中国石油天然气股份有限公司 Oil gas well under-pressure operation well head shackle device
CN103590765B (en) * 2012-08-13 2015-10-28 中国石油天然气股份有限公司 Oil gas well under-pressure operation well head shackle device
CN104819140A (en) * 2015-05-19 2015-08-05 成都北方石油勘探开发技术有限公司 Rotary rod oil well pump and rotary rod oil pumping system formed by the same

Similar Documents

Publication Publication Date Title
CN203939499U (en) Pipe string of oil-water well leakage tester
CN2924070Y (en) Bidirectional oil-well pump
CN109779563B (en) Combined oil pump for preventing well flushing from polluting oil layer
CN2886053Y (en) Going-into-well resistance absorber for horizontal well casing
CN207405593U (en) A kind of integration pump lock of rotatable 90 ° of the unlatching of gate
CN2812001Y (en) High-temperature high-pressure sand bed filtration tester
CN203476281U (en) Expanding-type leakage-proof well-flushing packer
CN2846741Y (en) Sand proof tubular pole for water injection well
CN2851546Y (en) Leak proof packer
CN2851571Y (en) Capillary pressure-transmission barrel
CN2844439Y (en) Pressure tester of operation well
CN201212375Y (en) Check valve
CN201137472Y (en) Flushing rotary oil rig tap flushing assembly
CN201013308Y (en) Sand-proof oil drain valve
CN201129173Y (en) Sliding bush type pipe testing device
CN203420678U (en) Low-yield wax precipitation oil well oil production pipe column
CN103485745B (en) Expanding leak-proof well-washing packer
CN208619075U (en) A kind of multifunctional well head attachment device
CN2823540Y (en) Packer with by-pass device
CN215292394U (en) Positive and negative well-flushing flow conversion device for oil and gas well
CN219587564U (en) Multifunctional sleeve matching device
CN201057141Y (en) Double-valve oil well pump
CN207406315U (en) Coiled tubing pouring valve
CN2489090Y (en) Christmus tree for oil-field oil well
CN216446864U (en) Exempt from to demolish high-pressure construction connecting device in pit of well head production flow

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070718

EXPY Termination of patent right or utility model