CN2886053Y - Going-into-well resistance absorber for horizontal well casing - Google Patents

Going-into-well resistance absorber for horizontal well casing Download PDF

Info

Publication number
CN2886053Y
CN2886053Y CN 200620029953 CN200620029953U CN2886053Y CN 2886053 Y CN2886053 Y CN 2886053Y CN 200620029953 CN200620029953 CN 200620029953 CN 200620029953 U CN200620029953 U CN 200620029953U CN 2886053 Y CN2886053 Y CN 2886053Y
Authority
CN
China
Prior art keywords
plug
sliding
sliding plug
sleeve
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620029953
Other languages
Chinese (zh)
Inventor
石凤岐
周战云
常伟
周忠平
徐相欣
孙杰
苟明
Original Assignee
石凤岐
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石凤岐 filed Critical 石凤岐
Priority to CN 200620029953 priority Critical patent/CN2886053Y/en
Application granted granted Critical
Publication of CN2886053Y publication Critical patent/CN2886053Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a sleeves mounting decelerator in a horizontal well, which is composed of a sleeve connecting hoop, a shell, a bearing ring, a jaw looper and in turn threaded connected a sliding plug socket sleeve, a connection sleeve, a rubber plug core sleeve and a seal rubber plug under the jaw. A sliding plug ring is fixed on the upper end of the sliding plug socket sleeve via a sliding plug ring pin, a sliding plug is fixed on the lower end of the sliding plug socket sleeve via a sliding plug pin; a sliding plug check ring is fixed on the lower end of the connection sleeve via a sliding plug lever; the seal rubber plug is socketed on the rubber plug core sleeve. The utility model is mounted on the interspace between a sleeve string of a high angle well section or a horizontal well section and a sleeve string of a vertical section, the inside of the sleeve string of the high angle well section or the horizontal well section is fully charged with air, thereby the friction force between the sleeves and the wall of a well can be greatly reduced, and the frictional resistance when mounting the sleeves in a well can be reduced, thereby the wear of the sleeves and the completion cost can be reduced, in addition the completion cycle can be shortened.

Description

Horizontal well casing pipe is gone into the well resistance absorber
Technical field: the utility model relates to a kind of horizontal well casing pipe and goes into the well resistance absorber, belongs to oil drilling casing appliances technical field.
Background technology: at present, domestic in the big gradient of probing exploitation, big displacement and horizontal well process, finish very difficulty of casing job, the easy jam of sleeve pipe not only, and casing wear is also relatively more serious, and sometimes even the more casing replacing of having to, this has not only increased completion time and completion cost, and had a strong impact on the extensive use of big displacement oil gas well, slackened the advantage of such well in the oil drilling exploitation.Solve sleeve pipe and go into the key issue of well difficulty and be how to effectively reduce frictional resistance between the sleeve pipe and the borehole wall, background technology mainly contains: use setting of casing boosting instrument, use the roller centralizer, adopt the casing floating technology.Use the tool operation of setting of casing boosting loaded down with trivial details, instrument costs an arm and a leg, and is unfavorable for extensive popularization; Though use the variable sliding friction of roller centralizer to be rolling friction, because roller easily embeds the stratum, drag-reduction effect is not clearly; At present for realizing that its structure of casing floating technology employed " casing floating box cupling " also has big defective, show mainly between its internals and the body and use pin to be connected that the pin hole of body has reduced whole bunch tube intensity; Cut off for the ease of pin in addition, make that the gap of its core component and internal surface of sleeve pipe is unsuitable excessive, therefore it is bigger to be pushed to the risk that jam takes place in the process of spoiler after tamponade, in case jam just means the well cementation failure, even might cause scrapping of whole mouthful of well.
Summary of the invention: the purpose of this utility model is to avoid in the prior art in order to overcome, sleeve pipe is gone into the deficiency of well drag reduction technology, effectively eliminate the fault of construction of " casing floating box cupling " at present, design a kind of risk that reduces the casing floating technology, reduce between the sleeve pipe and the borehole wall a kind of horizontal well casing pipe of frictional resistance and go into the well resistance absorber.
The utility model is made up of the sliding obturating plug cover that is threaded successively under casing coupling, housing, retainer ring, claw support set and the claw, branch sleeve, plug core retainer plate and sealing plug, sliding plug ring by sliding plug ring dowel fixes in sliding obturating plug set upper side, sliding plug is fixed on the lower end of sliding obturating plug cover by sliding plug pin nail, sliding plug stop ring is by sliding the lower end that the plug lever is fixed on branch sleeve, and the fluid sealant plug sleeve is on the plug core retainer plate.
Invention effect: the utility model is installed between high angle hole section or net horizontal section bunch tube and the vertical section bunch tube, the hollow hole of the sliding obturating plug cover of sliding plug sealing, it can make in high angle hole section or the net horizontal section bunch tube and be full of air, after this part sleeve pipe enters pit shaft, be subjected to the buoyancy of drilling fluid in the pit shaft, just can reduce the frictional force between the sleeve pipe and the borehole wall greatly, making sleeve pipe go into well frictional resistance reduces, reduce casing wear, reduce the completion cost, shorten completion period.
Description of drawings: accompanying drawing 1 is the utility model structural representation.
Among the figure: 1-casing coupling, 2-retainer ring, 3-claw, the sliding plug ring pin of 4-, the sliding obturating plug cover of 5-, 6-branch sleeve, the sliding plug of 7-lever, 8-seals plug, 9-claw support set, the sliding plug ring of 10-, the sliding plug of 11-, the 12-housing, 13-sliding plug stop ring, 14-plug gland, 15-plug core retainer plate, the sliding plug pin nail of 16-.
The specific embodiment: as can be known by accompanying drawing 1, the utility model is made up of sliding obturating plug cover 5, branch sleeve 6, plug core retainer plate 15 and sealing plug 8 that casing coupling 1, housing 12, retainer ring 2, claw support set 9, claw 3 and claw are threaded for 3 times successively, sliding plug ring 10 is fixed on sliding obturating plug by sliding plug ring pin 4 and overlaps 5 upper ends, sliding plug 11 is fixed on the lower end of sliding obturating plug cover 5 by sliding plug pin nail 16, sliding plug stop ring 13 is by sliding the lower end that plug lever 7 is fixed on branch sleeve 6, and sealing plug 8 is enclosed within on the plug core retainer plate 15.
In the cementing operation process, turn on pump before the well cementation, under pressure, cut off sliding plug pin nail 16, sliding plug 11 moves in the branch sleeve 6 and is slided plug lever 7 and shelves that sliding plug stop ring 13 hinders, make the conducting of upper/lower terminal bunch tube form path, circulation and cementing operation before can cementing the well this moment; After the cementing operation is finished, open cementing concrete first speed pin, cementing plug is pressed in the casing string, cementing plug is obstructed when moving to claw bearing sleeve 9 upper ends by well head, rising pressure, promoting claw support set 9 moves downward, cut off sliding plug ring pin 4 successively, sliding plug pin nail, build the pressure and cut off sliding plug ring pin 4, sliding plug ring 10 moves down into sliding obturating plug with claw support set 9 and overlaps 5 bottoms, and this moment, claw 3 was because of losing the radially bracketing of claw support set 9, inside radial contraction under axial compression, finally leave retainer ring 2, the parts in the housing 12 are finished well cementing operation by the block ring place bruising that cementing plug is passed the bunch tube bottom under for slurry pressure.

Claims (1)

1, a kind of horizontal well casing pipe is gone into the well resistance absorber, form by the sliding obturating plug cover (5) that is threaded successively under casing coupling (1), housing (12), retainer ring (2), claw support set (9), claw (3) and the claw (3), branch sleeve (6), plug core retainer plate (15) and sealing plug (8), it is characterized in that sliding plug ring (10) is fixed on sliding obturating plug cover (5) upper end by sliding plug ring pin (4), sliding plug (11) is followed closely the lower end that (16) are fixed on sliding obturating plug cover (5) by sliding plug pin, and sliding plug stop ring (13) is fixed on the lower end of branch sleeve (6) by sliding plug lever (7).
CN 200620029953 2006-01-24 2006-01-24 Going-into-well resistance absorber for horizontal well casing Expired - Fee Related CN2886053Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620029953 CN2886053Y (en) 2006-01-24 2006-01-24 Going-into-well resistance absorber for horizontal well casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620029953 CN2886053Y (en) 2006-01-24 2006-01-24 Going-into-well resistance absorber for horizontal well casing

Publications (1)

Publication Number Publication Date
CN2886053Y true CN2886053Y (en) 2007-04-04

Family

ID=37961143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620029953 Expired - Fee Related CN2886053Y (en) 2006-01-24 2006-01-24 Going-into-well resistance absorber for horizontal well casing

Country Status (1)

Country Link
CN (1) CN2886053Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005708A (en) * 2013-02-26 2014-08-27 中国石油化工股份有限公司 Casing drag-reduction device
CN105697848A (en) * 2016-03-21 2016-06-22 福州品行科技发展有限公司 Infrared induction faucet with filter element easily replaced
CN107401377A (en) * 2017-09-11 2017-11-28 长江大学 A kind of deep drilling anti-friction damping device
CN109611061A (en) * 2018-11-29 2019-04-12 中国海洋石油集团有限公司 A method of floating tripping in screen casing
CN109611060A (en) * 2018-11-26 2019-04-12 中国海洋石油集团有限公司 A kind of floating screen casing
CN109681120A (en) * 2018-12-21 2019-04-26 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of ultra-long horizontal section casing continues tripping in method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005708A (en) * 2013-02-26 2014-08-27 中国石油化工股份有限公司 Casing drag-reduction device
CN104005708B (en) * 2013-02-26 2016-06-29 中国石油化工股份有限公司 Sleeve pipe resistance absorber
CN105697848A (en) * 2016-03-21 2016-06-22 福州品行科技发展有限公司 Infrared induction faucet with filter element easily replaced
CN107401377A (en) * 2017-09-11 2017-11-28 长江大学 A kind of deep drilling anti-friction damping device
CN109611060A (en) * 2018-11-26 2019-04-12 中国海洋石油集团有限公司 A kind of floating screen casing
CN109611061A (en) * 2018-11-29 2019-04-12 中国海洋石油集团有限公司 A method of floating tripping in screen casing
CN109681120A (en) * 2018-12-21 2019-04-26 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of ultra-long horizontal section casing continues tripping in method

Similar Documents

Publication Publication Date Title
CN2886053Y (en) Going-into-well resistance absorber for horizontal well casing
CN110805410A (en) Intelligent sliding sleeve of bridge-plug-free multistage fracturing electric control switch
CN106246115A (en) Double damping helicoid hydraulic motor
CN116577091A (en) Pressure testing device for underground testing tool of oil field
CN201326410Y (en) Tugger of logging tool
CN208763623U (en) A kind of Cementing rubber plug anti-rotation device
CN201144822Y (en) Uniform wall thickness rubber screw rod stator
CN201176911Y (en) Emulsion pump suitable for down-hole of coal mine
CN2869388Y (en) Equal-wall-thickness stator screw pump for oil production
CN103174398B (en) A kind of drillable press-fracturing bridge plug
CN101832112B (en) Optimal experimental device for coupling centralizer
CN201074589Y (en) Multipurpose standing valve for oil-well pump
CN2837505Y (en) Down-hole grouting tool
CN2924070Y (en) Two-way oil pump
CN205243458U (en) High temperature resistant big latus rectum hydraulic pressure reinforcement inflation hangs instrument
CN110700758A (en) External clamping type top drive casing pipe lowering device
CN205918394U (en) Novel active liquid accuse packer
CN201943694U (en) Slide-sleeve type sampling device
CN202348232U (en) Steel brush cleaner for underground sleeve
CN2929156Y (en) Oil-water well casing tandem connector
CN206158632U (en) Novel ware is crawled into to water conservancy
CN2869300Y (en) Packer for horizontal well side drilling and horizontal well operation
CN205663418U (en) Electric drive casing patching power device
CN203441418U (en) Eccentric test wellhead equipment
CN201865628U (en) Rotary oil leaking device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee