CN103590765A - Wellhead breakout device for oil and gas wells under pressure - Google Patents
Wellhead breakout device for oil and gas wells under pressure Download PDFInfo
- Publication number
- CN103590765A CN103590765A CN201210286453.6A CN201210286453A CN103590765A CN 103590765 A CN103590765 A CN 103590765A CN 201210286453 A CN201210286453 A CN 201210286453A CN 103590765 A CN103590765 A CN 103590765A
- Authority
- CN
- China
- Prior art keywords
- end connects
- connects
- oil
- centre bore
- rotary barrel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Earth Drilling (AREA)
- Pipe Accessories (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种油气井带压作业井口卸扣装置,属于油气井带压起钻作业技术领域。The invention relates to a wellhead breakout device for snubbing operation of oil and gas wells, and belongs to the technical field of snubbing operation of oil and gas wells.
背景技术 Background technique
在气田生产过程中,有时会因地层出砂、脏物沉淀、生产管柱窜漏和油管断落造成气井暂被水淹,或因井下事故、套管变形、腐蚀、破裂、油管腐蚀穿孔、断落及油管堵塞造成气井停产,以致报废,因此,为恢复气井生产,就要进行修井。常规的修井方法主要有两种,一是不压井,即在高压气井作业时,利用不放喷井口装置控制气井不喷;另一种是压井,即从地面向井里注入密度适当的流体,恢复和重建压力平衡。In the process of gas field production, sometimes the gas well is temporarily flooded due to formation sand, dirt precipitation, production string leakage and tubing breakage, or due to downhole accidents, casing deformation, corrosion, rupture, tubing corrosion and perforation, The gas well is shut down due to falling off and clogging of the tubing, so that it is scrapped. Therefore, in order to restore the gas well production, it is necessary to carry out workover. There are two main conventional workover methods, one is not snubbing, that is, when the high-pressure gas well is operating, the wellhead device is used to control the gas well not to blow out; Fluid, restores and rebuilds pressure balance.
气井不压井作业技术是在不压井条件下起下管柱的一种方法,其采用桥塞或堵塞器封堵油管内的压力,用不压井作业机防喷器组控制油套环空压力,依靠不压井作业机举升系统及修井机起下管柱。The gas well snubbing technology is a method of tripping the pipe string under the snubbing condition. It uses bridge plugs or plugs to block the pressure in the tubing, and uses the snubbing machine blowout preventer group to control the oil sleeve ring. The air pressure depends on the lifting system of the snubbing machine and the workover rig to lift and lower the pipe string.
井内完井管柱主要有光油管生产管柱、单封隔器生产管柱和多级封隔器生产管柱三种类型。光油管生产管柱结构简单,可将桥塞投放到最后一根油管,坐封成功后可一次起出全部管柱。封隔器生产管柱结构复杂,要在井下工具上部投放常规桥塞,以起出井内工具以上油管。但井筒内剩余工具串无法一次起出,需要通过卸扣才能将管柱分开起出,而目前的技术无法实现井口带压卸扣,不能满足油气井带压起下复杂管柱的作业需求。In-well completion strings mainly include three types: bare tubing production strings, single packer production strings and multi-stage packer production strings. The light oil pipe production string has a simple structure, and the bridge plug can be put into the last oil pipe, and all the strings can be pulled out at one time after setting is successful. The production string structure of the packer is complex, and a conventional bridge plug needs to be placed on the upper part of the downhole tool to pull out the tubing above the downhole tool. However, the remaining tool strings in the wellbore cannot be pulled out at one time, and the pipe string needs to be pulled out separately through shackles. However, the current technology cannot realize the shackle of the wellhead under pressure, and cannot meet the operation requirements of oil and gas wells with the complex pipe string under pressure.
发明内容 Contents of the invention
本发明的目的在于提供一种油气井带压作业井口卸扣装置,其能配合油气井复杂管柱的带压起钻作业,在卸扣装置内完成带压卸扣后,将复杂管柱起出带压井口。The object of the present invention is to provide a wellhead breakout device for oil and gas well under pressure operation, which can cooperate with the under pressure tripping operation of complex pipe strings in oil and gas wells. Out of the pressurized wellhead.
本发明的具体技术方案如下:Concrete technical scheme of the present invention is as follows:
井口卸扣装置的支撑柱上端连接上法兰盘,下端连接下法兰盘;The upper end of the support column of the wellhead shackle device is connected to the upper flange, and the lower end is connected to the lower flange;
上法兰盘中心阶梯孔柱连接上压帽,筒形上接头上端连接上压帽中心孔,下端连接旋转筒体中心孔;The stepped hole column in the center of the upper flange is connected to the upper pressure cap, the upper end of the cylindrical upper joint is connected to the center hole of the upper pressure cap, and the lower end is connected to the center hole of the rotating cylinder;
下法兰盘中心阶梯孔柱连接下压冒,筒形下接头下端连接下压冒中心孔,上端连接旋转筒体中心孔;下法兰盘中心阶梯孔柱筒壁上设有径向的紧固卡瓦,紧固卡瓦前端连接调节螺栓,后端连接紧固卡瓦弹簧;The stepped hole column in the center of the lower flange is connected to the lower pressure riser, the lower end of the cylindrical lower joint is connected to the center hole of the lower pressure riser, and the upper end is connected to the center hole of the rotating cylinder; the wall of the lower flange center stepped hole column is provided with a radial tightening Fixing the slips, the front end of the fastening slips is connected to the adjusting bolt, and the rear end is connected to the fastening slip springs;
旋转筒体筒壁上设有径向的旋转孔和旋转筒体紧固卡瓦,旋转筒体紧固卡瓦前端连接调节螺栓,后端连接旋转筒体紧固卡瓦弹簧。The wall of the rotating cylinder is provided with radial rotating holes and fastening slips of the rotating cylinder. The front end of the fastening slips of the rotating cylinder is connected with the adjusting bolt, and the rear end is connected with the spring of the fastening slips of the rotating cylinder.
本发明油气井带压作业井口卸扣装置工作可靠,操作简便,能实现井口带压卸扣,满足油气井带压起下复杂管柱的作业需求。The wellhead breakout device for oil and gas well underpressure operation of the present invention is reliable in operation and easy to operate, can realize wellhead underpressure breakout, and satisfies the operation requirements of oil and gas well underpressure for complex pipe strings.
附图说明 Description of drawings
图1为油气井带压作业井口卸扣装置结构示意图。Fig. 1 is a schematic diagram of the structure of the wellhead breakout device for the oil and gas well under pressure operation.
具体实施方式 Detailed ways
参照图1对本发明的实施例进一步说明:Embodiments of the present invention are further described with reference to Fig. 1:
实施例:Example:
油气井带压作业井口卸扣装置包括上压冒1、上接头2、旋转筒体紧固卡瓦弹簧4、旋转筒体紧固卡瓦3、下接头5、下压冒6、紧固卡瓦弹簧8、紧固卡瓦7、下法兰盘9、调节螺栓10、旋转孔11、旋转筒体12、支撑柱13和上法兰盘14:The wellhead breakout device for oil and gas wells under pressure operation includes an upper pressure riser 1, an
支撑柱13上端连接上法兰盘14,下端连接下法兰盘9;The upper end of the
上法兰盘14中心阶梯孔柱外螺纹连接上压帽1,筒形上接头2上端外螺纹连接上压帽1中心孔,下端外螺纹连接旋转筒体12中心孔;The outer thread of the stepped hole column in the center of the
下法兰盘9中心阶梯孔柱连接下压冒6,筒形下接头5下端外螺纹连接下压冒6中心孔,上端外螺纹连接旋转筒体12中心孔;下法兰盘9中心阶梯孔柱筒壁上设有径向的紧固卡瓦7,紧固卡瓦7前端连接调节螺栓10,后端连接紧固卡瓦弹簧8;The
旋转筒体12筒壁上设有径向的旋转孔11和旋转筒体紧固卡瓦3,旋转筒体紧固卡瓦3前端连接调节螺栓10,后端连接旋转筒体紧固卡瓦弹簧4。The wall of the rotating
本井口卸扣装置工作时,下法兰盘9连接井口法兰盘,上法兰盘14连接带压作业装置,形成卸扣装置密封腔。上方管柱穿在上法兰盘14中心阶梯孔柱内,由旋转筒体紧固卡瓦3锁定,下方管柱穿在下法兰盘9中心阶梯孔柱内,由紧固卡瓦7锁定。需要将管柱起出井口时,旋转调节螺栓10,上紧旋转筒体紧固卡瓦3和紧固卡瓦7,夹紧管柱,然后将专用工具插入旋转孔11,反向转动旋转筒体12卸扣,卸扣完成后,带压作业装置随即起出上方管串,实现井筒内管柱的不压井起钻。When the wellhead breakout device works, the
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210286453.6A CN103590765B (en) | 2012-08-13 | 2012-08-13 | Wellhead breakout device for oil and gas wells under pressure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210286453.6A CN103590765B (en) | 2012-08-13 | 2012-08-13 | Wellhead breakout device for oil and gas wells under pressure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103590765A true CN103590765A (en) | 2014-02-19 |
| CN103590765B CN103590765B (en) | 2015-10-28 |
Family
ID=50081062
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210286453.6A Active CN103590765B (en) | 2012-08-13 | 2012-08-13 | Wellhead breakout device for oil and gas wells under pressure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103590765B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106351594A (en) * | 2016-10-10 | 2017-01-25 | 杨颖辉 | Closed hydraulic tongs |
| CN107900977A (en) * | 2017-12-25 | 2018-04-13 | 中国石油集团川庆钻探工程有限公司长庆钻井总公司 | A kind of device and method for loading and unloading well head bottom flange |
| CN110630204A (en) * | 2019-08-21 | 2019-12-31 | 中国石油天然气股份有限公司 | A kind of snubbing operation equipment and snubbing operation method for gas drive injection well completion |
| CN111878016A (en) * | 2020-08-05 | 2020-11-03 | 四川圣诺油气工程技术服务有限公司 | Under-pressure back-off device for gas well and oil pipe lifting method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB655256A (en) * | 1946-08-22 | 1951-07-18 | Standard Oil Dev Co | Improvements in or relating to apparatus for rotating cylindrical bodies |
| CN2924070Y (en) * | 2006-06-14 | 2007-07-18 | 中国石油天然气股份有限公司 | Two-way oil well pump |
| CN101864904A (en) * | 2010-06-09 | 2010-10-20 | 李呈祥 | Operation device for stripping sucker rod at pressure |
| CN201794525U (en) * | 2010-06-09 | 2011-04-13 | 李呈祥 | Sucker rod trip operating device under pressure |
| CN201802330U (en) * | 2010-09-01 | 2011-04-20 | 中国石油天然气集团公司 | Uninterrupted circular drilling device |
| US20110308815A1 (en) * | 2009-03-06 | 2011-12-22 | Cameron International Corporation | Multi-pressure flange connection |
-
2012
- 2012-08-13 CN CN201210286453.6A patent/CN103590765B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB655256A (en) * | 1946-08-22 | 1951-07-18 | Standard Oil Dev Co | Improvements in or relating to apparatus for rotating cylindrical bodies |
| CN2924070Y (en) * | 2006-06-14 | 2007-07-18 | 中国石油天然气股份有限公司 | Two-way oil well pump |
| US20110308815A1 (en) * | 2009-03-06 | 2011-12-22 | Cameron International Corporation | Multi-pressure flange connection |
| CN101864904A (en) * | 2010-06-09 | 2010-10-20 | 李呈祥 | Operation device for stripping sucker rod at pressure |
| CN201794525U (en) * | 2010-06-09 | 2011-04-13 | 李呈祥 | Sucker rod trip operating device under pressure |
| CN201802330U (en) * | 2010-09-01 | 2011-04-20 | 中国石油天然气集团公司 | Uninterrupted circular drilling device |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106351594A (en) * | 2016-10-10 | 2017-01-25 | 杨颖辉 | Closed hydraulic tongs |
| CN106351594B (en) * | 2016-10-10 | 2018-05-08 | 杨颖辉 | Closed hydraulic tongs |
| CN107900977A (en) * | 2017-12-25 | 2018-04-13 | 中国石油集团川庆钻探工程有限公司长庆钻井总公司 | A kind of device and method for loading and unloading well head bottom flange |
| CN110630204A (en) * | 2019-08-21 | 2019-12-31 | 中国石油天然气股份有限公司 | A kind of snubbing operation equipment and snubbing operation method for gas drive injection well completion |
| CN111878016A (en) * | 2020-08-05 | 2020-11-03 | 四川圣诺油气工程技术服务有限公司 | Under-pressure back-off device for gas well and oil pipe lifting method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103590765B (en) | 2015-10-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101586462B (en) | Method of suspending, completing and working over a well | |
| CN204703814U (en) | Integral type wellhead column hitch | |
| CN105275417B (en) | Method for running in and out coiled tubing production string | |
| CN204984329U (en) | Built -in coiled tubing hanger | |
| CN204703876U (en) | A bridge-type concentric dispensing string | |
| CN103590765B (en) | Wellhead breakout device for oil and gas wells under pressure | |
| CN103541697B (en) | Anti-sliding single rubber tube downhole throttling device | |
| US20120312529A1 (en) | Reducing trips in well operations | |
| CN201778671U (en) | An expansion cone locking mechanism | |
| CN201567998U (en) | Drainage gas production well head sealing suspension device | |
| CN201092845Y (en) | Hydraulic pressure, double back-off hand type dragable bridge plug | |
| CN205000922U (en) | Built -in coiled tubing completion pipe string | |
| CN204941402U (en) | Grappling water booster system | |
| CN201695990U (en) | Split type slips suspension packer | |
| CN104847295A (en) | Mandrel-type hanger capable of replacing failure metal sealing part after well cementation | |
| CN201620839U (en) | Gas well production string | |
| CN105649568B (en) | Hydraulic releasing wellhead hanger and self-injection-to-mechanical-production integrated assembly | |
| CN104514528A (en) | Throttle rubber cartridge dissolving agent dispensing device | |
| CN104514519B (en) | Oil well pipe string breaking off falling object device | |
| CN105298427B (en) | Mechanical wellhead suspension device and integrated device for self-spraying, turning and mining | |
| CN207485366U (en) | A kind of earth cuttings support system | |
| CN210105804U (en) | Well cementation matched tool without replacing well control blowout preventer core | |
| CN207245677U (en) | A kind of underwater well head tripping in instrument | |
| CN207568551U (en) | A kind of packer for realizing infinite stages pressure break | |
| CN206503583U (en) | The high-pressure sealed plug that bores uses anti-ejection device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |