CN2913460Y - Retaining wall against sliding and collapse - Google Patents

Retaining wall against sliding and collapse Download PDF

Info

Publication number
CN2913460Y
CN2913460Y CN 200520068109 CN200520068109U CN2913460Y CN 2913460 Y CN2913460 Y CN 2913460Y CN 200520068109 CN200520068109 CN 200520068109 CN 200520068109 U CN200520068109 U CN 200520068109U CN 2913460 Y CN2913460 Y CN 2913460Y
Authority
CN
China
Prior art keywords
retaining wall
barb
taper
junction plate
building unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520068109
Other languages
Chinese (zh)
Inventor
黄大文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200520068109 priority Critical patent/CN2913460Y/en
Application granted granted Critical
Publication of CN2913460Y publication Critical patent/CN2913460Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a skid and collapse resistance retaining wall, which comprises wall body formed by arranging building units similar to sandbag and connecting plates in staggered and overlapped manner. Alternatively arranged conical cuspate bulges are made on the front and rear surfaces of the connecting plate, wherein at least three conical cuspate bulges are provided with notch barb and/or at least two rivets, and a row of conical cuspate bulges with notch barb can be connected into a whole with soil reinforcement grids. The connecting plates will not be separated with the building units under external force action. The utility model solves the problems that the retaining wall in the prior art has no connecting plates with bulges with barb, can only be placed at flat floor in overlapped manner, cannot be used in inclined hillside site or steep rock, and has the shortcomings of low antiskid ability, easy transitional movement of the building units, easy generation of creepage and deformation due to rain wash, and easy man-made movement. The utility model can fasten the building units on any slopes via rivet connecting plates and rivet rods, and make the building units like sandbag to form an integral wall body via connecting plates.

Description

The retaining wall that antiskid is moved and caved in
Technical field
The utility model relates to a kind of retaining wall that is used for road and bridge, dam construction, especially prevents the retaining wall that sloping body slides and caves in.
Retaining wall in the known technology is the building unit with similar sand hill, according to the form and the construction requirement on ground, along the overlapping in turn one by one wall body structure of putting into of straight line.For the building unit that prevents overlapping sand hill slides, so-called in the prior art " retaining wall " with lock wall construction unit, between the building unit of per two sand hills or similar sand hill, be placed with a junction plate that has ridge, this retaining wall that only connects and composes between the building unit with sand hill or similar sand hill, usually an independently body of wall face of vertical ground can only be formed, overlapping putting can only be on more smooth ground, carried out.If on the rock that is used in the location, hillside of inclination or sticks up suddenly, in case the bag that occur to expand is damaged, or sliding bag shifts out, and body of wall will collapse and cave in.Press mechanics principle, also there is certain slip in the body of wall that only relies on conical protruding point to connect, and antiskid power is less, easily wriggled naturally by rainwater, by the people be move may.The wall height of this class body of wall generally can not surpass 1.5 meters, will have the danger of caving in, slide, falling in case surpass.Therefore national design specifications stipulates that also the height of this class formation retaining wall can not be above 1.5 meters.
Summary of the invention
The purpose of this utility model provides a kind of improved retaining wall, it can prevent effectively on any slope that overlapping packaging material building unit from sliding and wriggling caves in, can surpass 1.5 meters bodies of wall high in, the moving and retaining wall that caves in of the antiskid of caving in of can not falling.
The technical scheme that its technical problem that solves the utility model adopts is: the retaining wall that a kind of antiskid is moved and caved in, comprise: the body of wall that constitutes by the overlapping arrangement of building unit staggered floor of similar sand hill, and be pressed in up and down and connect similar sand hill building unit between the row, and positive and negative has the junction plate of tapered protrusion, it is characterized in that, be shaped on the pointed projection of spaced taper on the positive and negative of described junction plate, and having at least the pointed projection of taper more than three to be shaped on breach barb and/or at least two rivets, the pointed projection of taper that wherein has at least a row to have the breach barb can link into an integrated entity with fiber reinforced grating for earth engineering.
The utility model has following beneficial effect than prior art.
Positive and negative has the junction plate of the pointed protruding breach barb of taper and/or at least two rivets, this junction plate has the barb function, join together with assurance junction plate and building unit, or multilayer stack back and formation integral body. junction plate can not separate with building unit under external force.Not only avoided prior art not have the junction plate of barb design ridge, can only be in that to carry out overlapping defective and the antiskid kinetic force of putting on the rock that can not be used in tilted mountain hillside fields section or stick up suddenly on the ground grading little, the easy sliding transfer of building unit, easily being washed away by rainwater and mountain torrents and produce wriggling and distortion, is the deficiency of moving by the people easily.The coniform barb of a row that increases can link into an integrated entity netted fiber reinforced grating for earth engineering plate, tamps for retaining wall thereafter carries out backfill behind, and netted fiber reinforced grating for earth engineering and the soil body are fused provides technical support.This kind is called the force structure of reinforced soil retaining wall, meet in the national design specifications: the regulation of " length of successively going deep in the retaining wall tamped backfill when reinforced grating is not less than 0.7 times of wall height (and being not less than 3.5 meters), and the reinforced soil retaining wall design height is unrestricted ".The utility model can be can be on any slope fixing on the slope with junction plate by rivet rod by the rivet junction plate, and the building unit sand hill of similar sand hill is formed an overall structure body of wall by junction plate.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the connection layout that is shaped on pointed protruding junction plate of taper and reinforced grating on the utility model positive and negative.
Fig. 2 is the lateral view that is shaped on the pointed protruding junction plate of taper on the utility model positive and negative.
Fig. 3 is that the utility model building unit is the schematic diagram that the pyramid staggered floor is connected with junction plate.
Fig. 4 is that the utility model passes through embodiment Fig. 6 A of rivet junction plate to enlarged diagram on sloping body.
Fig. 5 is that the utility model band breach barb junction plate is connected the embodiment schematic diagram that gos deep into the retaining wall tamped backfill with reinforced grating.
Fig. 6 is the retaining wall embodiment schematic diagram that the utility model is laid on tilted mountain hillside fields section.
The specific embodiment
In Fig. 1, Fig. 2,4 fens upper and lower surfaces of junction plate, or tow sides.On the positive and negative of junction plate 4, be shaped on pointed protruding 3 and be shaped on the taper pointed protruding 2 of breach barb of spaced taper.In the pointed projection of taper that is spaced on junction plate 4 positive and negatives, have at least the taper pointed protruding 3 more than three to be shaped on breach barb and/or at least two rivets, rivet is by junction plate 4 rivet holes 5.The junction plate 4 downward sides can have 16 garden taper point projectioies 3, wherein can there be eight and have the breach barb, upwards the side can be shaped on the cone shape point projection 2 of three band breach barbs, so that the adjacent building unit in the left and right sides 7 that reaches up and down shown in Figure 3 links into an integrated entity.It is with second layer sand hill, or the building unit 7 of similar sand hill, is pressed in up and down on the first floor sand hill staggered floor, and the building unit 7 of similar sand hill is connected into pyramidal overlapping spread pattern.So just can go deep into building unit 7 junction plate 4 of (comprising software and hardware) by taper protruding point about having, put arbitrarily one deck independently that building unit 7 (comprising software and hardware) is connected, the building unit 7 of second, third that will superpose and even multilayer (comprising software and hardware) fuses simultaneously.Wherein, junction plate 4 taper pointed protruding 2 that has at least a row to have a breach barb can be connected with fiber reinforced grating for earth engineering.This band breach barb taper pointed protruding 2 can be by each several rows of being listed on the junction plate up and down, every row can have the taper of four band breach barbs pointed protruding 2, wherein has the pointed projection of row's band breach barb taper to hook junction plate 4 by the ribbed lattice 6 of external fiber reinforced grating for earth engineering 1.Described reinforced grating 6 is whole board-like lacing wire and tandem lacing wire.Reinforced grating 6 is a kind of low modulus, high creep polypropylene geotechnique band lacing wire material.The tensile strength of material is controlled by creep, and the surface is shaped on coarse decorative pattern.The building unit 7 of the utility model indication can be packeted soil, packed sand, packed stone, packed fine grained (comprising software and hardware).Shape is as common rice bag or rectangular-shaped cloth bag.Also can be a kind ofly can permeate rainwater, can make the ecological packaging bag of plant growing.
In Fig. 4 or embodiment shown in Figure 6, junction plate 4 of the present utility model can pass through rivet clasp or rivet 8, with junction plate 4 be laid on 9 locations, inclination hillside or stick up building unit 7 (comprising software and hardware) on the rock suddenly, ground or metope is capable is integral, the building unit that connects and ground or metope are fused.The back-filling in layers compacting native 10 then.
In the embodiment shown in fig. 6, be laid on 9 locations, inclination hillside or stick up building unit 7 on the rock suddenly, usually can be by the tonsure broken-up laying, inciting somebody to action independently by the junction plate 4 of ridge about having, building unit 7 (comprising software and hardware) deeply connects into the building retaining wall structure that multilayer is arranged overlapping one.At first digging out gutter 13, on the ground of mortar flag stone, lay out first row's building unit 7, interlock being shaped on pointed protruding junction plate 4 of taper and reinforced grating 1 on the positive and negative shown in Figure 1 then, successively lay, press the massif above-ground route by back-filling in layers soil pressure 12, and compacting constitutes reinforced soil retaining wall.When reaching segmentation ladder high H1, H2 or H3, make a platform that can make 4% draining.Do not have that ground supports domatic on building unit 7 can rank overlapping laying one by one by junction plate rivet 8 shown in Figure 4, constitute sloping body wall.Usually can make catchwater 11 on the top, to make things convenient for draining.

Claims (6)

1. the moving and retaining wall that caves in of an antiskid, comprise: the body of wall that constitutes by the overlapping arrangement of building unit staggered floor of similar sand hill, and be pressed in up and down and connect similar sand hill building unit between the row, and positive and negative has the junction plate of tapered protrusion, it is characterized in that, be shaped on the pointed projection of spaced taper on the positive and negative of described junction plate, and having at least the pointed projection of taper more than three to be shaped on breach barb and/or at least two holdfasts, the pointed projection of taper that wherein has at least a row to have the breach barb can link into an integrated entity with fiber reinforced grating for earth engineering.
2. according to the retaining wall shown in the claim 1, it is characterized in that, the pointed projection of described band breach barb taper is by each several rows of being listed on the junction plate up and down, every row can have four pointed projectioies of band breach barb taper, wherein has the pointed projection of row's band breach barb taper to hook junction plate by the ribbed lattice of external reinforced grating.
3. according to the retaining wall shown in the claim 1, it is characterized in that described reinforced grating is whole board-like lacing wire or tandem lacing wire.
4. according to the retaining wall shown in the claim 3, it is characterized in that described reinforced grating is a kind of low modulus, high creep polypropylene geotechnique band lacing wire material, the surface is shaped on coarse decorative pattern.
5. according to the retaining wall shown in the claim 1, it is characterized in that described building unit is packeted soil, packed sand, packed stone, packed fine grained, comprises software and hardware.
6. according to the retaining wall shown in the claim 5, it is characterized in that described building unit is a kind of ecological packaging bag that can permeate rainwater and make plant growing.
CN 200520068109 2005-11-30 2005-11-30 Retaining wall against sliding and collapse Expired - Fee Related CN2913460Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520068109 CN2913460Y (en) 2005-11-30 2005-11-30 Retaining wall against sliding and collapse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520068109 CN2913460Y (en) 2005-11-30 2005-11-30 Retaining wall against sliding and collapse

Publications (1)

Publication Number Publication Date
CN2913460Y true CN2913460Y (en) 2007-06-20

Family

ID=38168058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520068109 Expired - Fee Related CN2913460Y (en) 2005-11-30 2005-11-30 Retaining wall against sliding and collapse

Country Status (1)

Country Link
CN (1) CN2913460Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774617A (en) * 2013-12-06 2014-05-07 浙江水利水电学院 Mutually-embedded type slope protection building block and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774617A (en) * 2013-12-06 2014-05-07 浙江水利水电学院 Mutually-embedded type slope protection building block and construction method thereof
CN103774617B (en) * 2013-12-06 2016-05-18 浙江水利水电学院 A kind of embedding type slope protection block and construction method thereof mutually

Similar Documents

Publication Publication Date Title
KR101873313B1 (en) Geo cell for improving workability and increasing strength using functional connector, and method for constructing this same
KR100660379B1 (en) Plantable reinforced earth wall and its block and construction method of reinforced earth wall
CN203429660U (en) Stereo stiffened rigid-flexible combined ecological retaining wall
CN110593281A (en) High-steep rock slope ecological protection system and construction method thereof
CN107642098A (en) One kind washes away area's side slope ecological protection structure and preparation method thereof by force
KR101077949B1 (en) Block for reinforcement and construction method
CN211036596U (en) Integral reinforced steel-plastic geogrid
CN104652181B (en) Light supporting structure for existing railway station roadbed on filling roadbed
CN111254952A (en) Ecological restoration structure of high and steep side slope of refuse dump
CN101705695B (en) Ecological bag reinforced retaining wall
CN104775395A (en) Arch type flexible ecological revetment structure for small and medium-sized valley or river channel and construction method for arch type flexible ecological revetment structure
CN211816332U (en) Ecological restoration structure of high and steep side slope of refuse dump
CN2913460Y (en) Retaining wall against sliding and collapse
JP6186031B1 (en) Honeycomb retaining wall
CN210216318U (en) Ecological river course side slope protective structure
CN2887961Y (en) Interlocked anti-skid breast wall
CN108560495A (en) A kind of adjustable Ecological Retaining Wall of angular range
KR102261999B1 (en) Construction Method for Drainage and Slope Restoration Using Eco-friendly Earth Pouch Wire Net Kit
KR102485557B1 (en) Breast wall structure
CN210886796U (en) Subgrade is consolidated to weak soil
KR100780216B1 (en) Method for constructing a honeycomb-shaped mat
KR100995097B1 (en) Method for constructing wall block
CN209958376U (en) High slope reinforcement system
CN112411584A (en) Anti-slide pile and greening strip combined grout rubble highway slope protection structure
CN207062983U (en) A kind of prefabricated frame posture retaining wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070620

Termination date: 20091230