CN2907971Y CN 200620073238 CN200620073238U CN2907971Y CN 2907971 Y CN2907971 Y CN 2907971Y CN 200620073238 CN200620073238 CN 200620073238 CN 200620073238 U CN200620073238 U CN 200620073238U CN 2907971 Y CN2907971 Y CN 2907971Y
Authority
CN
China
Prior art keywords
coal gas
gas
production line
utility
metal mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620073238
Other languages
Chinese (zh)
Inventor
陈宗明
高杰
储贵安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui FENGXING Wear Resistant Materials Ltd.
Original Assignee
ANHUI NINGGUO WEAR RESISTANT MATERIALS GENERAL PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI NINGGUO WEAR RESISTANT MATERIALS GENERAL PLANT filed Critical ANHUI NINGGUO WEAR RESISTANT MATERIALS GENERAL PLANT
Priority to CN 200620073238 priority Critical patent/CN2907971Y/en
Application granted granted Critical
Publication of CN2907971Y publication Critical patent/CN2907971Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The utility model discloses a metal mould preheating device for ball casting product line, which comprises an idler-type level convey frame for metal mould, a coal gas producing furnace, a gas transmission pipe and a gas combustion device. The utility model is characterized in that two to four sets of the gas combustion device are installed on the bottom of the level-conveying frame of the metal mould; the gas combustion device is composed of a gas burner of pipe type and a flame holding grill. The gas combustion device is connected with the coal gas producing furnace through the gas pipe and a valve. The utility model can preheat the metal mould of ball casting product line automatically and provide necessary conditions for the subsequent procedure of covering lumen of the mould with sand, which saves energy and protects the environment. The operation and maintenance of the utility model are both easy to assure the continuous running of the ball casting product line.

Description

Casting ball production line metal die preheating device
Technical field
The utility model belongs to a kind of ball casting machine tool process units, specifically is casting ball production line metal die preheating device.
Background technology
At present, domestic casting ball generally all is to adopt the metal die hand teeming to produce, and production environment is abominable, and labor intensity is big, and labor productivity is low, and product quality is difficult to guarantee.After adopting mechanical production line, though improved production efficiency, the metal die die cavity is covered sand before, need carry out preheating to guarantee to cover the sand effect to the metal die die cavity.Can only adopt at present below production line and to place simple and easy coal stove or oil oven toasts preheating to metal die, not only the temperature of mould and die preheating is difficult to control, and covering the sand effect can not guarantee.And on-the-spot fume amount is big, the energy consumption height, and severe operational environment, production efficiency are also very low.
The utility model content
The purpose of this utility model provides a kind of preheating device of casting the ball production line metal die, promptly below the rolling type horizontal feed frame of metal casting ball production line, gas burner is set, use the metal die on the producer gas heating production line, it is heated to carries out next road die cavity after certain temperature and cover the sand operation, to guarantee the serialization operation of casting ball production line.
The technical solution of the utility model is as follows:
Casting ball production line metal die preheating device, include rolling type metal die horizontal feed frame, gas generator, gas pipeline and coal gas burner, it is characterized in that two to four groups of coal gas burners of metal die horizontal feed frame below installation, described coal gas burner is made up of pipe row's formula coal gas burner and steady flame grille, and coal gas burner connects with the gas producer stove by gas pipeline and valve.
Described coal gas burner is provided with steady flame grille, and steady flame grille is by heat-resisting or refractory material manufacturing.
The utility model preheating device is taked the producer gas heating, and valve is installed on the gas pipe, below the rolling type horizontal feed frame of casting ball production line two to four groups of coal gas burners is set, and can satisfy the preheating needs to metal die.Metal die intermittently moves on the horizontal feed frame of casting ball production line, and coal gas burner can heat metal die after igniting.Because steady flame grille is set on coal gas burner, can improve the combustion conditions of burner, guarantee that coal gas evenly burns, obviously improve the reliability and the efficiency of combustion of coal gas burner.Coal gas burner is fixedly mounted on the horizontal feed frame below of casting ball production line, by valve control gas using quantity, but the preheat temperature of flexible modulation metal die.
The utility model has been realized the automatic preheating to casting ball production line upper mold, creates necessary condition for follow-up mold cavity covers the sand operation, this utility model modern design, energy-conserving and environment-protective, and operation and maintenance are all very convenient.Guaranteed the serialization operation of casting ball production line.
Description of drawings
Fig. 1 is the utility model structural representation.
The specific embodiment
Casting ball production line upper mold preheating device, include rolling type metal die horizontal feed frame, gas generator, gas pipeline 1 and coal gas burner 2, two to four groups of coal gas burners 2 (Figure 1 shows that two groups) are installed below the horizontal feed frame of casting ball production line, and described coal gas burner 2 is made up of pipe row's formula coal gas burner 3 and steady flame grille 4.Steady flame grille 4 is by heat-resisting or refractory material manufacturing, and coal gas burner 2 links with gas generator by gas pipeline 1 and valve 5.Steady flame grille 4 forms a circle at the periphery of coal gas burner 2, can be circular, polygon, also can arrange between the coal gas burner 3 simultaneously to be provided with at each, plays compartmentation.

Claims (2)

1, casting ball production line metal die preheating device, include rolling type metal die horizontal feed frame, gas generator, gas pipeline and coal gas burner, it is characterized in that two to four groups of coal gas burners of metal die horizontal feed frame below installation, described coal gas burner is made up of pipe row's formula coal gas burner and steady flame grille, and coal gas burner connects with the gas producer stove by gas pipeline and valve.
2, casting ball production line metal die preheating device according to claim 1 is characterized in that described coal gas burner is provided with steady flame grille, and steady flame grille is by heat-resisting or refractory material manufacturing.
CN 200620073238 2006-05-27 2006-05-27 Preheating device for metal mould of cast ball production line Expired - Fee Related CN2907971Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620073238 CN2907971Y (en) 2006-05-27 2006-05-27 Preheating device for metal mould of cast ball production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620073238 CN2907971Y (en) 2006-05-27 2006-05-27 Preheating device for metal mould of cast ball production line

Publications (1)

Publication Number Publication Date
CN2907971Y true CN2907971Y (en) 2007-06-06

Family

ID=38127182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620073238 Expired - Fee Related CN2907971Y (en) 2006-05-27 2006-05-27 Preheating device for metal mould of cast ball production line

Country Status (1)

Country Link
CN (1) CN2907971Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305547A (en) * 2011-07-30 2012-01-04 宁波合力模具科技股份有限公司 Preheating device of round bar mold insert used for cast
CN104028693A (en) * 2014-06-24 2014-09-10 江苏亚太安信达铝业有限公司 Tool structure for heating of dies and molds
CN106392024A (en) * 2016-09-30 2017-02-15 马鞍山钢铁股份有限公司 Die casting mold baking device and using method thereof
CN107695323A (en) * 2017-09-14 2018-02-16 云南云铝涌鑫铝业有限公司 Mould preheating device and die assembly
CN112517888A (en) * 2020-12-08 2021-03-19 大冶市安实模具科技有限公司 Preheating device for metal mold of cast ball production line

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305547A (en) * 2011-07-30 2012-01-04 宁波合力模具科技股份有限公司 Preheating device of round bar mold insert used for cast
CN104028693A (en) * 2014-06-24 2014-09-10 江苏亚太安信达铝业有限公司 Tool structure for heating of dies and molds
CN106392024A (en) * 2016-09-30 2017-02-15 马鞍山钢铁股份有限公司 Die casting mold baking device and using method thereof
CN107695323A (en) * 2017-09-14 2018-02-16 云南云铝涌鑫铝业有限公司 Mould preheating device and die assembly
CN112517888A (en) * 2020-12-08 2021-03-19 大冶市安实模具科技有限公司 Preheating device for metal mold of cast ball production line

Similar Documents

Publication Publication Date Title
CN2907971Y (en) Preheating device for metal mould of cast ball production line
CN201313871Y (en) Special welding furnace for high-purity silica pot of polysilicon cast ingot
CN103245190B (en) Vehicle-mounted rotary enamel sintering furnace
CN204648921U (en) A kind of natural gas cupola
CN103994658B (en) Biomass fuel melts aluminium stove
CN202350493U (en) Cupola
CN201366502Y (en) Novel ladle baking device
CN206882775U (en) It is a kind of from heat accumulating type Ladle Furnace Heating And Drying Equipments
CN202204308U (en) Intermediate frequency furnace lining for casting silver
CN209802102U (en) Scrap steel preheating device
CN203810911U (en) Aluminum melting furnace using biomass fuel
CN201459060U (en) Simple two-stage gas furnace
CN202037333U (en) Roaster for steel teeming ladle
CN202709729U (en) Wax melting furnace for bronze ware manufacture
CN200975671Y (en) Roasters for special for steel-smelting continuous casting pouring box blast furnace gas with heat recovery device
CN203533601U (en) Oil heating system used for reverberating furnace
CN202648371U (en) External-heat, air-blowing and water-cooling cupola furnace with long furnace age
CN208346228U (en) A kind of glowing furnace
CN203286879U (en) Water cooling tuyere for cupola furnace
CN2348345Y (en) Updraft non-oxygen copper bar oil-fired (gas) holding furnace
CN202109515U (en) Novel water cooling device for pulverized coal combustion chamber furnace door
CN2538806Y (en) Double-blasting fast-smelting blast furnace
CN212585469U (en) Precision casting film shell through type roasting furnace
CN108020085A (en) A kind of novel biomass fuel aluminium melting furnace
CN2670880Y (en) Pearlite expanding electric furnaces

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: FENGXING ANTI-WEAR MATERIALS CO., LTD., ANHUI PROV

Free format text: FORMER NAME OR ADDRESS: NINGGUO CITY WEAR-RESISTING MATERIAL GENERAL FACTORY, ANHUI PROV.

CP03 Change of name, title or address

Address after: Nanjing Port Road, Anhui, Ningguo Province, China: 242300

Patentee after: Anhui FENGXING Wear Resistant Materials Ltd.

Address before: Nanjing Port Road, Anhui, Ningguo Province, China: 242300

Patentee before: Anhui Ningguo Wear Resistant Materials General Plant

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070606

Termination date: 20150527

EXPY Termination of patent right or utility model