CN2538806Y - Double-blasting fast-smelting blast furnace - Google Patents

Double-blasting fast-smelting blast furnace Download PDF

Info

Publication number
CN2538806Y
CN2538806Y CN 01279863 CN01279863U CN2538806Y CN 2538806 Y CN2538806 Y CN 2538806Y CN 01279863 CN01279863 CN 01279863 CN 01279863 U CN01279863 U CN 01279863U CN 2538806 Y CN2538806 Y CN 2538806Y
Authority
CN
China
Prior art keywords
blast furnace
refining
double
air
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01279863
Other languages
Chinese (zh)
Inventor
卢云光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 12 Building 10 Dadukouyueguang Village Chon
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01279863 priority Critical patent/CN2538806Y/en
Application granted granted Critical
Publication of CN2538806Y publication Critical patent/CN2538806Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model relates to a double heating and fast refining blast furnace, which can settles the disadvantages of single heating, slow refining, low yield, high consumption and low benefit of the prior high furnaces. On the prior blast furnaces, the big circular air duct and the pipe branches of the air port are all arranged on a circumference plane, and the hot blast sent into the furnace is also centralized on the plan. Just when the charge goes to the filmy high temperature melting zone, the charge can be melted and then sink into the crucible. Refining iron with coke is the second combustion of coal, so the consumption is great and the firepower is not enough. With the added coal dust or coal gas, the effect of the prior blast furnaces is not ideal yet. The utility model is characterized in that: at the proper position above the present big circular air duct, another same big circular air duct and a plurality of pipe branches of the air port are added; a wind brake is arranged on the chief pipe connecting the air duct and the hot blast stove, so as to regulate the air volume and the temperature in the furnace. Adopting the double air ducts to refine pig iron, the utility model has the advantages of double heating, fast refining, high yield, low consumption and high profit. The efficacy of the prior technology is increased greatly.

Description

Double-blasting fast-smelting blast furnace
Affiliated technical field
The utility model relates to a kind of smelting new technology of existing blast furnace, can realize the Double-blasting fast-smelting blast furnace of fast refining, high yield, low consumption, high benefit.
Background technology
As everyone knows, existing blast furnace all is to adopt a big circular duct of circle and more piece arm to be communicated with the air port of furnace wall, and the wind conveying pipe of hotblast stove is communicated with big circular duct and hot blast cooked a meal into smelts operation in the stove.This single tube air supply mode follows so far and did not change.Found the state so far, especially "Patent Law" is since the execution on April 1 in 85 year, and former patent newspaper now be intellectual property newspaper, invent and authoritative newpapers and periodicals such as innovation, there is no to step on the change report of air supply line system of blast furnace both domestic and external.Its subject matter is: ore fusion slowly, grow, yield poorly, consume height, of poor benefits, the potentiality that can not give full play to blast furnace tap to tap time.
Summary of the invention
Technical problem to be solved: the key of blast-furnace smelting is: strong wind, high temperature, fine fodder.At present, the blast furnace of state-owned big-and-middle-sized iron and steel enterprise has generally all reached this requirement, and still, its effect is still not ideal enough, and the annual utilization coefficient is difficult to reach more than 1: 2.Its reason of opinion: the one, the refining of cooking a meal of single airduct air feed, its air port all on a planar circumferential line, cause furnace high-temperature melting range section shallow, and blast furnace is very high, hot blast is cooked a meal in the stove also mainly in this shallow-thin layer, and charge goes downwards to could be burnt here for liquid and sinks to cupola well; The 2nd, coke ironmaking is burning for the second time, and it is relatively poor that its heat is imitated function, especially lacks flame resistivity and reserve strength, more do not have robust flame to upper punch, the above crude fuel of pre-heating duct, and cupola well also can be suffered from cold sometimes, produces some faults.Generally speaking, the firepower deficiency, oligopepsia, output are not high.Therefore, blast furnace both domestic and external is all adding Coal powder spray or coal gas.At present ubiquitous be singly cook a meal, refining slowly, low yield, high consumption, poor benefit problem.
Solve the technical scheme that its technical problem adopts: the technical scheme that the utility model adopted is: under the prerequisite that does not change at the existing air supply line of blast furnace system and other each position, set up a new air supply line system identical with former pipeline, adopt the refining of cooking a meal of two airducts, the capacity of its stove stomach and digestion ability are comparable to be twice originally.The two-tube wind of cooking a meal is means, and refining high yield soon is purpose, realizes by blast furnace, so cry: Double-blasting fast-smelting blast furnace.Its technical characterictic is: the appropriate location (deciding according to the blast furnace size) on the big circular duct of the existing circle of blast furnace, newly establish identical therewith airduct and the air port arm of a circle, be fixed on the steel bracing frame on the outer cover of steel plate of blast furnace circumference, should there be the suitable gradient that dips down in its arm and air port, ore speed hot melt is separated, and wind power energy affects crude fuel descending, can prevent that the air port from stopping up and the hanging fault; Newly-increased air port of going up the circle airduct should enclosed down between the air port of airduct, the air port should be arranged in a crossed manner up and down, can not overlap, can form cook a meal refining zone of a hot blast that increases newly thus, the expansion section s of stove gastric capacity just, can not only keep the up and down hot blast rate in zone and the equilibrium of temperature, and can will go up the thermophilic digestion regional integration that infracommissure becomes the original twice speed heat of ratio, softening, semi-molten, running down, just can give full play to the potentiality of blast furnace; Newly-increased circular duct leads between the house steward of hotblast stove, and air lock should be installed, so that regulate hot blast rate and temperature in the stove.
Beneficial effect against existing technologies: the beneficial effects of the utility model are: many one times of the hot blast rate of supply blast furnace, the fast hot melt of crude fuel separate layer thicken one times, high temperature melting zone expand be twice, ore scorification speed is fast again, the temperature in the stove also can significantly improve, can reduce or avoid the obstruction in iron notch, slag notch, air port to damage fault, can give full play to the potentiality of blast furnace, reach two and cook a meal, the purpose of refining, high yield soon.Significantly technique effect will inevitably produce significant output value benefit.Can not only increase considerably pig iron output, and can reduce consumption, especially can reduce coke ratio, because of the burnt amount of iron output and consumption is inverse ratio, output is high more, and coke ratio is low more, not only can save a large amount of coke, and blast furnace need not add Coal powder spray or coal gas again, reach dual energy-conservation purpose.High yield, low consumption, high benefit are total beneficial effects.
Description of drawings
Fig. 1: the blast furnace front view, only painted cupola well, furnace bosh, three positions of shaft, furnace roof and this case are irrelevant, the Therefore, omited; Fig. 2; It is the vertical view of Fig. 1; Fig. 3: be the vertical cross-sectional of Fig. 1, promptly therefrom analyse and observe to the iron notch right side from the hotblast stove left side.Blast furnace is a round, and is identical all around, be built on the reinforced concrete seat, the Therefore, omited left and right side view and upward view.The label 1-11 of Fig. 2 and Fig. 3 is consistent with the label 1-11 of Fig. 1.
Fig. 1-1 is an iron notch; Fig. 1-2 is the cupola well position; Fig. 1-3 is a slag notch; Fig. 1-4 is the original big circular duct of blast furnace; Fig. 1-5 is the arm and the air port of original big circular duct; Fig. 1-6 is the furnace bosh position; The big circular duct of Fig. 1-7 for newly establishing; Fig. 1-8 is the arm and the air port of the big circular duct newly established; Fig. 1-9 is the shaft position; Fig. 1-10 is the house steward that original big circular duct is communicated with hotblast stove, and hot blast house steward thus leads to the big circular duct of Fig. 1-4, again in stove is cooked a meal in Fig. 1-5 arm and air port; The house steward that Fig. 1-11 is communicated with hotblast stove for the big circular duct newly established, hot blast is the big circular duct newly established towards Fig. 1-7 of house steward thus, again in stove is cooked a meal in Fig. 1-8 arm and air port.
Embodiment
1, with reference to existing big circular duct, carry out second big circular duct of circle and the air port arm in advance, there is the suitable gradient that dips down in its arm and air port.
2, calculate wind speed, the air quantity of existing blower fan in advance, can be enough? so that take measures;
Can 3, appearance air quantity, the wind-warm syndrome of many hotblast stoves reach requirement? also should carry out prediction work.
4, utilize the blast furnace overhaul chance, install the big circular duct of second circle.The igniting baker is finished in overhaul, treat that stove fire is vigorous after, progressively open the air lock that encloses airduct again, the Double-blasting fast-smelting blast furnace commencement of commercial operation.
5, state-owned iron and steel enterprise blast furnace is more, and the overhaul time is in turn arranged.Machinery, equipment leave the factor of assurance about 50% when design, above-mentioned 2,3 is for precautions averts perils.

Claims (1)

  1. A kind of Double-blasting fast-smelting blast furnace, be that a same air supply line system is set on the air supply line system of blast furnace, be fixed on the steel bracing frame on the outer cover of steel plate of blast furnace circumference, just be and be Double-blasting fast-smelting blast furnace, it is characterized in that: air supply line system that this kind blast furnace is many, manifest is that two pipelines are vertically overlapping, two airducts laterally arranged side by side are the cook a meal innovation blast furnace of refining of air feeds simultaneously, on enclose the arm of airduct and lead to into that should there be downward obliquity in the interior air port of stove, enclose up and down the air port of airduct should be arranged in a crossed manner can not be overlapping, the newly-increased big circular duct of circle of going up should be installed air lock towards between the house steward of hotblast stove.
CN 01279863 2001-12-28 2001-12-28 Double-blasting fast-smelting blast furnace Expired - Fee Related CN2538806Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01279863 CN2538806Y (en) 2001-12-28 2001-12-28 Double-blasting fast-smelting blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01279863 CN2538806Y (en) 2001-12-28 2001-12-28 Double-blasting fast-smelting blast furnace

Publications (1)

Publication Number Publication Date
CN2538806Y true CN2538806Y (en) 2003-03-05

Family

ID=33683014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01279863 Expired - Fee Related CN2538806Y (en) 2001-12-28 2001-12-28 Double-blasting fast-smelting blast furnace

Country Status (1)

Country Link
CN (1) CN2538806Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702054A (en) * 2017-01-13 2017-05-24 张英华 Improved iron-smelting blast furnace and production method for air outlet pipes and hollow grate
CN109355449A (en) * 2018-12-18 2019-02-19 康书信 Blast furnace ironmaking equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702054A (en) * 2017-01-13 2017-05-24 张英华 Improved iron-smelting blast furnace and production method for air outlet pipes and hollow grate
CN109355449A (en) * 2018-12-18 2019-02-19 康书信 Blast furnace ironmaking equipment
CN109355449B (en) * 2018-12-18 2020-10-09 康书信 Blast furnace ironmaking equipment

Similar Documents

Publication Publication Date Title
CN102778124A (en) Secondary radial air-supplying device for direct reduction equipment of rotary kiln
CN201740068U (en) Premixing type combustion energy-saving stove
CN201555446U (en) Smelting rotary hearth furnace for directly reducing nickel
CN104805247B (en) A kind of energy-conservation regulation and control method of blast funnace hot blast stove combustion fan
CN2538806Y (en) Double-blasting fast-smelting blast furnace
CN201104092Y (en) Built-in coal based sponge iron shaft furnace
CN104891831A (en) Energy-saving environment-friendly active lime roasting shaft kiln
CN201497328U (en) Novel resistance band expansion furnace for vitrified small balls
CN203364408U (en) Direct-fired coal hot air furnace with built-in heat exchange mixing chamber in hearth box
CN208472137U (en) A kind of low-grade Iron concentrate directly melts iron-smelting device
CN201581100U (en) Efficient and energy-saving burner for top combustion stove
CN103278016A (en) Method of pre-heating pre-loaded material by using waste heat of flue gas
CN210215414U (en) Blast furnace coal powder injection and hot blast stove air/coal gas series preheating system
CN109022660B (en) A kind of heating furnace heating high hydrogen content reducing gas
CN203159642U (en) Air quantity regulation device of blast furnace
CN207231215U (en) A kind of intelligent natural gas kiln with novel energy-conserving technology
CN201203356Y (en) Energy-saving furnace-in-furnace
CN206037701U (en) Living beings melt aluminium stove
CN203295520U (en) Blast furnace and blast furnace and medium-frequency induction furnace integrated smelting system
CN201217652Y (en) Coal gas burnt lime vertical kiln
CN203890377U (en) Gas-based reduction shaft furnace device
CN108609872A (en) The energy conservation and environmental protection limekiln of furnace temperature monitored by microcomputer
CN204714712U (en) Energy-saving environment protection active lime roasting shaft kiln
CN202648371U (en) External-heat, air-blowing and water-cooling cupola furnace with long furnace age
CN102795757B (en) Method for applying low-heat value gas to combustion in melting furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: NO. 12, BUILDING 10, DADUKOUYUEGUANG VILLAGE, CHON

Free format text: FORMER NAME OR ADDRESS: NO. 59, BUILDING 73, DAYANYI VILLAGE, DADUKOU DISTRICT, CHONGQING CITY, 400080

CP03 Change of name, title or address

Patentee address after: 400084 Chongqing Dadukou village 10 Building No. 12 moonlight

Patentee address before: 400080 Chongqing Dadukou District weir village 73 Building No. 59

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20030305

Termination date: 20100128