CN2869589Y - Combined boiler - Google Patents

Combined boiler Download PDF

Info

Publication number
CN2869589Y
CN2869589Y CN 200620030035 CN200620030035U CN2869589Y CN 2869589 Y CN2869589 Y CN 2869589Y CN 200620030035 CN200620030035 CN 200620030035 CN 200620030035 U CN200620030035 U CN 200620030035U CN 2869589 Y CN2869589 Y CN 2869589Y
Authority
CN
China
Prior art keywords
boiler
cooling wall
water
header
cove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620030035
Other languages
Chinese (zh)
Inventor
刘伟
沙晓明
李鹏
赵志才
王晓艳
白周方
李红星
闫银萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU BOILER CO Ltd
Original Assignee
ZHENGZHOU BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU BOILER CO Ltd filed Critical ZHENGZHOU BOILER CO Ltd
Priority to CN 200620030035 priority Critical patent/CN2869589Y/en
Application granted granted Critical
Publication of CN2869589Y publication Critical patent/CN2869589Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses an assembled boiler. The upper of the boiler is a boiler body containing and constructed by a boiler cylinder, a plurality of flowing convection pipes and a boiler chamber, the lower of the boiler contains a coal hopper and a chain boiler grate, on the bottom of the front side of the boiler chamber is equipped with a fore linked tank, on the top of the tail of the chain boiler grate is equipped with a rear linked tank, between the fore linked tank and the boiler cylinder is connected with a fore water cooling wall, between the rear linked tank and an upper boiler cylinder is connected with a rear water cooling wall, the lower section of the rear cooling wall protruding towards the center of the boiler chamber then bending towards back of the boiler is connected with the rear linked tank, a boiler cove using the water cooling wall as a support bone is laid evenly, which enhances the strength of the boiler cove on one side and on the other side increases the heating surface area on the upper section of the boiler grate, the more rational arrangement of the boiler cove is easier to get, the high temperature heat on the upper of the boiler bed is absorbed boiler, the boiler cove outlet temperature is decreased, the boiler efficiency is higher and the damage and the clash of the boiler cove is prevented validly.

Description

A kind of semi-packaged boiler
Technical field
The utility model relates to a kind of assembling chain grate boiler.
Background technology
The assembling chain grate boiler divides two big part assemblings, and top is boiler body, comprises burner hearth, convection bank etc., the bottom is the traveling-grate stoker part, comprise coal bunker, traveling-grate stoker etc., after two big parts are assembled on-site, carry out to come into operation after necessary furnace wall, the pipeline installation.Big of boiler body of semi-packaged boiler and traveling-grate stoker are after the building site closes up at present, only need to build by laying bricks or stones part furnace wall and chimney arch, forward and backward chimney arch at the scene according to the requirement of design coal with refractory brick or the curved arching building of refractory concrete on fire grate top, be supported on the fire grate both sides, wall is built by laying bricks or stones on rear arch with refractory brick behind the burner hearth.And chimney arch is the key position that influences fuel fire, this furnace arch structure is not arranged heating surface because of lower furnace portion, the high temperature that coal combustion produces can not get timely absorption, and lower furnace portion high temperature damages front and back arch exit burning even caves in, and need regularly repair and overhaul.Being arranged in of arch is subjected to the constraint that arc encircles to a certain extent on the other hand, and be relatively poor to the adaptability of coal, influences the efficient of boiler.
Summary of the invention
The utility model is for the chimney arch rapid wear that the solves traditional semi-packaged boiler problem of easily collapsing, and provides a kind of thermal efficiency higher semi-packaged boiler.
For achieving the above object, the utility model adopts following technical scheme: a kind of semi-packaged boiler, its top is the boiler body that comprises that drum, convection bank and burner hearth are formed, the bottom comprises coal bunker and traveling-grate stoker, burner hearth front side bottom is provided with front header, and traveling-grate stoker afterbody top is provided with back header, is connected preceding water-cooling wall between described front header and the upper drum, be connected the back water-cooling wall between described back header and the upper drum, back water-cooling wall bottom is turned then behind stove to the burner hearth intermediate projections and is linked with back header.
Water-cooling wall and water-cooling wall bottom, back all are wrapped with the uniform refractory material of a layer thickness and form preceding chimney arch and back chimney arch respectively before described.
Water-cooling wall upper end, described back is welded in the upper drum, the last flex point place that extends downwardly into the mid point ± 300mm of upper drum center line and interface distance folds to the stokehold forward down, rolls over back header to the oblique back, following flex point place of below, composition surface 200mm~300mm to weld together.
Adopt technical scheme described in the utility model, because front header is moved down into bottom, burner hearth front side, traveling-grate stoker afterbody top is provided with back header, chimney arch is that to make skeleton with water screen tube evenly distributed, has increased the intensity of chimney arch, has increased heating surface and the easier reasonable Arrangement of chimney arch on the other hand on fire grate top, make the high temperature on siege top be absorbed, reduced the chimney arch outlet temperature, the thermal efficiency of boiler is higher, and prevents the chimney arch damage effectively and cave in.
Description of drawings
Figure 1 shows that the general assembly subdivision structural representation of traditional semi-packaged boiler;
Fig. 2 is the utility model general assembly subdivision structural representation.
The specific embodiment
As shown in Figure 1, the top of tradition semi-packaged boiler is the boiler body that comprises that upper drum 4, lower drum 11, convection bank 12 and burner hearth 8 are formed, the bottom comprises coal bunker 2 and traveling-grate stoker 1, coal bunker 2 is positioned at furnace wall traveling-grate stoker 1 top, the afterbody boiler bottom surface of traveling-grate stoker 1 has cinder notch 3, front header 16 is positioned at the bottom of composition surface 18 top burner hearths 8, be connected between the upper drum 4 before water-cooling wall 5 and preceding down-comer 6.After upper and lower two big parts close up on-site, need build back wall 7 and preceding chimney arch 9, back chimney arch 10 by laying bricks or stones, before chimney arch 9, back chimney arch 10 at the scene according to the requirement of design coal with refractory brick or the curved arching building of refractory concrete on fire grate 1 top, be supported on fire grate 1 both sides, wall 7 usefulness refractory brick are built by laying bricks or stones on the chimney arch 10 of back behind the burner hearth.Chimney arch is the key position that influences fuel fire, this furnace arch structure is not arranged heating surface because of lower furnace portion, the high temperature that coal combustion produces can not get timely absorption, and burner hearth 8 bottom high temperature damage 9, the 10 exit burning of front and back arch even cave in, and need regularly repair and overhaul.Being arranged in of arch 9,10 is subjected to the constraint that arc encircles to a certain extent on the other hand, and be relatively poor to the adaptability of coal, influences the efficient of boiler.
As shown in Figure 2, the top of the utility model semi-packaged boiler is the boiler body that comprises that upper drum 4, lower drum 11, convection bank 12 and burner hearth 8 are formed, the bottom comprises coal bunker 2 and traveling-grate stoker 1, coal bunker 2 is positioned at furnace wall traveling-grate stoker 1 top, the intermediate arrangement of traveling-grate stoker 1 has some air channels 17, the afterbody boiler bottom surface of traveling-grate stoker 1 has cinder notch 3, front header 16 is positioned at 18 belows, composition surface, bottom, burner hearth 8 front sides, traveling-grate stoker 1 afterbody top is provided with back header 14, and front header 16 and back header 14 all are fixed on the traveling-grate stoker support.Water-cooling wall 5 and preceding down-comer 6 before being connected between front header 16 and the upper drum 4, be connected back down-comer 15 between back header 14 and the lower drum 11, with be connected between the upper drum 4 back water-cooling wall 13, back water-cooling wall 13 upper ends are welded in the upper drum 4, last flex point 19 places that extend downwardly into the mid point ± 300mm of upper drum 4 center lines and composition surface 18 distances fold to the stokehold forward down, and oblique back, following flex point 20 places of 18 below 200mm~300mm folding welds together with back header 14 to the composition surface.The particular location of last flex point 19 and following flex point 20 will be according to using the different of coal to adjust.Burner hearth 8 rear walls need be built back wall 7 by laying bricks or stones, and preceding water-cooling wall 5 and water-cooling wall 13 bottoms, back all are wrapped with the uniform refractory material of a layer thickness and form preceding chimney arch 9 and back chimney arch 10 respectively.
Coal-fired coal bunker 2 by the front portion falls into fire grate 1 front end, falls into cinder notch 3 and discharged by mucking machine after burning.Air 17 enters fire grate 1 bottom subregion and enters siege from the air channel, and the coal-fired high-temperature flue gas that produces in burning back on the grate enters atmosphere by dedusting behind burner hearth 8 convection tubes 12 heating surfaces such as grade.Water carries out Natural Circulation in boiler body after entering upper drum 4 after the back-end surfaces preheating.
The chimney arch of improved the utility model semi-packaged boiler is that to make skeleton with water screen tube evenly distributed, increased the intensity of chimney arch, heating surface and the easier reasonable Arrangement of chimney arch have been increased on the other hand on fire grate 1 top, make the high temperature on siege top be absorbed, reduced the temperature of chimney arch outlet, the thermal efficiency of boiler is higher, and can prevent the chimney arch damage effectively and cave in.

Claims (3)

1, a kind of semi-packaged boiler, its top is the boiler body that comprises that drum, convection bank and burner hearth are formed, the bottom comprises coal bunker and traveling-grate stoker, it is characterized in that: bottom, burner hearth front side is provided with front header, traveling-grate stoker afterbody top is provided with back header, is connected water-cooling wall afterwards between the water-cooling wall before being connected between described front header and the upper drum, described back header and upper drum, back water-cooling wall bottom is turned then behind stove to the burner hearth intermediate projections and is linked with back header.
2, semi-packaged boiler as claimed in claim 1 is characterized in that: water-cooling wall and water-cooling wall bottom, back all are wrapped with the uniform refractory material of a layer thickness and form preceding chimney arch and back chimney arch respectively before described.
3, semi-packaged boiler as claimed in claim 1 or 2, it is characterized in that: water-cooling wall upper end, described back is welded in the upper drum, the last flex point place that extends downwardly into the mid point ± 300mm of upper drum center line and interface distance folds to the stokehold forward down, rolls over back header to the oblique back, following flex point place of below, composition surface 200mm~300mm to weld together.
CN 200620030035 2006-02-16 2006-02-16 Combined boiler Expired - Lifetime CN2869589Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620030035 CN2869589Y (en) 2006-02-16 2006-02-16 Combined boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620030035 CN2869589Y (en) 2006-02-16 2006-02-16 Combined boiler

Publications (1)

Publication Number Publication Date
CN2869589Y true CN2869589Y (en) 2007-02-14

Family

ID=37724527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620030035 Expired - Lifetime CN2869589Y (en) 2006-02-16 2006-02-16 Combined boiler

Country Status (1)

Country Link
CN (1) CN2869589Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922725A (en) * 2010-08-27 2010-12-22 江苏太湖锅炉股份有限公司 Structure of biomass boiler for preventing coal bucket from being burnt out
CN102901079A (en) * 2011-07-28 2013-01-30 宜兴天地节能技术有限公司 Chamber combustion type pulverized coal fired boiler with water pipes
CN104976612A (en) * 2015-07-23 2015-10-14 仲伟军 Horizontal biomass-fired chain boiler
CN108954341A (en) * 2018-06-13 2018-12-07 光大环境科技(中国)有限公司 A kind of incinerator feed stocker control system and incinerator are fed stocker control method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922725A (en) * 2010-08-27 2010-12-22 江苏太湖锅炉股份有限公司 Structure of biomass boiler for preventing coal bucket from being burnt out
CN102901079A (en) * 2011-07-28 2013-01-30 宜兴天地节能技术有限公司 Chamber combustion type pulverized coal fired boiler with water pipes
CN102901079B (en) * 2011-07-28 2014-06-04 宜兴天地节能技术有限公司 Chamber combustion type pulverized coal fired boiler with water pipes
CN104976612A (en) * 2015-07-23 2015-10-14 仲伟军 Horizontal biomass-fired chain boiler
CN104976612B (en) * 2015-07-23 2017-10-03 仲伟军 Horizontal biomass-burning chain-grate boiler
CN108954341A (en) * 2018-06-13 2018-12-07 光大环境科技(中国)有限公司 A kind of incinerator feed stocker control system and incinerator are fed stocker control method

Similar Documents

Publication Publication Date Title
CN102635844A (en) Boiler system using waste heat of flue gas of rotary hearth furnace
CN2869589Y (en) Combined boiler
CN103256711A (en) Chain type dual-purpose environment-friendly biomass hot-air and normal-pressure hot-water boiler
CN216131907U (en) Biomass fuel burning corner tube type steam boiler
CN103388815B (en) Horizontal type triple-pass chain-grate boiler combusting coal and biomass fuel
CN2786439Y (en) Reciprocating grate type coal-coal gas integrated boiler
CN106500307A (en) A kind of novel multi-pass biomass thermal wind furnace
CN101498503A (en) Coal burning hot air furnace with horizontal-reciprocating grate
CN201652791U (en) Horizontal type coal hot air furnace with combustion air preheater
CN201487967U (en) Flashback type garbage pyrolysis gasification incinerator
CN109855102A (en) A kind of waste incinerator and its method of construction
CN201715546U (en) Central arc device for boiler
CN203421664U (en) Coal and biomass fuel burning horizontal type three-return-stroke chain-grate boiler
CN2639716Y (en) Back burn gas furnace for reforming boiler
CN2835881Y (en) Vertical coal-fired boiler
CN2733248Y (en) Novel hot-water boiler
CN213746811U (en) Assembled biomass chain boiler
CN207179646U (en) A kind of new full fin panel casing CFBB
CN208154441U (en) SZL fin panel casing assembles chain-grate boiler fastly
RU2202733C2 (en) Solid fuel combustion device (alternatives)
CN104976612B (en) Horizontal biomass-burning chain-grate boiler
CN208253542U (en) A kind of list drum longitudinal Water-Fire Tube Shell Boilers
CN201476025U (en) Air preheater of primary air of fluidized bed incinerator for special waste
CN2200107Y (en) Coal-fired energy-saving boiler
CN219014327U (en) System is reformed transform to msw incineration boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070214

EXPY Termination of patent right or utility model