Three-dimensional indoor plastering device automatically
Technical field: the utility model relates to apparatus of plastering, is specially the automatic indoor plastering device of a kind of three-dimensional.
Background technology: in builing industry, after the house moulding, indoor plastering is a very important procedure.At present, China's building construction indoor plastering is mainly finished by workman's manual operations.Plaster by hand and have following problem: 1, labor strength is big, and efficient is low; 2, because plaster, troweling carries out for twice, the operating time is long; 3, the technical level with the workman is relevant, can not ensure the quality of products; 4, when smearing eminence, must build a framework; 5, shelf was very inconvenient about the workman wanted; 6, the workman plasters on the top of the shelf, and people's feed must be arranged, many people's operations; 7, when plastering to the roof, shelf will be taken De Genggao, and workman's operation is more difficult, more tired, and quality more be cannot say for sure to demonstrate,prove.
Summary of the invention: the purpose of this utility model is to provide a kind of simple in structure, with low cost, safe and reliable, easy for operation, the three-dimensional indoor plastering device automatically of ensuring the quality of products.The purpose of this utility model is achieved in that it comprises adjustable jackscrew (1), top cap (2), core pipe (3), upper sliding sleeve (4), last sideslip post (5), column (6), ground transmission case (7), following dropping fraction (8), under touch hawk stator (9), following sideslip post (10), low sleeve (11), roller (12), following jackscrew (13), main substrate (14), rocking bar (15), last plastering plate stator (16), the little stator of last ash-pit (17), the big stator of last ash-pit (18), roof transmission case (19), side wall transmission case (20), side wall ash-pit rear carrier plate (21), side plastering plate stator (22), guide rail (23), lifting tackle frame (24), bearing support (25), lifting reel (26), top sheave frame (27), wire rope (28), little jackscrew (29), manual link block (30), reductor (31), wire rope (32), last ash-pit (33), agitator arm (34), driving belt (35), big belt pulley (36), ash trough floor (37), small belt pulley (38), auxiliary substrate (39), plastering plate (40), side wall ash-pit (41), wire rope (42), side wall sliding sleeve (43), sliding sleeve brace (44), large pulley (45), motor pulley (46), motor (47), V-belt (48), reductor belt pulley (49), reductor (50), side wall transmission case (51), motor-driven contiguous block (52), transmission reel (53), pulley (54), pulley base (55), wire rope fixed block (56), skewback (57), big jackscrew (58), side top sheave frame (59).Going up sideslip post (5) two ends for two is connected with upper sliding sleeve (4), two following sideslip posts (10) two ends be connected with low sleeve (11), four columns (6) upper end is by adjustable jackscrew (1), top cap (2), core pipe (3) connects, formation holds out against structure, the lower end is connected with auxiliary substrate (39) with following main substrate (14), the implementation framework braced structures, four following jackscrews (13) upper end is connected with auxiliary substrate (39) with main substrate (14), the lower end holds out against in ground through rotation, four rolling (12) is connected with auxiliary substrate (39) lower end with main substrate (14) by pulley base (55) and is seated on the guide rail (23), bearing support (25), lifting reel (26), reductor (31) is connected with main substrate (14), manually link block (30) two ends are connected with the axle of reductor (31) and lifting reel (26) respectively, large pulley (45), motor (47), reductor (50), bearing support (25), transmission reel (53), pulley (54), pulley base (55), wire rope fixed block (56) all is fixed on the side wall transmission case (51), side wall ash-pit (41) is connected on the side wall transmission case (51) by side wall ash-pit rear carrier plate (21), plastering plate (40) is connected on side wall transmission case (51) bottom surface by side plastering plate stator (22), motor-driven contiguous block (52) is connected (53) two axles of reductor (50) and transmission reel, (48) are connected motor pulley (46) with reductor belt pulley (49) through the V-belt, agitator arm (34) is installed on the side wall ash-pit (41), big belt pulley (36) is on transmission reel (53), small belt pulley (38) is connected on agitator arm (34) axle, driving belt (35) one ends are connected with big belt pulley (36), the other end is connected with small belt pulley (38), sliding sleeve brace (44) one ends are connected with side wall transmission case (51), the other end is connected with side wall sliding sleeve (43), side top sheave frame (59) is connected with column (6) upper end, after wire rope (42) one ends are fixed on wire rope wire rope fixed block (56), through side top sheave frame (59), large pulley (45), again through another group pulley of side top sheave frame (59), be connected with transmission reel (53) with pulley base (55) through pulley (54) again, side wall sliding sleeve (43) is connected with column (6), and can go up at column (6) and slide, roof transmission case (19) is connected with last sideslip post (5) with side wall sliding sleeve (43) through sliding sleeve brace (44), and can go up at last sideslip post (5) and slide, ground transmission case (7) is connected with following sideslip post (10) with side wall sliding sleeve (43) through sliding sleeve brace (44), and can be in upward slip of sideslip post (10) down, skewback (57) and core pipe (3) and pulley (54), pulley base (55) connects, and wire rope (28) one ends are around lifting reel (26), the other end is connected with upper sliding sleeve (4) with another lifting tackle frame (24) through lifting tackle frame (24).The utility model has the advantages that: simple in structure, with low cost, safe and reliable, easy for operation, improved quality, efficient.
Description of drawings: Fig. 1 looks schematic diagram for the utility model structural principle master; Fig. 2 is the utility model structural principle schematic top plan view; Fig. 3 is the utility model structural principle schematic side view; Fig. 4 is that the utility model structural principle A is to cross-sectional schematic; Fig. 5 is that the utility model structural principle B is to cross-sectional schematic; Fig. 6 is that the utility model structural principle C is to cross-sectional schematic.
The specific embodiment: go up sideslip post (5) two ends for two and be connected with upper sliding sleeve (4), two following sideslip posts (10) two ends be connected with low sleeve (11), four columns (6) upper end is by adjustable jackscrew (1), top cap (2), core pipe (3) connects, formation holds out against structure, the lower end is connected with auxiliary substrate (39) with following main substrate (14), the implementation framework braced structures, four following jackscrews (13) upper end is connected with auxiliary substrate (39) with main substrate (14), the lower end holds out against in ground through rotation, four rolling (12) is connected with auxiliary substrate (39) lower end with main substrate (14) by pulley base (55) and is seated on the guide rail (23), bearing support (25), lifting reel (26), reductor (31) is connected with main substrate (14), manually link block (30) two ends are connected with the axle of reductor (31) and lifting reel (26) respectively, large pulley (45), motor (47), reductor (50), bearing support (25), transmission reel (53), pulley (54), pulley base (55), wire rope fixed block (56) all is fixed on the side wall transmission case (51), side wall ash-pit (41) is connected on the side wall transmission case (51) by side wall ash-pit rear carrier plate (21), plastering plate (40) is connected on side wall transmission case (51) bottom surface by side plastering plate stator (22), motor-driven contiguous block (52) is connected (53) two axles of reductor (50) and transmission reel, (48) are connected motor pulley (46) with reductor belt pulley (49) through the V-belt, agitator arm (34) is installed on the side wall ash-pit (41), big belt pulley (36) is on transmission reel (53), small belt pulley (38) is connected on agitator arm (34) axle, driving belt (35) one ends are connected with big belt pulley (36), the other end is connected with small belt pulley (38), sliding sleeve brace (44) one ends are connected with side wall transmission case (51), the other end is connected with side wall sliding sleeve (43), side top sheave frame (59) is connected with column (6) upper end, after wire rope (42) one ends are fixed on wire rope wire rope fixed block (56), through side top sheave frame (59), large pulley (45), again through another group pulley of side top sheave frame (59), be connected with transmission reel (53) with pulley base (55) through pulley (54) again, side wall sliding sleeve (43) is connected with column (6), and can go up at column (6) and slide, roof transmission case (19) is connected with last sideslip post (5) with side wall sliding sleeve (43) through sliding sleeve brace (44), and can go up at last sideslip post (5) and slide, ground transmission case (7) is connected with following sideslip post (10) with side wall sliding sleeve (43) through sliding sleeve brace (44), and can be in upward slip of sideslip post (10) down, skewback (57) and core pipe (3) and pulley (54), pulley base (55) connects, and wire rope (28) one ends are around lifting reel (26), the other end is connected with upper sliding sleeve (4) with another lifting tackle frame (24) through lifting tackle frame (24).
The utility model course of work: the thickness that at first makes preceding plastering plate of side wall transmission case and between the walls gap transfer to required ash.Rotate adjustable jackscrew, rotation is risen, and teeming top cap and roof, holds out against, and four columns all hold out against, and then four following jackscrews are held out against, and can begin float work.Transmission case is moved to leftward position, the roof transmission case is also moved to extreme lower position.Each transmission case wire rope and pulley are connected, and the order of plastering can be carried out according to roof → side wall → ground.Upwards ash-pit (33) fills up the ash material that stirs, and the roof transmission case is moved to right-most position, shakes rocking bar (15), wire rope is by reductor, manually link block, lifting reel, the effect of lifting tackle frame, to go up the sideslip post and promote,, reserve certain interval (available patch) until the roof.Reductor has auto-lock function, bigger jackscrew (58) is held out against, and can carry out plastered work.Start the motor of roof transmission case, drive the deceleration skilled worker and do by motor pulley, V-belt, reductor belt pulley, simultaneously by motor-driven contiguous block, transmission reel, pulley and wire rope fixed block, the sideslip post is moved to the left on the transmission case whole box body edge, roof making under the effect of wire rope, simultaneously by small belt pulley, driving belt, big belt pulley, agitator arm is rotated very fast, throw away mortar to ceiling on the one hand, on the one hand gap feed between roof and plastering plate.When moving to the leftmost side, promptly smeared one, disable motor quits work.Unclamp big jackscrew, oppositely shake rocking bar, plastered in the roof and partly fall, unclamp adjustable jackscrew, descend jackscrew promotion column to restrain next plastering plate position along guide rail.Again the roof transmission case is moved on to the rightmost side, upwards ash-pit fills up the ash material that stirs, and circulates with this, and the roof is smeared.Backhaul can be carried out the side wall float work.Before side wall begins to plaster, the roof part of plastering is risen to the roof peak.The part of at first side wall being plastered reduces as far as possible, and rotates adjustable jackscrew, and rotation is risen, and top cap and roof are held out against, and four columns all hold out against, and then four following jackscrews are held out against.The ash material that stirs is inserted in the side wall ash-pit, started side wall transmission case (20) motor, under the wire rope effect, the side wall part of plastering rises, plasters.During to peak, disable motor quits work.Unclamp adjustable jackscrew, following jackscrew, the pulling column moves to next plastering plate position along guide rail.So side wall is smeared in circulation.The ground part of plastering: ground program and the roof part of plastering of plastering is identical, does not only have agitator arm, and by dropping fraction (8) down, the ash material is directly rendered on the ground.So, can finish indoor float work.Part makes up but also individual event use, pair substrate portion and side wall are plastered, and just can finish the float work of side wall.