CN2846083Y CN 200520032011 CN200520032011U CN2846083Y CN 2846083 Y CN2846083 Y CN 2846083Y CN 200520032011 CN200520032011 CN 200520032011 CN 200520032011 U CN200520032011 U CN 200520032011U CN 2846083 Y CN2846083 Y CN 2846083Y
Authority
CN
China
Prior art keywords
support
wallboard
frame
base
rope sheave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520032011
Other languages
Chinese (zh)
Inventor
胡清社
常林辉
周奇
卢勋
张弘
张长有
Original Assignee
胡清社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 胡清社 filed Critical 胡清社
Priority to CN 200520032011 priority Critical patent/CN2846083Y/en
Application granted granted Critical
Publication of CN2846083Y publication Critical patent/CN2846083Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a movable high efficiency pipe pulling machine of core pipes which is suitable for forming porous partition wall boards with mechanical vibration. The machine is provided with a base seat, the lower part of the base seat is provided with rollers which can move on the track, and the upper part of the base seat is fixedly provided with a traction mechanism which is used for pulling wallboard core pipes and is driven by a motor; the base seat is connected with an upper guard board, an oblique guard board, an oblique support, a horizontal support and a lengthened frame through a support, wherein the oblique support, the horizontal support and the lengthened frame are connected with the support, and the end part of the lengthened frame is provided with a jack used for balancing tensile force. The pipe pulling machine can simultaneously pull two wallboard core pipes at one time and can pull 70 wallboard core pipes on one machine set just over 10 minutes, and the efficacy of the utility model is tens of times more than manual. Pulled wallboard core pipes do not need washing with water, and thus, water resource is saved, and the work intensity of workers is reduced. The utility model has the advantages of simple structure, convenient operation and high work efficiency.

Description

The movable high-efficiency drawbench
Technical field
The utility model belongs to the building material machinery technical field, is a kind of movable high-efficiency drawbench that is applicable to mechanical oscillation moulding porous partition board with the core pipe.
Background technology
At present, be used to make that the light porous partition board great majority adopt is shaping machine set, unit can be made the porous partition board about 10 simultaneously, in the forming process of wallboard, arrange in the die cavity of each wallboard to put a plurality of wallboard core pipes are arranged, wait to cast behind the slurry coagulation forming, from the wallboard of moulding, the core pipe is extracted again.In existing technology, the wallboard core pipe of choosing is normally by manually finishing, and is before wallboard does not solidify fully, just all the wallboard core pipes in the whole unit all need be extracted.But manually pull out the defective that there are following several respects in corer:
(1) if wallboard core pipe extract too early, occur the glass fiber layer of cloth distortion of wallboard hole inwall easily, and throw off the phenomenon that is two skins with wallboard, cause the Forming Quality of wallboard poor thus.And that the core pipe is extracted is late excessively, and wallboard solidifies fully, at this moment, by manpower wallboard core pipe is extracted very difficulty.
(2) speckle with more cement mortar on the wallboard core tube wall of extracting, after needing to wash wallboard core pipe, just can carry out the use of next round wallboard when making, not only take a lot of work, time-consuming, effort, and cause the waste of water resource with a large amount of water.
(3) as early as possible the core pipe all being extracted for catching up with before wallboard does not solidify fully, needed many people to carry out drawing simultaneously, and have nearly 70 wallboard core pipes on a shaping machine set, singly is to pull out corer, just needs to consume a large amount of time.Therefore, labour intensity is big, inefficiency.
(4) in the process of wallboard core pipe of choosing, because the height difference of core pipe present position, by the discontinuity equalization of manually choosing, and manpower and wallboard core pipe are not on the same horizontal line, the effort of not only choosing, and easily to damaging property of wallboard moulding, to such an extent as to have influence on the quality of whole wallboard.
The utility model content
The purpose of this utility model provides a kind of simple in structure, easy for operation, can with the matching used movable high-efficiency drawbench of wall panel forming machine group, enable to improve tube drawing efficient and stable wallboard end product quality.
Realize that the technical scheme that the purpose of this utility model is taked is: this machine has a base, the roller that can move in orbit is equipped with in the base bottom, be fixed with the wallboard core pipe and of being used to choose on the base by motor-driven haulage gear, be connected with upper guard board and oblique backplate and the tilted supporter that is connected with support, horizontal stand and lengthening frame by the support that is provided with on the base, wherein, employing activity twisted axis is connected between lengthening frame and the horizontal stand, and the jack that is used for the balance pulling force is equipped with in the end of the frame that extends.
Described haulage gear is made up of decelerator, serving cylinder, rope sheave frame, rope sheave, pull rope, drag hook, wherein, the output shaft of decelerator links to each other with the rotating shaft of serving cylinder, be wound with the pull rope that is used for drawing wallboard core pipe on the cylinder, base afterbody with serving cylinder correspondence position, the rope sheave frame fixedly is housed, support body is provided with the draw-in groove of regulating the rope sheave height, be installed with rope sheave by sheave shaft on the draw-in groove, pull rope stretches out and walks around rope sheave from the serving cylinder, can connect with wallboard core pipe hanger by the drag hook of installing on the traction fag end.
Described jack adopts spiral jack structure, comprises that the screw, the spinning that are arranged on lengthening frame end portion are provided with adjusting handle stem, screw rod end by the support power member that has been threaded on the screw rod on the screw, screw rod.
The movable high-efficiency drawbench of making according to such scheme, be the drawing of after wallboard solidifies, carrying out the core pipe, two the wallboard core pipes of once can choosing simultaneously, 70 wallboard core pipes on the unit of choosing, only needed to finish in more than ten minute, its effect is than manually exceeding tens of times.And the wallboard hole wall that pulls out behind the corer is smooth, and the wallboard core pipe of choosing also need not clean by water, has both saved water resource, has reduced labor strength again.In addition, also can be according to the height of wallboard core pipe present position, adjust the position of rope sheave,, pull out the wallboard inclined hole that occurs in the corer process, the phenomenon of Forming Quality difference thereby effectively overcome to guarantee that pull rope can carry out the drawing of application of force equilibrium at same horizontal axis when pulling out corer.Compared with prior art, simple in structure, easy to operate, the high efficiency, practical of this machine.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is that A among Fig. 2 is to view.
The specific embodiment
Referring to Fig. 1, Fig. 2, movable high-efficiency drawbench of the present utility model, has a base 1, roller 6 is housed so that move in the bottom of base 1, this roller 6 is placed on the guide rail on wallboard unit opposite, and laterally move along guide rail, drive motors 5 is equipped with on the top of base 1, distribution box 2, manipulation of switches 8 and by decelerator 3, serving cylinder 4, rope sheave frame 9, rope sheave 10, pull rope 11, the haulage gear that is used for drawing wallboard core pipe 23 that drag hook 12 is formed, wherein, the power shaft of decelerator 3 links to each other with drive motors 5, output shaft links to each other with the rotating shaft of serving cylinder 4, base afterbody with serving cylinder 4 correspondence positions, a rope sheave frame 9 fixedly is housed, and (referring to Fig. 3) support body is provided with draw-in groove 9-1, is installed with rope sheave 10 by sheave shaft 10-1 on draw-in groove 9-1, by draw-in groove 9-1, can make rope sheave 10 carry out the adjustment of upper-lower position,, be convenient to choosing of core pipe so that remain on same horizontal level with the wallboard core pipe 23 of choosing.The drag hook 12 that is used to articulate wallboard core pipe 23 is equipped with at the fag end place of the pull rope 11 that twines on the serving cylinder 4, and pull rope 11 is through the rope sheave groove and walk around rope sheave 10, articulates by the draw ring 23-1 on drag hook 12 and wallboard 24 core pipes.On base 1, the upper guard board 13 of protective action, tiltedly backplate 14 and the horizontal stand 7 that is connected with base support, tilted supporter 7a, the frame 16 that extends, wherein have been housed by base support, employing activity twisted axis 15 is connected between lengthening frame 16 and the horizontal stand 7, a Ground roller 19 is housed in the junction, when not working, lengthening frame 16 can be folded on the tilted supporter 7a, takes up an area of the space so that save.Lengthening frame 16 is provided with supporting leg 20, the jack of sped structure is equipped with in its end, and this jack comprises that the screw 17a, the screw rod 17 on the spinning screw, the screw rod 17 that are installed in lengthening frame 16 ends are provided with the support power member 18 that hold by the tape spool that is threaded the end of the handle stem 21 that is used for rotating screw bolt 17, screw rod 17.Use this jack, can in the process of drawing wallboard core pipe 23, choose the position of tube drawing location, by handle stem 21, turn screw rod 17 makes support power member 18 withstand on base 22 positions of wallboard unit, its effect balance pulling force prevents drawbench Yin Lali and produces displacement.
The operation principle of this machine: the anterior position in a plurality of wall panel forming machine groups, be laid with guide rail, drawbench is positioned on the guide rail by roller, during use, folding lengthening frame 16 is stretched out, reserve the orientation of tube drawing after, withstand on base 22 positions of wallboard unit with jack.Rope sheave 10 is adjusted among the corresponding draw-in groove 9-1 according to the high and low position of institute's depoling pipe, pull rope 11 is placed grooving, at this moment, manipulation of switches 8 on the start-up operation box, pulling traction rope 11, and articulate by the draw ring 23-1 on 23 of two drag hooks on the pull rope 11 12 and the wallboard core pipes, the reverse button in pressing manipulation of switches 8 can be implemented outwards choosing of wallboard core pipe 23.When needs are adjusted the position of drawbench, by rotating the handle stem 21 on the jack, support power member 18 can unclamp, at this moment, promote the drawbench orbiting to desired location, withstand the base 22 of wallboard unit again with the support power member 18 of jack, can carry out the operation of choosing of another group wallboard core pipe.

Claims (3)

1, a kind of movable high-efficiency drawbench, it is characterized in that: this machine has a base, the roller that can move in orbit is equipped with in the base bottom, be fixed with the wallboard core pipe and of being used to choose on the base by motor-driven haulage gear, be connected with upper guard board and oblique backplate and the tilted supporter that is connected with support, horizontal stand and lengthening frame by the support that is provided with on the base, wherein, employing activity twisted axis is connected between lengthening frame and the horizontal stand, and the jack that is used for the balance pulling force is equipped with in the end of the frame that extends.
2, movable high-efficiency drawbench according to claim 1, it is characterized in that: described haulage gear is by decelerator, the serving cylinder, the rope sheave frame, rope sheave, pull rope, drag hook is formed, wherein, the output shaft of decelerator links to each other with the rotating shaft of serving cylinder, be wound with the pull rope that is used for drawing wallboard core pipe on the cylinder, base afterbody with serving cylinder correspondence position, the rope sheave frame fixedly is housed, support body is provided with the draw-in groove of regulating the rope sheave height, be installed with rope sheave by sheave shaft in the draw-in groove, pull rope stretches out and walks around rope sheave from the serving cylinder, can connect with wallboard core pipe hanger by the drag hook of installing on the traction fag end.
3, movable high-efficiency drawbench according to claim 1, it is characterized in that: described jack adopts spiral jack structure, comprises that the screw that is arranged on lengthening frame end portion, spinning is provided with rotating screw bolt on the screw rod on the screw, screw rod handle stem, screw rod end are by the support power member that has been threaded.
CN 200520032011 2005-09-26 2005-09-26 Movable high efficiency pipe puller Expired - Fee Related CN2846083Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520032011 CN2846083Y (en) 2005-09-26 2005-09-26 Movable high efficiency pipe puller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520032011 CN2846083Y (en) 2005-09-26 2005-09-26 Movable high efficiency pipe puller

Publications (1)

Publication Number Publication Date
CN2846083Y true CN2846083Y (en) 2006-12-13

Family

ID=37511501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520032011 Expired - Fee Related CN2846083Y (en) 2005-09-26 2005-09-26 Movable high efficiency pipe puller

Country Status (1)

Country Link
CN (1) CN2846083Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102233608A (en) * 2010-04-29 2011-11-09 中国科学院上海硅酸盐研究所 Tool piece for multistation isostatic pressing, and application of tool piece
CN106144984A (en) * 2016-08-13 2016-11-23 江苏标新工业有限公司 One pulls out hole jack lifting moving fixed platform
CN106272919A (en) * 2016-10-27 2017-01-04 周秘起 A kind of mould preparation pipe drawing device of lightweight wall producing equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102233608A (en) * 2010-04-29 2011-11-09 中国科学院上海硅酸盐研究所 Tool piece for multistation isostatic pressing, and application of tool piece
CN102233608B (en) * 2010-04-29 2015-05-06 上海电气钠硫储能技术有限公司 Tool piece for multistation isostatic pressing, and application of tool piece
CN106144984A (en) * 2016-08-13 2016-11-23 江苏标新工业有限公司 One pulls out hole jack lifting moving fixed platform
CN106272919A (en) * 2016-10-27 2017-01-04 周秘起 A kind of mould preparation pipe drawing device of lightweight wall producing equipment

Similar Documents

Publication Publication Date Title
CN2846083Y (en) Movable high efficiency pipe puller
CN106827181B (en) A kind of cement brick production stable molding device
CN208483156U (en) Steel bar cut-off device is used in a kind of production of electric pole
CN211153420U (en) Fishing device suitable for macrobrachium nipponensis
CN201087540Y (en) High-efficiency troweling device for concrete surface
CN210263949U (en) Telescopic string tube device
CN217834045U (en) Concrete panel preparation mould for building
CN210100329U (en) Instant demoulding device for overhang roll forming concrete pipe
CN215887339U (en) Improved reciprocating type bale plucker
CN214061941U (en) Liftable steel structure frame
CN210682845U (en) Engineering distribution pipe cable drawing device
CN209777879U (en) Electric power construction is with braking unwrapping wire support
CN209245897U (en) A kind of lighting device for building
CN211486550U (en) A stage property wall for stage performance
CN216105555U (en) Adjustable assembly type building stair component hoisting tool
CN2338413Y (en) Machine for cleaning external wall of high building
CN213115809U (en) Construction guardrail convenient to adjust
CN219952366U (en) Curtain wall convenient to clean
CN218893301U (en) Earth surface cable fastener for construction
CN219156273U (en) Hoisting mechanism for inflatable membrane structure
CN109626107A (en) Braided wire traction device
CN218623354U (en) Trapezoidal cross-section support based on self-stabilization
CN211646392U (en) Ground anchor dismounting device for power engineering
CN207682647U (en) A kind of suspension apparatus of tubular chimney prefabricated component
CN214993642U (en) Arresting grid for irrigation canal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee