CN2833667Y - Automatic blast-furnace tuyere slag control apparatus - Google Patents

Automatic blast-furnace tuyere slag control apparatus Download PDF

Info

Publication number
CN2833667Y
CN2833667Y CN 200520073531 CN200520073531U CN2833667Y CN 2833667 Y CN2833667 Y CN 2833667Y CN 200520073531 CN200520073531 CN 200520073531 CN 200520073531 U CN200520073531 U CN 200520073531U CN 2833667 Y CN2833667 Y CN 2833667Y
Authority
CN
China
Prior art keywords
blast
wind turning
valve
blast furnace
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520073531
Other languages
Chinese (zh)
Inventor
吴宗霞
孙章连
樊冰茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAANSHAN FIRST AUTO-CONTROL Co Ltd
Original Assignee
Maanshan Fusite Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Fusite Technology Development Co ltd filed Critical Maanshan Fusite Technology Development Co ltd
Priority to CN 200520073531 priority Critical patent/CN2833667Y/en
Application granted granted Critical
Publication of CN2833667Y publication Critical patent/CN2833667Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

The utility model discloses a kind of automatic controller of blast-furnace tuyere pour slag, its principal feature is between the air supply duct of two blast furnaces, set up the wind turning pipeline of a suitable bore near the entry position of heat generator, two is equipped with electronic cut-out butterfly valve, the centre is equipped with the wind turning control butterfly valve of quick unlatching, the PLC system and device is connected with the control corresponding valve with two blast furnace blower motors, and its running status is detected judgement, and corresponding execution wind turning control action; The PLC system detects and carries out the action control procedure.This device can solve the disconnected wind remedial measures in emergency circumstances of blast furnace, and slag is irritated in the prevention air port, and the continuous stable yields of blast furnace is played good facilitation.

Description

Automatic controller of blast-furnace tuyere pour slag
Technical field
The utility model relates to a kind of ironmaking tuyere of blast furnace ventilation controller.
Technical background
Along with the development of China's steel and iron industry, the blast furnace sum of China has reached nearly thousand.All kinds of blast furnaces are in operation and all will run into an insoluble problem, Here it is blast-furnace tuyere pour slag.Blast furnace is normally in service, fan blower similarly is the heart of blast furnace, it constantly send hot blast by heat generator to blast furnace, the hot blast of sending in the burner hearth has certain blast pressure, in order to overcome fan resistance and stock column resistance, to guarantee in the burner hearth coke and the coal dust generation reductive agent that fully burns, make reduction of iron ore in the burner hearth form molten iron and produce slag and sink to cupola well, slag is lighter than molten iron and floats over above the molten iron.But under special circumstances,, thereby cause suddenly out-of-blast accident to take place owing to the reason of each side such as blower fan machinery, electric automatic protective system can cause sudden power or shutdown.To about 8 seconds after 380-450 square metre the medium and small blast furnace blowing-out, the potpourri of unsegregated molten iron and slag is all solidifying under the deposition on tens air outlets in the stove, thereby causes the air port to irritate slag.After forming the air port and irritating slag, the blast furnace repairing that must stop production will be employed great amount of manpower and material resources the air port is changed, and the repairing process approximately needs tens hours, and the direct economic loss that every blast furnace causes owing to this accident will be more than 1,000,000 yuan.
The air port is irritated the slag accident and is difficult to prediction, and inevitable, every blast furnace all will take place 1-2 time every year, and the whole nation is annual because the economic loss that this accident causes will be more than 1,000,000,000 yuans.Temperature, dust, poisonous gas all can bring great injury to the maintainer in the State of Blast Furnace, and the repairing condition is very arduous.Therefore, Iron industry presses for provides the realistic plan that can solve blast-furnace tuyere pour slag.
Summary of the invention
The purpose of this utility model provides a kind of ironmaking tuyere of blast furnace that can prevent and irritates the ventilation controller of slag.
The scheme that the utility model automatic controller of blast-furnace tuyere pour slag provides is: between the air supply duct of two blast furnaces, set up the wind turning pipeline of a suitable bore near the entry position of heat generator, two is equipped with electronic cut-out butterfly valve, the centre is equipped with the wind turning control butterfly valve of quick unlatching, the PLC system and device is connected with the control corresponding valve with the state of two blast furnace blower motors, its running status is detected judgement, and corresponding execution wind turning control action; The PLC system detects and also to carry out the action control procedure: 1. the PLC system detects the operating mode of safe operation of running status, the blower fan of blower motor, in order to the normal and accident condition of judgment task blower fan, and corresponding execution wind turning control action; 2. the PLC system detects the opening of air-valve, in order to judge that this typhoon machine is orderly closedown or force outage, avoids wind turning control misoperation; 3. the PLC system detects the full-gear of blower fan outlet non-return valve, in order to the protection exception blower fan, prevents from blower fan machinery is caused pernicious damage; 4. the PLC system detects the blast pressure of operate as normal blower fan; blast pressure must (generally be set at 100~120KPa) greater than certain set pressure; just allow to carry out the wind turning control action, in order to protect normal but be in the blast furnace and the blower fan (only a few operating mode) of slow air quantity air feed.5. input/the exit status of other opening, wind turning control, hand-operated forced, pilot system, accident action record etc. as the wind turning isolation valve.
The utility model automatic controller of blast-furnace tuyere pour slag can detect the ordinary production and the improper production status of blast furnace blower simultaneously, and the operating condition of other blast furnace blowers solves the disconnected wind remedial measures in emergency circumstances of blast furnace, characteristics at blast-furnace tuyere pour slag, within short several seconds, before the air port slag solidifies, certain blast is recovered to reach in each air port, to keep overcoming stock column resistance in the stove, reach the prevention air port and irritate the effect of slag, the continuous stable yields of blast furnace is played good facilitation.
Description of drawings
Fig. 1 is the utility model automatic controller of blast-furnace tuyere pour slag synoptic diagram.
Fig. 2 is the utility model automatic controller of blast-furnace tuyere pour slag working site synoptic diagram.
Among Fig. 1: 1, Ethernet bridge 2, PLC system 3, measuring instrument 4, valve site
Among Fig. 2: 5; heat generator 6; 1# blast furnace 7; 2# blast furnace 8; standby fan 9; standby fan non-return valve 10; standby fan goes out air-valve 11; 1# blower fan 12; 1# blower fan safe operation protection action 13; 1# motor stopped status 14; 1# blower fan non-return valve 15; the 1# blower fan goes out air-valve 16; 1# blower fan blast pressure 17; wind turning pipeline 18; V3 isolation valve 19; V4 operation valve 20; V5 isolation valve 21; 2# blower fan 22; 2# blower fan safe operation protection action 23; 2# motor stopped status 24; 2# blower fan non-return valve 25; the 2# blower fan goes out air-valve 26; 2# blower fan blast pressure
Embodiment
In conjunction with Fig. 1 and Fig. 2 the utility model automatic controller of blast-furnace tuyere pour slag course of work is described as follows:
As seen from Figure 1, utilize between the air supply duct of two blast furnaces, set up the wind turning pipeline of a suitable bore near the entry position of heat generator, two is equipped with electronic cut-out butterfly valve, the centre is equipped with the wind turning control butterfly valve of quick unlatching, and the PLC system of device is judged the two typhoon machines of ordinary production and the detection of motor operating state.Concrete detect and executing state is: 1. under the normal condition, the PLC system detects the operating mode of safe operation of running status, the blower fan of two blast furnace blower motors 1,2, in order to the judgment task blower fan normally and accident condition, and corresponding execution wind turning control action; 2. go out the opening of air-valve,, avoid wind turning control misoperation in order to judge that this typhoon machine is orderly closedown or force outage; 3. the full-gear of blower fan outlet non-return valve in order to the protection exception blower fan, prevents from blower fan machinery is caused pernicious damage; 4. the blast pressure of operate as normal blower fan must (generally be set at 100~120KPa), just allow carry out the wind turning control action, in order to protect normal but be in the blast furnace and the blower fan (only a few operating mode) of slow air quantity air feed greater than certain set pressure.5. input/the exit status of other the opening as the wind turning isolation valve, wind turning control, hand-operated forced, pilot system, accident action record etc. are supporting display operation and management tool.Break down in emergency circumstances at a certain typhoon machine, carry out fast control command, wind turning control butterfly valve was opened fully at 2.5 seconds, made because of the break blast-furnace tuyere of wind of fan trouble to recover ventilation rapidly in 6 seconds, and keep certain pressure, prevent that the blast-furnace tuyere pour slag accident from taking place.
Control procedure that can the illustrative system wind turning from Fig. 2 is as follows:
1. the PLC system detects the operating mode of safe operation of running status, the blower fan of blower motor, the normal and accident condition of judgment task blower fan, and corresponding execution wind turning control action; When system is in wind turning equipment normal condition, this moment, operating personnel should confirm that V3, V5 wind turning isolate motorized valve and open; When possessing the wind turning logical condition, wind turning operation valve V4 will open fast; After wind turning finished, operating personnel will close one with wind turning isolation valve V3 or V5 earlier, then quick closedown wind turning operation valve V4;
2. the PLC system detects the opening of air-valve, judges that this typhoon machine is orderly closedown or force outage, avoids wind turning control misoperation; When 1,2 blower fans go out air-valve and are in open mode, can assert that two typhoon machines are in normal operation, therefore a certain typhoon machine fault allows when the wind turning condition is set up to this blast furnace wind turning; Go out air-valve during orderly closedown and be in closed condition, also need not to this blast furnace wind turning even other condition is set up;
3. the PLC system detects the blast pressure of operate as normal blower fan, and blast pressure must generally be set at 100~120KPa greater than certain set pressure, just allows to carry out the wind turning control action; When a certain fan trouble, the blower fan that a condition of blast furnace and the wind turning of blower fan safety is another work exert oneself (blast) want the setting value of overpressure just to allow to another blast furnace wind turning, otherwise can influence the operating mode of this normal blast furnace and blower fan;
4. take place or main motor operation signal disappears and blower fan outlet non-return valve complete shut-down when the safe operation guard signal of a certain blower fan, under the condition that 1. this condition all takes place and~3. possess simultaneously, wind turning operation valve V4 will open fast, realize the wind turning function;
5. getting rid of under the situation of all conditions, when needing to force manual wind turning, can open the V4 operation valve fast, realizing manual wind turning function;
6. put into operation or main air blower recovers normal when standby fan, after pressure reaches set-point, can be earlier with V3 or V5 wherein a motorized valve close, quick closedown V4 operation valve then, working fan is in normal ventilation state; The operating mode of the running status of PLC system detection blower motor, the safe operation of blower fan, the normal and accident condition of judgment task blower fan, and corresponding execution wind turning control action.

Claims (1)

1, a kind of automatic controller of blast-furnace tuyere pour slag, form by wind turning pipeline, by-pass valve control and PLC control system device, it is characterized in that between the air supply duct of two blast furnaces, set up the wind turning pipeline of a suitable bore near the entry position of heat generator, two is equipped with electronic cut-out butterfly valve, the centre is equipped with the wind turning control butterfly valve of quick unlatching, the PLC system and device is connected with the control corresponding valve with two blast furnace blower motors, its running status is detected judgement, and corresponding execution wind turning control action.
CN 200520073531 2005-07-12 2005-07-12 Automatic blast-furnace tuyere slag control apparatus Expired - Lifetime CN2833667Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520073531 CN2833667Y (en) 2005-07-12 2005-07-12 Automatic blast-furnace tuyere slag control apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520073531 CN2833667Y (en) 2005-07-12 2005-07-12 Automatic blast-furnace tuyere slag control apparatus

Publications (1)

Publication Number Publication Date
CN2833667Y true CN2833667Y (en) 2006-11-01

Family

ID=37197979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520073531 Expired - Lifetime CN2833667Y (en) 2005-07-12 2005-07-12 Automatic blast-furnace tuyere slag control apparatus

Country Status (1)

Country Link
CN (1) CN2833667Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051437A (en) * 2010-12-30 2011-05-11 中国恩菲工程技术有限公司 Air-supplying device for revolving furnace
CN102174665A (en) * 2010-12-30 2011-09-07 中国恩菲工程技术有限公司 Air supply control method for converter
CN103266193A (en) * 2013-05-24 2013-08-28 重庆钢铁(集团)有限责任公司 Wind transfer security system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051437A (en) * 2010-12-30 2011-05-11 中国恩菲工程技术有限公司 Air-supplying device for revolving furnace
CN102174665A (en) * 2010-12-30 2011-09-07 中国恩菲工程技术有限公司 Air supply control method for converter
CN102051437B (en) * 2010-12-30 2013-11-13 中国恩菲工程技术有限公司 Air-supplying device for revolving furnace
CN102174665B (en) * 2010-12-30 2015-10-28 中国恩菲工程技术有限公司 A kind of air feed control method for converter
CN103266193A (en) * 2013-05-24 2013-08-28 重庆钢铁(集团)有限责任公司 Wind transfer security system

Similar Documents

Publication Publication Date Title
CN201046970Y (en) Tuyere slag-filling preventing automatic control device for blast furnaces
CN1896895A (en) Automatic controller of blast-furnace tuyere pour slag
CN201378274Y (en) Automatic emergency lifting device when in PLC breakdown
CN2833667Y (en) Automatic blast-furnace tuyere slag control apparatus
CN110699526B (en) Operation method of nitrogen interlocking control system for hot galvanizing vertical annealing furnace upper and lower furnace pressure detection
CN102344980B (en) Air dispensation control system for blower system of blast furnace in metallurgical enterprise
CN101270400A (en) Air dispensation system of multi-main pipe blast furnace
CN105420435A (en) Automatic blast furnace air adjusting system and air adjusting method for metallurgic industry
CN105507941B (en) Underground coal mine working face automates safety system
CN102840315B (en) Coal pulverizer gearbox lubrication cooling cleaning method
CN102721155A (en) Control device and control method for rapidly detecting abnormality of commercial air conditioning water system and protecting commercial air conditioning water system
CN214572081U (en) Blast furnace gas system overpressure safety interlocking control equipment
CN207632830U (en) A kind of blast furnace control system of list main pipe
CN102337367B (en) Air distributing control method for blast furnace blower system
CN104698977B (en) The breakdown judge and aftertreatment technology of the infrared scale of conticaster
CN202583849U (en) Coke oven gas pipeline low-pressure automatic protection system
CN2453014Y (en) Hot blast adjusting protection device for blst furnace
CN102698862A (en) Lubricating protection control method for powder preparation intermediate-speed mill of blast furnace
CN205654569U (en) Power plant is with taking booster fan of bypass
CN201962304U (en) Auxiliary control device for top pressure of blast furnace
CN202297637U (en) Control device for realizing mutual air distribution during operation of air supply systems of different blast furnaces
CN207196825U (en) The control circuit of air-conditioning system
CN104928446A (en) Furnace door multipath water supply device
CN102085569B (en) Safety control device of brake of continuous casting withdrawing and straightening unit
CN203295516U (en) Air-distribution security system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: MAANSHAN FIRST AUTO-CONTROL CO., LTD.

Free format text: FORMER OWNER: FUSITE SCIENCE AND TECHNOLOGY DEVELOPMENT CO., LTD., MAANSHAN

Effective date: 20140725

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 243011 MAANSHAN, ANHUI PROVINCE TO: 243000 MAANSHAN, ANHUI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140725

Address after: 243000 Anhui city of Ma'anshan province Dangtu Lixian Industrial Park Road and the intersection of Longchang Road

Patentee after: Maanshan First Auto-control Co., Ltd.

Address before: 243011, the three section of plum blossom garden, Jiangdong Avenue, Anhui, Ma'anshan

Patentee before: Fusite Science and Technology Development Co., Ltd., Maanshan

CX01 Expiry of patent term

Expiration termination date: 20150712

Granted publication date: 20061101

EXPY Termination of patent right or utility model