CN205654569U - Power plant is with taking booster fan of bypass - Google Patents
Power plant is with taking booster fan of bypass Download PDFInfo
- Publication number
- CN205654569U CN205654569U CN201620405056.XU CN201620405056U CN205654569U CN 205654569 U CN205654569 U CN 205654569U CN 201620405056 U CN201620405056 U CN 201620405056U CN 205654569 U CN205654569 U CN 205654569U
- Authority
- CN
- China
- Prior art keywords
- motor
- booster fan
- base
- air port
- journal stirrup
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model discloses a power plant is with taking booster fan of bypass belongs to coal power generation sector for when solution booster fan or boiler break down, the unable unobstructed exhaust problem of high temperature flue gas. It includes the base, is located the motor of base top, is located the left booster fan body of motor, motor and booster fan body are connected to the base upper end, the base includes base body, is located the journal stirrup of base body top, is located the left fixed stay of journal stirrup, threaded hole is opened to the journal stirrup up end, the fixed stay is opened there is the through -hole, the through -hole is on a parallel with the horizontal plane, the motor includes motor body, overlaps the rotation axis in the motor, the motor body lower extreme is equipped with the mount pad that matches with the journal stirrup, mount pad and journal stirrup pass through bolted connection, rotatory axle sleeve is in the through -hole. This technical scheme provides a power plant is with taking booster fan of bypass, has realized when the trouble cooling of high temperature flue gas, desulfurization and emission.
Description
Technical field
This utility model belongs to coal power field, specifically, is the booster fan of power plant band bypass.
Background technology
In order to realize the strict supervision to coal-fired power plant's desulfurization equipment, the national environmental protection Room has issued each department Thermal Power Enterprises will be progressively
Transforming the notice of built desulfurization equipment, environment-development 2012 No. 27 literary composition in osmanthus, Guangxi District " sets about strengthening fossil power plant desulfurization
Execute operation and desulfurization electricity price management notice " in also require that more than 300,000 kilowatts pure generating fired power generating unit of unit will be before the end of the year 2013
Complete transformation.
Desulphurization system and boiler are fully formed haplotype train, and therefore the operational reliability of whole unit can be substantially reduced.
Main cause have following some: first, desulfurizer is connected with main frame, it is necessary to synchronize start and stop, if booster fan stop jumping, cigarette
Gas leads to the passage of chimney and is almost cut off, inevitable significantly load shedding or the shutdown of unit;Secondly, (example when boiler side breaks down
Such as air preheater stop jumping), high-temperature flue gas does not bypass can be walked, and will be directed into absorption tower, and in certainly will causing tower, facility is badly damaged very
Scrap to absorption tower, cause tremendous economic to lose;It addition, the flue gas that during start and stop, furnace fuel oil produces can pollute serosity,
How to replace and process the working medium being polluted by the oil in shutdown process, be also the problem needing to solve.Therefore, it is necessary to have careful, thin
Cause, related system is transformed by feasible scheme.
Utility model content
This utility model purpose is intended to provide a kind of power plant band realizing cooling high-temperature fume, desulfurization and discharge and bypasses
Booster fan.
For realizing above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
The booster fan that power plant bypasses with band, including base, is positioned at the motor above base, is positioned at the supercharging wind on the left of motor
Machine body, described base upper end connects motor and booster fan body, and described base includes base body, is positioned on base body
Side journal stirrup, be positioned at the fixing support on the left of journal stirrup, described journal stirrup upper surface has screwed hole, and described fixing support has through hole,
Described through hole is parallel to horizontal plane;Described motor includes motor body, the rotary shaft being placed in motor, described motor body lower end
Being provided with the mounting seat mated with journal stirrup, described mounting seat and journal stirrup are bolted, and described rotary sleeve is in through hole;Described
Booster fan body includes casing, the fan blades being positioned at casing, is positioned at the air inlet on the left of casing, is positioned at the air-out of cabinet front
Mouthful, described casing lower end is welded in base body upper end, and described fan blades is placed on rotary shaft left end, described air inlet include main air port,
Being positioned at the standby air port above main air port, connect casing on the right side of described main air port, described main air port is provided with electric-controlled switch, described standby
With air port in the left side of electric-controlled switch.
Using the utility model of technique scheme, fixing support has through hole, rotary sleeve is in through hole, it is to avoid because of vibrations
Problem and rotary shaft life-span of causing reduces.Air inlet includes main air port, is positioned at the standby air port above main air port, in normal work
When making, enter casing from boiler flue gas out from main air port, after fan blades supercharging, flow to absorption tower by air outlet, then
It is discharged into chimney.When booster fan breaks down, owing to main air port is provided with electric-controlled switch, electric-controlled switch can be controlled, close
Main air port, flue gas can only be flowed out by standby air port, flow to from standby air port physical features relatively low process pond temporarily, it is to avoid because increasing
When pressure fan breaks down, flue gas can be arranged nowhere, the problem causing compressor emergency shutdown.
Limiting further, described main air port is provided with spray equipment, and described spray equipment includes spray piping, is positioned at spray piping end
The spray head of end, described spray piping is perpendicular to main air port, and described spray head has some apertures.
When boiler breaks down, the spray equipment set up can effectively be lowered the temperature, and protective conduit is from the infringement of high-temperature flue gas.
Spray head has some apertures, it is possible to effectively diverted liquid, increases the contact area of liquid and flue gas, reaches more preferably to lower the temperature
Effect.
Limiting further, described spray equipment has 2.
2 spray equipments, one supplies fire demand water, and one for sulfur removal technology water, it is achieved that while cooling, moreover it is possible to realizes
Desulfurization processes, and reaches the effect of environmental protection.
Limiting further, described standby tuyere diameter is 20cm.
This utility model compared to existing technology, can realize cooling high-temperature fume, desulfurization and discharge, and safety is good, economical environment-protective.
Accompanying drawing explanation
This utility model can be further illustrated by the nonlimiting examples that accompanying drawing is given;
Fig. 1 is the structural representation (diagram is not drawn into fan blades) of the booster fan of this utility model power plant band bypass;
Fig. 2 is the structural representation of spray head;
Main element symbol description is as follows:
Base 1, motor 2, booster fan body 3, base body 101, journal stirrup 102, fixing support 103, motor body
201, rotary shaft 202, mounting seat 4, bolt 5, casing 301, air inlet 302, air outlet 303, main air port 302a, standby
Use air port 302b, electric-controlled switch 6, spray equipment 7, spray piping 701, spray head 702.
Detailed description of the invention
In order to make those skilled in the art that this utility model be may be better understood, below in conjunction with the accompanying drawings with embodiment to this practicality
New technique scheme further illustrates.
Embodiment one,
As shown in Figure 1 and Figure 2, the booster fan that power plant bypasses with band, including base 1, be positioned at the motor 2 above base 1,
Being positioned at the booster fan body 3 on the left of motor 2, base 1 upper end connects motor 2 and booster fan body 3, and base 1 includes the end
Seat body 101, it is positioned at the journal stirrup 102 above base body 101, is positioned at the fixing support 103 on the left of journal stirrup 102, journal stirrup 102
Upper surface has screwed hole, and fixing support 103 has through hole, and through hole is parallel to horizontal plane;Motor 2 include motor body 201,
The rotary shaft 202 being placed in motor 2, motor body 201 lower end is provided with the mounting seat 4 mated with journal stirrup 102, mounting seat 4 He
Journal stirrup 102 is connected by bolt 5, and rotary shaft 202 is placed in through hole;Booster fan body 3 includes casing 301, is positioned at case
Fan blades in body 301, it is positioned at the air inlet 302 on the left of casing, is positioned at the air outlet 303 on front side of casing 301, casing 301 times
End is welded in base body 101 upper end, and fan blades is placed on rotary shaft 202 left end, and air inlet 302 includes main air port 302a, is positioned at
Standby air port 302b above main air port 302a, connects casing 301 on the right side of main air port 302a, main air port 302a is provided with automatically controlled opening
Closing 6, standby air port 302b is in the left side of electric-controlled switch 6.
Preferably, main air port 302a is provided with spray equipment 7, and spray equipment 7 includes spray piping 701, is positioned at spray piping 701
The spray head 702 of end, spray piping 701 is perpendicular to main air port 302a, and spray head 702 has some apertures.
Embodiment two,
As shown in Figure 1 and Figure 2, the booster fan that power plant bypasses with band, including base 1, be positioned at the motor 2 above base 1,
Being positioned at the booster fan body 3 on the left of motor 2, base 1 upper end connects motor 2 and booster fan body 3, and base 1 includes the end
Seat body 101, it is positioned at the journal stirrup 102 above base body 101, is positioned at the fixing support 103 on the left of journal stirrup 102, journal stirrup 102
Upper surface has screwed hole, and fixing support 103 has through hole, and through hole is parallel to horizontal plane;Motor 2 include motor body 201,
The rotary shaft 202 being placed in motor 2, motor body 201 lower end is provided with the mounting seat 4 mated with journal stirrup 102, mounting seat 4 He
Journal stirrup 102 is connected by bolt 5, and rotary shaft 202 is placed in through hole;Booster fan body 3 includes casing 301, is positioned at case
Fan blades in body 301, it is positioned at the air inlet 302 on the left of casing, is positioned at the air outlet 303 on front side of casing 301, casing 301 times
End is welded in base body 101 upper end, and fan blades is placed on rotary shaft 202 left end, and air inlet 302 includes main air port 302a, is positioned at
Standby air port 302b above main air port 302a, connects casing 301 on the right side of main air port 302a, main air port 302a is provided with automatically controlled opening
Closing 6, standby air port 302b is in the left side of electric-controlled switch 6.
Preferably, main air port 302a is provided with spray equipment 7, and spray equipment 7 includes spray piping 701, is positioned at spray piping 701
The spray head 702 of end, spray piping 701 is perpendicular to main air port 302a, and spray head 702 has some apertures.
Spray equipment 7 has 2.
Optimum, the standby a diameter of 20cm of air port 302b.
The difference of embodiment one and embodiment two is: implements two and defines that spray equipment 7 has 2, by one for fire-fighting
Water, one for sulfur removal technology water, it is achieved that while cooling, moreover it is possible to realizes desulfurization and processes, reaches the effect of environmental protection.
The booster fan of the power plant band bypass provided this utility model above is described in detail.Saying of specific embodiment
Bright being only intended to helps to understand method of the present utility model and core concept thereof.It should be pointed out that, the common skill for the art
For art personnel, on the premise of without departing from this utility model principle, it is also possible to this utility model is carried out some improvement and modification,
These improve and modification also falls in this utility model scope of the claims.
Claims (4)
1. the booster fan that power plant bypasses with band, including base, is positioned at the motor above base, is positioned on the left of motor
Booster fan body, it is characterised in that: described base upper end connects motor and booster fan body, and described base includes that base is originally
Body, being positioned at the journal stirrup above base body, be positioned at the fixing support on the left of journal stirrup, described journal stirrup upper surface has screwed hole, institute
Stating fixing support and have through hole, described through hole is parallel to horizontal plane;Described motor includes motor body, the rotation being placed in motor
Axle, described motor body lower end is provided with the mounting seat mated with journal stirrup, and described mounting seat and journal stirrup are bolted, described rotation
Rotating shaft is placed in through hole;Described booster fan body include casing, the fan blades being positioned at casing, be positioned at the air inlet on the left of casing,
Being positioned at the air outlet of cabinet front, described casing lower end is welded in base body upper end, and described fan blades is placed on rotary shaft left end, institute
State air inlet to include main air port, be positioned at the standby air port above main air port, on the right side of described main air port, connect casing, described main air port
Being provided with electric-controlled switch, described standby air port is in the left side of electric-controlled switch.
The booster fan of power plant the most according to claim 1 band bypass, it is characterised in that: described main air port is provided with spray
Shower device, described spray equipment includes spray piping, is positioned at the spray head of spray piping end, and described spray piping is perpendicular to main
Air port, described spray head has some apertures.
The booster fan of power plant the most according to claim 2 band bypass, it is characterised in that: described spray equipment has 2
Individual.
The booster fan of power plant the most according to claim 3 band bypass, it is characterised in that: described standby tuyere diameter
For 20cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620405056.XU CN205654569U (en) | 2016-05-06 | 2016-05-06 | Power plant is with taking booster fan of bypass |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620405056.XU CN205654569U (en) | 2016-05-06 | 2016-05-06 | Power plant is with taking booster fan of bypass |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205654569U true CN205654569U (en) | 2016-10-19 |
Family
ID=57402136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620405056.XU Active CN205654569U (en) | 2016-05-06 | 2016-05-06 | Power plant is with taking booster fan of bypass |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205654569U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108662708A (en) * | 2017-03-31 | 2018-10-16 | 顶风 | Wind turbine with bypass functionality and heat exchanger |
-
2016
- 2016-05-06 CN CN201620405056.XU patent/CN205654569U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108662708A (en) * | 2017-03-31 | 2018-10-16 | 顶风 | Wind turbine with bypass functionality and heat exchanger |
CN108662708B (en) * | 2017-03-31 | 2020-07-07 | 顶风 | Fan and heat exchanger with bypass function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100588720C (en) | Gas totally-drying purifying dust-collecting process of blast-furnace | |
CN103334946B (en) | The online diagnosis of energy saving control system of a kind of thermal power plant's steam-driven induced draft fan | |
CN205654569U (en) | Power plant is with taking booster fan of bypass | |
CN207816009U (en) | A kind of ferromanganese smelting electric furnace flue gas recovery system | |
CN102304595A (en) | Top gas pressure recovery turbine generating system | |
CN206093453U (en) | Gas turbine auxiliary oil cylinders system | |
CN210165777U (en) | Coke oven self waste heat power generation and induced air sharing device | |
CN108730951B (en) | Auxiliary frequency modulation and peak shaving system and method by using high-pressure low-temperature economizer | |
CN202169134U (en) | Novel desulphurization accident flue gas spray cooling system | |
CN207741585U (en) | A kind of heat recovery coke oven high-temperature flue gas system compact type technology arrangement structure | |
CN203375464U (en) | Linkage type air induction device in thermal power plant desulfurization smoke system | |
CN202303372U (en) | Explosion-proof type combustor valve system | |
EP2647810B1 (en) | Power plant | |
CN103335325B (en) | Coordinated type blower unit in heat-engine plant desulfurized flue gas system and method for operating thereof | |
CN208566707U (en) | A kind of environmental-friendcombustion combustion furnace that exhaust emission rate is low | |
CN205535888U (en) | Low -level (stack -gas) economizer overhauls device on line | |
CN105087079B (en) | A kind of gasification furnace power failure self-protecting device and method | |
CN204574093U (en) | Regenerative air preheater Recovery of Seal Oil energy conserving system | |
CN211084808U (en) | Efficient smelting furnace for processing stainless steel | |
CN221703798U (en) | Device capable of carrying out waste heat recovery power generation | |
CN201485517U (en) | Aluminum cell smoke residual heat reclaiming system | |
CN207538530U (en) | A kind of in-service head cover polished construction workplace system in power station | |
CN211082003U (en) | Waste heat power generation device | |
CN107941031A (en) | A kind of heat recovery coke oven high-temperature flue gas system compact type method for arranging technological process | |
CN219824254U (en) | Blast furnace damping down gas recovery device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 536017 the Guangxi Zhuang Autonomous Region Beihai city Tieshan shitoubu port Patentee after: Guangxi Investment Group Beihai Power Generation Co., Ltd Address before: 536017 the Guangxi Zhuang Autonomous Region Beihai city Tieshan shitoubu port Patentee before: SDIC BEIBUWAN ELECTRIC POWER Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |