CN2795600Y - Pipe-jacking construction building block type steel structure sinking well - Google Patents
Pipe-jacking construction building block type steel structure sinking well Download PDFInfo
- Publication number
- CN2795600Y CN2795600Y CN 200520025623 CN200520025623U CN2795600Y CN 2795600 Y CN2795600 Y CN 2795600Y CN 200520025623 CN200520025623 CN 200520025623 CN 200520025623 U CN200520025623 U CN 200520025623U CN 2795600 Y CN2795600 Y CN 2795600Y
- Authority
- CN
- China
- Prior art keywords
- steel structure
- jacking construction
- pipe
- open caisson
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model belongs to a pipe-jacking construction building block type steel structure sinking well, which is used for pipe-jacking construction (water outlet pipes or running water pipes) for municipal engineering. The utility model is mainly characterized in that four upright walls of the sinking well are in a building block type structure composed of steel structure box bodies which are mutually and fixedly connected by preembedded screw nails, bit angle frameworks are fixedly arranged on the lower bottom surfaces of the four upright walls and steel reinforced concrete basal plates are arranged among the bit angle frameworks. The utility model can be used for many times, the utility model has the advantages of assembly time saving and simple operation, the security and the work efficiency are increased, the labor intensity of workers is reduced and a large quantity of lumber is saved.
Description
Technical field
The utility model belongs to (waste pipe or running water pipe) employed a kind of jacking construction cordwood steel structure open caisson in the municipal engineering jacking construction.
Background technique
Present domestic unit in charge of construction is the non-excavation method jacking construction of most employings in the jacking construction process, can reduce befouling environment like this, and the construction operation face is little, and the amount of being unearthed is few, can also reduce a large amount of machinery, the manufacturing efficiency height; In jacking construction, also do not influence traffic, guarantee the not protruding and depression in road surface.Its working procedure is: dig a working pit (also crying main hole) on ground, this working pit is decided according to pipe diameter designed depth push-bench size, does one again according to apex distance and receives hole (also crying secondary hole).The way in work on hand hole is: the mud stirring pile of at first fetching water in the working pit outside, according to the degree of depth of the degree of depth decision stirring pile of working pit, with pile driver I-steel is driven underground then, and determine to squeeze into the quantity and the model of I-steel according to the difference of top power.Working pit periphery is made a call to 4 wells, and purpose is a precipitation before the excavation working pit, the excavation in the hole of starting working during all left and right sides of precipitation one, and lead frame is layed foundation, and erection unit is placed back back iron (back back iron placement I-steel front position).After a push pipe working pit was finished, pipe jacking equipment was hung out by the pair hole.More than be that domestic jacking construction method adopts more a kind of form.Another kind of jacking construction method is that main hole work one open caisson (reinforced concrete) is used for replacing main hole, after a push pipe operation is finished, reinforced concrete open caisson just cancels, and this open caisson is because cost is high and concrete solidification intensity needs certain hour, so present use less of this method.Comprehensive the above, the shortcoming of existing jacking construction method is: open caisson in jacking construction (I-steel open caisson) when squeezing into I-steel because the geological state difference, the I-steel of being squeezed into often with the ground out of plumb, cause the horizontal plane run-off the straight, back back iron can not accurately be placed, because active force just acts on the I-steel in the push pipe process, because the I-steel position produces deviation, so pipe jacking equipment just is easy to generate bigger top power in jack-in process in construction, unfavorable to pipe jacking equipment and I-steel back like this, to the certain influence of quality generation of push pipe.The underground water that position problems produced owing to I-steel in jacking construction flows into working pit, equipment in the operating pit and electrical system are produced potential safety hazard, because phreatic inflow produces mud and water workman's operation is also produced unsafe factor as explosion-proof, waterproof etc.; And the push pipe ingress often also flows into mud and water, and the quality to push pipe also exerts an influence like this.After a push pipe operation was finished, I-steel need be extracted from ground, extracted the back in underground generation cavity.Because the cavity can't be added real (not adding soil later substantially in construction), as repairing the roads, the road surface time has been grown and has been rolled by vehicular traffic later in the operation of back, and a main hole and a road surface of paying on cheating can produce sinking, the road surface needs repeatedly to repair, and has wasted great amount of manpower and material resources.
Summary of the invention:
The purpose of this utility model is to overcome the deficiencies in the prior art and provides a kind of simple in structure, can simple and efficient construction and the jacking construction cordwood steel structure open caisson of good seal performance.
The utility model solves its technical problem and takes following technological scheme to realize:
This jacking construction cordwood steel structure open caisson, housing structure for steel structure casing, back back iron, push-bench inlet formation, it is characterized in that: four walls of open caisson are steel structure casing and by the mutual affixed modular construction that constitutes of screw pre-buried on it, bottom surface at these four walls all is fixed with a basil framework by pre-sunk screw, is perfused with a reinforced concrete substrate between this basil framework.
And, between basil framework and the steel structure casing, between the steel structure casing waterproof sealing gasket is installed all.
And, the uniform pulp-water through hole that is shaped on the steel structure casing that constitutes four walls.
And, vertically be embedded with the two rows pre-sunk screw affixed on the basil framework with the steel structure casing.
The utility model compared with prior art has significant advantage and beneficial effect, is in particular in:
This steel structure open caisson can be risked the figure of plurality of specifications model (as length; width; the degree of depth; inlet diameter) satisfies the needs of our municipal engineering push pipe; and can repeatedly use repeatedly; assembly unit saves time; simple to operate; Security raising greatly for push pipe; also played protective action for the electric equipment in the hole; reduced working strength of workers; can accomplish clean and tidy clean in the foundation ditch; after finishing, jacking construction can not produce the cavity, ground; there is not hidden danger in pavement construction in the future yet; and in the hole, do not have flowing water and stream mud phenomenon; ground building has also been played protective action, can reduce construction cost greatly, increased work efficiency; save a large amount of timber.
Description of drawings
Fig. 1 is a form structure plan view of the present utility model;
Fig. 2 is that the A-A of Fig. 1 is to cross-sectional view;
Fig. 3 is that the B-B of Fig. 1 is to cross-sectional view;
Fig. 4 is the C part enlarged view of Fig. 2.
Embodiment
Below in conjunction with accompanying drawing the utility model embodiment is further described:
This jacking construction cordwood steel structure open caisson, it is a kind of housing structure, its four walls are up and down tired folded and adopt screw pre-buried it the on 6 mutual affixed modular constructions that constitute about a plurality of steel structure casings 1 pass through, and length, width and the degree of depth of tiring out the housing structure of folding that is constituted about between this steel structure casing up and down depend on caliber, the degree of depth of the desired push pipe of former design.Section bar by the steel structure casing on a wall is assemblied with push-bench inlet 5, is placed with a back back iron 3 in the wall inboard on the opposite that this push-bench enters the mouth.The bottom surface of these four walls all is fixed with a basil framework 8 by pre-sunk screw, vertically is embedded with the two rows pre-sunk screw affixed with the steel structure casing on the basil framework.This basil framework is formed by reinforced concrete prefabricated, is shaped on the conduit of the reinforced concrete substrate 2 that can install perfusion betwixt on the wall of the inside of this basil framework.
In order to improve the sealability of open caisson, between basil framework and the steel structure casing, between the steel structure casing waterproof sealing gasket 4 is installed all.
In work progress, because integral frame need progressively sink at subsurface after assembly unit is good, in order to improve subsidence velocity, raise the efficiency, the uniform pulp-water through hole 7 that is shaped on the steel structure casing that constitutes four walls, this pulp-water through hole can uniformly be shaped on a plurality of on four walls according to soil property, be four of one sides in the present embodiment.
Working method of the present utility model is:
Just assembled basil framework and steel-structure box body at the scene and form the steel open caisson before the excavation working pit, the steel open caisson can be spliced into plurality of specifications and form.The steel open caisson that splicing is good sinks to working pit when can dig working pit by machinery or manually, can annotate oiling agent to steel open caisson outer wall by the pulp-water through hole in sinking to process, quickens the efficient that sinks to of steel open caisson.After the steel open caisson sinks to design attitude, inject the slit sealing of cement slurry seal perimeter again to the pulp-water through hole.Therefore sealing is carried out in the double seal of the sealing gasket that the utility model can be by outer wall sealing and steel structure casing, has improved sealing effect effectively.Casting reinforced concrete forms substrate in the conduit of basil framework then, puts into back back iron and pipe jacking equipment and can construct.
After a push pipe operation is finished, only need to remove the steel structure casing and get final product, can abandon cost very low basil framework and substrate, can not form the cavity of similar I-steel.
Claims (4)
1. jacking construction cordwood steel structure open caisson, housing structure for steel structure casing, back back iron, push-bench inlet formation, it is characterized in that: four walls of open caisson are steel structure casing and by the mutual affixed modular construction that constitutes of screw pre-buried on it, bottom surface at these four walls all is fixed with a basil framework by pre-sunk screw, is perfused with a reinforced concrete substrate between this basil framework.
2. jacking construction cordwood steel structure open caisson according to claim 1 is characterized in that: between basil framework and the steel structure casing, between the steel structure casing waterproof sealing gasket is installed all.
3. jacking construction cordwood steel structure open caisson according to claim 1 is characterized in that: the uniform pulp-water through hole that is shaped on the steel structure casing that constitutes four walls.
4. jacking construction cordwood steel structure open caisson according to claim 1 and 2 is characterized in that: vertically be embedded with the two rows pre-sunk screw affixed with the steel structure casing on the basil framework.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520025623 CN2795600Y (en) | 2005-04-19 | 2005-04-19 | Pipe-jacking construction building block type steel structure sinking well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520025623 CN2795600Y (en) | 2005-04-19 | 2005-04-19 | Pipe-jacking construction building block type steel structure sinking well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2795600Y true CN2795600Y (en) | 2006-07-12 |
Family
ID=36813355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520025623 Expired - Fee Related CN2795600Y (en) | 2005-04-19 | 2005-04-19 | Pipe-jacking construction building block type steel structure sinking well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2795600Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103090107A (en) * | 2013-02-04 | 2013-05-08 | 中铁第一勘察设计院集团有限公司 | Rectangular large section steel structure assembled temporary support pipe joint jack-in mechanism |
CN104594909A (en) * | 2014-12-19 | 2015-05-06 | 中建六局土木工程有限公司 | Installation construction method for back device of super-long pipe curtain |
-
2005
- 2005-04-19 CN CN 200520025623 patent/CN2795600Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103090107A (en) * | 2013-02-04 | 2013-05-08 | 中铁第一勘察设计院集团有限公司 | Rectangular large section steel structure assembled temporary support pipe joint jack-in mechanism |
CN104594909A (en) * | 2014-12-19 | 2015-05-06 | 中建六局土木工程有限公司 | Installation construction method for back device of super-long pipe curtain |
CN104594909B (en) * | 2014-12-19 | 2016-10-19 | 中建六局土木工程有限公司 | A kind of construction method of installation of the back device of ultra-long tube curtain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110485473B (en) | Assembly type recyclable rectangular working well with preset detachable door opening and construction method thereof | |
CN103215960B (en) | Grouting method for high polymer vertical support system | |
CN103556579A (en) | Box culvert pushing construction method integrating comprehensive grouting, pressure maintaining and pipe roof support | |
CN1800514A (en) | Big section pipe roof- box culvert jacking construction method | |
CN204298839U (en) | The recyclable dewatering installation of building foundation pit | |
CN1563612A (en) | Construction method for underground structure through half reverse course of action of inverting connection | |
CN206204972U (en) | A kind of prefabricated tubular pile as well-points dewatering | |
CN111733853A (en) | Tongue-and-groove type prefabricated underground continuous wall structure | |
CN111456055A (en) | Foundation pit dewatering construction method | |
CN204662494U (en) | Highway retaining wall reinforced structure | |
CN1054463A (en) | Radial that foundation dewatering is used and construction technology and equipment | |
CN202247924U (en) | Assembled steel structure open caisson in pipe jacking construction | |
CN204059460U (en) | The interior river intake structure of electric power plant circulating water system | |
CN2795600Y (en) | Pipe-jacking construction building block type steel structure sinking well | |
CN104074234B (en) | The interior river intake structure of electric power plant circulating water system and construction method thereof | |
WO2018177304A1 (en) | Fabricated underground building and construction method thereof | |
CN106978814A (en) | A kind of Fabricated Structure for Support of Excavation | |
CN115075289B (en) | Rapid construction method for assembled arc ecological frame retaining wall | |
CN201078234Y (en) | Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed | |
CN215410517U (en) | Single-well double-line pipe jacking well | |
CN203113361U (en) | Deep foundation pit sealing precipitation device | |
CN206600524U (en) | A kind of modularization assembling steel backrest | |
CN214832376U (en) | Assembled ecological revetment | |
CN201158823Y (en) | Recoverable impact drill steel pipe downcast well | |
CN113339003A (en) | Construction method of tunnel integrated arch sheathing trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20060712 |