CN104594909B - A kind of construction method of installation of the back device of ultra-long tube curtain - Google Patents

A kind of construction method of installation of the back device of ultra-long tube curtain Download PDF

Info

Publication number
CN104594909B
CN104594909B CN201410802223.XA CN201410802223A CN104594909B CN 104594909 B CN104594909 B CN 104594909B CN 201410802223 A CN201410802223 A CN 201410802223A CN 104594909 B CN104594909 B CN 104594909B
Authority
CN
China
Prior art keywords
steel
elongated strip
footing
curtain
ladder shape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410802223.XA
Other languages
Chinese (zh)
Other versions
CN104594909A (en
Inventor
王丽梅
周发明
辛猛
黄文松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201410802223.XA priority Critical patent/CN104594909B/en
Publication of CN104594909A publication Critical patent/CN104594909A/en
Application granted granted Critical
Publication of CN104594909B publication Critical patent/CN104594909B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses the construction method of installation of the back device of a kind of ultra-long tube curtain, it comprises the following steps: excavate square overlength foundation ditch respectively at the two ends of the tunneling section of pipe curtain to be worn;Elongated strip footing and isolated footing is poured, at top, basis pre-embedded steel slab embedded part at the foundation ditch bottom surface at pipe curtain two ends;Steel plate embedded part welds many foundation end I-steel;The bottom I-steel of elongated strip footing welds double-channel door shape I-steel framework;Between many foundation end I-steel, lateral separation is welded to connect I-steel;Laterally spaced welding multiple ladder shape support on I-steel is connected two rows near elongated strip footing;Along longitudinally mounted I-steel on multiple ladder shape supports, I-steel is transversely installed slide rail, slide rail is installed push-bench pedestal.Use this method safe bearing capacity big.

Description

A kind of construction method of installation of the back device of ultra-long tube curtain
Technical field
The present invention relates to the back device construction method of installation of pipe curtain, particularly relate to the installation of the back device of a kind of ultra-long tube curtain of constructing Construction method.
Background technology
In recent years, due to the development and utilization of the underground space, the Structural Engineering of existing pipeline and highway under occurring in that in a large number, is worn.? Run below busy highway and normal use underground utilities, when building the underground engineerings such as passage lanes, the constructions using tunnelings more Method.Generally tunneling Section Design overarches structure, and stress is easier to control.And underpass and underground structure are as one Entirety, is designed as rectangular configuration stress and is relatively difficult to control, particularly should consider by vapour during engineering in particular cases boring construction Car Under Dynamic Load, also needs to consider that road underground pipelines settles the impact caused.Add the overlength foundation ditch that pipe curtain two ends are squares, execute The back device of work pipe curtain does not has an available rear soil body, especially force status and the peace to the back device of construction ultra-long tube curtain The most totally unfavorable.
The Chinese patent of 1 Application No. 2012105878846 disclose " portal gear soil device and underground pedestrian passageway construction system System and method ", for using push-bench and tube coupling to carry out the construction of underground pedestrian passageway, including being located at the upper pre-of door opening inner top side Bury the lower pre-embedded steel slab of steel plate and lower end, on described, be welded with some being vertically arranged between pre-embedded steel slab and described lower pre-embedded steel slab Vertical shaped steel, be welded to connect by horizontally disposed horizontal shaped steel between two adjacent vertical shaped steel, described vertical shaped steel and Forming the square hole that some vertical directions are arranged between described horizontal shaped steel, when construction, described square hole is for described tube coupling and push-bench Pass.This patent is the portal gear soil device in push-bench front, does not disclose the back wall device of pipe curtain construction.
The Chinese patent of 2 Application No. 201010574063X discloses " a kind of rectangular channel construction in deep earthing stratum Push-bench start tunneling method ", after the starting well fender post completion outside the building enclosure of station, before not excavating, first carry out rectangle Push pipe enters to be reinforced at hole, uses 2 row's three axes agitating pile constructions, and rectangular pipe jacking machine enters hole step: enter by actual axis at starting well Slope is put in the location of row reaction frame and launcher, rectangular pipe jacking machine go into the well assembled in place after, start to install antipriming, portal coagulation After soil is cut and install the front access bridge in the circle of hole by secondary, use small oil tank to synchronize jacking machine and enter hole circle, top dress after installation Put, rectangular pipe jacking machine, after point of a knife encounters the reinforcing of triple high-pressure rotary jet grouting pile, just shut down, enter at machete disk area pulverized fuel ash slurry Row is filled and carries out pulling out of H profile steel in the three axes agitating pile of interior row.This patent is the push-bench start tunneling of rectangular channel construction, The back wall device of pipe curtain construction is not disclosed.
The Chinese patent of 3 Application No. 2012102832234 disclose " a kind of non-relay jacking construction device of ultra-long tube curtain and Method ", described device includes portal pressurizer and pipe curtain steel pipe;Described portal pressurizer includes the soil body, is located at outside the soil body Rotary churning pile and Grouting Pipe, rotary churning pile, as hermetic seal wall, is provided with steel pile casting in rotary churning pile, steel pile casting outer end is sequentially provided with close Sealing rubber ring and steel plate ring, be provided with the blind plate being connected with Grouting Pipe outside steel plate ring;Lubrication injected hole and slip casting is set at pipe curtain steel pipe Connect and control device, reducing jacking resistance, in soil 35mm gap, Kong Yuguan periphery, setting up 0.1 to 0.5mPa pressure simultaneously, To resist soil cave deformation, reach to control the purpose of its upper track face sedimentation.There is the available rear soil body this patent pipe backstage side, no Being suitable for pipe curtain two ends is overlength foundation ditch, does not has the pipe curtain back device of the available rear soil body.
The Chinese patent of 4 Application No. 2014100061151 discloses " wears the big straight of construction of structures under a kind of Shallow-buried Large-span Tunnel Path length pipe curtain construction method ", step is: the manually digging hole 1) applying a stay tube curtain supports stake and both sides borehole enclosing stake;2) water Build an apical cap beam, form many door shape supporting constructions supported in both sides, hole;3) pour parados after jacking steel pipe, lay steel pipe Slideway, handling steel pipe, jacking forms pipe curtain;4) the longitudinal length branch piecemeal excavation soil body;5) at top and lateral tube curtain and Main body first paragraph firm structure digging hole pile foundation, cushion cap and the firm structure of main body, cushion cap and agent structure is applied longitudinally under the protection of temporary support Anchorage length reserved by reinforcing bar;Slip casting between agent structure and steel pipe;6) repeat step 4), 5) until excavation the final stage soil body And pour into a mould corresponding agent structure;7) remove the door shape supporting construction of more than cushion cap bottom surface, apply the two ends residue firm structure of gate-type, cast Separating bottom plate, forms an overall structure form.This patent is the construction method of construction ultra-long tube curtain, does not disclose pipe curtain and executes The back wall device of work.
Summary of the invention
It is an object of the invention to overcome the deficiency of prior art, it is provided that a kind of convenient and reliable, a kind of overlength that safe bearing capacity is big The installation method of the back device of pipe curtain.
A kind of construction method of installation of the back device of ultra-long tube curtain, it comprises the following steps:
(1) square overlength foundation ditch is excavated respectively until reaching desired depth in the two ends at the tunneling section of pipe curtain to be worn, then at base The surrounding in hole installs fender post;
(2) along longitudinally pouring the elongated strip footing of back device and in elongated bar shaped at the foundation ditch bottom surface at pipe curtain two ends Longitudinally spaced on foundation ditch bottom surface outside basis multiple rows of isolated footing is set, is pouring into a mould the same of elongated strip footing and isolated footing Time, at elongated strip footing and top, isolated footing pre-embedded steel slab embedded part;
(3) along wearing, with pipe curtain, the horizontal direction that direction is identical in described elongated strip footing with the steel plate embedded part of isolated footing Weld many foundation end I-steel;
(4) the bottom I-steel in described elongated strip footing tightens tube curtain two ends and is respectively welded double-channel door shape I-steel framework;
(5) between many foundation end I-steel, multiple rows of longitudinally disposed connection I-steel is welded in lateral separation;
(6) longitudinally spaced welding multiple ladder shape support on I-steel is connected two rows near elongated strip footing;
(7) the vertical bar of each ladder shape stent outer and between the connection I-steel of ladder shape stent outer along tiltedly To welding oblique I-steel;
(8) in vertical bar and oblique I-steel and the bottom work being positioned at ladder shape stent outer of each ladder shape stent outer The steelframe of triangle is installed between word steel;
(9) it is positioned in multiple transverse bar member of sustained height along longitudinally mounted I-steel at multiple ladder shape supports, at described I-shaped Slide rail is transversely installed on steel, described slide rail is installed push-bench pedestal.
The invention has the beneficial effects as follows: the two ends of the pipe curtain that this method is to be installed are overlength foundation ditches, construction pipe curtain back device time There is no the available rear soil body.Using the back device of this method construction, safe bearing capacity is big, makes construction period not affect The normal usage function of portion's strategic road, and can effectively control the sedimentation of the important construction of structures in earth's surface and top.Ensure that and excavated In journey, safe operation and the road traffic of top pipeline are properly functioning.
Accompanying drawing explanation
Fig. 1 is two ends the bowing through road of the tunneling section that the installation method of the back device of the present invention a kind of ultra-long tube curtain relates to Depending on schematic diagram;
Fig. 2 is that the basis of the back device of the ultra-long tube curtain that the installation method of the back device of the present invention a kind of ultra-long tube curtain relates to is stood Face figure;
Fig. 3 is the basic mounting vertical plane figure of the construction method of installation of the back device of a kind of ultra-long tube curtain of constructing of the present invention;
Fig. 4 is that the door shape I-steel framework of the construction method of installation of the back device of a kind of ultra-long tube curtain of constructing of the present invention is installed vertical Face figure;
Fig. 5 is that the bottom I-steel installation vertical view of the construction method of installation of the back device of a kind of ultra-long tube curtain of constructing of the present invention is shown It is intended to.
Fig. 6 is the back device elevational schematic view of the construction method of installation of the back device of a kind of ultra-long tube curtain of constructing of the present invention;
Fig. 7 is that the back device of the construction method of installation of the back device of a kind of ultra-long tube curtain of constructing of the present invention is installed with push-bench Elevational schematic view.
Detailed description of the invention
With specific embodiment, the present invention is described in detail below in conjunction with the accompanying drawings.
The as shown in drawings construction method of installation of the back device of a kind of ultra-long tube curtain of the present invention, it comprises the following steps:
(1) square overlength foundation ditch 2 is excavated respectively until reaching desired depth in the two ends at the tunneling section 1 of pipe curtain 21 to be worn, Then the surrounding at foundation ditch 2 installs fender post 3;
(2) along longitudinally pouring the elongated strip footing 4 of back device and logical at foundation ditch 2 bottom surface at pipe curtain 21 two ends Longitudinally spaced on foundation ditch 2 bottom surface outside long strip footing 4 multiple rows of isolated footing 7 is set, pour into a mould elongated strip footing and While isolated footing, at elongated strip footing and top, isolated footing pre-embedded steel slab embedded part 5;
(3) along wearing the horizontal side that direction is identical with pipe curtain in described elongated strip footing 4 with the steel plate embedded part 5 of isolated footing To welding many foundation end I-steel 8;
(4) the bottom I-steel 8 in described elongated strip footing 4 tightens tube curtain two ends and is respectively welded double-channel door shape I-shaped steel framework Frame 6;
(5) between many foundation end I-steel 8, multiple rows of longitudinally disposed connection I-steel is welded in lateral separation, as it can be seen, can Think that first row connects I-steel 9, second row connects I-steel 10 and the 3rd row connects I-steel 16.
(6) longitudinally spaced welding multiple ladder shape support on I-steel is connected two rows near elongated strip footing 4, such as figure institute Showing, each ladder shape support includes that being respectively welded at first row connects first on I-steel 9 and second row connection I-steel 10 Vertical I-steel 11 and the second vertical I-steel 12, along horizontal between the first vertical I-steel 11 and the second vertical I-steel 12 Middle first I-steel 13, middle second I-steel 14 and top I-steel 15 is had to the connection being spaced up and down;
(7) the vertical bar of each ladder shape stent outer and between the connection I-steel of ladder shape stent outer along tiltedly To welding oblique I-steel 17;
(8) in vertical bar and oblique I-steel 17 and the bottom being positioned at ladder shape stent outer of each ladder shape stent outer The steelframe 18 of triangle is installed between I-steel 8;
(9) it is positioned in multiple transverse bar member of sustained height along longitudinally mounted I-steel 20 at multiple ladder shape supports, described Slide rail is transversely installed on I-steel 20, described slide rail is installed push-bench pedestal 19.
Employing this method has been constructed after back device, installs push-bench 22, pacify in push-bench jack-in process on push-bench pedestal 19 Complete stable, there is no sinking and the rising phenomenon of generator tube curtain steel pipe, the most do not occur ground settlement excessive or work surface collapses the thing such as collapse Therefore.Ensure that the safe operation of pipeline above push-bench in construction, jacking front is when running into the relatively barrier such as cobble stone, boulder, boulder The bearing capacity of back device is the most safe and reliable, ensure that the properly functioning of road traffic simultaneously.

Claims (1)

1. the construction method of installation of the back device of a ultra-long tube curtain, it is characterised in that it comprises the following steps:
(1) square overlength foundation ditch is excavated respectively until reaching desired depth in the two ends at the tunneling section of pipe curtain to be worn, and then exists The surrounding of foundation ditch installs fender post;
(2) along longitudinally pouring the elongated strip footing of back device and at elongated bar at the foundation ditch bottom surface at pipe curtain two ends Longitudinally spaced on foundation ditch bottom surface outside shape basis multiple rows of isolated footing is set, is pouring into a mould elongated strip footing and isolated footing While, at elongated strip footing and top, isolated footing pre-embedded steel slab embedded part;
(3) along wearing the horizontal side that direction is identical with pipe curtain in described elongated strip footing with the steel plate embedded part of isolated footing To welding many foundation end I-steel;
(4) the bottom I-steel in described elongated strip footing tightens tube curtain two ends and is respectively welded double-channel door shape I-shaped steel framework Frame;
(5) between many foundation end I-steel, multiple rows of longitudinally disposed connection I-steel is welded in lateral separation;
(6) longitudinally spaced welding multiple ladder shape support on I-steel is connected two rows near elongated strip footing;
(7) the vertical bar of each ladder shape stent outer and between the connection I-steel of ladder shape stent outer edge The oblique I-steel of oblique welding;
(8) in vertical bar and oblique I-steel and the bottom being positioned at ladder shape stent outer of each ladder shape stent outer The steelframe of triangle is installed between I-steel;
(9) it is positioned in multiple transverse bar member of sustained height along longitudinally mounted I-steel at multiple ladder shape supports, described Slide rail is transversely installed on I-steel, described slide rail is installed push-bench pedestal.
CN201410802223.XA 2014-12-19 2014-12-19 A kind of construction method of installation of the back device of ultra-long tube curtain Active CN104594909B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410802223.XA CN104594909B (en) 2014-12-19 2014-12-19 A kind of construction method of installation of the back device of ultra-long tube curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410802223.XA CN104594909B (en) 2014-12-19 2014-12-19 A kind of construction method of installation of the back device of ultra-long tube curtain

Publications (2)

Publication Number Publication Date
CN104594909A CN104594909A (en) 2015-05-06
CN104594909B true CN104594909B (en) 2016-10-19

Family

ID=53120918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410802223.XA Active CN104594909B (en) 2014-12-19 2014-12-19 A kind of construction method of installation of the back device of ultra-long tube curtain

Country Status (1)

Country Link
CN (1) CN104594909B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2795600Y (en) * 2005-04-19 2006-07-12 天津第六市政公路工程有限公司 Pipe-jacking construction building block type steel structure sinking well
CN102748033A (en) * 2012-07-23 2012-10-24 中铁十六局集团北京工程有限公司 Filling mechanism for ultra-long jacking-pipe resistance-reducing slurry bin
CN102777189A (en) * 2012-08-09 2012-11-14 中铁十六局集团北京工程有限公司 Intermediate-jacking-station-free jacking construction device of ultra-long pipe roof and method thereof
CN103090107A (en) * 2013-02-04 2013-05-08 中铁第一勘察设计院集团有限公司 Rectangular large section steel structure assembled temporary support pipe joint jack-in mechanism
CN202970719U (en) * 2012-08-09 2013-06-05 中铁十六局集团北京工程有限公司 Relay chamber-free jacking construction device for ultra-long pipe roof
CN103696784A (en) * 2014-01-03 2014-04-02 沈阳铁道勘察设计院有限公司 Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103938703A (en) * 2014-05-07 2014-07-23 中国五冶集团有限公司 Pipe jacking construction method
CN103967052A (en) * 2014-05-26 2014-08-06 沈阳铁道勘察设计院有限公司 Method for protecting height difference soil bodies of bases of new frame structure bridge and old frame structure bridge

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001173363A (en) * 1999-12-22 2001-06-26 Tokyo Electric Power Co Inc:The Earth retaining wall of shaft in starting section or arrival section in tunnel excavation method and its installation method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2795600Y (en) * 2005-04-19 2006-07-12 天津第六市政公路工程有限公司 Pipe-jacking construction building block type steel structure sinking well
CN102748033A (en) * 2012-07-23 2012-10-24 中铁十六局集团北京工程有限公司 Filling mechanism for ultra-long jacking-pipe resistance-reducing slurry bin
CN102777189A (en) * 2012-08-09 2012-11-14 中铁十六局集团北京工程有限公司 Intermediate-jacking-station-free jacking construction device of ultra-long pipe roof and method thereof
CN202970719U (en) * 2012-08-09 2013-06-05 中铁十六局集团北京工程有限公司 Relay chamber-free jacking construction device for ultra-long pipe roof
CN103090107A (en) * 2013-02-04 2013-05-08 中铁第一勘察设计院集团有限公司 Rectangular large section steel structure assembled temporary support pipe joint jack-in mechanism
CN103696784A (en) * 2014-01-03 2014-04-02 沈阳铁道勘察设计院有限公司 Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103938703A (en) * 2014-05-07 2014-07-23 中国五冶集团有限公司 Pipe jacking construction method
CN103967052A (en) * 2014-05-26 2014-08-06 沈阳铁道勘察设计院有限公司 Method for protecting height difference soil bodies of bases of new frame structure bridge and old frame structure bridge

Also Published As

Publication number Publication date
CN104594909A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN101775988B (en) Construction method for inclined shaft to main tunnel of weak surrounding rock
CN109914456B (en) Design and construction method for adjacent and simultaneous construction of bridge and subway tunnel
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
KR101401934B1 (en) Method for constructing underground structure of railroad using steel pipe roof of two-side semicircle arch type and apparatus for pressing guidance pipe
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
CN105736001A (en) Construction method for building subway station through precast parts
CN109371980B (en) Deep foundation pit enclosure construction method combining spray anchor reverse construction and punched pile
CN102410031B (en) Underground space structure constructed by pile wall construction method
CN103244143B (en) A kind of underground construction excavating construction method and underground station
CN107964971B (en) A kind of precipitation method of the subway station using the construction of PBA engineering method
CN109989407B (en) Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway
CN209941754U (en) High-voltage power pipe culvert in-situ protection structure
CN209760299U (en) light and shade of avoiding house to tear open and move is dug and is combined subway station structure
CN105986830A (en) Underground-excavation building method for roadside strip-shaped underground garage
CN104594909B (en) A kind of construction method of installation of the back device of ultra-long tube curtain
CN112282770B (en) Construction method for pile-breaking type underpass existing supporting row pile
CN211038701U (en) Mine method subway interval air shaft with shield first and well second
CN110847206B (en) Construction method for newly-built subway tunnel to penetrate existing bridge piles
CN204357445U (en) The mounting structure of pipe curtain back device
CN209958372U (en) Railway newly-added second-line platform back way foundation pile pipe curtain supporting structure
CN209704560U (en) Build the scaffolding structure that an ultra shallow buries Large Underground space
CN106761770B (en) Bored tunnel stress system two times transfer construction method
CN106968271B (en) Underground pipe gallery excavates and the construction method of support
CN111827307A (en) Pile supporting structure in combined construction method and construction method thereof
AU2016102393A4 (en) A Method of constructing a column, a tunnel, and a tunnel made from the method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20180914

Granted publication date: 20161019

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20161019

PD01 Discharge of preservation of patent