- Publication number
- CN201158823Y CN201158823Y CNU2008200622781U CN200820062278U CN201158823Y CN 201158823 Y CN201158823 Y CN 201158823Y CN U2008200622781 U CNU2008200622781 U CN U2008200622781U CN 200820062278 U CN200820062278 U CN 200820062278U CN 201158823 Y CN201158823 Y CN 201158823Y
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- recoverable
- precipitation
- pipeline section
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a facility for lowering underground water level in civil construction fields, which particularly relates to a recoverable percussion drill steel pipe dewatering well. The recoverable percussion drill steel pipe dewatering well is formed by standard steel pipe segments (1) which are connected through welding an adjacent pipe well end, the numbers of the standard steel pipe segments (1) are two-four, and the recoverable percussion drill steel pipe dewatering well is vertically arranged underground, the upper end (2) of a dewatering well and the lower end (3) of the dewatering well are opened, and the lower end (3) of the dewatering well is provided with a diving pump 4.
Description
Technical field
The utility model relates to dewatering facility in the middle of the civil engineering ground, is specially a kind of recoverable Churn drill steel pipe precipitation well.
Background technology
Precipitation is meant and utilizes the hydrogeology principle, by phreatic water levels such as the perched water in precipitation facility eliminating surface water body or the reduction stratum, divings, satisfies the precipitation depth and the time requirement of construction work.When the foundation dredging of building operations, beneath pipeline operation, all need artificial dewatering, general facilities is for offering bright row and pipe well, pipe well is exactly around deep foundation ditch etc. needs the construction ground of dewatering the well casing that is deeper than substrate to be set, underground water is extracted out underground water by the submersible pump that is arranged in the well casing, thereby made groundwater table be lower than the end, hole.Present precipitation pipe well is by digging the cement pipeline section that bigbore Jing Dong places single section 2.5 meters long one by one, form the cement pipe well of 300 millimeters of internal diameters, though the shaft bottom submersible pump only needs 245 millimeters hole diameter, but because the cement pipe well is a cement prefabricated component, its specification is coarse, at least the cement pipe well that needs in the middle of the practice of construction to be made into 300 millimeters of internal diameters could be placed the shaft bottom submersible pump, adds the thickness of cement pipe well self tube wall, and the needed well hole dia of whole cement precipitation well is very big.Prefabricated cement well casing section is confined to 2.5 meters because make reason, and disconnected list cuts the well casing section repeatedly to be pieced together knot and also prolonged the construction period, and the thick and heavy transportation of prefabricated in addition cement well casing body is installed and all shown inconvenience.It is long in time limit that large diameter Jing Dong consumes in the cutting process, and the sinking shaft difficulty is big, and sinking cost is with high, and so the cost cost of precipitation well is about 80 ~ 130 yuan.Such precipitation well can not be extracted repeated use because the cement tube wall of laying is disposable, more makes the integral body of precipitation well become the local exchange height not down, becomes permanent civil engineering excavation obstacle underground leaving over after the precipitation well uses simultaneously.
Summary of the invention
The utility model is just at above technical problem, and purpose is to provide a kind of recoverable Churn drill steel pipe precipitation well, realizes low cost, casual labourer's phase, small-bore cutting.
The technical solution of the utility model is as follows:
Recoverable Churn drill steel pipe precipitation well, form by standard steel pipeline section (1) by recoverable Churn drill steel pipe precipitation well casing body, facing the tube wall end mutually by welding between the standard steel pipeline section (1) connects, the quantity of standard steel pipeline section (1) is 2 to 4, recoverable Churn drill steel pipe precipitation well is vertically set on underground, the aboveground end of precipitation (2), precipitation downhole end (3) are opened, and precipitation down-hole (3) end is provided with submersible pump 4.
The internal diameter of standard steel pipeline section (1) is 245 millimeters.
The single tube length of standard steel pipeline section (1) is 6 meters.
The material of standard steel pipeline section (1) is an iron and steel.
The utility model recoverable Churn drill steel pipe precipitation well is equally dug Jing Dong with traditional pipe of cement precipitation well, but the well hole dia is little a lot, thereby wide open cutter time of well and the wide open cutter difficulty of well have been reduced significantly, the recoverable Churn drill steel pipe precipitation well casing body that after the wide open cutter of well 2 to 4 root beads is connected into type is placed in the middle of the well hole, submersible pump is set in the down-hole carries out the precipitation operation.Groundwater table is reduced to after the degree of requirement of engineering, at first takes out submersible pump, recoverable Churn drill steel pipe precipitation well casing body integral body is extracted to get final product then from the well hole.Recoverable Churn drill steel pipe precipitation well casing body can repeatedly use repeatedly, promptly avoids occurring civil engineering excavation obstacle to carrying out backfill with Jing Dong.
Show by implementing good effect of the present utility model:
1, recoverable Churn drill steel pipe precipitation well well hole dia is little, has reduced wide open cutter difficulty of well and cost, has shortened the construction period.
2, recoverable Churn drill steel pipe precipitation well casing body material is light, is convenient to transportation and construction.
3, the down slotting Jing Dong of recoverable Churn drill steel pipe precipitation well casing body one piece has shortened the construction period.
4, steel pipe precipitation well casing body can use repeatedly, and the single depreciation cost is low to moderate 5 yuan/meter, has reduced the dewatering project cost.
5, civil engineering excavation obstacle can be avoided forming in the well hole behind the pumpback steel pipe precipitation well casing body.
6, steel pipe precipitation well casing body internal diameter is smooth evenly is convenient to place submersible pump.
Description of drawings
Accompanying drawing is a structural representation of the present utility model
Wherein, 1---the standard steel pipeline section, 2---the aboveground end of precipitation, 3---the precipitation downhole end, 4---submersible pump, 5---gutter.
The specific embodiment
The utility model is described in further detail below in conjunction with the specific embodiment.
Specific embodiment 1:
Recoverable Churn drill steel pipe precipitation well, form by standard steel pipeline section (1) by recoverable Churn drill steel pipe precipitation well casing body, facing the tube wall end mutually by welding between the standard steel pipeline section (1) connects, the quantity of standard steel pipeline section (1) is 2, long 12 meters of whole well casing, recoverable Churn drill steel pipe precipitation well is vertically set on underground, and the aboveground end of precipitation (2), precipitation downhole end (3) are opened, and precipitation down-hole (3) end is provided with submersible pump 4.
The internal diameter of standard steel pipeline section (1) is 245 millimeters.
The single tube length of standard steel pipeline section (1) is 6 meters.
The material of standard steel pipeline section (1) is an iron and steel.
Specific embodiment 2:
Recoverable Churn drill steel pipe precipitation well, form by standard steel pipeline section (1) by recoverable Churn drill steel pipe precipitation well casing body, facing the tube wall end mutually by welding between the standard steel pipeline section (1) connects, the quantity of standard steel pipeline section (1) is 2.5, long 15 meters of whole well casing, recoverable Churn drill steel pipe precipitation well is vertically set on underground, and the aboveground end of precipitation (2), precipitation downhole end (3) are opened, and precipitation down-hole (3) end is provided with submersible pump 4.
The internal diameter of standard steel pipeline section (1) is 245 millimeters.
The single tube length of standard steel pipeline section (1) is 6 meters.
The material of standard steel pipeline section (1) is an iron and steel.
Specific embodiment 3:
Recoverable Churn drill steel pipe precipitation well, form by standard steel pipeline section (1) by recoverable Churn drill steel pipe precipitation well casing body, facing the tube wall end mutually by welding between the standard steel pipeline section (1) connects, the quantity of standard steel pipeline section (1) is 3, long 18 meters of whole well casing, recoverable Churn drill steel pipe precipitation well is vertically set on underground, and the aboveground end of precipitation (2), precipitation downhole end (3) are opened, and precipitation down-hole (3) end is provided with submersible pump 4.
The internal diameter of standard steel pipeline section (1) is 245 millimeters.
The single tube length of standard steel pipeline section (1) is 6 meters.
The material of standard steel pipeline section (1) is an iron and steel.
Specific embodiment 4:
Recoverable Churn drill steel pipe precipitation well, form by standard steel pipeline section (1) by recoverable Churn drill steel pipe precipitation well casing body, facing the tube wall end mutually by welding between the standard steel pipeline section (1) connects, the quantity of standard steel pipeline section (1) is 4, long 24 meters of whole well casing, recoverable Churn drill steel pipe precipitation well is vertically set on underground, and the aboveground end of precipitation (2), precipitation downhole end (3) are opened, and precipitation down-hole (3) end is provided with submersible pump 4.
The internal diameter of standard steel pipeline section (1) is 245 millimeters.
The single tube length of standard steel pipeline section (1) is 6 meters.
The material of standard steel pipeline section (1) is an iron and steel.
Claims (4)
1, recoverable Churn drill steel pipe precipitation well, form by standard steel pipeline section (1), it is characterized in that: face the tube wall end mutually by welding between the standard steel pipeline section (1) and connect, the quantity of standard steel pipeline section (1) is 2 to 4, recoverable Churn drill steel pipe precipitation well is vertically set on underground, the aboveground end of precipitation (2), precipitation downhole end (3) are opened, and precipitation down-hole (3) end is provided with submersible pump (4).
2, recoverable Churn drill steel pipe precipitation well according to claim 1, it is characterized in that: the internal diameter of described standard steel pipeline section (1) is 245 millimeters.
3, recoverable Churn drill steel pipe precipitation well according to claim 1, it is characterized in that: the single tube length of described standard steel pipeline section (1) is 6 meters.
4, recoverable Churn drill steel pipe precipitation well according to claim 1, it is characterized in that: the material of described standard steel pipeline section (1) is an iron and steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200622781U CN201158823Y (en) | 2008-02-27 | 2008-02-27 | Recoverable impact drill steel pipe downcast well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200622781U CN201158823Y (en) | 2008-02-27 | 2008-02-27 | Recoverable impact drill steel pipe downcast well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201158823Y true CN201158823Y (en) | 2008-12-03 |
Family
ID=40109413
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200622781U Expired - Fee Related CN201158823Y (en) | 2008-02-27 | 2008-02-27 | Recoverable impact drill steel pipe downcast well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201158823Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317047A (en) * | 2014-05-30 | 2016-02-10 | 中国二十冶集团有限公司 | Method for removing UPVC double-wall corrugated precipitation tube well |
CN106437728A (en) * | 2016-07-05 | 2017-02-22 | 上海建工二建集团有限公司 | Combined type pressure reduction well casing used for shield excavation interval and mounting method of combined type pressure reduction well casing |
CN110318661A (en) * | 2019-04-24 | 2019-10-11 | 武汉一冶建筑安装工程有限责任公司 | Dewatering well construction method |
-
2008
- 2008-02-27 CN CNU2008200622781U patent/CN201158823Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317047A (en) * | 2014-05-30 | 2016-02-10 | 中国二十冶集团有限公司 | Method for removing UPVC double-wall corrugated precipitation tube well |
CN105317047B (en) * | 2014-05-30 | 2017-04-19 | 中国二十冶集团有限公司 | Method for removing UPVC double-wall corrugated precipitation tube well |
CN106437728A (en) * | 2016-07-05 | 2017-02-22 | 上海建工二建集团有限公司 | Combined type pressure reduction well casing used for shield excavation interval and mounting method of combined type pressure reduction well casing |
CN106437728B (en) * | 2016-07-05 | 2018-08-21 | 上海建工二建集团有限公司 | Combined type for shield driving section is depressured well casing and its installation method |
CN110318661A (en) * | 2019-04-24 | 2019-10-11 | 武汉一冶建筑安装工程有限责任公司 | Dewatering well construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104694746B (en) | A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof | |
CN100480475C (en) | Controllable one-well lamina precipitation construction method | |
CN103603342B (en) | Major diameter assembled casing super-long filling pile construction method | |
CN207260136U (en) | Ultra-deep bored pile borehole cleaning system | |
CN104018534B (en) | Electronic milling fluting wall forming machine | |
CN103046931B (en) | Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode | |
CN109371974A (en) | A kind of PHC tubular pole implantation construction method suitable for hard geology | |
CN103924602B (en) | Deep Thick Soft Ground foundation ditch construction method | |
CN106122589B (en) | A kind of earth pressure balance method | |
CN104631438B (en) | Long auger guncreting uplift pile construction method | |
CN108532586A (en) | A kind of construction method of garage parking diaphram wall | |
CN110424430A (en) | Deep basal pit powder land floor Deep Pumped Wells construction method and its application | |
CN104314071A (en) | Construction method of underground diaphragm wall by employing rotary drilling rig | |
CN108867673A (en) | A kind of underwater prevention method in the foundation pit based on the curtain that draws water | |
CN201158823Y (en) | Recoverable impact drill steel pipe downcast well | |
CN203441498U (en) | Anti-seepage structure for large-section water-bearing layer passing shaft of inclined shaft | |
CN101481913A (en) | Construction method of rock-socketed underground continuous wall punching slot section | |
CN105545315A (en) | Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction | |
CN102817361A (en) | Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover | |
CN201078234Y (en) | Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed | |
CN209798792U (en) | open cut foundation pit deep silt layer vacuum dewatering system | |
CN105586978A (en) | Construction method of soil replacement stir waterproof curtain based on gravels | |
CN105040705A (en) | Ground foundation treatment construction technology under multi-karst-cave geological conditions | |
CN205804362U (en) | The long screw auger drilling deposited pile constructing device of rock can be entered | |
CN210857242U (en) | Side slope anti-skidding supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081203 |