CN2789259Y - Biomass gasification furnace igniting and gasifying apparatus - Google Patents

Biomass gasification furnace igniting and gasifying apparatus Download PDF

Info

Publication number
CN2789259Y
CN2789259Y CN 200520050980 CN200520050980U CN2789259Y CN 2789259 Y CN2789259 Y CN 2789259Y CN 200520050980 CN200520050980 CN 200520050980 CN 200520050980 U CN200520050980 U CN 200520050980U CN 2789259 Y CN2789259 Y CN 2789259Y
Authority
CN
China
Prior art keywords
preheating
chamber
preheating chamber
burner hearth
igniting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520050980
Other languages
Chinese (zh)
Inventor
董颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200520050980 priority Critical patent/CN2789259Y/en
Application granted granted Critical
Publication of CN2789259Y publication Critical patent/CN2789259Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model relates to a biomass gasifying furnace igniting and gasifying apparatus which mainly solves the technical problems of incomplete conversion, difficult ignition, etc. of an existing gasifying furnace. A hearth (12) is formed by the periphery of an upper and a lower sandwich structures which are isolated, wherein the upper sandwich layer is a water storage chamber (1); the lower sandwich layer is a preheating chamber (3). A preheating pipe (5) penetrating through the hearth (12) is arranged in the preheating chamber (3); an igniting pipe (4) penetrates through the hearth; a heating pipe (15) connected with a power supply is arranged in the igniting pipe (4). A flow meter (7) is connected between the water storage chamber (1) and the preheating chamber (3); a hollow screw rod (6) is arranged between the inner and the outer walls of the lower part of the preheating chamber (3). The utility model is mainly used for a biomass gasifying furnace.

Description

Gasifying biomass furnace igniting and gasification installation
Technical field
The utility model relates to a kind of gasifying biomass furnace igniting and gasification installation.
Background technology
Biomass gasifying furnace is a kind of equipment that biological anoxycausis produces inflammable gas.At present, the biomass gasifying furnace of selling on the market is the vapourizing furnace of fuel with bavin, straw etc. especially, all can only burn down a part of raw material; Slag is charcoal or the siccative that varies in size, and can not be gasified totally.Existing simultaneously biomass gasifying furnace also exists igniting difficult, sootiness operator, easy carbon monoxide poisoning when lighting.Can not reach environmental requirement, also just give to promote the use of and brought restriction.
Summary of the invention
The purpose of this utility model provides a kind of gasifying biomass furnace igniting and gasification installation of being used for.
The technical scheme that its technical problem that solves the utility model adopts is: isolated up and down sandwich structure surrounds burner hearth 12, the top interlayer is retaining chamber 1, the bottom interlayer is a preheating chamber 3, the point preheating tube 5 that passes burner hearth 12 is installed in the preheating chamber 3, adorn heat-generating pipe 15 in the ignitron 4 and pass burner hearth 12, heat-generating pipe 15 connects external power source, connects under meter 7 between retaining chamber 1 and the preheating tube 5; The other end of preheating tube 5 and preheating chamber 3 communicate, empty screw rod 6 in having between the inside and outside wall of preheating chamber 3 bottoms.In the interior empty screw rod 6 passage 17 is arranged, hole 18 communicates with preheating chamber 3, and the other end outlet 19 communicates downwards and with burner hearth 12.Passage 17 has internal thread and connects another bolt 14 near the port of nut.
The beneficial effects of the utility model are, water is controlled by under meter, after preheating tube and preheating chamber, vaporization and with the air thorough mixing, solved water and can not be converted into steam fully and enter burner hearth and reduce the problem of furnace temperature; Can fully react with biomass after entering burner hearth, improve transformation efficiency.Because outlet 19 is installed downwards, makes the gasification reaction zone extend to burner hearth bottom as far as possible, has promptly enlarged the combustion gasification district, thereby has improved conversion reaction efficient, can accomplish that biomass are gasified totally in stove.Owing to set up ignitron, energy automatic electrical ignition can not solved the difficult problem of igniting by sootiness when making igniting, avoids carbon monoxide poisoning.
Relatively prove by experiment: the fuel that weight is identical, after adopting the utility model, the vapourizing furnace gas production rate is higher than 2-3 times of existing vapourizing furnace, moreover, low to demanded fuel, as long as energy incendiary material, thereby fuel source is widely arranged, can make fuel as firewood, straw, straw, husk, wood chip, coal etc. and various combustiblematerials.
Description of drawings
Fig. 1 is the assembling synoptic diagram of this utility unit.
Fig. 2 is a kind of distributed architecture synoptic diagram of ignitron and preheating tube and interior empty screw rod.
Fig. 3 is interior empty screw rod synoptic diagram.
Among the figure: 1. retaining chamber, 2. water-in, 3. preheating chamber, 4. ignitron, 5 water preheat pipes., 6. in empty screw rod, 7. under meter, 8. ash output hole, 9. inlet mouth, 10. air outlet, 11. water outlets, 12 burner hearths, 14 bolts, 15 heat-generating pipes, 17. passages, 18 holes, 19 outlets.
Embodiment
By Fig. 1 and Fig. 2 as can be known, isolated up and down sandwich structure crosses burner hearth 12, and the top interlayer is retaining chamber 1, and the bottom interlayer is a preheating chamber 3, and preheating tube 5 passes burner hearth 12, ignitron 4 pass burner hearth and in dress heat-generating pipe 15.Ignitron 4 passes burner hearth from shell by preheating chamber 3, and terminal is fixed on the inwall of burner hearth 12.Preheating tube 5 one ends connect under meter, and the another port leads directly to preheating chamber 3.Connect under meter 7 between retaining chamber 1 and the preheating chamber 3, empty screw rod 6 in symmetry is installed between the inside and outside wall of preheating chamber 3 bottoms.Have passage 17, one stomidiums 18 to communicate with preheating chamber 3 in the interior empty screw rod 6, the other end outlet 19 communicates downwards and with burner hearth 12.Passage 17 has internal thread near the port of nuts, with bolt 14 bolts tightly in the outer end of interior empty screw rod 6.Heat-generating pipe 15 links to each other with external power source.
During use: at first turn on the power switch, when heat-generating pipe 15 generates heat to the 500 degree left and right sides, ignitron 4 igniting.Simultaneously gas blower is by inlet mouth 9 oxygen supplys, oxygen through preheating chamber 3 preheatings after, 18 enter burner hearth 12 to outlet 19 from the hole, and combustion reactions takes place; Thereby solved manual ignition's inconvenience, realized igniting automatically.Shut power supply after lighting material, can take out heat-generating pipe 15 at any time, be beneficial to its permanent use.Open under meter 7 at the same time, and control flow well, water enters two pipelines of preheating tube 5, during preheating tube 5 process burner hearths 12, by heat, the water of the inside becomes water vapour, water vapour enters preheating chamber 3 back and continues preheatings, and enters burner hearth by hole 18 to outlet 19 after the air mixed and reacts.Because outlet 19 is downward installations, from burner hearth bottom, has guaranteed the thickness of combustion gasification layer during combustion gasification, can allow material be gasified totally; Solved the bad defect of traditional vapourizing furnace gasification result, traditional vapourizing furnace bottom is remaining to be the charcoal slag, also can be gasified totally with charcoal independent behind this device, exceeds 2~3 efficiency-timed rates than existing stove.Because of the installation of under meter, it is readable, controlled that the water amount of vaporization has been accomplished, prevented to fall when vapourizing furnace moisturizing in the past is too much the phenomenon of end furnace temperature or spray fire extinguishing, and moisturizing is the not good situation of gasification result after a little while.

Claims (4)

1, a kind of gasifying biomass furnace igniting and gasification installation, it is characterized in that: isolated up and down sandwich structure surrounds burner hearth (12), the top interlayer is retaining chamber (1), the bottom interlayer is preheating chamber (3), the preheating tube (5) that passes burner hearth (12) is installed in the preheating chamber (3), ignitron (4) passes burner hearth (12), connects under meter (7) between retaining chamber (1) and the preheating tube (5); Empty screw rod (6) in having between the inside and outside wall of preheating chamber (3) bottom.
2, gasifying biomass furnace igniting as claimed in claim 1 and gasification installation is characterized in that: passage (17) is arranged in the interior empty screw rod (6), and passage (17) has hole (18) and the outlet (19) downward and that communicate with burner hearth (12) that communicates with preheating chamber (3); Passage (17) has internal thread and connects another bolt (14) near the port of nut.
3, gasifying biomass furnace igniting as claimed in claim 1 and gasification installation is characterized in that: connect under meter (7) between retaining chamber (1) and the preheating tube.
4, gasifying biomass furnace igniting as claimed in claim 1 and gasification installation is characterized in that: heat-generating pipe (15) is housed in the ignitron (4).
CN 200520050980 2005-05-31 2005-05-31 Biomass gasification furnace igniting and gasifying apparatus Expired - Fee Related CN2789259Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520050980 CN2789259Y (en) 2005-05-31 2005-05-31 Biomass gasification furnace igniting and gasifying apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520050980 CN2789259Y (en) 2005-05-31 2005-05-31 Biomass gasification furnace igniting and gasifying apparatus

Publications (1)

Publication Number Publication Date
CN2789259Y true CN2789259Y (en) 2006-06-21

Family

ID=36789592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520050980 Expired - Fee Related CN2789259Y (en) 2005-05-31 2005-05-31 Biomass gasification furnace igniting and gasifying apparatus

Country Status (1)

Country Link
CN (1) CN2789259Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008017243A1 (en) * 2006-07-31 2008-02-14 Dianfeng Pang An equipment for making stalk charcoal, a method of producing charcoal with the equipment and uses of the charcoal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008017243A1 (en) * 2006-07-31 2008-02-14 Dianfeng Pang An equipment for making stalk charcoal, a method of producing charcoal with the equipment and uses of the charcoal

Similar Documents

Publication Publication Date Title
CN102634358B (en) Efficient selectable pyrolysis system and using method thereof
CN2879022Y (en) Biomass vaporization boiler
CN201354358Y (en) Non-pressure biological substance gasification boiler
CN206176390U (en) Domestic waste pyrolysis gasification treatment system
CN2789259Y (en) Biomass gasification furnace igniting and gasifying apparatus
CN104764047B (en) Counter-burning type biological straw briquetting heating-cooking dual-purpose stove
CN101482273A (en) Environment-friendly solid fuel gasifying combustion and energy conversion system
CN200974832Y (en) Small-sized biomass and coal mixing fixed bed gasification system
CN2789258Y (en) Biomass gasification furnace
CN102703124B (en) Biomass particle gasification generator for kiln
CN102703123B (en) Biomass particle gasification process for kiln
CN201636898U (en) Biomass steamed bread non-pressure boiler
CN201497008U (en) Semi-water gas furnace
CN106123010A (en) A kind of combustion method of biomass fuel
CN201391907Y (en) Straw gasifying furnace
CN201497009U (en) Semi-water gas furnace
CN201301303Y (en) Biomass straw gasification device
CN201507956U (en) Household biomass gasifier
CN201264990Y (en) Photovoltaic biomass gasification stoves
CN110630996A (en) Water immersion type biomass fuel steam pressure boiler
CN201560179U (en) Novel straw gasifier
CN215765018U (en) Biomass particle fuel and fuel dual-purpose small steam boiler
CN2556203Y (en) High-efficiency biomass gasification furnace
CN201459078U (en) Upper/lower air suction type multifunctional gasification furnace
CN203582818U (en) Double-layer-combustion mixed coal gas generating furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee