CN2786077Y - Discharged aluminium weighting mechanism of operation machine for electrolyte tank - Google Patents

Discharged aluminium weighting mechanism of operation machine for electrolyte tank Download PDF

Info

Publication number
CN2786077Y
CN2786077Y CN 200420150909 CN200420150909U CN2786077Y CN 2786077 Y CN2786077 Y CN 2786077Y CN 200420150909 CN200420150909 CN 200420150909 CN 200420150909 U CN200420150909 U CN 200420150909U CN 2786077 Y CN2786077 Y CN 2786077Y
Authority
CN
China
Prior art keywords
aluminium
balance wheel
pulley group
discharged
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420150909
Other languages
Chinese (zh)
Inventor
徐茂君
吕俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN 200420150909 priority Critical patent/CN2786077Y/en
Application granted granted Critical
Publication of CN2786077Y publication Critical patent/CN2786077Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a discharged aluminium weighting mechanism of an operation machine for an electrolyte tank, which comprises a winding machine installed on a discharged aluminium car, a movable pulley group connected with the winding machine through steel cables, a fixed pulley group connected with the movable pulley group through steel cables, a hook connecter connected to a connecting shaft of the movable pulley group, and a balance wheel which is installed on a balance wheel bracket and connected with the movable pulley group through steel cables, wherein the balance wheel bracket is fixedly installed on a pin shaft type weighing sensor of a supporting base of a platform of the discharged aluminium car, and a hook is connected to the hook connecter through a pin shaft. The utility model has the advantage of preventing the sensor and signal cables from being damaged, with simple structure and easy installation.

Description

Electrolytic bath goes out the aluminium Weighing mechanism with manipulator
Technical field:
The utility model relates to electrolytic bath in a kind of Aluminum Electrolysis Production and goes out the aluminium Weighing mechanism with manipulator.
Background technology:
At present, in the production of electrolytic aluminium, employed electrolytic bath goes out the aluminium Weighing mechanism with manipulator, and its pin type LOAD CELLS adopts down that mounting means is installed on the suspension hook attaching parts, the suspension hook attaching parts is contained on the adapter shaft of movable pulley, and suspension hook is contained on the pin type LOAD CELLS.Load on the feasible direct scale hook of LOAD CELLS energy that is installed on the suspension hook attaching parts of this frame mode, its weighing precision height, but because LOAD CELLS will be with together lifting of suspension hook, signal cable on the sensor also can be in company with hook lifting, make signal cable be easy to be bent and break like this, influenced normally carrying out of producing.
Summary of the invention:
The purpose of this utility model is: a kind of simple in structure, sensor signal cable relative fixed is provided, can well protect electrolytic bath that sensor and signal cable be not damaged with manipulator go out the aluminium Weighing mechanism, to overcome above-mentioned the deficiencies in the prior art.
The utility model is to constitute like this: it comprises winch (7) that is installed in out on the aluminium car and the running block (3) that links to each other with winch (7) by steel rope, and with running block (3) by the suspension hook attaching parts (9) on steel rope fixed pulley group (8) that links to each other and the adapter shaft that is connected running block (3) (5) and the balance wheel (6) that is installed in that balance wheel support (4) is gone up and links to each other with running block (3) by steel rope, balance wheel support (4) is installed on the pin type LOAD CELLS (2) that is fixed on out on the aluminium car stage support, and suspension hook (1) is connected on the suspension hook attaching parts (9) by bearing pin (10).
Owing to adopted technique scheme, it has been installed in the pin type LOAD CELLS on the balance wheel support, the bearing pin that replaces the balance wheel support that uses in the prior art with the pin type LOAD CELLS, not only make the signal cable relative fixed of LOAD CELLS, avoided signal cable to be damaged because of frequent lifting; And make that its structure is simpler, it is easier to install.So the utility model compared with prior art, and it has can well protect sensor and signal cable not to be damaged and advantage simple in structure, easy for installation.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model.
The specific embodiment:
Embodiment of the present utility model: as shown in Figure 1, balance wheel (6) is fixed on the lower end of balance wheel support (4) with bearing pin, with the winch (7) that is installed in out on the aluminium car, running block (3), fixed pulley group (8) and balance wheel (6) link together with steel rope according to prior art and suspension hook (1) are fixed on the suspension hook attaching parts (9) with bearing pin (10), suspension hook attaching parts (9) is connected on the adapter shaft (5) of running block (3), then the upper end of balance wheel support (4) is installed in the pin type LOAD CELLS (2) that is fixed on out on the aluminium car stage support and goes up and get final product, pin type LOAD CELLS (2) directly adopts the finished product of selling on the market to install.

Claims (1)

1. an electrolytic bath goes out the aluminium Weighing mechanism with manipulator, it comprises winch (7) that is installed in out on the aluminium car and the running block (3) that links to each other with winch (7) by steel rope, and with running block (3) by the suspension hook attaching parts (9) on steel rope fixed pulley group (8) that links to each other and the adapter shaft that is connected running block (3) (5) and the balance wheel (6) that is installed in that balance wheel support (4) is gone up and links to each other with running block (3) by steel rope, it is characterized in that: balance wheel support (4) is installed on the pin type LOAD CELLS (2) that is fixed on out on the aluminium car stage support, and suspension hook (1) is connected on the suspension hook attaching parts (9) by bearing pin (10).
CN 200420150909 2004-12-13 2004-12-13 Discharged aluminium weighting mechanism of operation machine for electrolyte tank Expired - Fee Related CN2786077Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420150909 CN2786077Y (en) 2004-12-13 2004-12-13 Discharged aluminium weighting mechanism of operation machine for electrolyte tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420150909 CN2786077Y (en) 2004-12-13 2004-12-13 Discharged aluminium weighting mechanism of operation machine for electrolyte tank

Publications (1)

Publication Number Publication Date
CN2786077Y true CN2786077Y (en) 2006-06-07

Family

ID=36774652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420150909 Expired - Fee Related CN2786077Y (en) 2004-12-13 2004-12-13 Discharged aluminium weighting mechanism of operation machine for electrolyte tank

Country Status (1)

Country Link
CN (1) CN2786077Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718143A (en) * 2011-03-31 2012-10-10 象王重工股份有限公司 Novel weighing device structure of shipbuilding gantry crane
CN108137290A (en) * 2015-10-01 2018-06-08 维斯塔斯风力系统有限公司 For promoting the lifting device of wind turbine component
CN108557651A (en) * 2018-05-29 2018-09-21 湖北卡斯工业科技有限公司 The accurate folding and unfolding hanging of massive casting mold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718143A (en) * 2011-03-31 2012-10-10 象王重工股份有限公司 Novel weighing device structure of shipbuilding gantry crane
CN108137290A (en) * 2015-10-01 2018-06-08 维斯塔斯风力系统有限公司 For promoting the lifting device of wind turbine component
US10577224B2 (en) 2015-10-01 2020-03-03 Vestas Wind Systems A/S Lifting arrangement for lifting a wind turbine component
CN108137290B (en) * 2015-10-01 2020-06-02 维斯塔斯风力系统有限公司 Lifting device for lifting a wind turbine component
CN108557651A (en) * 2018-05-29 2018-09-21 湖北卡斯工业科技有限公司 The accurate folding and unfolding hanging of massive casting mold

Similar Documents

Publication Publication Date Title
CN102795555B (en) Large slalom crane for offshore platform
CN201176370Y (en) Electric generator stator combination sling
CN2786077Y (en) Discharged aluminium weighting mechanism of operation machine for electrolyte tank
CN2880774Y (en) Portable lifter
CN202214131U (en) Three-point lifting beam
CN212245882U (en) Hoist device of prefabricated stair board of assembled
CN205653054U (en) Explosion -proof electric single beam crane
CN111847267A (en) Cantilever crane
CN2848803Y (en) Cable crane
CN206692231U (en) The self-chambering boom hoisting of battery pole piece rolling mill
CN2224191Y (en) Self-lifting tower crane capable of carrying person
CN213679490U (en) Large-tonnage low-spacing main and auxiliary lifting trolley
CN212514068U (en) Elevator well baffle impact test frame
CN2839219Y (en) Auxiliary exchanging block tray
CN202379588U (en) Special suspension bracket for small furnace lid of electric furnace
CN203319472U (en) Installation structure of cargo lift counterweight housing counterweight wheel
CN202924577U (en) Special hanger frame for small lid of electric furnace
CN102303812A (en) Large-scale wind turbine installation vessel crane and integral assembling method thereof
CN201424346Y (en) Crane for clamping coal block
CN212712457U (en) Cantilever crane
CN205472332U (en) Rotatable simple and easy armful of pole hoist
CN2703694Y (en) Digger crawler-support turning-over fitting device
CN2786081Y (en) Large-vehicle mounting mechanism of operation machine for electrolyte tank
CN205768767U (en) A kind of bracket type Messenger Wire base
CN2605472Y (en) Lifting-guiding hanging-unhanging device for high-post lamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060607

Termination date: 20121213