CN201176370Y - Electric generator stator combination sling - Google Patents

Electric generator stator combination sling Download PDF

Info

Publication number
CN201176370Y
CN201176370Y CNU2008200765944U CN200820076594U CN201176370Y CN 201176370 Y CN201176370 Y CN 201176370Y CN U2008200765944 U CNU2008200765944 U CN U2008200765944U CN 200820076594 U CN200820076594 U CN 200820076594U CN 201176370 Y CN201176370 Y CN 201176370Y
Authority
CN
China
Prior art keywords
hanger
pulley group
tie
lifting
combined pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200765944U
Other languages
Chinese (zh)
Inventor
王生银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200765944U priority Critical patent/CN201176370Y/en
Application granted granted Critical
Publication of CN201176370Y publication Critical patent/CN201176370Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The utility model discloses a combination lifting tool of a generator stator, which belongs to a mechanical lifting tool. The combination lifting tool reduces the cost of an existing lifting tool and a set of the combination lifting tool can satisfy the lifting of most generator stators below 1000MW, the lifting tool adopts the combination of a draw rod and a brace rod to replace an H-shaped hanging beam, thereby the stress of the lifting tool is more reasonable, the lifting tool is matched with a fixed pulley block of a travelling crane in a deformable combination mode, thereby the lifting tool adapts to travelling cranes with different tonnages or manufacturers, a single-purpose lifting hook which is used for the sheering of the generator stator is replaced by a lifting hook of a giant crane, thereby the unnecessary investment cost is reduced, the brace rod and the draw rod adopt the segment combination, thereby the lifting tool can adapt to the using requirements of various sets and travelling cranes. The lifting tool is a combination lifting tool which comprises the travelling crane, a carriage which walks on the travelling crane, and the combination pulley block, an upper brace rod and a drawplate, a U-shaped lifting eye and a lower brace rod, a lifting eye, a lifting wire for lifting, and an inverted triangle with double-layer which is composed of small hanging beams. The lifting tool can satisfy the lifting of most generator stators below 1000MW.

Description

The generator unit stator combined sling
Technical field
The utility model relates to a kind of suspender that lifts weight, employed special combination suspender during particularly a kind of hoisting large-size power plant generator unit stator.It is fit to utilize directly lifting generator unit stator of driving, and can significantly reduce the generator unit stator lifting cost and use.
Background technology
At present, known domestic large thermal power plant generator unit stator lifting operation is that the power plant carries out the electrical generator difficult point in when construction assembling, prior art is to utilize driving and special hoisting bar to lift generator unit stator, this special hoisting bar is a H shape, during lifting it is kept flat the back at its underpart lifting generator unit stator, there is following technical matters in this hanging method: the one, and H shape hanging beam has increased the load of driving from great, has also increased traffic cost; The 2nd, H shape hanging beam manufacturing expense height; The 3rd, the size of H shape hanging beam is generally fixing, can not change flexibly with the changes in weight of lifted weight thing, can not change with the variation of lifting condition.
Summary of the invention
The utility model provides a kind of generator unit stator combined sling, can not only satisfy generator unit stator lifting needs, and reduce generator unit stator lifting cost usefulness significantly, and the deadweight that has alleviated suspender simultaneously decreases the load of driving.This combined sling can have the distortion combination ability according to the execution conditions difference, can adapt to the unit of different sizes and the requirement of driving.
The technical scheme that its technical matters that solves the utility model adopts is as follows:
Total inventive concept of the present utility model is to adopt pull bar and strut combination to replace H shape hanging beam, makes the more reasonable stress of suspender; Suspender and the form of driving fixed pulley group coupling for the deformable combination are to adapt to the driving of different tonnages or producer; Cancel generator unit stator and turned to the special-purpose suspension hook of use, but used the suspension hook of goliath, reduced unnecessary expense input; Strut and pull bar adopt the segmentation combination, can adapt to the user demand of different units and driving.The generator unit stator combined sling comprises driving, in up dolly and the Combined pulley group of walking of driving, and described dolly is four ones, promptly right front dolly 15, left front dolly 16, right back dolly 31, left back dolly 30; Described Combined pulley group also is four ones, promptly right front Combined pulley group 12, left front Combined pulley group 19, right back Combined pulley group 33, left back Combined pulley group 28; Be provided with right front hoist rope 13 between right front dolly 15 and the right front Combined pulley group 12, be provided with left front hoist rope 18 between left front dolly 16 and the left front Combined pulley group 19, be provided with right back hoist rope 32 between right back dolly 31 and the right back Combined pulley group 33, be provided with left back hoist rope 29 between left back dolly 30 and the left back Combined pulley group 28, between hanger on the described left front Combined pulley group 19 and the hanger on the left back Combined pulley group 28, be provided with upper left strut 37, hanger on the left front Combined pulley group 19 also is fixed together with an end of left front short arm-tie 20, one end of the other end of left front short arm-tie 20 and left front long arm-tie 21 is fixed together, the other end of left front long arm-tie 21 is fixedly connected on the left U type hanger 22, hanger on the left back Combined pulley group 28 also is fixed together with an end of left back short arm-tie 27, one end of the other end of left back short arm-tie 27 and left back long arm-tie 26 is fixed together, and the other end of left back long arm-tie 26 is fixedly connected on the left U type hanger 22; Between the hanger of the hanger of right front Combined pulley group 12 and right back Combined pulley group 33, be provided with upper right strut 36, hanger on the right front Combined pulley group 12 also is fixed together with an end of right front short arm-tie 11, one end of the other end of right front short arm-tie 11 and right front long arm-tie 10 is fixed together, the other end of right front long arm-tie 10 is fixedly connected on the right U type hanger 9, hanger on the right back Combined pulley group 33 also is fixed together with an end of right back short arm-tie 34, one end of the other end of right back short arm-tie 34 and right back long arm-tie 35 is fixed together, and the other end of right back long arm-tie 35 is fixedly connected on the right U type hanger 9; Left U type hanger 22 and right U type hanger 9 be provided with lower supporting rod 8, also be provided with left hanger 23 at left U type hanger 22, on right U type hanger 9, also be provided with right hanger 7.
Described left hanger 23 and right hanger 7 the right side jack line 6 of the left side jack line 24 by lifting usefulness and lifting usefulness and one respectively fall trapezoidal little hanging beam 5 and link together, and little hanging beam 5 is provided with hanging hook steel rope 4, and steel rope is fixed with suspension hook 34 times.
Described upper left strut bar 37, upper right strut bar 36 and lower supporting rod 8 are that the multistage bar is formed by flange and bolt combination.
The array mode of another kind of generator unit stator combined sling comprises driving, in up dolly and the Combined pulley group of walking of driving a vehicle, and described dolly is two ones, promptly right front dolly 15, left front dolly 16; Described Combined pulley group also is two ones, promptly right front Combined pulley group 12, left front Combined pulley group 19; Be provided with right front hoist rope 13 between right front dolly 15 and the right front Combined pulley group 12, be provided with left front hoist rope 18 between left front dolly 16 and the left front Combined pulley group 19, hanger on the left front Combined pulley group 19 and an end of left front short arm-tie 20 are fixed together, the other end of left front short arm-tie 20 is fixedly connected on the left U type hanger 22, hanger on the right front Combined pulley group 12 and an end of right front short arm-tie 11 are fixed together, and the other end of right front short arm-tie 11 is fixedly connected on the right U type hanger 9; Left U type hanger 22 and right U type hanger 9 be provided with lower supporting rod 8, also be provided with left hanger 23 at left U type hanger 22, on right U type hanger 9, also be provided with right hanger 7.
Described left hanger 23 and right hanger 7 the right side jack line 6 of the left side jack line 24 by lifting usefulness and lifting usefulness and one respectively fall trapezoidal little hanging beam 5 and link together, and little hanging beam 5 is provided with hanging hook steel rope 4, and steel rope is fixed with suspension hook 34 times.
Described lower supporting rod 8 is that the multistage bar is formed by flange and bolt combination.
The beneficial effects of the utility model are the costs that reduced suspender, and a cover combined sling can satisfy 1000MW and following most generator unit stator liftings, and combined sling reduces the load of driving, has reduced the requirement to the hoisting capacity of driving.
Description of drawings
Fig. 1 is the front view of the utility model when being used for generator unit stator and turning to.
Fig. 2 is the left view of the utility model when being used for generator unit stator and turning to.
Fig. 3 is the back view of the utility model when being used for generator unit stator and turning to.
Fig. 4 is the right elevation of the utility model when being used for generator unit stator and turning to.
Fig. 5 be used for the lifting of 300MW and following set generator stator from the Combined pulley group to hanger connection mode front view.
Fig. 6 be used for the lifting of 300MW and following set generator stator from the Combined pulley group to hanger connection mode left view.
Fig. 7 is upper left strut array mode partial enlarged view.
Fig. 8 is a lower supporting rod array mode partial enlarged view.
Fig. 9 is used for 600MW and above generator unit stator lifting arm-tie to hanger connection mode front view.
Figure 10 is used for 600MW and above generator unit stator lifting arm-tie to hanger connection mode left view.
Figure 11 is used for 600MW and above generator unit stator lifting Combined pulley group to arm-tie connection mode front view.
Figure 12 is used for 600MW and above generator unit stator lifting Combined pulley group to arm-tie connection mode left view.
1. generator unit stator 2. turns to and uses right side jack line, 3. suspension hook, 4. hanging hook steel rope, 5. little hanging beam, 6. lifting right side jack line, 7. right hanger, 8. lower supporting rod, 9. right U-shaped hanger, 10. right front long arm-tie, 11. right front short arm-ties, 12. right front Combined pulley groups, 13. right front hoist rope, the driving of 14. right sides, 15. right front dollies, 16. left front dolly, 17. left drivings, 18. left front hoist ropes, 19. left front Combined pulley group, 20. left front short arm-ties, 21. left front long arm-ties, 22. left U-shaped hanger, 23. left hangers, 24. lifting left side jack lines, use the left side jack line 25. turn to, 26. left back long arm-ties, 27. left back short arm-ties, 28. left back Combined pulley group, 29. left back hoist rope, 30. left back dollies, 31. right back dollies, 32. right back hoist rope, 33. right back Combined pulley group, 34. right back short arm-ties, 35. right back long arm-ties, 36. upper right strut, 37. upper left struts.
The specific embodiment
The distortion combination base model of combined sling has three kinds: first kind of array mode as shown in Figure 1 and Figure 2, is used for generator unit stator and turns to.It is different when in place that most generator unit stators transportations cause after the steam turbine building its direction, need horizontally rotate 90 °, unloads and turn to needs so combined sling at first must satisfy generator unit stator.Little hanging beam 5 times hangs the crane hook of using 3 by hanging hook steel rope 4, and suspension hook 3 times is hung generator unit stator 1 by turning to jack line, so just can realize that generator unit stator unloads, turns to.Little hanging beam 5 tops hang on the hanger with jack line by lifting, and hanger and lower supporting rod 8, U-shaped hanger link together by bearing pin, and concrete connection mode is seen Fig. 9, Figure 10.The U-shaped hanger is connected arm-tie bottom by bearing pin, and the top of arm-tie links together by the two ends of bearing pin and last strut, the lower end of Combined pulley group, and concrete connection mode is seen Figure 11, Figure 12.The Combined pulley group hangs on the dolly by hoist rope.Second kind of array mode is used for generator unit stator lifting, this array mode remove remove little hanging beam 5, suspension hook 3, hanging hook with the steel rope 4 and first kind identical, lift and directly hang generator unit stator 1 with the jack line lower end.The third array mode, be used for the lifting of 300MW and following generator unit stator, this array mode is compared with second kind of combination, two dollies, two cover hoist ropes, two Combined pulley groups have only been kept, removed and all gone up struts, whole long arm-ties, three short arm-ties are hung by bearing pin by each Combined pulley group bottom, and the U-shaped hanger is hung by bearing pin by weak point arm-tie bottom, sees Fig. 5, Fig. 6.Connection mode and second kind of combination below the U-shaped hanger are identical.Because the Combined pulley group of this combined sling can be combined as 6 wheels or 8 wheels (referring to Figure 11, Figure 12, remove 4 distance covers at two Combined pulley group upper pin two ends, two otic placodes can endwisely slip on Combined pulley group lower bearing pin, can adorn two pulleys on each Combined pulley group upper pin in the middle of two otic placodes like this, the Combined pulley group is just taken turns from 6 and is become 8 and take turns), last strut, lower supporting rod all adopts flange, bolt segmentation combination, arm-tie also makes up by bearing pin, can be equipped with the arm-tie of different length, so this combined sling is easy to and different manufacturers, the driving of different tonnages is complementary.
For the 600MW-1000MW generator set, in every driving, need to increase by one and overlap the dolly that hoists (this method is identical with existing utilization driving lifting generator unit stator), two drivings are the totally 4 covers dolly that hoists, and every cover hoists and wears around a Combined pulley group (removing the former main suspension hook that hoists of driving) with hoist rope under the dolly.Use first kind of combination to realize that generator unit stator turns to, use second kind of combination to realize the generator unit stator hoisted in position.
For 300MW and following generator set, two covers that two drivings of general using the carry dolly that hoists can satisfy generator unit stator lifting needs, so adopt the third combination to realize the generator unit stator hoisted in position.Need turn to as generator unit stator, on the basis of the third combination, in the lifting with the jack line lower end carry additionally little hanging beam 5, hanging hook just can realize that with steel rope 4, suspension hook 3 generator unit stator turns to, the bottom section of hang and first kind of combination is identical.Indivedual 300MW and following generator unit stator design weight are bigger, and two cover lifting mechanisms can also adopt the hanging method of 600MW-1000MW generator unit stator noted earlier can not satisfy the lifting needs time.

Claims (6)

1, a kind of generator unit stator combined sling comprises driving, in up dolly and the Combined pulley group of walking of driving, and described dolly is four ones, promptly right front dolly (15), left front dolly (16), right back dolly (31), left back dolly (30); Described Combined pulley group also is four ones, promptly right front Combined pulley group (12), left front Combined pulley group (19), right back Combined pulley group (33), left back Combined pulley group (28); Be provided with right front hoist rope (13) between right front dolly (15) and the right front Combined pulley group (12), be provided with left front hoist rope (18) between left front dolly (16) and the left front Combined pulley group (19), be provided with right back hoist rope (32) between right back dolly (31) and the right back Combined pulley group (33), be provided with left back hoist rope (29) between left back dolly (30) and the left back Combined pulley group (28), it is characterized in that, between the hanger on hanger on the described left front Combined pulley group (19) and the left back Combined pulley group (28), be provided with upper left strut (37), hanger on the left front Combined pulley group (19) also is fixed together with an end of left front short arm-tie (20), one end of the other end of left front short arm-tie (20) and left front long arm-tie (21) is fixed together, the other end of left front long arm-tie (21) is fixedly connected on the left U type hanger (22), hanger on the left back Combined pulley group (28) also is fixed together with an end of left back short arm-tie (27), one end of the other end of left back short arm-tie (27) and left back long arm-tie (26) is fixed together, and the other end of left back long arm-tie (26) is fixedly connected on the left U type hanger (22); Between the hanger of the hanger of right front Combined pulley group (12) and right back Combined pulley group (33), be provided with upper right strut (36), hanger on the right front Combined pulley group (12) also is fixed together with an end of right front short arm-tie (11), one end of the other end of right front short arm-tie (11) and right front long arm-tie (10) is fixed together, the other end of right front long arm-tie (10) is fixedly connected on the right U type hanger (9), hanger on the right back Combined pulley group (33) also is fixed together with an end of right back short arm-tie (34), one end of the other end of right back short arm-tie (34) and right back long arm-tie (35) is fixed together, and the other end of right back long arm-tie (35) is fixedly connected on the right U type hanger (9); Left U type hanger (22) and right U type hanger (9) be provided with lower supporting rod (8), also be provided with left hanger (23) at left U type hanger (22), on right U type hanger (9), also be provided with right hanger (7).
2, a kind of generator unit stator combined sling according to claim 1, it is characterized in that, described left hanger (23) and right hanger (7) the left side jack line (24) by lifting usefulness and the lifting right side jack line (6) of usefulness and one respectively fall trapezoidal little hanging beam (5) and link together, little hanging beam (5) is provided with hanging hook steel rope (4), is fixed with suspension hook (3) under the steel rope (4).
3, a kind of generator unit stator combined sling according to claim 1 is characterized in that, described upper left strut bar (37), upper right strut bar (36) and lower supporting rod (8) are that the multistage bar is formed by flange and bolt combination.
4, a kind of generator unit stator combined sling comprises driving, in up dolly and the Combined pulley group of walking of driving, and described dolly is two ones, promptly right front dolly (15), left front dolly (16); Described Combined pulley group also is two ones, promptly right front Combined pulley group (12), left front Combined pulley group (19); Be provided with right front hoist rope (13) between right front dolly (15) and the right front Combined pulley group (12), be provided with left front hoist rope (18) between left front dolly (16) and the left front Combined pulley group (19), it is characterized in that, one end of hanger on the left front Combined pulley group (19) and left front short arm-tie (20) is fixed together, the other end of left front short arm-tie (20) is fixedly connected on the left U type hanger (22), one end of hanger on the right front Combined pulley group (12) and right front short arm-tie (11) is fixed together, and the other end of right front short arm-tie (11) is fixedly connected on the right U type hanger (9); Left U type hanger (22) and right U type hanger (9) be provided with lower supporting rod (8), also be provided with left hanger (23) at left U type hanger (22), on right U type hanger (9), also be provided with right hanger (7).
5, a kind of generator unit stator combined sling according to claim 4, it is characterized in that, described left hanger (23) and right hanger (7) the left side jack line (24) by lifting usefulness and the lifting right side jack line (6) of usefulness and one respectively fall trapezoidal little hanging beam (5) and link together, little hanging beam (5) is provided with hanging hook steel rope (4), is fixed with suspension hook (3) under the steel rope (4).
6, a kind of generator unit stator combined sling according to claim 4 is characterized in that, described lower supporting rod (8) is that the multistage bar is formed by flange and bolt combination.
CNU2008200765944U 2008-03-22 2008-03-22 Electric generator stator combination sling Expired - Fee Related CN201176370Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200765944U CN201176370Y (en) 2008-03-22 2008-03-22 Electric generator stator combination sling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200765944U CN201176370Y (en) 2008-03-22 2008-03-22 Electric generator stator combination sling

Publications (1)

Publication Number Publication Date
CN201176370Y true CN201176370Y (en) 2009-01-07

Family

ID=40216385

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200765944U Expired - Fee Related CN201176370Y (en) 2008-03-22 2008-03-22 Electric generator stator combination sling

Country Status (1)

Country Link
CN (1) CN201176370Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102060231A (en) * 2010-12-23 2011-05-18 中色科技股份有限公司 Hoisting method and device for work roller or middle roller
CN101635490B (en) * 2009-07-17 2012-11-28 中冶实久建设有限公司 Supporting and regulating device for installation in position of main motor stator and method for installing main motor stator by using same
CN101624164B (en) * 2009-07-29 2013-10-02 广东火电工程总公司 Hoisting method of machine set generator stator and special mechanism thereof
CN104045003A (en) * 2014-06-20 2014-09-17 山东电力建设第一工程公司 Generator stator lifting device
CN104291207A (en) * 2013-07-17 2015-01-21 五冶集团上海有限公司 Tool special for mounting of large-scale motor equipment and use method of tool
CN104495633A (en) * 2014-12-15 2015-04-08 国家电网公司 Compact vertical hoisting device
CN105000461A (en) * 2015-08-12 2015-10-28 上海核工程研究设计院 Lifting device commonly used for hoisting nuclear power equipment and modules
CN105523474A (en) * 2014-10-21 2016-04-27 五冶集团上海有限公司 Lifting method for high-altitude heavy objects in workshop
CN109761141A (en) * 2019-03-22 2019-05-17 中冶建工集团有限公司 Steel box-girder transports auxiliary device and operating method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101635490B (en) * 2009-07-17 2012-11-28 中冶实久建设有限公司 Supporting and regulating device for installation in position of main motor stator and method for installing main motor stator by using same
CN101624164B (en) * 2009-07-29 2013-10-02 广东火电工程总公司 Hoisting method of machine set generator stator and special mechanism thereof
CN102060231A (en) * 2010-12-23 2011-05-18 中色科技股份有限公司 Hoisting method and device for work roller or middle roller
CN104291207A (en) * 2013-07-17 2015-01-21 五冶集团上海有限公司 Tool special for mounting of large-scale motor equipment and use method of tool
CN104045003A (en) * 2014-06-20 2014-09-17 山东电力建设第一工程公司 Generator stator lifting device
CN105523474A (en) * 2014-10-21 2016-04-27 五冶集团上海有限公司 Lifting method for high-altitude heavy objects in workshop
CN104495633A (en) * 2014-12-15 2015-04-08 国家电网公司 Compact vertical hoisting device
CN105000461A (en) * 2015-08-12 2015-10-28 上海核工程研究设计院 Lifting device commonly used for hoisting nuclear power equipment and modules
CN109761141A (en) * 2019-03-22 2019-05-17 中冶建工集团有限公司 Steel box-girder transports auxiliary device and operating method
CN109761141B (en) * 2019-03-22 2023-11-17 中冶建工集团有限公司 Steel box girder transferring auxiliary device and operation method

Similar Documents

Publication Publication Date Title
CN201176370Y (en) Electric generator stator combination sling
CN201545635U (en) Holding rod with double flat arms
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN102756978A (en) Foldable arm of crawler crane
CN201582039U (en) Turn-over device of hydraulic generator roller
CN202321966U (en) Special lifting appliance for multi-lifting-point high wire coil rod
CN202704895U (en) Articulated boom of crawler crane
CN201999647U (en) Ladle crane with structure of two trolleys and two main beams
CN206088728U (en) Novel large -scale gallows of taking a trial run
CN208182486U (en) Construction lifting mechanical device
CN205045732U (en) Portable lifting device
CN104649164A (en) Heavy object hoisting device
CN207524820U (en) A kind of auxiliary lifting device for power equipment installation
CN204454371U (en) Weight hanging apparatus
CN205662256U (en) High rises pergola side and hangs a semi -portal bridge crane
CN201842583U (en) Foldable double-balanced suspension arm
CN201280390Y (en) Large-tonnage suspending beam
CN204549877U (en) A kind of lifting appliance for generator unit stator
CN102992183A (en) Marine 15-ton lifting hook group
CN208747486U (en) A kind of balance hanging beam group suspender
CN201584868U (en) Stator frame turn-over device of through-flow generator
CN203173677U (en) Hoisting tool for replacing plate hook of large traveling crane
CN202924577U (en) Special hanger frame for small lid of electric furnace
CN205011223U (en) Middle -size and small -size rolling -mill housing installation hoist
CN205662284U (en) Two poles become platform ground jack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090107