CN102303812A - Large-scale wind turbine installation vessel crane and integral assembling method thereof - Google Patents

Large-scale wind turbine installation vessel crane and integral assembling method thereof Download PDF

Info

Publication number
CN102303812A
CN102303812A CN201110250868A CN201110250868A CN102303812A CN 102303812 A CN102303812 A CN 102303812A CN 201110250868 A CN201110250868 A CN 201110250868A CN 201110250868 A CN201110250868 A CN 201110250868A CN 102303812 A CN102303812 A CN 102303812A
Authority
CN
China
Prior art keywords
crane
place
tie
support
scale wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110250868A
Other languages
Chinese (zh)
Inventor
邹纪祥
范正林
黄叶锋
钟炳贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Original Assignee
SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd filed Critical SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority to CN201110250868A priority Critical patent/CN102303812A/en
Publication of CN102303812A publication Critical patent/CN102303812A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a large-scale wind turbine installation vessel crane and an integral assembling method thereof. The large-scale wind turbine installation vessel crane comprises a cylinder body. A reverse roller apparatus is arranged on the upper part of the cylinder body. A reversing chassis is arranged on the upper part of the reverse roller apparatus. A gin pole is arranged on the upper part of the reversing chassis. An obliquely positioned industrial draw plate is arranged between two supports of the gin pole. One end of the industrial draw plate is fixed on the bottom of a first support. The other end of the industrial draw plate is a boom hinging point which is fixed on a second support. A supporting seat is arranged between the other end of the industrial draw plate and the gin pole. The top of the gin pole is a place for a pitching pulley. The place for the pitching pulley and the boom hinging point are connected to a floating crane through steel cables. The crane and the method provided by the invention have advantages of short production period and reduced cost.

Description

A kind of large-scale wind electricity is installed ship hoisting crane and whole general assembly method thereof
Technical field:
The present invention relates to a kind of large-scale wind electricity ship hoisting crane and whole general assembly method thereof are installed.
Background technology:
It is short that the 800T wind-powered electricity generation is installed the ship project duration; Because the hull fabrication cycle is long, hoisting crane assembly unit, general assembly accuracy requirement height are as being behind water under the hull by conventional hoisting crane general assembly method; On hull, carry out the substep installation one by one of each parts of hoisting crane, so the long cost that increased of production cycle.
Summary of the invention:
The objective of the invention is in order to overcome above deficiency, provide a kind of a kind of large-scale wind electricity with short production cycle, cost-cutting that ship hoisting crane and whole general assembly method thereof are installed.
The present invention realizes by the following technical programs: a kind of large-scale wind electricity is installed the ship crane; Comprise cylinder; The top of cylinder is provided with anti-roller devices; The top of anti-roller devices is provided with reversing chassis; The top of reversing chassis is provided with man-like shelf; Be provided with tilted-putted technology arm-tie between two supports of man-like shelf; One end of technology arm-tie is fixed on the bottom of first support; The other end of technology arm-tie is jib hinge place; Be fixed on second support; Be provided with supporting base between the other end of technology arm-tie and the man-like shelf, the top of man-like shelf is pitching pulley place, and pitching pulley place is connected with crane barge by steel wire rope with jib hinge place.
A kind of large-scale wind electricity is installed the whole general assembly method of ship lifting, comprises the steps:
A, anti-roller structure is installed on cylinder, on the top of anti-roller structure reversing chassis is installed, Shears is installed above reversing chassis, inclination mounting process arm-tie is whole between first support of Shears and second support, and formation is rigidly connected;
B, 4 gib heads of crane barge are carried out whole general assembly, wherein two gib head suspension centres are chosen in back pitching pulley place, and two other gib head suspension centre is chosen in jib hinge place, the installation bearing seat at jib hinge place;
C, in back pitching pulley place and jib hinge place, put on the lifting steel rope, install and respectively lift frock, with the slowly lifting synchronously of 4 gib heads, and mobile crane barge, the ship hoisting crane will be installed hang on the hull and dock with hull.
The present invention compared with prior art has the following advantages: the present invention changes tradition and on hull, carries out the general assembly method that each parts of hoisting crane distribute one by one and install; Shorten the production cycle; Cost-cutting; Partly lifting at global wind-powered electricity generation installation ship hoisting crane is a big invention, for the general assembly of the ship of wind-powered electricity generation installation has from now on been gained most valuable experience.
Description of drawings:
Fig. 1 is the front view of structural representation of the present invention;
Fig. 2 is the right elevation of structural representation of the present invention;
Label among the figure: pitching pulley place, 7-jib hinge place, 8-supporting base, 9-technology arm-tie, 10-first support, 11-second support behind 1-cylinder, the anti-roller structure of 2-, 3-reversing chassis, 4-Shears, 5-crane barge, the 6-.
The specific embodiment:
In order to deepen to understanding of the present invention, will combine embodiment and accompanying drawing that the present invention is made further detailed description below, this embodiment only is used to explain the present invention, does not constitute the qualification to protection domain of the present invention.
Like Fig. 1, Fig. 2 a kind of specific embodiment that a kind of large-scale wind electricity of the present invention is installed ship crane and whole general assembly method thereof is shown; A kind of large-scale wind electricity is installed the ship crane; Comprise cylinder 1; The top of cylinder 1 is provided with anti-roller devices 2; The top of anti-roller devices 2 is provided with reversing chassis 3; The top of reversing chassis 3 is provided with man-like shelf 4; Be provided with tilted-putted technology arm-tie 9 between two supports of man-like shelf 4; One end of technology arm-tie 9 is fixed on the bottom of first support 10; The other end of technology arm-tie 9 is jib hinge place 7; Be fixed on second support 11; Be provided with supporting base 8 between the other end of technology arm-tie 9 and the man-like shelf 4; The top of man-like shelf 4 is pitching pulley place 6, and pitching pulley place 6 is connected with crane barge 5 by steel wire rope with jib hinge place 7.
A kind of large-scale wind electricity is installed the whole general assembly method of ship lifting, comprises the steps:
A, anti-roller structure 2 is installed on cylinder 1; Reversing chassis 3 is installed on top at anti-roller structure 2; Shears 4 is installed above reversing chassis 3, inclination mounting process arm-tie 9 between first support 10 of Shears 4 and second support 11, whole formation is rigidly connected;
B, 4 gib heads of crane barge 5 are carried out whole general assembly, wherein two gib head suspension centres are chosen in back pitching pulley place 6, and two other gib head suspension centre is chosen in jib hinge place 7,7 installation bearing seats 8 at jib hinge place;
Before the calculating machine gravity is inclined to one side, cause jib hinge place 7 to be laid particular stress on, the setting of supporting base 8 overcomes unfavorable factors such as unbalance loading, guarantees the stationarity of unit assembling of ship machinery.
C, in back pitching pulley place 6 and jib hinge place 7, put on the lifting steel rope, install and respectively lift frock, with the slowly lifting synchronously of 4 gib heads, and mobile crane barge 5, the ship hoisting crane will be installed hang on the hull and dock with hull.
The present invention changes tradition and on hull, carries out the general assembly method that each parts of hoisting crane distribute one by one and install; Shorten the production cycle; Cost-cutting, partly lifting at global wind-powered electricity generation installation ship hoisting crane is a big invention, for the general assembly of the ship of wind-powered electricity generation installation has from now on been gained most valuable experience.

Claims (2)

1. a large-scale wind electricity is installed the ship crane; It is characterized in that: comprise cylinder (1); The top of said cylinder (1) is provided with anti-roller devices (2); The top of said anti-roller devices (2) is provided with reversing chassis (3); The top of said reversing chassis (3) is provided with man-like shelf (4); Be provided with the technology arm-tie (9) that is obliquely installed between two supports of said man-like shelf (4); One end of said technology arm-tie (9) is fixed on the bottom of one first support (10); The other end of said technology arm-tie (9) is jib hinge place (7); Be fixed on second support (11); Be provided with supporting base (8) between the other end of said technology arm-tie (9) and the said man-like shelf (4); The top of said man-like shelf (4) is pitching pulley place (6), and said pitching pulley place (6) is connected with crane barge (5) by steel wire rope with said jib hinge place (7).
2. a large-scale wind electricity is installed ship hoisting crane and whole general assembly method thereof, it is characterized in that, comprises the steps:
A, anti-roller structure (2) go up to be installed at cylinder (1); Reversing chassis (3) is installed on top at anti-roller structure (2); Shears (4) is installed in top at reversing chassis (3); Inclination mounting process arm-tie (9) between first support (10) of Shears (4) and second support (11), whole formation is rigidly connected;
B, 4 gib heads of crane barge (5) are carried out whole general assembly, wherein two gib head suspension centres are chosen in pitching pulley place (6), back, and two other gib head suspension centre is chosen in jib hinge place (7), at jib hinge place (7) installation bearing seat (8);
C, in back pitching pulley place (6) and jib hinge place (7), put on the lifting steel rope, install and respectively lift frock, 4 gib heads are slowly lifted by crane synchronously, and mobile crane barge (5), the ship hoisting crane will be installed hang on the hull and dock with hull.
CN201110250868A 2011-08-29 2011-08-29 Large-scale wind turbine installation vessel crane and integral assembling method thereof Pending CN102303812A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110250868A CN102303812A (en) 2011-08-29 2011-08-29 Large-scale wind turbine installation vessel crane and integral assembling method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110250868A CN102303812A (en) 2011-08-29 2011-08-29 Large-scale wind turbine installation vessel crane and integral assembling method thereof

Publications (1)

Publication Number Publication Date
CN102303812A true CN102303812A (en) 2012-01-04

Family

ID=45377757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110250868A Pending CN102303812A (en) 2011-08-29 2011-08-29 Large-scale wind turbine installation vessel crane and integral assembling method thereof

Country Status (1)

Country Link
CN (1) CN102303812A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557126A (en) * 2013-10-23 2014-02-05 中国中铁航空港建设集团有限公司 Installation device and installation method for wind power generation device
CN105152041A (en) * 2015-09-21 2015-12-16 上海振华重工集团(南通)有限公司 Hoisting process of full-circle slewing crane
CN109080770A (en) * 2018-08-10 2018-12-25 大连中船新材料有限公司 Semi-automatic mounting shipping A-frame special equipment
CN114031008A (en) * 2021-12-07 2022-02-11 南通振华重型装备制造有限公司 Modularized final assembly process for floating crane

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101181927A (en) * 2007-12-19 2008-05-21 上海振华港口机械(集团)股份有限公司 Semi-submersible offshore multifunctional engineering ship
CN101293618A (en) * 2007-04-27 2008-10-29 上海振华港口机械(集团)股份有限公司 Trestle crane barge final assembly technique
CN101746480A (en) * 2008-12-12 2010-06-23 中国海洋石油总公司 Technique for assembling large revolving crane on crane ship
US20100293781A1 (en) * 2009-05-22 2010-11-25 Kok Seng Foo Offshore wind turbine installation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293618A (en) * 2007-04-27 2008-10-29 上海振华港口机械(集团)股份有限公司 Trestle crane barge final assembly technique
CN101181927A (en) * 2007-12-19 2008-05-21 上海振华港口机械(集团)股份有限公司 Semi-submersible offshore multifunctional engineering ship
CN101746480A (en) * 2008-12-12 2010-06-23 中国海洋石油总公司 Technique for assembling large revolving crane on crane ship
US20100293781A1 (en) * 2009-05-22 2010-11-25 Kok Seng Foo Offshore wind turbine installation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557126A (en) * 2013-10-23 2014-02-05 中国中铁航空港建设集团有限公司 Installation device and installation method for wind power generation device
CN103557126B (en) * 2013-10-23 2016-05-04 中国中铁航空港建设集团有限公司 The erecting device of wind power plant and installation method
CN105152041A (en) * 2015-09-21 2015-12-16 上海振华重工集团(南通)有限公司 Hoisting process of full-circle slewing crane
CN109080770A (en) * 2018-08-10 2018-12-25 大连中船新材料有限公司 Semi-automatic mounting shipping A-frame special equipment
CN114031008A (en) * 2021-12-07 2022-02-11 南通振华重型装备制造有限公司 Modularized final assembly process for floating crane
CN114031008B (en) * 2021-12-07 2023-10-24 南通振华重型装备制造有限公司 Modularized final assembly process of floating crane

Similar Documents

Publication Publication Date Title
CN203064994U (en) Lifting device for disassembling negative ring segments
CN205246367U (en) Stranded cable machine stranded cable test device
CN102303812A (en) Large-scale wind turbine installation vessel crane and integral assembling method thereof
CN105540410A (en) Lifting device and method for wind turbine generator set
CN103925172A (en) Integral mounting assisting device and mounting method for tension leg type offshore floating wind turbine
CN105417403A (en) Method for installing ultrahigh ultra-large type floating crane in dock
CN201362553Y (en) Aquatic large-sized reinforcing cage hoisting roll-over device
CN101445206A (en) Above-water large-scale reinforcement cage hoisting and overturning device
CN104527923B (en) Cabin entering mounting method used for main push motor and adopting auxiliary mounting bracket
CN209797280U (en) Tower drum turnover device
CN102720386A (en) Inversing method of inner side clustering hoop of vertical storage tank
CN202829369U (en) Crane and ocean platform having same
CN201615032U (en) Base installing structure for installing off-shore wind turbine generator system
CN205170227U (en) Removable davit bracket of integrated double hook hook cage
CN102423847B (en) Method for assembling axial-flow movable-blade type hydraulic turbine and support device adopted by axial-flow movable-blade hydraulic turbine
CN202483781U (en) Water turbine rotating wheel supporting device
CN202785391U (en) Three-hanging-point hoisting mechanism of overweight-type seaborne crane
CN204297913U (en) Ammonia convertor special hanger
CN107487724A (en) A kind of the large-scale floating crane arm support erecting device and installation method of non-loop wheel machine auxiliary
CN201694777U (en) Self hoisting device of hydraulic turbine volute
CN103286706A (en) Movable plate clamp
CN204022346U (en) Offshore wind turbine hanging device
CN102815625B (en) A kind of ocean platform crane
CN202430700U (en) Continuous lifting device for large-tonnage upper assembly block of ocean platform
CN205527300U (en) A hoisting structure for dismouting of offshore oil platform loop wheel machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120104