CN2785932Y - Pipe-carrying vehicle for tunnel construction - Google Patents
Pipe-carrying vehicle for tunnel construction Download PDFInfo
- Publication number
- CN2785932Y CN2785932Y CN 200520077642 CN200520077642U CN2785932Y CN 2785932 Y CN2785932 Y CN 2785932Y CN 200520077642 CN200520077642 CN 200520077642 CN 200520077642 U CN200520077642 U CN 200520077642U CN 2785932 Y CN2785932 Y CN 2785932Y
- Authority
- CN
- China
- Prior art keywords
- chassis
- crossbeam
- pipe
- lifting
- rubber tire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a pipe-carrying vehicle for a tunnel construction, which is composed of a girder, a bearing front rubber wheel, a steel rail and a driving carriage. A prestress pipe can be conveniently lifted to a required position through two groups of hydraulic air cylinders arranged on the girder. Then, the pipe-carrying vehicle can travel along a track through a lifting carriage and the driving carriage which are arranged in front of and at the back of the girder. When the utility model is used, a great amount of manpower is saved and work efficiency is enhanced on one hand. On the other hand, assembly and disassembly automation and installation automation can be realized.
Description
Technical field
The utility model relates to a kind of engineering mechanical device fortune tubulature car, particularly relates to a kind of tunnel fortune tubulature car that constructing tunnel is used that is used in.
Background technology
In today of traffic prosperity, the traffic in mountain area more and more causes people's attention, and the past is because high and steep mountains, road is obstructed, tend to waste a lot of times, cause very big loss, nowadays, the tunnel engineering utilization is more and more, a large amount of prestressed pipes is applied in the engineering and goes, but how to transport these prestressed pipes, under the particularly ungetable situation, transport these large-sized prestress pipes, become the problem of comparison difficulty.
Summary of the invention
The purpose of this utility model will provide a kind of tunnel fortune tubulature car exactly, and it can orbit, and can improve the efficient of mechanical execution greatly in general travels down again, has reduced the labour intensity of workman's construction.
The purpose of this utility model is to realize like this, tunnel fortune tubulature car by crossbeam, load-bearing before rubber tire, rail, driving chassis formed, it is characterized in that: the act pipe support is set on crossbeam, lifts pipe support and be made up of two groups of hydraulic cylinders, the engine hydraulic pressure group is arranged on lifts in the pipe support; Rubber tire and lifting chassis before the front end of crossbeam is provided with load-bearing respectively, the lower end of described lifting chassis is provided with rail wheel, and the lifting chassis can be along vertical upper and lower the moving of crossbeam; Be respectively arranged with the lifting rubber tire in described crossbeam rear end and drive chassis, the lower end that drives chassis is equipped with the rail wheel actuating device.
The utility model is simple in structure, and is easy for operation, can solve the big problem of labor strength in the transportation better.Simultaneously, also improved the construction effect widely.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is that A of the present utility model is to scheme drawing.
Fig. 3 is that B of the present utility model is to scheme drawing.
In the drawings, 1, rubber tire 3, lifting chassis 4 before crossbeam 2, the load-bearing, lift pipe support 5, lifting rubber tire 6, drive chassis 7, engine hydraulic pressure group 8, rail 9, prestressed pipe
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
In the drawings, the utility model tunnel fortune tubulature car by crossbeam 1, load-bearing before rubber tire 2, rail 8, drive chassis 6 and form, it is characterized in that: be provided with on crossbeam 1 and lift pipe support 4, lift pipe support 4 and be made up of two groups of hydraulic cylinders, engine hydraulic pressure group 7 is arranged on lifts in the pipe support 4; Rubber tire 2 and lifting chassis 3 before the front end of crossbeam 1 is provided with load-bearing respectively, the lower end of described lifting chassis 3 is provided with rail wheel, and lifting chassis 3 can be along crossbeam 1 vertical upper and lower moving; Be respectively arranged with lifting rubber tire 5 in described crossbeam 1 rear end and drive chassis 6, the lower end that drives chassis 6 is equipped with the rail wheel actuating device.During concrete enforcement, to drive on chassis 6 and the lifting chassis 3 and draw, pack up, at this moment, fortune tubulature car in tunnel is all by rubber tire 2 before the load-bearing and 5 operations of lifting rubber tire, after lifting rubber tire 5 passes prestressed pipe 9, prestressed pipe 9 is fixed on the central authorities of crossbeam 1, start engine hydraulic pressure group 7 then, two groups of hydraulic cylinders are worked simultaneously, and prestressed pipe 7 is given rise to certain height, fixing, when shrinking lifting rubber tire 5, the set rail wheel alignment rail 8 of lifting chassis 3 and driving chassis 6 lower ends of front and back is put down, to support equipment package, adjust the height of lifting chassis 3, so that prestressed pipe 9 breaks away from ground.At this moment, whole tunnel fortune tubulature car is placed on two strands of tracks reposefully, during operation, starts the drive motor that drives on the chassis 6, just track can be transported the tubulature car and transport to any driving surface along track.Whole construction, transportation, installation process can realize automation mechanized operation, have alleviated working strength of workers greatly, have improved the work efficiency of mechanical transport.
Claims (1)
1, tunnel fortune tubulature car is made up of crossbeam (1), the preceding rubber tire (2) of load-bearing, rail (8), driving chassis (6), it is characterized in that: on crossbeam (1), be provided with and lift pipe support (4), lift pipe support (4) and be made up of two groups of hydraulic cylinders, engine hydraulic pressure group (7) is arranged on lifts in the pipe support (4); Rubber tire (2) and lifting chassis (3) before the front end of crossbeam (1) is provided with load-bearing respectively, the lower end of described lifting chassis (3) is provided with rail wheel, and lifting chassis (3) can be along vertical upper and lower the moving of crossbeam (1); Be respectively arranged with lifting rubber tire (5) in described crossbeam (1) rear end and drive chassis (6), the lower end that drives chassis (6) is equipped with the rail wheel actuating device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520077642 CN2785932Y (en) | 2005-11-14 | 2005-11-14 | Pipe-carrying vehicle for tunnel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520077642 CN2785932Y (en) | 2005-11-14 | 2005-11-14 | Pipe-carrying vehicle for tunnel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2785932Y true CN2785932Y (en) | 2006-06-07 |
Family
ID=36774507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520077642 Expired - Lifetime CN2785932Y (en) | 2005-11-14 | 2005-11-14 | Pipe-carrying vehicle for tunnel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2785932Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104553940A (en) * | 2014-12-30 | 2015-04-29 | 中国长江三峡集团公司 | Self-loading/unloading pipeline conveying device and self-loading/unloading conveying method thereof |
CN109703578A (en) * | 2019-01-24 | 2019-05-03 | 国网山东省电力公司日照供电公司 | A kind of big molded cannula mobile device of converter station and moving method |
-
2005
- 2005-11-14 CN CN 200520077642 patent/CN2785932Y/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104553940A (en) * | 2014-12-30 | 2015-04-29 | 中国长江三峡集团公司 | Self-loading/unloading pipeline conveying device and self-loading/unloading conveying method thereof |
CN109703578A (en) * | 2019-01-24 | 2019-05-03 | 国网山东省电力公司日照供电公司 | A kind of big molded cannula mobile device of converter station and moving method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204640450U (en) | A kind of assembling-type precast box girder integral moving die plate | |
CN201154873Y (en) | Mobile crane for automobile maintenance | |
CN109914166B (en) | Urban rail scattered paving method mechanized construction equipment and construction method thereof | |
CN103016028A (en) | Hydraulic self-propelled steel form carrier for tunnel secondary lining operation | |
CN208996741U (en) | A kind of included track laying device of tunnel lining trolley | |
CN205444937U (en) | Guide tracked conveyer of arc | |
CN107762552B (en) | The rapid translation trolley and method of mating trailer after TBM | |
CN2785932Y (en) | Pipe-carrying vehicle for tunnel construction | |
CN2918643Y (en) | Multipurpose hydraulic lifting carrying device for hand truck | |
CN2597445Y (en) | Crawler-type lifting beam integrated machine | |
CN111362159A (en) | Movable hoisting device for mounting tunnel internal structure | |
CN108275579B (en) | Quick dismantling device for pipeline in tunnel | |
CN102839578A (en) | Construction method for manually longitudinally moving temporary beam in reinforcing multi-track line by use of D type temporary beam | |
CN108798714A (en) | A kind of working portable shifting formwork trolley of channel wall body and its construction method | |
CN103184878B (en) | Method for improving second lining construction efficiency in tunnel widening section | |
CN1598147A (en) | Technology of changing railway switch construction and its equipment of changing railway switch | |
CN2498025Y (en) | Wreck for safety fence on highway | |
CN201849911U (en) | Conveying device for heavy equipment | |
CN2766039Y (en) | Light culvert template trolley | |
CN110645020B (en) | Construction equipment walking method | |
CN110645019B (en) | Integrated form tunnel construction equipment | |
CN208310801U (en) | A kind of working portable shifting formwork trolley of channel wall | |
CN210066384U (en) | Urban rail scattered paving method mechanical construction equipment | |
CN210361895U (en) | Prefabricated field opening and closing door type protective steel plate trolley | |
CN202294069U (en) | Hydraulic type tire disassembling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20060607 |
|
EXPY | Termination of patent right or utility model |