CN2780993Y - 锚杆预应力控制装置 - Google Patents
锚杆预应力控制装置 Download PDFInfo
- Publication number
- CN2780993Y CN2780993Y CN 200420057952 CN200420057952U CN2780993Y CN 2780993 Y CN2780993 Y CN 2780993Y CN 200420057952 CN200420057952 CN 200420057952 CN 200420057952 U CN200420057952 U CN 200420057952U CN 2780993 Y CN2780993 Y CN 2780993Y
- Authority
- CN
- China
- Prior art keywords
- spring
- rod
- anchor rod
- anchor
- stress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种锚杆预应力控制装置,该装置由标示杆、弹簧、弹簧套筒组成,其特征是将螺母、标示杆、弹簧、弹簧套筒与托板依次装在锚杆杆体上,托板与岩面密贴,螺母与锚杆杆体通过丝扣连接,标示杆、弹簧、弹簧套筒串装在锚杆杆体上,拧紧螺母,标示杆压紧弹簧,弹簧封装在弹簧套筒内。该装置结构简单、适用于高地应力区岩石隧道、巷道和硐室的锚杆支护。
Description
技术领域
本实用新型涉及一种锚杆预应力控制装置,适用于高地应力区岩石隧道、巷道和硐室支护锚杆安装过程的预应力控制与运行后期的应力松弛补偿,需与高强预应力岩石锚杆配套使用;也可用于其它岩土工程(如岩质边坡)锚杆支护结构的预应力控制与应力松弛补偿。
技术背景
随着资源开采深度的增加,地应力增大、地质条件恶化,导致矿井深部巷道围岩支护的难度加大。巷道开挖后,由于应力重分布导致洞周应力集中,巷道自由面一侧应力减为零,围岩由开挖前的三向应力状态转化为二向应力状态,开挖扰动区内的围岩受到的压剪应力超过其长期强度,如不及时有效地支护,围岩很快由表及里发生破裂失稳。
因此,要维护巷道的稳定,首先必须在巷道开挖后尽快恢复和改善围岩的应力状态,将巷道开挖后因二次应力调整形成的二向应力状态恢复到三向应力状态。改善和恢复应力状态的措施越及时越有利于围岩稳定;巷道自由面上的压应力恢复得越高,越有利于围岩稳定。这就要求巷道开挖后必须立即支护,而且初期支护力(预应力)必须达到足够的量值。对深度在800~1000米左右的岩石巷道,即使在自重应力作用下,其竖向原岩应力也高达20~30MPa,在煤系地层中一般都赋存了很高的构造应力,以致于水平应力和垂直应力均远高于岩体自重引起的原岩应力,而且水平地应力通常是垂直地应力的1.25~2.5倍。理论分析和工程实践表明,对煤矿深部岩石巷道而言,要想取得充分有效的支护效果,必须使锚杆预应力达到80kN以上。然而现场用的锚杆常因施工时预应力偏低和不均衡,达不到预期的围岩支护加固效果。由于岩石材料本身具有的应力松弛特性和围岩整体位移逐步由围岩表面向深处发展两方面的原因,锚杆的锚固力在达到峰值以后将随着时间的推移而逐步降低。
发明内容
本实用新型的目的在于提供一种锚杆预应力控制装置,可对锚杆安装过程中的预应力大小进行调整,对预应力锚杆的施工质量进行控制;对锚杆运行后期出现的应力松弛起到补偿作用。该装置结构简单,价格低廉,易于推广应用。
为了达到上述目的,本实用新型采用以下技术措施,该装置由预应力标示杆、应力松弛自补偿高强弹簧、弹簧护筒组成。预应力标示杆上具有反映锚杆预应力大小的标示刻度值,应力松弛自补偿弹簧可在弹簧护筒内伸缩滑动。通过预应力标示杆上与弹簧护筒端部平齐的标示线可即时判断锚杆安装过程中所承受的预应力大小,既可以按照设计值对预应力的大小进行调整,又可用于检验锚杆的施工质量;应力松弛自补偿弹簧对锚杆运行后期出现的应力松弛能起到一定的补偿作用,同时还可以对锚杆起到增阻延伸的作用;弹簧护筒对弹簧起到保护作用,避免喷射混凝土侵入造成弹簧失效。
附图说明
图1:锚杆预应力控制装置结构示意图
图2:锚杆预应力控制装置与锚杆配套使用示意图
具体实施方式
下面结合附图对本实用新型作进一步描述。
如图1、图2所示,将螺母4、标示杆1、弹簧2、弹簧套筒3与托板6依次套装在锚杆杆体5上,托板6与岩面密贴。螺母4与锚杆5通过丝扣联结,其余部件串装在锚杆5上,拧紧螺母4,预应力标示杆1压紧弹簧2,这样在弹簧2受到压力时会通过螺母4传给锚杆杆体5一拉应力。应力松弛自补偿弹簧2封装在弹簧套筒3内,弹簧护筒3对弹簧2起到保护作用,标示杆1压紧弹簧2能够在弹簧护筒3内滑动,其位移量等于弹簧2的压缩变形量,并与其所受的压力值呈正比关系,根据此正比关系在预应力标示杆1上预先刻上刻度,其数值同时也能反映锚杆所受力的大小,这样就能通过标示杆1上的刻度直观反映锚杆预应力的大小。安装锚杆时通过大扭矩机具拧紧螺母,通过标示杆1上的刻度控制锚杆预应力的大小。由于围岩本身具有应力松弛特性,而且,围岩的整体位移随时间的推移会逐步由围岩表面向深处扩展,当锚杆应力达到峰值后将会随时间逐渐松弛,因而发生锚杆支护失效。使用高强弹簧后,利用杆体材料的刚度系数远大于弹簧的刚度系数这一特性可以实现应力补偿。
Claims (2)
1、一种锚杆预应力控制装置,它由标示杆(1)、弹簧(2)和弹簧套筒(3)组成,其特征是将螺母(4)、标示杆(1)、弹簧(2)、弹簧套筒(3)与托板(6)依次装在锚杆杆体(5)上,托板(6)与岩面密贴,螺母(4)与锚杆杆体(5)通过丝扣连接,标示杆(1)、弹簧(2)、弹簧套筒(3)串装在锚杆杆体(5)上,拧紧螺母(4),标示杆(1)压紧弹簧(2)。
2、根据权利要求1所述的锚杆预应力控制装置,其特征在是弹簧(2)封装在弹簧套筒(3)内。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420057952 CN2780993Y (zh) | 2004-12-24 | 2004-12-24 | 锚杆预应力控制装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420057952 CN2780993Y (zh) | 2004-12-24 | 2004-12-24 | 锚杆预应力控制装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2780993Y true CN2780993Y (zh) | 2006-05-17 |
Family
ID=36762195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420057952 Expired - Fee Related CN2780993Y (zh) | 2004-12-24 | 2004-12-24 | 锚杆预应力控制装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2780993Y (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103422872A (zh) * | 2013-08-08 | 2013-12-04 | 淮南矿业(集团)有限责任公司 | 锚杆装置 |
CN104790413A (zh) * | 2015-04-21 | 2015-07-22 | 常州工学院 | 一种维持膨胀土堑坡稳定的自加压防护装置及其方法 |
CN108037012A (zh) * | 2017-12-04 | 2018-05-15 | 兰州空间技术物理研究所 | 一种适用于空间电场探测的传感器电缆力学试验模拟装置 |
CN109611129A (zh) * | 2018-12-25 | 2019-04-12 | 中国电建集团华东勘测设计研究院有限公司 | 可缩式预应力拱架结构及施工方法 |
-
2004
- 2004-12-24 CN CN 200420057952 patent/CN2780993Y/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103422872A (zh) * | 2013-08-08 | 2013-12-04 | 淮南矿业(集团)有限责任公司 | 锚杆装置 |
CN104790413A (zh) * | 2015-04-21 | 2015-07-22 | 常州工学院 | 一种维持膨胀土堑坡稳定的自加压防护装置及其方法 |
CN108037012A (zh) * | 2017-12-04 | 2018-05-15 | 兰州空间技术物理研究所 | 一种适用于空间电场探测的传感器电缆力学试验模拟装置 |
CN109611129A (zh) * | 2018-12-25 | 2019-04-12 | 中国电建集团华东勘测设计研究院有限公司 | 可缩式预应力拱架结构及施工方法 |
CN109611129B (zh) * | 2018-12-25 | 2024-04-19 | 中国电建集团华东勘测设计研究院有限公司 | 可缩式预应力拱架结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102108703B (zh) | 可调节预应力锚固装置 | |
CN102937030B (zh) | 深部巷道围岩分区破裂的锚注一体化支护方法 | |
CN102996149B (zh) | 一种高预应力锚索锚注复合破碎动压巷道软岩顶板支护方法 | |
CN111764940B (zh) | 一种软弱围岩隧道双层初期支护结构及其施工方法 | |
CN2878511Y (zh) | 拉压组合自锚型岩石锚杆 | |
CN103133026A (zh) | 一种新型胀壳倒楔式可注浆锚杆 | |
Feng et al. | Mechanical response of fully bonded bolts under cyclic load | |
CN202991077U (zh) | 一种自钻式中空注浆锚杆 | |
CN102808635B (zh) | 一种胀壳式内锚头预应力锚杆及其安装使用方法 | |
CN102635377A (zh) | 深部软岩巷道抗拉钢筋混凝土喷体支护方法 | |
CN203230443U (zh) | 一种新型胀壳倒楔式可注浆锚杆 | |
CN101725364A (zh) | 位移释放式锚头装置 | |
KANG et al. | Research progress on support technology and methods for soft rock with large deformation hazards in China | |
CN2780993Y (zh) | 锚杆预应力控制装置 | |
CN108331041B (zh) | 一种土锚拉拔的试验装置及方法 | |
Zhibiao et al. | Double-directional control bolt support technology and engineering application at large span Y-type intersections in deep coal mines | |
CN101581225A (zh) | 可缩增阻式锚杆预应力控制部件 | |
CN103590844A (zh) | 一种用于软岩支护的高预应力让压均压耦合锚具 | |
CN2830644Y (zh) | 可控预应力超高强锚杆 | |
CN206397531U (zh) | 一种新型注浆锚杆 | |
CN205778957U (zh) | 一种动压巷道滞后段支护系统 | |
CN202325581U (zh) | 一种适合动载的预应力锚杆支护系统 | |
CN203570332U (zh) | 一种用于软岩支护的高预应力让压均压耦合锚具 | |
CN201202483Y (zh) | 自锁型锚杆预应力控制装置 | |
CN208380611U (zh) | 一种可适应不同围岩条件的锚杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20060517 Termination date: 20111224 |