CN2764756Y - Long member hoisting ship - Google Patents

Long member hoisting ship Download PDF

Info

Publication number
CN2764756Y
CN2764756Y CN 200520081507 CN200520081507U CN2764756Y CN 2764756 Y CN2764756 Y CN 2764756Y CN 200520081507 CN200520081507 CN 200520081507 CN 200520081507 U CN200520081507 U CN 200520081507U CN 2764756 Y CN2764756 Y CN 2764756Y
Authority
CN
China
Prior art keywords
hoisting mechanism
ship
hoisting
water
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520081507
Other languages
Chinese (zh)
Inventor
陈振新
陈泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200520081507 priority Critical patent/CN2764756Y/en
Application granted granted Critical
Publication of CN2764756Y publication Critical patent/CN2764756Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a long member hoisting ship, which belongs to over-water construction equipment. The utility model comprises a ship body and has the technical scheme that a fixing hoisting mechanism and a moving hoisting mechanism which comprises a winding engine are arranged on the ship body. When the utility model is used, a crane is driven on the ship, and the crane is positioned between the fixing hoisting mechanism and the moving hoisting mechanism; a member can be hung to the side of the ship by utilizing a crawling crane with multiple hoisting points, after the member is sunk in water, the weight of one end of the member in water can be born by the fixing hoisting mechanism, and the weight of the other end can be born by the moving hoisting mechanism, wherein one end of the moving hoisting mechanism is fixed on the ship body. As the weight of the member in water is reduced by half nearly and the strength of the member is unchanged, four hoisting points of the crawling crane can be disassembled to convert to two hoisting points for erecting the member to carry out pile-sinking job.

Description

Long lifting component ship
Technical field
The utility model is a kind of long lifting component ship, belongs to a kind of over-water construction equipment.
Background technology
At present, the long lifting component in the aquatic building engineering will be used the large-scale hanging device of crane barge, costs an arm and a leg.Use the utility model can reach following purpose: on general ship, to utilize crawler crane can lift greater than the long member more than 30 meters.
Summary of the invention
The utility model comprises hull, and its technical scheme is: be equipped with on the hull fixedly hoisting mechanism and with the movable hoisting mechanism that comprises winch.During use, hoisting crane is reached on the ship, and be located at fixedly between the hoisting mechanism and movable hoisting mechanism, utilize crawler crane member to be hung the ship limit with many suspension centres, after not in water (as Fig. 1), fixedly hoisting mechanism is born the end weight of member in water, and the weight of the other end is born by a movable hoisting mechanism that is fixed on the hull.(as Fig. 2), component strength is constant because member weight saving in water is partly near.Four suspension centres of crawler crane can unload, and convert two suspension centres to and member are holded up (as Fig. 3), carry out pile sinking operation (as Fig. 4).
During specific design, movable hoisting mechanism can adopt the pulley that is installed on the hull.And fixedly hoisting mechanism can comprise that an end is fixed on the rope on the hull.Be handled easily, fixedly should be fixed with suspension hook in the rope of hoisting mechanism or the movable hoisting mechanism with on the winch bonded assembly rope.In addition, as required, fixedly hoisting mechanism or movable hoisting mechanism are fixed on the boat deck or other position of hull.
Description of drawings
Fig. 1-Fig. 4 is the utility model running condition scheme drawing;
Wherein, 1, fixing hoisting mechanism, 2, movable hoisting mechanism, 3, be crawler crane, 4, hull, 5, member, 6, suspension centre, 7, the water surface.
The specific embodiment
As shown in the figure, present embodiment comprises hull, and fixedly hoisting mechanism 1 and movable hoisting mechanism 2 are installed on the deck of hull.Fixedly hoisting mechanism 1 is the rope that an end is fixing above deck, the other end has suspension hook.Movable hoisting mechanism 2 comprises winch and the fixing pulley above deck of axle that is installed on the hull, and the rope of winch is walked around pulley, and its outer end has suspension hook.

Claims (5)

1, a kind of long lifting component ship comprises hull, it is characterized in that: be equipped with on the hull fixedly hoisting mechanism (1) and with the movable hoisting mechanism (2) that comprises winch.
2, long lifting component ship according to claim 1 is characterized in that: said movable hoisting mechanism (2) is for being installed in the pulley on the hull.
3, long lifting component ship according to claim 1 and 2, it is characterized in that: described fixedly hoisting mechanism (1) comprises that an end is fixed on the rope on the hull.
4, long lifting component ship according to claim 3 is characterized in that: fixedly be fixed with suspension hook in the rope of hoisting mechanism (1) or the movable hoisting mechanism (2) with on the winch bonded assembly rope.
5, long lifting component ship according to claim 3, it is characterized in that: said fixedly hoisting mechanism (1) or movable hoisting mechanism are fixed (2) on the boat deck.
CN 200520081507 2005-02-18 2005-02-18 Long member hoisting ship Expired - Fee Related CN2764756Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520081507 CN2764756Y (en) 2005-02-18 2005-02-18 Long member hoisting ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520081507 CN2764756Y (en) 2005-02-18 2005-02-18 Long member hoisting ship

Publications (1)

Publication Number Publication Date
CN2764756Y true CN2764756Y (en) 2006-03-15

Family

ID=36167675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520081507 Expired - Fee Related CN2764756Y (en) 2005-02-18 2005-02-18 Long member hoisting ship

Country Status (1)

Country Link
CN (1) CN2764756Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014043995A1 (en) * 2012-09-21 2014-03-27 湖南三一智能控制设备有限公司 Split type crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014043995A1 (en) * 2012-09-21 2014-03-27 湖南三一智能控制设备有限公司 Split type crane

Similar Documents

Publication Publication Date Title
CN201901539U (en) Internal climbing type and external climbing type tower crane with luffing jib
CN201301179Y (en) Crawler crane self-dismounting device
WO2002034664A1 (en) A method of placing a crane in connection with a windmill
CN112703166A (en) Lifting block for crane
CN103640987A (en) Folding arm hydraulic crane
CN104032718A (en) Light self-floating manual-erecting elevated structure
CN203558761U (en) Hydraulic knuckle crane
CN110185057A (en) A kind of tooling and construction method for the lifting staking out of offshore wind farm single-pile foundation steel-pipe pile
CN204702437U (en) A kind of build-up type power pontoon combination mast crane device
CN2764756Y (en) Long member hoisting ship
CN103640999A (en) Marine multi-section arm telescopic crane
CN102826459A (en) Device and method for hoisting underwater structural part of ocean platform
CN209023076U (en) Jacket handling integrated ship
CN101954958B (en) Lifting device for cement barge loading and unloading ship
CN109441734A (en) Jacket handling integral type construction technology
CN107487724A (en) A kind of the large-scale floating crane arm support erecting device and installation method of non-loop wheel machine auxiliary
CN201686393U (en) Derrick mast hoisting tool
CN202164066U (en) Hoisting device for large-scale articles
CN203558758U (en) Marine electric crane
CN210151774U (en) Tool for hoisting vertical pile of steel pipe pile of offshore wind power single-pile foundation
CN201472628U (en) Automatic positioning device of cement barge for a loading and unloading boat of cement barge
CN203558757U (en) Marine amplitude invariable hydraulic crane
CN202825838U (en) Multifunctional mechanical hand
CN201573777U (en) Lifting device for cement barge loading/unloading ship
CN202988610U (en) Mooring rope type mast crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee